Attachment 2 Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Updated_Drawings_(Amendment_5).pdf | ||
| Updated_Specs__(amendment_5).pdf | ||
| Amendment_5.pdf | ||
| Questions_Set_3.docx | DOCX document | |
| Amendment_4.pdf | ||
| Amendment_notice.docx | DOCX document | |
| Notice_Regarding_Pre-proposal_confrence.docx | DOCX document | |
| Questions_Set_2.docx | DOCX document | |
| Amendment_3.pdf | ||
| Updated_Specs_(Amendment_3).pdf | ||
| Updated_Drawings_(Amendment_3).pdf | ||
| Questions_set_1.docx | DOCX document | |
| updated_Specs_for_amendment_2.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| updated_Drawings_(Amendment_1).pdf | ||
| Attach_1_Specs.pdf | ||
| Attach_4_All_Drawings.pdf | ||
| Attach_5_Wage_Determinations.docx | DOCX document | |
| Solicitation.pdf | ||
| Attach_3_SCHEDULE_OF_DRAWINGS.doc | DOC document | |
| Attach_6_Base_Entry_Policy_letter.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 98-2007A | Repair Security Lighting, MAFs | FA4626-14-R-0024 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO MISSILE ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | GENERAL REQUIREMENTS 01 00 00 - 3.6 Construction Work Schedule | 4 | *5d PTNP | * Tenative Work Schedule at Pre-Performance Meeting | |||||||||||||||||
| 2 | GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification | 4 | 6d PTSW | ||||||||||||||||||
| 3 | GENERAL REQUIREMENTS 01 00 00 - 3.11 Utility Outages | 4 | 10d PTO | ||||||||||||||||||
| 4 | GENERAL REQUIREMENTS 01 00 00 - 3.13.2 Quality Control Plan | 4 | 10d ANTP | ||||||||||||||||||
| 5 | GENERAL REQUIREMENTS 01 00 00 - 3.13.2.10 Testing (see Systems Checklist) | 1 | 72hr SRO | ||||||||||||||||||
| 6 | GENERAL REQUIREMENTS 01 00 00 - 3.13.5 Quality Control Records | 1 | EWD | ||||||||||||||||||
| 7 | GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5 As-Built Drawings | 4 | 45d AFI | ||||||||||||||||||
| 8 | GENERAL REQUIREMENTS 01 00 00 - 3.27 Notice of Final Inspection | 4 | 3d PTFI | ||||||||||||||||||
| 9 | GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.29.1 Form DD 1354 Checklist | 4 | 30d PTFP | ||||||||||||||||||
| 10 | GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.21 Contruction Near Utilities, Work Clearance Request (AF Form 103) | 4 | 3d PTO | ||||||||||||||||||
| 11 | GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16 Operation and Maintenance Instructions (AF Form 3000 ) | 4 | 30d PTFP | ||||||||||||||||||
| 12 | ENVIRONMENTAL PROTECTION 01 36 00 - 2.3 Environmental Permit Deliverables | 4 | 5d SRO | ||||||||||||||||||
| 13 | ENVIRONMENTAL PROTECTION 01 36 00 - 4.3 Stormwater Discharge Permit Compliance | 4 | 10d PTSW | ||||||||||||||||||
| 14 | ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1 Hazardous Materials List Attachment 5 | 4 | 10d SRO | ||||||||||||||||||
| 15 | ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.2 Authorization Request Worksheets, AF Form 3952 | 4 | 10d SRO | ||||||||||||||||||
| 16 | ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4 Hazmat Final Report | 4 | PTFA | ||||||||||||||||||
| 17 | ENVIRONMENTAL PROTECTION 01 36 00 - 11.3 Monthly Report of Solid Waste Disposal & Diversion Attachment 4 | 4 | 10d SRO | ||||||||||||||||||
| 18 | ENVIRONMENTAL PROTECTION 01 36 00 - 11.6 Non-Hazardous Solid Waste Diversion Report Attachment 1 | 4 | 10d ANTP | ||||||||||||||||||
| 19 | ENVIRONMENTAL PROTECTION 01 36 00 - 12.4 Recovered Materials Written Determination Form Attachment 2 | 4 | 10d SRO | ||||||||||||||||||
| 20 | ENVIRONMENTAL PROTECTION 01 36 00 - 12.5 Recycled Material Use Report Attachment 3 | 4 | 10d SRO | ||||||||||||||||||
| 21 | PAINTING 09 90 00 - 1.3.A. Product Data & 1.3.B. Color Samples | 4 | 4 | 10d ANTP | |||||||||||||||||
| 22 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 1.3.A | 4 | 15d ANTP | ||||||||||||||||||
| 23 | HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 29 - 1.4.A, B | 4 | 4 | 15d ANTP | |||||||||||||||||
| 24 | RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 1.4.A, B | 4 | 4 | 15d ANTP | |||||||||||||||||
| 25 | LIGHTING CONTROL DEVICES 26 09 23 - 1.3.A | 4 | 15d ANTP | ||||||||||||||||||
| 26 | EXTERIOR LIGHTING 26 56 00 - 1.5.A, B | 4 | 4 | 4 | 15d ANTP | ||||||||||||||||
| 27 | EXTERIOR LIGHTING 26 56 00 - 1.6.A, B, C, D Certificates, Qualifications, Reports, Warranties | 4 | 4 | 4 | 4 | 4 | 15d ANTP | ||||||||||||||
| 28 | EXCAVATION, TRENCHING & BACKFILL 312100 - 1.5.A. Underground marker tape | 4 | 10d ANTP |
| Schedule of Abbreviations: | ||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery |
| PTSW | = Prior to Starting Work | SN | = | Advance Notification |
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence |
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection |
| PTNP | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment |
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work |
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection |
| PTFA | = Prior to Final Acceptance | PT | = | Prior To |
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
| &"Times New Roman,Regular"&12Attachment 2 | &"Times New Roman,Regular"&12Repair Security Lighting 50 LFs |
| &"Times New Roman,Regular"&12FA4626-15-R-0024 |
&"Times New Roman,Regular"&12AF Form 66 02:
&F-&D &"Times New Roman,Regular"&12 SS-&P
REQUIRED TECHNICAL SUBMITTALS