Attach_2_Material_Submittal_Schedule.pdf

PDF 52 KB Posted

Attached to
Repair Cathodic Protection Federal contract opportunity
Solicitation number
FA4626-18-R-0014
Issued by
Department of the Air Force Global Strike Command

About this file

Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair Cathodic Protection, newest first.
File Type Posted
Clarification.docx DOCX document
Repair_CP_Rectifiers_Question_Sets.docx DOCX document
Repair_CP_Rectifiers_Amendment-1_Summary.docx DOCX document
Repair_CP_Rectifiers_B-01,_Sheet_E1.1_Amendment1.pdf PDF
Questions_set_1.docx DOCX document
Repair_CP_Rectifiers__H-01,_Sheet_E1.7_Amendment1.pdf PDF
Repair_CP_Rectifiers_Sheet_E3.3_Amendment1.pdf PDF
Amendment_2_conform_document.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Solicitation.pdf PDF
Attach_4_Drawings_all.pdf PDF
Attach_1_Cathodic_Specifications.pdf PDF
Attach_3_Schedule_of_Drawings.pdf PDF
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_8_Past_Performance_Questionaire.pdf PDF
Attach_7_Special_Contract_Requirements.pdf PDF
Attach_9_Subcontractor_Consent.pdf PDF
Attach_5_Wage_Determinations_MT_67,_76,78.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Repair Cathodic Protection NZAS 02-2030 FA4626-18-R-0014

AF Form 66 02:

Repair Cathodic Protection Submittal Schedule.xls-3/19/2018

SS-1

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-18-R-0014

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

FA

C

T U

R E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

IN

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

SI

O

N D

A T

E

(B Y

C

O N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

O R

R E

SU

B

M

IT

T A

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

1 GENERAL REQUIREMENTS 01 00 00 - 3.6 (Construction Work Schedule) 4 *5d

PTNP

* Tenative Work Schedule at Pre-Performance Meeting

2 GENERAL REQUIREMENTS 01 00 00 - 3.8 (Start of Work Notification) 1 6d

PTSW

3 GENERAL REQUIREMENTS 01 00 00 - 1.8 & 3.11 (Utility Outages) 1 10d

PTO

4 GENERAL REQUIREMENTS 01 00 00 - 1.8 & 3.13.2

(Quality Control Plan) 4 10d

ANTP

5 GENERAL REQUIREMENTS 01 00 00 - 3.13.2.10 (Testing (see Systems Checklist)) 1 72hr

SRO

6 GENERAL REQUIREMENTS 01 00 00 - 3.13.5 (Daily Quality Control Records) 1 EWD

1 1 1 1 1 10d

PTFI

5 5 5 5 5 20d AFI

GENERAL REQUIREMENTS 01 00 00 - 1.8, 3.16 & 3.17

(Operation and Maintenance Instructions with As-Built Redlined Drawings and Data, and Contractor Furnished Equipment Lists for each project site)

Number of Copies Required

NZAS 02-2030 REPAIR CATHODIC PROTECTION

02:

Repair Cathodic Protection Submittal Schedule.xls-3/19/2018

SS-2

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-18-R-0014

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

FA

C

T U

R E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

IN

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

O R

R E

SU

B

M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 02-2030 REPAIR CATHODIC PROTECTION

GENERAL REQUIREMENTS 01 00 00 - 1.8 & 3.22.1

(Contruction Near Utilities, Work Clearance Request (AF Form 103))

1 4 3d PTSW (each site)

9 GENERAL REQUIREMENTS 01 00 00 - 3.27 (Notice of Final Inspection) 1 3d PTFI

GENERAL REQUIREMENTS 01 00 00 - 1.8 & 3.29

(Transfer & Acceptance of Military Real Property Form Checklist (DD 1354))

4 10d

PTFI

11 SECURITY 01 10 00 - 1.3.1 & 3.1 (Missile Field Entry Authorization List) 4 30d

PTSW

12 ENVIRONMENTAL PROTECTION 01 36 00 - 2.3, 4.1.1,

4.3.1 & 6.1.2 (Environmental Permit Deliverables) 4 5d SRO

13 ENVIRONMENTAL PROTECTION 01 36 00 - 4.3.1

(Stormwater Discharge Permit Compliance) 4 10d

PTSW

14 ENVIRONMENTAL PROTECTION 01 36 00 - 7.0 & 8.1.1

(Hazardous Materials) 4 30d

PTSW

15 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.2

(Authorization Request Worksheets, AF Form 3952) 4 10d

SRO

02:

Repair Cathodic Protection Submittal Schedule.xls-3/19/2018

SS-3

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-18-R-0014

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

FA

C

T U

R E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

IN

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

O R

R E

SU

B

M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 02-2030 REPAIR CATHODIC PROTECTION

16 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4

(Hazmat Final Report) 4 10d

PTFA

ENVIRONMENTAL PROTECTION 01 36 00 - 11.3

(Monthly Report of Solid Waste Disposal & Diversion Attachment 4)

4 10d

SRO

18 ENVIRONMENTAL PROTECTION 01 36 00 - 11.6 (Non- Hazardous Solid Waste Diversion Report Attachment 1) 4 10d

PTFA

ENVIRONMENTAL PROTECTION 01 36 00 - 12.4

(Recovered Materials Written Determination Form Attachment 2)

4 10d

BMD

20 ENVIRONMENTAL PROTECTION 01 36 00 - 12.5

(Recycled Material Use Report Attachment 3) 4 PTFA

21 CAST-IN-PLACE CONCRETE 03 30 00 - 1.3 B. & C.

(Product data, Shop Drawings) 4 4 4 15d

ANTP

22 CAST-IN-PLACE CONCRETE 03 30 00 - 1.3 D. and 3.17 C.

(Test Report) 4 24hr

SRO

23 CAST-IN-PLACE CONCRETE 03 30 00 - 1.3 E.

(Certification in lieu of test report) 4 15d

ANTP

24 CAST-IN-PLACE CONCRETE 03 30 00 - 2.5 B. & F.

(Concrete mix design) 4 15d

PTSW

02:

Repair Cathodic Protection Submittal Schedule.xls-3/19/2018

SS-4

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-18-R-0014

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

FA

C

T U

R E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

IN

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

O R

R E

SU

B

M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 02-2030 REPAIR CATHODIC PROTECTION

25 PAINTING 09 90 00 - 1.3 4 4 4 4 15d

ANTP

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS

AND CABLES 26 05 19 - 1.3 (Cables, Conductors, Connectors & Splices)

4 15d

ANTP

27 HANGERS AND SUPPORTS FOR ELECTRICAL

SYSTEMS 26 05 29 - 1.4 4 4 15d

ANTP

28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 33 - 1.4 4 4 15d

ANTP

29 CATHODIC PROTECTION 26 42 00 - 1.4A (Product Data) 4 4 15d

ANTP

30 CATHODIC PROTECTION 26 42 00 - 1.4B (Shop Drawings) 4 4 15d

ANTP

31 CATHODIC PROTECTION 26 42 00 - 1.4C (Delegated Design) 4 4 30d

ANTP

32 CATHODIC PROTECTION 26 42 00 - 1.5A (Coordination Drawings) 4 15d

AWC

33 CATHODIC PROTECTION 26 42 00 - 1.5B (Qualifications) 4 15d

ANTP

02:

Repair Cathodic Protection Submittal Schedule.xls-3/19/2018

SS-5

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-18-R-0014

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

FA

C

T U

R E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

IN

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

O R

R E

SU

B

M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 02-2030 REPAIR CATHODIC PROTECTION

34 CATHODIC PROTECTION 26 42 00 - 1.5C (Field Reports) 4 15d

AWC

35 CATHODIC PROTECTION 26 42 00 - 1.5D (Warranty) 4 15d

AWC

36 CATHODIC PROTECTION 26 42 00 - 1.6 (Closeout) 4 4 PTFA

37 CATHODIC PROTECTION 26 42 00 - 2.6 (Anode test and certification) 4 4 10d

PTI

38 EXCAVATION, TRENCHING & BACKFILL 31 21 00 - 1.2

(trench maintenance) 4 PTFA

39 EXCAVATION, TRENCHING & BACKFILL 31 21 00 - 1.5

(underground marker tape & geotextile fabric) 4 15d

ANTP

40 ROCK MULCH 32 29 00 - 1.2 1 4 15d

PTSW

41 FENCING 32 31 13 - 1.3 4 4 15d

PTSW

42 SEEDING, SODDING AND FERTILIZING 32 92 12 - 3.3 4 4 15d

PTSW

43 HORIZONTAL DIRECTIONAL DRILLING 33 05 23 - 1.3

A. & B. (Qualifications, Drilling Plan, Schedule) 4 4 15d

ANTP

02:

Repair Cathodic Protection Submittal Schedule.xls-3/19/2018

SS-6

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-18-R-0014

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

FA

C

T U

R E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

FA

C

T U

R E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O

PE

R A

T

IN

G

IN

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

R E

Q U

IR

E

D S

U B

M

IS

SI

O

N D

A

N

T R

A C

T O

R

D A

T E

R E

C E

IV

E

D

IN

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

SP

E

N

SE

D A

T E

SU

B

M

IT

T A

L N

U M

B E

R S

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

O R

R E

SU

B

M

IT

T

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 02-2030 REPAIR CATHODIC PROTECTION

44 HORIZONTAL DIRECTIONAL DRILLING 33 05 23 - 1.3

C. (Record Drawings) 4 PTFA

45 HORIZONTAL DIRECTIONAL DRILLING 33 05 23 - 3.2

B. (Site Photos) 1 2d

PTSW

Schedule of Abbreviations:

AWC = After Work Completed = Before Material Delivery

PTSW = Prior to Starting Work SN = Advance Notification

AFA = After Final Acceptance SRO = After Each Occurrence

PTO = Prior to Outage PTFI = Prior to Final Inspection

PTNP = Prior to Notice to Proceed PTFP = Prior to Final Payment

ANTP = After Notice to Proceed PTCW = Prior to Completing Work

EWD = Each work day (AF Form 3000 not required) AFI = After Final Inspection

PTFA = Prior to Final Acceptance PTI = Prior To Installation

ACA = After Contract Award PSS = Per Submittal Schedule

BMD

Sheet1

File details come from the government source that posted it.