Paint spec.pdf
PDF 28 KB Posted
- Solicitation number
- FA465425B0002
About this file
This document is a detailed specification for airfield pavement marking, specifically addressing paint selection, surface preparation, application techniques, and quality control. Key requirements include using Federal Standard paint (TT-P-1952) and reflective media (TT-B-1325), with strict surface preparation protocols involving thorough cleaning, removing existing coatings, and ensuring completely dry surfaces before painting.
The specification provides comprehensive guidance for paint application, including moisture testing using a "plastic wrap method", pneumatic paint application with manual detailing for numbers and symbols, and immediate application of reflective glass spheres. Critical technical details mandate allowing new pavement to cure for 30 days, avoiding shot blasting on airfield pavements due to potential foreign object damage (FOD), and strictly controlling paint drying to prevent tire pickup or discoloration. The document emphasizes precise application techniques, equipment requirements, and quality inspection procedures to ensure high-quality airfield pavement markings.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.5 PAINT FOR AIRFIELD
FS TT-P-1952, COLOR AS INDICATED ON DRAWING.
3.6 REFLECTIVE MEDIA FOR AIRFIELD
FS TT-B-1325, TYPE I, GRADATION A.
3.7 PAINT SURFACE PREPARATION
ALLOW NEW PAVEMENT SURFACES TO CURE FOR A PERIOD OF
NOT LESS THAN 30 DAYS BEFORE APPLICATION OF MARKING
MATERIALS. THOROUGHLY CLEAN SURFACES TO BE MARKED
BEFORE APPLICATION OF THE PAINT. REMOVE DUST, DIRT, AND
OTHER GRANULAR SURFACE DEPOSITS BY SWEEPING,
BLOWING WITH COMPRESSED AIR, RINSING WITH WATER, OR A
COMBINATION OF THESE METHODS AS REQUIRED. REMOVE
RUBBER DEPOSITS, EXISTING PAINT MARKINGS, RESIDUAL
CURING COMPOUNDS, AND OTHER COATINGS ADHERING TO
THE PAVEMENT BY WATER BLASTING ACCORDING TO THE
REMOVAL REQUIREMENTS AND PROCEDURES OUTLINED IN
SECTION 2. FOR PORTLAND CEMENT CONCRETE PAVEMENT,
GRINDING, LIGHT SHOT BLASTING, AND LIGHT SCARIFICATION,
TO A RESULTING PROFILE EQUAL TO ICRI 03732 CSP 2, CSP 3,
AND CSP 4, RESPECTIVELY, CAN BE USED IN ADDITION TO
WATER BLASTING, TO EITHER REMOVE EXISTING COATINGS OR
FOR SURFACE PREPARATION ON MOST PAVEMENTS: SHOT
BLASTING SHALL NOT BE USED ON AIRFIELD PAVEMENTS DUE TO THE POTENTIAL OF
FOREIGN OBJECT DAMAGE (FOD)
TO AIRCRAFT. SCRUB AFFECTED AREAS, WHERE OIL OR
GREASE IS PRESENT ON OLD PAVEMENTS TO BE MARKED, WITH
SEVERAL APPLICATIONS OF TRISODIUM PHOSPHATE SOLUTION
OR OTHER APPROVED DETERGENT OR DEGREASER AND RINSE
THOROUGHLY AFTER EACH APPLICATION. AFTER CLEANING
OIL-SOAKED AREAS, SEAL WITH SHELLAC OR PRIMER
RECOMMENDED BY THE MANUFACTURER TO PREVENT
BLEEDING THROUGH THE NEW PAINT. DO NOT COMMENCE
PAINTING IN ANY AREA UNTIL PAVEMENT SURFACES ARE DRY
AND CLEAN.
3.8 APPLICATION
APPLY PAVEMENT MARKINGS TO DRY PAVEMENT ONLY. THE
CONTRACTOR SHALL TEST THE PAVEMENT SURFACE FOR
MOISTURE BEFORE BEGINNING WORK AFTER EACH PERIOD OF
RAINFALL, FOG, HIGH HUMIDITY, OR CLEANING, OR WHEN THE
AMBIENT TEMPERATURE HAS FALLEN BELOW THE DEW POINT.
DO NOT COMMENCE MARKING UNTIL THE PAVEMENT IS
SUFFICIENTLY DRY AND THE PAVEMENT CONDITION HAS BEEN
APPROVED BY THE CO OR AUTHORIZED REPRESENTATIVE.
EMPLOY THE "PLASTIC WRAP METHOD" TO TEST THE
PAVEMENT FOR MOISTURE AS FOLLOWS: COVER THE
PAVEMENT WITH A 300 MM BY 300 MM (12 INCH BY 12 INCH)
SECTION OF CLEAR PLASTIC WRAP AND SEAL THE EDGES WITH
TAPE. AFTER 15 MINUTES, EXAMINE THE PLASTIC WRAP FOR
ANY VISIBLE MOISTURE ACCUMULATION INSIDE THE PLASTIC.
DO NOT BEGIN MARKING OPERATIONS UNTIL THE TEST CAN BE
PERFORMED WITH NO VISIBLE MOISTURE ACCUMULATION
INSIDE THE PLASTIC WRAP.
3.8.1 PAINTING
APPLY PAINT PNEUMATICALLY WITH APPROVED EQUIPMENT AT
RATE OF COVERAGE SPECIFIED HEREIN. PROVIDE GUIDELINES
AND TEMPLATES AS NECESSARY TO CONTROL PAINT
APPLICATION. TAKE SPECIAL PRECAUTIONS IN MARKING
NUMBERS, LETTERS, AND SYMBOLS. MANUALLY PAINT
NUMBERS, LETTERS, AND SYMBOLS. SHARPLY OUTLINE ALL
EDGES OF MARKINGS. THE MAXIMUM DRYING TIME
REQUIREMENTS OF THE PAINT SPECIFICATIONS WILL BE
STRICTLY ENFORCED, TO PREVENT UNDUE SOFTENING OF
BITUMEN, AND PICKUP, DISPLACEMENT, OR DISCOLORATION BY
TIRES OF TRAFFIC. DISCONTINUE PAINTING OPERATIONS IF
THERE IS A DEFICIENCY IN DRYING OF THE MARKINGS UNTIL
CAUSE OF THE SLOW DRYING IS DETERMINED AND
CORRECTED.
3.8.2 REFLECTIVE MEDIA
APPLICATION OF REFLECTIVE MEDIA SHALL IMMEDIATELY
FOLLOW THE APPLICATION OF PAINT. ACCOMPLISH DROP-ON
APPLICATION OF THE GLASS SPHERES TO ENSURE EVEN
DISTRIBUTION AT THE SPECIFIED RATE OF COVERAGE. SHOULD
THERE BE MALFUNCTION OF EITHER PAINT APPLICATOR OR
REFLECTIVE MEDIA DISPENSER, DISCONTINUE OPERATIONS
UNTIL DEFICIENCY IS CORRECTED.
3.9 INSPECTION
EXAMINE MATERIAL AT THE JOB SITE TO DETERMINE THAT IT IS
THE MATERIAL REFERENCED IN THE REPORT OF TEST RESULTS
OR CERTIFICATE OF COMPLIANCE. A CERTIFICATE OF
COMPLIANCE SHALL BE ACCOMPANIED BY TEST RESULTS
SUBSTANTIATING
File details come from the government source that posted it. Updated .