Attach_2_Submittal_Schedule.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Repair Launch Facility Security Lighting Federal contract opportunity
Solicitation number
FA4626-15-R-0024
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair Launch Facility Security Lighting, newest first.
File Type Posted
Updated_Drawings_(Amendment_5).pdf PDF
Updated_Specs__(amendment_5).pdf PDF
Amendment_5.pdf PDF
Questions_Set_3.docx DOCX document
Amendment_4.pdf PDF
Amendment_notice.docx DOCX document
Notice_Regarding_Pre-proposal_confrence.docx DOCX document
Questions_Set_2.docx DOCX document
Amendment_3.pdf PDF
Updated_Specs_(Amendment_3).pdf PDF
Updated_Drawings_(Amendment_3).pdf PDF
Questions_set_1.docx DOCX document
updated_Specs_for_amendment_2.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
updated_Drawings_(Amendment_1).pdf PDF
Attach_1_Specs.pdf PDF
Attach_4_All_Drawings.pdf PDF
Attach_5_Wage_Determinations.docx DOCX document
Solicitation.pdf PDF
Attach_3_SCHEDULE_OF_DRAWINGS.doc DOC document
Attach_6_Base_Entry_Policy_letter.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 98-2007ARepair Security Lighting, MAFsFA4626-14-R-0024
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO MISSILE ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1GENERAL REQUIREMENTS 01 00 00 - 3.6 Construction Work Schedule4*5d PTNP* Tenative Work Schedule at Pre-Performance Meeting
2GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification46d PTSW
3GENERAL REQUIREMENTS 01 00 00 - 3.11 Utility Outages410d PTO
4GENERAL REQUIREMENTS 01 00 00 - 3.13.2 Quality Control Plan410d ANTP
5GENERAL REQUIREMENTS 01 00 00 - 3.13.2.10 Testing (see Systems Checklist)172hr SRO
6GENERAL REQUIREMENTS 01 00 00 - 3.13.5 Quality Control Records1EWD
7GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5 As-Built Drawings445d AFI
8GENERAL REQUIREMENTS 01 00 00 - 3.27 Notice of Final Inspection43d PTFI
9GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.29.1 Form DD 1354 Checklist430d PTFP
10GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.21 Contruction Near Utilities, Work Clearance Request (AF Form 103)43d PTO
11GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16 Operation and Maintenance Instructions (AF Form 3000 )430d PTFP
12ENVIRONMENTAL PROTECTION 01 36 00 - 2.3 Environmental Permit Deliverables45d SRO
13ENVIRONMENTAL PROTECTION 01 36 00 - 4.3 Stormwater Discharge Permit Compliance410d PTSW
14ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1 Hazardous Materials List Attachment 5410d SRO
15ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.2 Authorization Request Worksheets, AF Form 3952410d SRO
16ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4 Hazmat Final Report4PTFA
17ENVIRONMENTAL PROTECTION 01 36 00 - 11.3 Monthly Report of Solid Waste Disposal & Diversion Attachment 4410d SRO
18ENVIRONMENTAL PROTECTION 01 36 00 - 11.6 Non-Hazardous Solid Waste Diversion Report Attachment 1410d ANTP
19ENVIRONMENTAL PROTECTION 01 36 00 - 12.4 Recovered Materials Written Determination Form Attachment 2410d SRO
20ENVIRONMENTAL PROTECTION 01 36 00 - 12.5 Recycled Material Use Report Attachment 3410d SRO
21PAINTING 09 90 00 - 1.3.A. Product Data & 1.3.B. Color Samples4410d ANTP
22LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19 - 1.3.A415d ANTP
23HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 29 - 1.4.A, B4415d ANTP
24RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 1.4.A, B4415d ANTP
25LIGHTING CONTROL DEVICES 26 09 23 - 1.3.A415d ANTP
26EXTERIOR LIGHTING 26 56 00 - 1.5.A, B44415d ANTP
27EXTERIOR LIGHTING 26 56 00 - 1.6.A, B, C, D Certificates, Qualifications, Reports, Warranties4444415d ANTP
28EXCAVATION, TRENCHING & BACKFILL 312100 - 1.5.A. Underground marker tape410d ANTP
Schedule of Abbreviations:
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNP= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract AwardPSS=Per Submittal Schedule
&"Times New Roman,Regular"&12Attachment 2&"Times New Roman,Regular"&12Repair Security Lighting 50 LFs
&"Times New Roman,Regular"&12FA4626-15-R-0024

&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D &"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .