Amendment_1.pdf

PDF 46 KB Posted

Attached to
Repair Cathodic Protection Federal contract opportunity
Solicitation number
FA4626-18-R-0014
Issued by
Department of the Air Force Global Strike Command

About this file

Amendment to fix CLIN descriptions.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Cathodic Protection, newest first.
File Type Posted
Clarification.docx DOCX document
Repair_CP_Rectifiers_Amendment-1_Summary.docx DOCX document
Repair_CP_Rectifiers_Question_Sets.docx DOCX document
Repair_CP_Rectifiers_B-01,_Sheet_E1.1_Amendment1.pdf PDF
Repair_CP_Rectifiers_Sheet_E3.3_Amendment1.pdf PDF
Questions_set_1.docx DOCX document
Repair_CP_Rectifiers__H-01,_Sheet_E1.7_Amendment1.pdf PDF
Amendment_2_conform_document.pdf PDF
Amendment_2.pdf PDF
Attach_1_Cathodic_Specifications.pdf PDF
Attach_3_Schedule_of_Drawings.pdf PDF
Attach_6_Installation_Perimeter_Access.pdf PDF
Solicitation.pdf PDF
Attach_8_Past_Performance_Questionaire.pdf PDF
Attach_7_Special_Contract_Requirements.pdf PDF
Attach_9_Subcontractor_Consent.pdf PDF
Attach_5_Wage_Determinations_MT_67,_76,78.pdf PDF
Attach_2_Material_Submittal_Schedule.pdf PDF
Attach_4_Drawings_all.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NZAS 02-2030

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to f ix the CLIN descriptions of several option year CLINS and add mobilization to be included on all site w ork CLINS.

***CLIN 1010 A-01 IS TO BE LEFT BLANK. DO NOT BID CLIN 1010!***

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA462618R0014

X 9B. DATED (SEE ITEM 11)

11-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jun-2018

CODE

FA4626 341ST CONTRACTING SQUADRON

7015 GODDARD DRIVE BLDG 145

MALMSTROM AFB MT 59402-6863

FA4626 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA462618R0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0003

The CLIN extended description has changed from:

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the contract drawings.

To:

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the contract drawings. This CLIN is to include mobilization and demobilization costs.

CLIN 0004

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the

CLIN 0005

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAFs) C-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAFs) C-01, as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

CLIN 0006

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) G-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) G-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 0007

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) H-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) H-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 0008

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) I-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) I-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 0009

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) F-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) F-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 0010

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) A-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) A-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 1002

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF J-01 as shown on the drawings. This CLIN is to include mobilization and demobilization costs.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF D-01 as shown on the drawings. This CLIN is to include mobilization and

CLIN 1003

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF E-01 as shown on the drawings. This CLIN is to include mobilization and

CLIN 1004

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF K-01 as shown on the drawings. This CLIN is to include mobilization and

CLIN 1005

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAFs) C-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAFs) L-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 1006

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) G-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) N-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 1007

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) H-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) O-01, as shown on the drawings. This CLIN is to include mobilization

CLIN 1008

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) I-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) G-08 per the

CLIN 1009

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) F-01, as shown on the drawings.

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) H-05 per the

CLIN 1010

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, and electrical disconnects at Missile Alert Facility (MAF) A-01, as shown on the drawings.

****DO NOT BID THIS ITEM!**** MAF A-01 is found in CLIN 0010.

CLIN 2001

See drawings and specification section 01 22 00 for work to be accomplished. Work for this CLIN includes providing new cathodic protection (CP) rectifier, reference cells, test stations, conductors, anode box, electrical disconnects and anode well at MAF J-01 as shown on the drawings. This CLIN is to include mobilization and

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) H-09 per the

CLIN 2002

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) M-09 per the

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility(LF) H-10 per the

CLIN 2003

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) N-08 per the

See drawings and specification section 01 22 00 for work to be accomplished. Work for this item includes drill rig set-up, the drilling of the new anode well and installation of the well casing at Launch Facility (LF) I-07 per the contract drawings.This CLIN is to include mobilization and demobilization costs.

(End of Summary of Changes)

File details come from the government source that posted it.