10_B882 Roof Laydown Area.pdf
PDF 226 KB Posted
- Attached to
- DSN/CSN Repair Bldg. 882 Roof
- Solicitation number
- FA462626R0014
About this file
This document is a site map and operational guidelines for a federal facility or contractor work location. The document provides an aerial view of a compound with designated areas and access procedures for personnel and equipment.
The map identifies four key operational zones: a laydown area for equipment and materials staging in the main compound; a Conex box storage location that must not block access routes; a vehicle access corridor that must remain clear at all times; and an additional laydown area available in the back of the compound if space requirements exceed primary staging capacity. Gate access is restricted and controlled, with the entrance unlocking at 0630 hours and relocking at 1700 hours daily. Personnel and contractors must comply with these access windows and maintain clear pathways for vehicle movement throughout the facility to ensure operational efficiency and safety.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Conex Box, don’t block access
Laydown Area
Gate entrance, will unlock at 0630, relock at 1700 hrs.
Keep clear for vehicle access
Additional laydown area if required in back of compound
Slide Number 1
File details come from the government source that posted it. Updated .