Solicitation.pdf

PDF 469 KB Posted

Attached to
Repair Cathodic Protection Federal contract opportunity
Solicitation number
FA4626-18-R-0014
Issued by
Department of the Air Force Global Strike Command

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Repair Cathodic Protection, newest first.
File Type Posted
Clarification.docx DOCX document
Repair_CP_Rectifiers_Amendment-1_Summary.docx DOCX document
Repair_CP_Rectifiers_Question_Sets.docx DOCX document
Repair_CP_Rectifiers_Sheet_E3.3_Amendment1.pdf PDF
Repair_CP_Rectifiers_B-01,_Sheet_E1.1_Amendment1.pdf PDF
Questions_set_1.docx DOCX document
Repair_CP_Rectifiers__H-01,_Sheet_E1.7_Amendment1.pdf PDF
Amendment_2_conform_document.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attach_8_Past_Performance_Questionaire.pdf PDF
Attach_7_Special_Contract_Requirements.pdf PDF
Attach_9_Subcontractor_Consent.pdf PDF
Attach_5_Wage_Determinations_MT_67,_76,78.pdf PDF
Attach_1_Cathodic_Specifications.pdf PDF
Attach_3_Schedule_of_Drawings.pdf PDF
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_2_Material_Submittal_Schedule.pdf PDF
Attach_4_Drawings_all.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Cathodic Protection

Description of Work: The w ork for this project includes upgrades to the impressed current cathodic protection systems that use deep bed anodes to protect existing underground structures at 15 Missile Alert Facilities (MAFs) and 7 Launch Facilities (LFs).

Special Aw ard Provision: This acquisiton is being set-aside as a 100 percent small business set aside.

The magnitude of the project is betw een $1,000,000.00 and $5,000,000.00.

NOTICE TO OFFERORS: Funds are not presently available for this contract. The government's obligation under this contract is contingent upon the availability of appropriated funds from w hich payment for contract purposes can be made. No legal liability on the part of the government for any payment may arise until the funds are made available to the Contracting Officer.

The NAICS code for this project is 238190 w ith a small business size standard of $15,000,000.00.

GREGORY MCDONALD 406-731-4353

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

11-Jun-2018

(RFP)

(IFB)

X

CALL:

Repair CP Rectif iers MAFs & LFs

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________11 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______83 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

FA4626 341ST CONTRACTING SQUADRON

7015 GODDARD DRIVE BLDG 145

MALMSTROM AFB MT 59402-6863

FA4626

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

NZAS 02-2030

8. ADDRESS OFFER TO (If Other Than Item 7)

406-731-3748FAX:TEL: TEL: FAX:

FA462618R0014 63

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA462618R0014

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

MAF B-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work at this MAF site incudes the installation of new anode wells. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF B-01 as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

FOB: Destination

SIGNAL CODE: A

NET AMT

0002 1 Lot

MAF J-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF J-01 as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

0003 1 Lot

LF M-09

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the contract drawings.

0004 1 Lot

LF N-08

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the contract drawings.

0005 1 Lot

MAF C-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAFs) C-01, as shown on the drawings.

0006 1 Lot

MAF G-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) G-01, as shown on the drawings.

0007 1 Lot

MAF H-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) H-01, as shown on the drawings.

0008 1 Lot

MAF I-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) I-01, as shown on the drawings.

0009 1 Lot

MAF F-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) F-01, as shown on the drawings.

0010 1 Lot

MAF A-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) A-01, as shown on the drawings.

0011 44 Each Anode

FFP

Work for this item includes installing each anode. Payment will be made per number of anodes installed based on the results of the well testing and specified design life. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

0012 15 Each Wet Reference Cell

FFP

Work includes the additional cost for a wet reference cell. Work for this item includes installing wet reference cells when groundwater is encountered. Payment will be made for each wet reference cell installed. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

0013 100 Linear

Foot

Structure Bonding

FFP

Work for this item includes trenching and structure bonding. When during testing it is found that a structure is not connected to the cathodic protection system a new bond wire shall be installed. Work for this item includes trenching and installing bond wire in the trench, making appropriate/required connections, labeling wire, securing the wire and compacting trench. Payment will be made per lineal foot of trenching required for installation of the structure bond wire. Seeding over the new trench shall be included in this item. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

0014 50 Hours Security Delays

FFP

For security reasons the Contractor may be required to stop work or not allowed to work. Payment for this item will be made if the Contracting Officer determines that the Contractor incurred an unreasonable work stoppage or delay that was caused by the Government. Payment will be made per crew hour, which includes all costs associated with equipment and labor.

0015 1 Lot Bonding

FFP

Shall be paid the exact amount of payment to the Bonding Agency. Contractor shall provide bonding prior to payment for this line item.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

1001 1 Lot

OPTION MAF M-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work at this MAF site includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at M-01 as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

1002 1 Lot

OPTION MAF D-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF J-01 as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

1003 1 Lot

OPTION MAF E-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the contract drawings.

1004 1 Lot

OPTION MAF K-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the contract drawings.

1005 1 Lot

OPTION MAF L-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAFs) C-01, as shown on the drawings.

1006 1 Lot

OPTION MAF N-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) G-01, as shown on the drawings.

1007 1 Lot

OPTION MAF O-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) H-01, as shown on the drawings.

1008 1 Lot

OPTION LF G-08

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) I-01, as shown on the drawings.

1009 1 Lot

OPTION LF H-05

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) F-01, as shown on the drawings.

1010 1 Lot

OPTION MAF A-01

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) A-01, as shown on the drawings.

1011 56 Each OPTION Anode

FFP

Work for this item includes installing each anode. Payment will be made per number of anodes installed based on the results of the well testing and specified design life. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

1012 10 Each OPTION Wet Reference Cell

FFP

Work includes the additional cost for a wet reference cell. Work for this item includes installing wet reference cells when groundwater is encountered. Payment will be made for each wet reference cell installed. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

1013 80 Linear

Foot

OPTION Structure Bonding

FFP

Work for this item includes trenching and structure bonding. When during testing it is found that a structure is not connected to the cathodic protection system a new bond wire shall be installed. Work for this item includes trenching and installing bond wire in the trench, making appropriate/required connections, labeling wire, securing the wire and compacting trench. Payment will be made per lineal foot of trenching required for installation of the structure bond wire. Seeding over the new trench shall be included in this item. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

1014 40 Hours OPTION Security Delays

FFP

For security reasons the Contractor may be required to stop work or not allowed to work. Payment for this item will be made if the Contracting Officer determines that the Contractor incurred an unreasonable work stoppage or delay that was caused by the Government. Payment will be made per crew hour, which includes all costs associated with equipment and labor.

1015 1 Lot OPTION Bonding

FFP

Shall be paid the exact amount of payment to the Bonding Agency. Contractor shall provide bonding prior to payment for this line item.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2001 1 Lot

OPTION LF H-09

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF J-01 as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

2002 1 Lot

OPTION LF H-10

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the contract drawings.

2003 1 Lot

OPTION LF I-07

FFP

See drawings and specification section 01 22 00 for work to be accomplished.

Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the contract drawings.

2004 30 Each OPTION Anode

FFP

Work for this item includes installing each anode. Payment will be made per number of anodes installed based on the results of the well testing and specified design life. Payment for this item shall be full compensation for all costs including materials, equipment, preparation, labor and incidental items required to complete the work.

2005 15 Hours OPTION Security Delays

FFP

For security reasons the Contractor may be required to stop work or not allowed to work. Payment for this item will be made if the Contracting Officer determines that the Contractor incurred an unreasonable work stoppage or delay that was caused by the Government. Payment will be made per crew hour, which includes all costs associated with equipment and labor.

2006 1 Lot OPTION Bonding

FFP

Shall be paid the exact amount of payment to the Bonding Agency. Contractor shall provide bonding prior to payment for this line item.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER

VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001 1.00

10.00

0002 1.00

0003 1.00

0004 1.00

0005 1.00

0006 1.00

0007 1.00

0008 1.00

0009 1.00

0010 1.00

0011 1.00

0012 1.00

0013 1.00

0014 1.00

0015 1.00

1001 1.00

1002 1.00

1003 1.00

1004 1.00

1005 1.00

1006 1.00

1007 1.00

1008 1.00

1009 1.00

1010 1.00

1011 1.00

1012 1.00

1013 1.00

1014 1.00

1015 1.00

2001 1.00

2002 1.00

2003 1.00

2004 1.00

2005 1.00

2006 1.00

Section C - Descriptions and Specifications

DESCRIPTIONS & SPECIFICATIONS

Furnish all labor, materials, supervision, quality control, testing, equipment and transportation necessary to perform the work required by the drawings and specifications applicable to Malmstrom AFB, Project No. NZAS: 02-2030, dated: March 2018 and that are identified as attachments to this solicitation in Section J hereof.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 06-AUG-2018 TO

05-AUG-2019

N/A F2W3D3 341CES/CEMS-MISSILE

COMPLEX

FLOYD WANKE

39 78 ST N BLDG 470

MALMSTROM AFB MT 59402

406-731-7201

F2W3D3

0002 POP 06-AUG-2018 TO

05-AUG-2019

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 06-AUG-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 06-AUG-2019 TO

05-AUG-2020

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 06-AUG-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 06-AUG-2020 TO

05-AUG-2021

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 06-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 06-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 06-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 06-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 06-AUG-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the time specified on each delivery order. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $903.14 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

2 in 1 stand alone

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Destination

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4626 Admin DoDAAC FA4626 Inspect By DoDAAC F2W3D3 Contracting Officer FA4626

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Gregory.mcdonald.13@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

WAWF Help Desk

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-21 Basic Safeguarding of Covered Contractor Information

Systems

JUN 2016

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-7 Information Regarding Responsibility Matters JUL 2013 52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications

OCT 2010

52.217-5 Evaluation Of Options JUL 1990 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-3 Alt I Hazardous Material Identification and Material Safety Data

(Jan 1997) - Alternate I

JUL 1985

52.223-5 Alt I Pollution Prevention and Right-to-Know Information (May 2011) Alternate I

MAY 2011

52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.243-5 Changes and Changed Conditions APR 1984 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items NOV 2017 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.215-7000 Pricing Adjustments DEC 2012

252.216-7006 ORDERING (MAY 2011)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from 6 August 2018 through 5 August 2021

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c)(1) If issued electronically, the order is considered ``issued'' when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.

(2) If mailed or transmitted by facsimile, a delivery order or task order is considered ``issued'' when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.

(3) Orders may be issued orally only if authorized in the schedule.

(End of Clause)

252.223-7001 Hazard Warning Labels DEC 1991 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.227-7003 Termination AUG 1984 252.227-7033 Rights in Shop Drawings APR 1966 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7006 Cost Limitation JAN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than one site (LF or MAF), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of 10 Sites (LF or MAF);

(2) Any order for a combination of items in excess of 10 Sites; or

(3) A series of orders from the same ordering office within 10 days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 7 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-21 REQUIREMENTS (OCT 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 5 August 2021.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 15; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 notice days before the contract expires. The preliminary does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed the basic contract period plus a total of 2 option years for a total of 3 years.

52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL

HYDROFLUOROCARBONS (JUN 2016)

Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.

High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at (http://www.epa.gov/snap/).

Hydrofluorocarbons means compounds that only contain hydrogen, fluorine, and carbon.

Ozone-depleting substance means any substance the Environmental Protection Agency designates in 40 CFR part 82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform;

or

(2) Class II, including, but not limited to, hydrochlorofluorocarbons.

(b) The Contractor shall label products that contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), (d), and (e) and 40 CFR part 82, subpart E, as follows:

Warning: Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

* The Contractor shall insert the name of the substance(s).

(c) Reporting. For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons, the Contractor shall--

(1) Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by--

(i) Type of hydrofluorocarbon (e.g., HFC-134a, HFC-125, R-410A, R-404A, etc.);

(ii) Contract number; and http://www.epa.gov/snap/

(iii) Equipment/appliance;

(2) Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after--

(i) Annually by November 30 of each year during contract performance; and

(ii) At the end of contract performance.

(d) The Contractor shall refer to EPA's SNAP program (available at http://www.epa.gov/snap) to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap.

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the http://www.sam.gov/ http://www.epa.gov/snap http://www.epa.gov/snap manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph…