AE MAC QA_3 09 Mar 22.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- AE Multiple Award Contract for Malmstrom AFB, MT Federal contract opportunity
- Solicitation number
- FA462622R0001
About this file
This document includes a request for qualifications (RFQ) and statement of work for an Architect and Engineer Multiple Award Contract supporting Malmstrom Air Force Base. The solicitation requests qualifications from firms to be awarded an indefinite delivery/indefinite quantity contract for design and engineering services across multiple disciplines including mechanical, electrical, civil, structural, architectural, fire protection, and environmental work. Responses are due by March 9, 2022 with the intent to award up to eight IDIQ contracts. Task orders will be competed among awardees based on technical qualifications with price becoming a consideration for selection once technical acceptability is established.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A_AE MAC RFQ Amend 04.pdf | ||
| AE MAC QA_4 15 Mar 22.xlsx | XLSX spreadsheet | |
| A1_Malmstrom AE MAC SOW Amend 04.pdf | ||
| A_AE MAC RFQ Amend 03.pdf | ||
| A1_Malmstrom AE MAC SOW Amend 03.pdf | ||
| A_AE MAC RFQ Amend 02.pdf | ||
| A_AE MAC RFQ Amend 01.pdf | ||
| AE MAC QA_2 18 Feb 22.xlsx | XLSX spreadsheet | |
| A1_Malmstrom AE MAC SOW Amend 01.pdf | ||
| AE MAC QA_1 15 Feb 22.xlsx | XLSX spreadsheet | |
| A2_SF330-AE Qualifications.pdf | ||
| A_AE MAC RFQ.pdf | ||
| A1_Malmstrom AE MAC SOW.pdf | ||
| A3_ Past Present Perf Questionnaire.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| MALMSTROM AE MAC | |||
| SOLICITATION - FA462622R0001 | |||
| QUESTIONS AND ANSWERS | |||
| QUESTIONS | ANSWERS | AMEND # | |
| 1 | A_AE MAC RFQ - Item 1.3 Task Orders. "However, please note, that if a Firm is submitting a proposal on a task order as a Prime, then the Firm cannot submit a proposal on the same task order as a subcontractor." |
Regarding this clause, is the government's intent to either discourage or prohibit a Firm who is proposing as a Prime Contractor from also being a Subcontractor on another team? If not, will team scoring be negatively affected if a Firm proposing as a prime is also included as a sub consultant on a different team?
| A Firm can be a Prime Contractor, and a subcontractor on another team for the AE MAC IDIQ contract with no negative scoring. However, at the Task Order level, if a firm wants to submit a proposal as a Prime Contractor, then they can not submit as a Subcontractor on the same Task order. (UPDATED WITH AMEND 3_ no restriction on teaming) | 3 | ||
| 2 | Can a Firm submit a SF330 as the prime and also be on another team or multiple teams as a sub? | A Firm can be a Prime Contractor, and a subcontractor on another team or multiple teams for the AE MAC IDIQ contract. However, at the Task Order level, if a firm wants to submit a proposal as a Prime Contractor, then they can not submit as a Subcontractor on the same Task order. (UPDATED WITH AMEND 3_ no restriction on teaming) | 3 |
| 3 | A_AE MAC RFQ - Item 1.4 North American Industry Classification. The primary North American Industry Classification (NAICS) code for this acquisition is 541330 Engineering Services. |
Regarding the NAICS Code is it the governments intent to preclude an architectural led team as a Prime Contractor on this solicitation? If architectural led teams are permitted and are considered small businesses, would they be required to fall under the Engineering small business size of $16,500,000 or the architectural small business size of $7,500,000?
| It is not the government's intent to preclude an architectural led team as a prime contractor on this solicitation. The primary North American Industry Classification (NAICS) code for this acquisition is 541330 Engineering Services and has been historically utilized in Malmstrom AFB requirements for Architecture and Engineering services. The PSC code utilized in this requirement is C219 which is specific to Architecture and Engineering. The government will be validating all firms are registered under the appropriate NAICS code upon receipt of proposals. | 1 |
| 4 | A_AE MAC RFQ – Item 5.3 (B) Submission Requirements. “Submit up to five (5) relevant projects, accomplished within the past three (3) years that best demonstrate…” |
And A_AE MAC RFQ – Item 5.5 Past Performance. “Within the past three (3) years shall mean from the date of package submission to three (3) years prior.” And “The term “substantially complete” shall mean a fully designed project with construction of the facility/project more than 80% complete.”
Regarding the above sections can the government clarify the allowed time frames? First does “accomplished” refer to design or to construction? Second many times on our past projects with the DoD there is an extended period of time between when design is complete and projects are constructed. Is the government’s preference to show substantially completed construction projects or substantially completed design projects? Since the Construction schedules are out of the control of the designer and sometimes delayed or cancelled, the 3-year limit is quite restrictive. Is the government willing to extend the time period from 3 years to 5 years?
| Item 5.3 (B): Accomplished does refer to construction of the facility/project and the government is willing to extend the time period from 3 years to 5 years. Therefore, this section will be changed to read "Submit up to five (5) relevant projects, accomplished within the past five (5) years that best demonstrate your relevant experience to the solicitation requirements." Item 5.5: The government is willing to extend the time period from 3 to 5 years. Therefore, this section will be changed to read "Within the past five (5) years" shall mean from date of package submission to five (5) years prior." | 1 |
| 5 | A_AE MAC RFQ – Item 5.6 Location. “Firms with satellite offices, and geographically separated offices may meet this requirement.” |
Can the government clarify if a Prime Contractor who does not have an office within the 4 hour requirement, but does have a subcontractor with an office within the 4 hour area would still earn the 10 points in this section?
Also, can a definition for the term “satellite office” be provided? Does that office need to be established at the time of submission of this RFQ?
| The subcontractor's office can be used for this rating. Therefore, this section will be changed to -"Firms (Prime and/or Subcontractor) with satellite offices, and geographically separated offices may meet this requirement. Definition of Satellite Office is: A leased out office space, address required on the submission for verification. The office does need to be established at the time of submission of this RFQ to receive full points. | 1 |
| 6 | A_AE MAC RFQ - 3. Selection for task order competition |
3.1 Technical Acceptability. In accordance with the Brooks Act, and FAR 16.500(d), Malmstrom AFB will select firms for task order award selection using lowest price technically acceptable as the procedures set forth in FAR 16.505 (b)
3.2 Fair Opportunity. The contracting officer will ensure fair opportunity is given to all IDIQ holders by notifying all IDIQ holders of a new task order requirements through a fair opportunity proposal request"
Is it the government’s intention to have each task order open to competition among all 8-firms or will several firms be short-listed and the task order only offered amongst the short-list? Additionally, will task order selection be awarded based on lowest price technically acceptable for each instance?
| The government's intention is to have each task order open to competition among all selected AE MAC IDIQ firms (unless it is a small business set aside, as stated in 1.1). The final task order selection will be awarded based on lowest price technically acceptable for each instance. (UPDATED WITH AMEND 3_ Task order selection based on most highly qualified) | 3 |
| 7 | In reading through the subject solicitation, we had a question regarding the paragraph 5.6. Location in the general geographical area of Malmstrom AFB (within 4 hours drive from Malmstrom AFB MT). |
A.Definitions:
-4 Hours is measured by using the free online web mapping service, www.google.com inputting driving directions criteria from the firm's physical address to Malmstrom AFB, MT 59402 -Firms with satellite offices, and geographically separated offices may meet this requirement.
Will the government accept sub consultant offices within the 4-hour driving radius as geographically acceptable to achieve the 10 points?
| The subcontractor's/sub consultant office can be used for this rating. Therefore, this section will be changed to -"Firms (Prime and/or Subcontractor) with satellite offices, and geographically separated offices may meet this requirement. | 1 | ||
| 8 | (Submission Requirements): Please clarify that this is a physical submission (1 original, 3 copies, and 1 CD) rather than an electronic submission (email, DoD Safe, etc.). | This is a physical submission. | 1 |
| 9 | (This is Not a Request for Proposal): If this is a physical submission (1 original, 3 copies, and 1 CD) rather than an electronic submission (email, DoD Safe, etc.), we request that an extension be given to the submission deadline to prepare for this submission format. | This is a physical submission and no extension will be granted at this time. (UPDATE WITH AMEND 2 and 3_ RFQ due date was extended) | 3 |
| 10 | (Submission requirements): Please clarify page count and page count exceptions because Part 1 includes parts A-H of the SF330 Part I but the solicitation section 7. Submission Requirements states "All pages submitted will be considered as part of the page count with the exceptions of cover letter (limited to 1 page), Part I, Part II, JV paperwork, front cover, back cover and divider pages/tabs (must not contain information related to selection criteria), pages defining acronyms, and past performance submissions." | Items not included within page restriction counts are as follows: Cover letter (limited to 1 page), Part I Section H, Part II Section G/JV paperwork, front cover, back cover and divider pages/tabs (must not contain information related to selection criteria), pages defining acronyms. (UPDATE WITH AMEND 3_ Page restrictions updated on RFQ Amend 03) | 3 |
| 11 | (5.2 Professional qualifications necessary for satisfactory performance of required services): Please clarify if 20 disciplines means 20 different disciplines with as many individual resumes within the page limit or if 20 different disciplines means 20 individual resumes. | 20 different disciplines means 20 individual resumes. (UPDATE WITH AMEND 3_ Only submit Resumes for Key Disciplines) | 3 |
| 12 | (5.3 Specialized experience and technical competence in the type of work required, and 5.5 Past Performance on Contract) Paragraph 5.5 requests projects that are both "within in the last 3 years" and "substantially complete" and then at the end requires that the Past Performance Questionnaires are the same as the projects included in response to Paragraph 5.3. However Paragraph 5.3 has only requires projects that have been "accomplished within the last 3 years" with no requirement for substantial completion. 1) Do Projects provided to respond to Paragraph 5.3 have to also be "substantially" complete? 2) Can Projects and Past Performance Questionnaires be provided to respond to 5.5 where the design has been "accomplished within the last three years" without having construction be "substantially complete". 3) Must the responses to paragraph 5.5 be restricted to only those provided in response to paragraph 5.3? | 1) Projects provided in response to 5.3 must also be "substantially" complete. 2) Projects and PPQs in response to 5.5 must have construction that is "substantially" complete. 3) Responses to Paragraph 5.5 does not need to be restricted to only those provided in response to paragraph 5.3. | 1 |
| 13 | (Section 3.1) Respectfully request clarification on Paragraph 3.1 which seems to indicate that AE task orders would be selected based on LPTA? This is contrary to how USACE, NAVFAC and AFCEC have awarded AE task orders, which has been based on qualifications and then negotiated, per the Brooks Act. LPTA has been used to award construction task orders, have typically not been used for AE task order awards. The Brooks Act (Public Law 92-582, 40 U.S.C. 541 et seq.), which was enacted on October 18, 1972, establishes the procurement process by which architects and engineers (A/Es) are selected for design contracts with federal design and construction agencies. The Brooks Act establishes a qualifications-based selection process, know as "QBS," in which contracts for A/Es are negotiated on the basis of demonstrated competence and qualification for the type of professional services required at a fair and reasonable price. Under Brooks Act procurement procedures, price quotations are not a consideration in the selection process. | The AE MAC IDIQ contracts will be awarded based on Brooks Act procurement procedures. This will give the government a pool of the most highly qualified, multi-disciplinary Firms, who will then compete for task orders with "lowest price technically acceptable" as the selection factor. (UPDATED WITH AMEND 3_ Task order selection based on most highly qualified) | 3 |
| 14 | After reviewing the solicitation, can you please provide an exact list of the “key personnel resumes/disciplines” that are required for this submission? | Key personnel/disciplines are: Mechanical/Electrical, Civil/Structural, Architectural, Fire Protection, and Environmental as stated in RFQ section 5.1(2) (UPDATE WITH AMEND 3_ Key Personnel have been updated) | 1 |
| 15 | (1.3 Task Orders): The RFQ states that the task orders will be awarded on “lowest price technically acceptable” basis. The Statement of Work (page 9) states: “All Task Orders will be executed in accordance with FAR 36.606, Negotiations, as follows: (1) The Government identifies a firm that most closely meets the needs of the required work to be performed based on the qualifications, specialized experience and technical competence; (2) The Government may take into consideration, but all inclusive of, other factors such as capacity, past performance, location of the firm; and (3) This determination is sent to the Contracting Officer, along with the required documents, for task order solicitation.” |
Please clarify how the task orders will be competed/awarded.
| The task orders will be awarded on a "lowest price technically acceptable bases" as all AE MAC IDIQ firms will be multi-disciplinary firms that can execute the task orders. The SOW will be corrected to reflect this. (UPDATED WITH AMEND 3_ Task order selection based on most highly qualified) | 3 |
| 16 | (5. IDIQ Selection Criteria 5.1, (2) – Notes “specialized experience, technical competence in the area of Fire/Civil/Mech/Elec.” 5.2, (A) – Notes “All technical disciplines listed in Attachment 1 of this advertisement shall be represented in order to obtain the most favorable rating.”): |
Assuming the Statement of Work is Attachment 1, we are not seeing a specific list of disciplines. Please clarify which disciplines will be evaluated as part of the selection criteria.
| Key personnel/disciplines are: Mechanical/Electrical, Civil/Structural, Architectural, Fire Protection, and Environmental as stated in RFQ section 5.1(2)(UPDATE WITH AMEND 3_ Key Personnel have been updated) | 1 |
| 17 | (5. IDIQ Selection Criteria, 5.5, (D) Past Performance/Basis of Evaluation): |
This section request PPQs. However, it further states: “Evaluating past performance may include information provided by the firm…..”. Please clarify if the contractor should provide additional information such as CPARS? If so, where should this information be included?
| The Government will pull any CPARs. The submission package and PPQs are the items requested for evaluation by the firm. (AMEND 3_ CPARS can replace PPQs if a PPQ can not be obtained) | 3 |
| 18 | (7. Submission Requirements): |
This section states: “Submit the attached past performance questionnaire (PPQ) filled out by the client. As an alternative to the prescribed PPQ form, information previously completed by a client may be submitted as long as the information contained is substantially the same information in the attached PPQ form. Past performance submissions shall be submitted under a separate tab labeled “Past Performance”. Include DUNS number for prime firm or JV partners in Part I.”
Please confirm that CPARS evaluations and/or previous PPQs will be accepted in lieu of a new PPQ?
It should further be noted, that based upon our experience the AF will not fill out PPQs.
| The government will pull CPARS, the PPQs need to be sent directly to the Contracting office as noted in 5.5 (b). Section 7 will be corrected to reflect this. (AMEND 3_ CPARS can replace PPQs if a PPQ can not be obtained) | 3 |
| 19 | (7. Submission Requirements): |
Tab E and Tab H are duplicative. Please clarify if the same information is to be included in both Tabs.
| Tab H has been removed. | 1 |
| 20 | (7. Submission Requirements): |
This section states:
“Responses shall not exceed 50 pages single-sided print or 25 pages double-sided print.”
and “All pages submitted will be considered as part of the page count with the exceptions of cover letter (limited to 1 page), Part I, Part II, JV paperwork, front cover, back cover and divider pages/tabs (must not contain information related to selection criteria), pages defining acronyms, and past performance submissions.”
Please clarify page count. The above states Part I is not included in page count. Part I includes Sections A through H. Section H is Additional Information. Typically, a page limitation is applied to Section H.
| Items not included within page restriction counts are as follows: Cover letter (limited to 1 page), Part I Section H, Part II Section G/JV paperwork, front cover, back cover and divider pages/tabs (must not contain information related to selection criteria), pages defining acronyms. (UPDATE WITH AMEND 3_ Page restrictions updated on RFQ Amend 03) | 3 |
| 21 | (7. Submission Requirements): This section states: “Please Submit one (1) original and four (3) copies……” |
Please clarify whether we should submit three or four copies.
| Firms will need to submit one (1) original and three (3) copies, and one (1) electronic copy on a CD/DVD. | 1 |
| 22 | (7. Submission Requirements): |
This section specifies hard copies are required.
Given that many firms are still work under “work from home” protocol, would you reconsider electronic submittals.
| Only physical submittals will be accepted. | 1 |
| 23 | (7. Submission Requirements): |
Please Submit one (1) original and four (3) copies, and one (1) electronic copy on a CD/DVD… Given that many firms are still work under “work from home” protocol, would you reconsider electronic signature on the original copy?
| Firms will need to submit one (1) original and three (3) copies, and one (1) electronic copy on a CD/DVD. | 1 |
| 24 | (8. This Is Not A Request for Proposal): |
Inquires are being accepted until March 3, 2022.
Will the government consider extending the deadline to the response due date to allow at least 3 additional weeks after all questions are answered?
Responses to our questions may significantly impact our response to this solicitation, particularly as they pertain to key disciplines and PPQs.
| At this time an extension is not being considered. (UPDATE WITH AMEND 2 and 3_ RFQ due date was extended) | 3 |
| 25 | I have an inquiry regarding A-E Contracts FA462618D0002 and FA462619DA002. |
I noticed that the government issued a solicitation for the A-E MAC program under FA462622R0001, which will consolidate several individual IDIQs for Malmstrom AFB. I wanted to ask if the services under the said A-E contracts will be part of the program?
| These Current IDIQ contracts will not be a part of the AE MAC program. | 1 | ||
| 26 | Please clarify the criteria for an eligible project. With the following three solicitation statements, “Within the past three (3) years’ shall mean from date of package submission to three (3) years prior,” and “Past performance relates to how well a firm has performed on substantially completed projects, within the past three (3) years,” and “The term ‘substantially complete’ shall mean a fully designed project with construction of the facility/project more than 80% complete.” Nearly all of our design projects completed within the past three (3) years have not been built yet, and we have no control over the timeline for the construction, which is oftentimes dictated by funding availability. Are design projects that have not yet been constructed eligible for consideration? If designs with 80%+ completed construction projects are desired, can the eligible years be extended to the past five or ten years, which allows for design and construction to occur? Larger design projects typically take longer than three years to get to 80% complete in construction. | The government is willing to extend the time period from 3 years to 5 years. Therefore, this section will be changed to read "Submit up to five (5) relevant projects, accomplished within the past five (5) years that best demonstrate your relevant experience to the solicitation requirements." Item 5.5: The government is willing to extend the time period from 3 to 5 years. Therefore, this section will be changed to read "Within the past five (5) years" shall mean from date of package submission to five (5) years prior." Design projects that have not yet been constructed are not eligible for consideration. | 1 |
| 27 | We request an extension of one to two weeks after all questions have been answered, so that we can adequately address the solicitation based on the answers to the questions. With printed copies due on March 9 and questions due March 3, we would not have enough time to ship the proposal while adequately addressing government responses to the questions posed. | At this time an extension is not being considered. (UPDATE WITH AMEND 2 and 3_ RFQ due date was extended) | 3 |
| 28 | Per solicitation language, “All pages submitted will be considered as part of the page count with the exceptions of cover letter (limited to 1 page), Part I, Part II, JV paperwork, front cover, back cover and divider pages/tabs (must not contain information related to selection criteria), pages defining acronyms, and past performance submissions.” Please clarify that Part I and Part II of this language should be omitted from the list of exceptions to the page count. Part I and Part II are the submission documents | Items not included within page restriction counts are as follows: Cover letter (limited to 1 page), Part I Section H, Part II Section G/JV paperwork, front cover, back cover and divider pages/tabs (must not contain information related to selection criteria), pages defining acronyms. (UPDATE WITH AMEND 3_ Page restrictions updated on RFQ Amend 03) | 3 |
| 29 | We would like to confirm that we may use our own SF 330 form as long as the proposal contains the same information and is submitted in Adobe PDF. | The SF 330 Form used must be the one provided, or pulled directly from the GSA website. | 1 |
| 30 | Per Section 5.2, A. “All technical disciplines listed in Attachment 1 of this advertisement shall be represented in order to obtain the most favorable rating. Resumes should be submitted for each discipline, principal, project manager, and other support personnel for up to 20 disciplines, that will handle work for the solicited task orders.” Please clarify where in Attachment 1 the technical disciplines are listed. Or is the Malmstrom AFB requesting we propose up to 20 disciplines based on the work described in attachment 1? | Contractor can submit up to 20 disciplines. Key personnel/disciplines are: Mechanical/Electrical, Civil/Structural, Architectural, Fire Protection, and Environmental as stated in RFQ section 5.1(2) (UPDATE WITH AMEND 3_ Only submit Resumes for Key Disciplines) | 3 |
| 31 | “Identify the firm's past and present workload and convey the understanding of being able to handle several task orders concurrently and within prescribed deadlines/constraints.” |
In RFQ paragraph 5.1(3) on page 5/13 of the RFQ, it is stated for evaluation purposes: “Capacity, staffing, workload. Maximum score of 20 Points.” On what criteria will workload be evaluated? Is the government looking for balanced workload for a set period of time, capacity to handle surges in workload, or something else?
| See RFQ section 5.4 for evaluation factors on "Capacity, staffing, workload." | 1 | ||
| 32 | Tabs E and H both list Specialized Experience and Technical Competence. Should Tab H be deleted, and the information provided under Tab E, Section H? | Tab H has been removed. | 1 |
| 33 | Can a government-completed CPARS for a project be submitted in lieu of a completed PPQ? | The government will pull CPARs for any government work completed. If private industry or outside Federal work has been completed a PPQ will need to be submitted for that work. (AMEND 3_ CPARS can replace PPQs if a PPQ can not be obtained) | 3 |
| 34 | “Completed Past Performance Questionnaires are to be emailed or mailed from the client directly to the Government Contracting Officer and are not to be submitted via the firm.” Also, “As an alternative to the prescribed PPQ form, information previously completed by a client may be submitted as long as the information contained is substantially the same information in the attached PPQ form. Past performance submissions shall be submitted under a separate tab labeled “Past Performance.” These statements are contradictory, can the government please clarify if previously submitted PPQ forms can be submitted with the proposal in lieu of asking previous clients to complete new PPQ forms, and if so, under which tab should they be included? | This has been corrected in Amendment 1. The PPQs will be submitted directly to the Contracting office, and is not a part of the submission package by the Firm(s). | 1 |
| 35 | “Please Submit one (1) original and four (3) copies.” Please clarify the number of required copies. | Firms will need to submit one (1) original and three (3) copies, and one (1) electronic copy on a CD/DVD | 1 |
| 36 | 5.5 Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. |
The solicitation states that firms shall have questionnaires submitted from the client directly to the government contracting officer and not submitted via the firm.
Would the government accept CPARS in lieu of new questionnaires submitted directly from the client?
| The government will pull CPARs for any government work completed. If private industry or outside Federal work has been completed a PPQ will need to be submitted for that work. (AMEND 3_ CPARS can replace PPQs if a PPQ can not be obtained) | 3 | ||
| 37 | The RFQ Paragraph 5.2 Part A says “All technical disciplines listed in Attachment 1 of this advertisement shall be represented in order to obtain the most favorable rating.” Attachment 1 is the Statement of Work and pages 2-5 list a variety of technical disciplines from community planning to seismic design. Are all technical disciplines considered of equal value, or are the technical disciplines considered the major headings such as Architectural, Landscape Design, Sprinkler & Fire protection and so on? | Key personnel/disciplines are: Mechanical/Electrical, Civil/Structural, Architectural, Fire Protection, and Environmental as stated in RFQ section 5.1(2) (UPDATE WITH AMEND 3_ Key Disciplines updated) | 3 |
| 38 | The RFQ Paragraph 3 Selection for Task Order Competition states: |
Technical Acceptability. In accordance with the Brooks Act, and FAR 16.500(d), Malmstrom AFB will select firms for task order award selection using lowest price technically acceptable as in the procedures set forth in FAR 16.505 (b).
Section 3.1 appears to be a violation of the Brooks Act and FAR 36.601-3(c). Is it the intent of the government to compete task orders by price?”
| The AE MAC IDIQ contracts will be awarded based on Brooks Act procurement procedures. This will give the government a pool of the most highly qualified, multi-disciplinary Firms, who will then compete for task orders with "lowest price technically acceptable" as the selection factor. (UPDATED WITH AMEND 3_ Task order selection based on most highly qualified) | 3 | ||
| 39 | The RFQ Paragraph 5.2 Part allows the submission of up to 20 resumes. Should the 20 resumes be in different technical disciplines, or are multiple resumes in the same discipline acceptable (or preferred)? | The 20 resumes should be in different technical disciplines. (UPDATE WITH AMEND 3_ Only submit Resumes for Key Disciplines) | 3 |
| 40 | Are projects completed by the prime contractor considered more relevant than those projects completed by teaming partners? | All projects included in the submission package hold the same value. | 1 |
| 41 | The RFQ Paragraph 7 states “As an alternative to the prescribed PPQ form, information previously completed by a client may be submitted as long as the information contained is substantially the same information in the attached PPQ form.” The standard government CPARS covers the same information as described in Paragraph 5.5 Part B: |
- Project description, Contract amount, Dates, and Client information;
- Providing a dialogue and a resulting rating for the areas of Quality, Professionalism, Cooperativeness, Problems, Adherence to schedule, Cost control, and Customer satisfaction;
- Answer the question - "Would you award this firm another contract?"
Given that the already completed CPARS contain the same information, will final and interim CPARS be acceptable in place of PPQs?
| The government will pull CPARs for any government work completed. If private industry or outside Federal work has been completed a PPQ will need to be submitted for that work. (UPDATE WITH AMEND 3_ CPARS can replace PPQs if a PPQ can not be obtained) | 3 | ||
| 42 | The response to question 4 regarding the time period for acceptable projects (extended to 5 years) appears to exclude AE products such as RFP packages, studies, assessments, planning, Title II construction services, energy audits, and others from submission in this proposal. Since these products do not result in a “fully designed project with construction of the facility/project more than 80% complete,” they would not be acceptable as demonstrations of past performance. Only 100% designs of projects that were subsequently built would be eligible. Is this the government’s intent? | Yes, this is the government's intent. Other services will be utilized marginally and should be listed in Section H of the SF 330. | 3 |
| 43 | Regarding the 5-year timeline noted in the response to Question 4, is it only the construction that must be complete in the 5-year window? For example, would a design completed in 2015, with construction complete in July 2017 be eligible under this 5-year standard? | It is only the construction that must be completed in the 5 year window, so a design completed in 2015, with the Construction completed in 2017, would be eligible. | 3 |
| 44 | To clarify the response to Question 6 regarding task order competition: will price be a factor in selecting firms for individual task orders? If so, is it the government’s intent that firms provide a full price proposal for each task order in order to compete for selection? | This has been updated with Amendment 3, Task order selection based on most highly qualified. Most highly qualified firm will then be sent a TORFP. | 3 |
| 45 | Please confirm material submitted in SF330 Part II General Qualifications does not count against the page limit | SF330 Part II General qualifications will count against the page limit. Part II will be restricted to 2 pages total (page 6 of the SF 330 and one additional page). | 3 |
| 46 | Will task orders be specific to the discipline type of prime firm you are seeking? For example, will it be specified that task orders should be architect-led versus engineering-led? | (UPDATED WITH AMEND 03) The government will find most highly qualified firm for each task order based on SF 330/submission packages, then send out a TORFP to the most highly qualified firm | 3 |
| 47 | Should subconsultants (non-prime firms) also submit Past Performance Questionnaires? | PPQs from Sub consultants should not be submitted. | 3 |
| 48 | RFQ Section 5.3(C), page 7: Would the Government rate projects with higher construction value more favorably than projects with lower construction value? | The Government will not rate projects with higher construction value more favorably than projects with lower construction value. The Government is looking more at a variety of scale in construction price. | 3 |
| 49 | RFQ Section 7, pages 12-13: Will the Government also evaluate information in Section H that addresses Professional Qualifications and/or Specialized Experience? | Yes, the Government will also evaluate information in Section H that addresses Professional Qualifications and/or Specialized Experience. | 3 |
| 50 | RFQ Section 7, page 12: The RFQ instructions in Section 5.1 allow resumes in the key disciplines, principal, project manager, and support disciplines up to 20 disciplines. Section 7 states “resumes for other positions will not be considered and should not be submitted.” Does this refer to submitting more than 20 total disciplines? Are there any support disciplines that will not be considered? | This has been updated/corrected in the RFQ with Amendment 3. Firms are to provide resumes for key disciplines only. | 3 |
| 51 | RFQ Section 7, page 12: Please confirm that, for the allowed 11x17 pages, a single side will be counted as one page. | A single side will be counted as one page. | 3 |
| 52 | Q&A Response to question 29: The Government states the SF330 Form used must be the one provided, or pulled directly from the GSA website. May offerors replicate the SF 330 form in Microsoft Word to more easily accommodate the additional pages required for responses to Part I Sections C, E, F, and H? This is a common practice for Offerors when submitting S330s to the majority of DOD and federal agencies. | Offerors must use the most current SF 330 Form from the GSA website, or utilize the one provided. | 3 |
| 53 | Q&A Response to question 33 (and 36 and 41): In the response to question 33 says the Government states directly that “if private industry or outside Federal work has been completed a PPQ will need to be submitted for that work.” For Federal clients, the Government says it will pull CPARS for government work completed. Please confirm that a completed CPARS pulled by the Government will count as one of the five questionnaires received and that a separate PPQ is not required to meet the 5.5(C) submission requirement. |
It is our understanding that a CPARS meets the definition of a previously completed by a client that is substantially the same information as the PPQ form.
| A CPARs will replace a PPQ for government work completed if a PPQ can not be obtained. | 3 | ||
| 54 | Q&A Response to question 39: “The 20 resumes should be in different technical disciplines.” Besides the PM, Principal, and 7 key disciplines required. Are we to choose the disciplines for the remaining 11 resumes that we feel are most important to be selected for this contract? Please consider listing the roles for all 20 resumes so all Offerors will know how each resume will be compared, evaluated and scored. | This has been updated/corrected in the RFQ with Amendment 3. Firms are to provide resumes for key disciplines only. | 3 |
| 55 | Q&A Response to question 29: We respectfully request the Government to allow Offerors to recreate the GSA’s fillable PDF for SF330 Part I to allow for the inclusion of images, graphics, color, standard fonts, 11x17 pages, consecutive page numbering and extra pages for resumes and projects. The GSA’s SF330 (PDF with fillable fields) are cumbersome to work with. The evaluation panel will also benefit from reviewing the submittals offered by visually compelling page layout, fonts, tables, color and graphics. | Offerors must use the most current SF 330 Form from the GSA website, or utilize the one provided. | 3 |
| 56 | Once answers are posted after March 3 (Thursday) deadline, there isn’t sufficient time remaining to address responses in our submittal; make our production deadline (with hardcopies); or ensure overnight shipping (Monday 3/7) arrives before your deadline. Please consider a 2-week extension. | An extension was approved with Amendment 2 and 3. | 3 |
| 57 | 5. IDIQ Selection Criteria: Please clarify: The summarized evaluation selection criteria in section 5.1 do not much the numerated sections (5.2-5.6), e.g., 5.1.(2) Specialized Experience, technical competence in the area of Fire/Civil/Mech/Elec. is different than 5.3. Specialized experience and technical competence in the type of work required, including but not limited to, experience in energy conversation, pollution prevention, waste reduction, Leadership in Energy and Environmental (LEED) Design and the use of recovered/recycled materials - the summary 5.1.(2) covers a broad range of experience while 5.3. focuses on sustainability. | Sections have been updated with Amendment 3. | 3 |
| 58 | 5.5 Past Performance on contracts with Government agencies and private industry in terms of cost control, quality work, and compliance with performance schedules: Please clarify: to meet the maximum five PPQs for evaluation, can firms solicit more than five clients due to the time needed for them to fill out and mail the PPQs to the evaluators by the deadline, and then designate the order that the solicited PPQs should be accepted by the evaluators rather than the first five received being accepted? | Firms should only solicit 5 PPQs, as the first 5 received by the Contracting Office, will be the PPQs utilized for evaluation. | 3 |
| 59 | If we have a CPARS for a government project, do we still need to have the client submit the PPQ? | A CPARs will replace a PPQ for government work completed if a PPQ can not be obtained. | 3 |
| 60 | The SF330 is composed of Part I and Part II. So, based upon the statement there is no page restrictions at all because Part I (Sections A through H) is not included in the page count. Typically, a page restriction is placed on Section H (Additional Information). Otherwise this could be endless. | Page restrictions have been updated/corrected in the RFQ with Amendment 3. | 3 |
| 61 | TAB C, Section F - Example Projects: Will the Government allow Offerors to provide IDIQ contracts as a Section F Example Project or will projects be defined as a stand-alone contract or a single task order in an IDIQ contract? | IDIQ Contracts will be allowed as a Section F example Project as long as they meet the evaluation criteria in section 5. | 3 |
| 62 | Is the Government requiring that all 5 projects presented in Section F to have been completed by a single proposing office and same team? Is that considered more important and will be scored higher that a more relevant project performed by team members that we are proposing on our Org Chart and resumes (Sections D and E)? |
The office/branch/individual team member must have completed all projects provided in the SF 330 and, likewise, must actually perform the work under this contract. The Government will exclude from evaluation consideration projects not performed by the office/branch/individual team member.
| This has been updated/corrected in the RFQ with Amendment 3. The 5 projects presented in Section F need to be completed by the Proposing office/branch. | 3 |
| 63 | Question 11 asks, "(5.2 Professional qualifications necessary for satisfactory performance of required services): Please clarify if 20 disciplines means 20 different disciplines with as many individual resumes within the page limit or if 20 different disciplines means 20 individual resumes." and the answer is "20 different disciplines means 20 individual resumes." |
But in answer to Question 30, Per Section 5.2, A. “All technical disciplines listed in Attachment 1 of this advertisement shall be represented in order to obtain the most favorable rating. Resumes should be submitted for each discipline, principal, project manager, and other support personnel for up to 20 disciplines, that will handle work for the solicited task orders.” Please clarify where in Attachment 1 the technical disciplines are listed. Or is the Malmstrom AFB requesting we propose up to 20 disciplines based on the work described in attachment 1?," the answer is "Contractor can submit up to 20 disciplines. Key personnel/disciplines are: Mechanical/Electrical, Civil/Structural, Architectural, Fire Protection, and Environmental as stated in RFQ section 5.1(2)"
And in answer to Question 39, "The RFQ Paragraph 5.2 Part allows the submission of up to 20 resumes. Should the 20 resumes be in different technical disciplines, or are multiple resumes in the same discipline acceptable (or preferred)?," the answer is "The 20 resumes should be in different technical disciplines."
| Please clarify if 20 disciplines means 20 resumes, each in different disciplines and that any extra resumes in a discipline will be disregarded or that 20 disciplines means 20 resumes regardless of discipline, though with emphasis on key personnel/discipline as answered in response to Questions 14, 16, 30, and 37 (Mechanical/Electrical, Civil/Structural, Architectural, Fire Protection, and Environmental). | This has been updated/corrected in the RFQ with Amendment 3. Firms are to provide resumes for key disciplines only. | 3 |
| 64 | ||
| 65 | ||
| 66 | ||
| 67 | ||
| 68 | ||
| 69 | ||
| 70 | ||
| 71 | ||
| 72 | ||
| 73 | ||
| 74 | ||
| 75 | ||
| 76 | ||
| 77 | ||
| 78 | ||
| 79 | ||
| 80 | ||
| 81 | ||
| 82 | ||
| 83 | ||
| 84 | ||
| 85 | ||
| 86 | ||
| 87 | ||
| 88 | ||
| 89 | ||
| 90 | ||
| 91 | ||
| 92 | ||
| 93 | ||
| 94 | ||
| 95 | ||
| 96 | ||
| 97 | ||
| 98 | ||
| 99 | ||
| 100 | ||
| 101 | ||
| 102 |