Attch 2 List of Submittals.xls

XLS spreadsheet 75 KB Posted

Attached to
Replace Military Working Dog Kennel Federal contract opportunity
Solicitation number
FA4626-11-R-0003
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 Material Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Replace Military Working Dog Kennel, newest first.
File Type Posted
Amendment 0003 Question and Answers.docx DOCX document
Drawings.pdf PDF
Bid Schedule.docx DOCX document
Addendum for Dog Kennel Amendment 0003.docx DOCX document
Amendment 003.doc DOC document
Questions and Answers.docx DOCX document
Kennel Bore Logs.pdf PDF
Bore Logs.docx DOCX document
Federal Government Shut Down.docx DOCX document
Site Visit Attendees.pdf PDF
Dog Kennel Pre-Proposal.pptx PPTX presentation
Questions and Answers.docx DOCX document
Attch 4 Corrected Drawings.zip ZIP file
Amendment 02.doc DOC document
Ammendment 0001.doc DOC document
Addendum 1 MWD Kennel.docx DOCX document
Questions and Answers.docx DOCX document
Questions and Answers.docx DOCX document
Attch 1 Specifications.zip ZIP file
Attch 6 Past Performance Quest.docx DOCX document
Attch 4 Drawings.zip ZIP file
Attch 7 - Subcontractor Consent Form - 10R0027.docx DOCX document
Attch 3 Schedule of Drawings.doc DOC document
Attch 5 Wage Determination.docx DOCX document
Solicitation.doc DOC document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 08-6006Replace MWD Kennel FacilityFA4626-11-R-0003
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO MISSILE ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1GENERAL REQUIREMENTS 01 00 00 - 3.5.2 As-Built Field Data / Record Drawings345d AFI
2GENERAL REQUIREMENTS 01 00 00 - 3.10 Start of Work Notification36d PTSW
3GENERAL REQUIREMENTS 01 00 00 - 3.11 Notice of Final Inspection33d PTFI
4GENERAL REQUIREMENTS 01 00 00 - 3.12 Work Clearance Request (AF Form 103)315d PTSW
5GENERAL REQUIREMENTS 01 00 00 - 3.13 Utility Outage Notice310d PTO
6GENERAL REQUIREMENTS 01 00 00 - 3.17 Quality Control Plan310d ANTP
7GENERAL REQUIREMENTS 01 00 00 - 3.18 Property Inventory Checklist (AF Form 1354)330d PTFP
8GENERAL REQUIREMENTS 01 00 00 - 3.19 Construction Work Schedule310d ANTP
9ENVIRONMENTAL PROTECTION 01 36 00 - 11.0 Waste Management Plan310d ANTP
10ENVIRONMENTAL PROTECTION 01 36 00 - 11.3 Monthly Report of Solid Waste Disposal & Diversion310d SRO
11ENVIRONMENTAL PROTECTION 01 36 00 - 12.4 Recovered Materials Written Determination Form310d SRO
12ENVIRONMENTAL PROTECTION 01 36 00 - 12.5 Recycled Material Use Report310d SRO
13PORTLAND CEMENT CONCRETE 03 01 00315d ANTP
14CONCRETE FORMING & ACCESSORIES 03 10 00315d ANTP
15PLACING & FINISHING CONCRETE 03 35 00315d ANTP
16PRECAST ARCHITECTURAL CONCRETE 03 45 00315d ANTP
17GROUT 03 60 00315d ANTP
18UNIT MASONRY 04 42 00315d ANTP
19STRUCTURAL STEEL 05 12 00315d ANTP
20STEEL DECK 05 31 003315d ANTP
21COLD FORMED METAL FRAMING 05 40 003315d ANTP
22COLD-FORMED STEEL TRUSSES 05 44 00333330d ANTP
23METAL FABRICATIONS 05 50 00315d ANTP
24ROUGH CARPENTRY 06 10 00315d ANTP
25FINISH CARPENTRY 06 20 00315d ANTP
26ARCHITECTURAL WOOD CASEWORK3315d ANTP
27SOLID SURFACING FABRICATIONS - 06 61 1633315d ANTP
28BOARD INSULATION 07 21 1333315d ANTP
29BLANKET INSULATION 07 21 163315d ANTP
30BLOWN INSULATION - 07 21 26 1.3B33315d ANTP
31EXTERIOR INSULATION & FINISH SYSTEMS 07 24 00333315d ANTP
32VAPOR RETARDERS 07 26 003315d ANTP
33AIR BARRIERS 07-27 003315d ANTP
34SHEET METAL ROOFING 07 61 003315d ANTP
35SHEET METAL FLASHING & TRIM 07 62 003315d ANTP
36FIRESTOPPING 07 84 0033315d ANTP
37JOINT PROTECTION - 07 90 00315d ANTP
38STANDARD STEEL FRAMES - 08 12 14333315d ANTP
39STANDARD STEEL DOORS 08 13 14333315d ANTP
40FLUSH WOOD DOORS - 08 14 163333315d ANTP
41ALUMINUM-FRAMED ENTRANCES 08 41 13333315d ANTP
42TRANSLUCENT WALL & ROOF ASSEMBLIES 08 45 00333315d ANTP
43ALUMINUM WINDOWS 08 51 1333315d ANTP
44DOOR HARDWARE - 08 71 0033315d ANTP
45DOOR HARDWARE - 08 71 00 1.5A (Operation & Maintenance Data)315d AFI
46DOOR HARDWARE - 08 71 00 1.5B (Keys)35d PTFI
47GLAZING 08 80 003315d ANTP
48GYPSUM BOARD ASSEMBLIES 09 21 16315d ANTP
49FIBERGLASS REINFORCED PANELS 09 27 13333315d ANTP
50TILING 09 30 003315d ANTP
51TILING 09 30 00 -1.4A (Operation & Maintenance Data)315d AFI
52ACOUSTICAL PANEL CEILINGS 09 51 13333315d ANTP
53RESILIENT FLOORING 09 65 003315d ANTP
54RESILIENT FLOORING 09 65 00 - 1.4B (Operation & Maintenance Data)315d AFI
55FLUID-APPLIED FLOORING - 09 67 00333315d ANTP
56FLUID-APPLIED FLOORING - 09 67 00 1.4B (Operation & Maintenance Data)315d AFI
57TILE CARPETING 09 68 1333315d ANTP
58TILE CARPETING 09 68 13 - 1.4B (Operation & Maintenance Data)315d AFI
59ACOUSTICAL TREATMENTS 09 80 0033315d ANTP
60PAINTING AND COATING 09 90 003315d ANTP
61VISUAL DISPLAY BOARDS 10 11 0033315d ANTP
62WIRE MESH PARTITIONS 10 22 13 - 1.4B33315d ANTP
63WALL & DOOR PROTECTION 10 26 00 - 1.2B33315d ANTP
64TOILET & BATH ACCESSORIES 10 28 0033315d ANTP
65TOILET & BATH ACCESSORIES 10 28 00 1.2D (Maintenance Instructions)315d AFI
66FIRE PROTECTION SPECIALTIES 10 44 00 - 1.4B315d ANTP
67FIRE PROTECTION SPECIALTIES 10 44 003315d ANTP
68FIRE PROTECTION SPECIALTIES 10 44 00 - 1.5B (Operation & Maintenance Data)315d AFI
69METAL LOCKERS 10 51 13 - 1.3B33315d ANTP
70HOISTS 14 62 00 - 1.3B315d ANTP
71COMMON WORK RESULTS FOR PLUMBING 22 05 00 -1.5B3315d ANTP
72GENERAL DUTY VALVES FOR PLUMBING PIPING 22 05 233333315d ANTP
73HANGARS & SUPPORTS FOR PLUMBING PIPING & EQUIPMENT 22 05 29333315d ANTP
74IDENTIFICATION FOR PLUMBING PIPING & EQUIPMENT 22 05 533315d ANTP
75PLUMBING INSULATION 22 07 00 - 1.3B3315d ANTP
76FACILITY WATER DISTRIBUTION 22 11 00 - 1.3B3315d ANTP
77FACILITY WATER DISTRIBUTION 22 11 00 - 1.4B (Project Record Documents)345d AFI
78FACILITY WATER DISTRIBUTION 22 11 00 - 1.4C (Operation & Maintenance Data)315d PTFI
79FACILITY SANITARY SEWERAGE 22 13 00 - 1.3B3315d ANTP
80FACILITY SANITARY SEWERAGE 22 13 00 - 1.4B (Project Record Documents)345d AFI
81FUEL-FIRED DOMESTIC WATER HEATERS 22 34 003315d ANTP
82FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 1.4B (Operation & Maintenance Data)315d PTFI
83PLUMBING FIXTURES 22 40 00 - 1.3B3315d ANTP
84PLUMBING FIXTURES 22 40 00 - 1.4B (Operation & Maintenance Data)315d PTFI
85COMMON WORK RESULTS FOR HVAC 23 05 00 - 1.5B33315d ANTP
86COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23 05 13 - 1.3B315d ANTP
87GENERAL DUTY VALVES FOR HVAC PIPING - 23 05 23 - 1.3B3315d ANTP
88GENERAL DUTY VALVES FOR HVAC PIPING - 23 05 23 - 1.4B (Project Record Documents)345d AFI
89GENERAL DUTY VALVES FOR HVAC PIPING - 23 05 23 - 1.4C (Operation & Maintenance Data)315d PTFI
90HANGERS & SUPPORTS FOR HVAC PIPING & EQUIPMENT 23 05 2933315d ANTP
91VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 48 - 1.4B3315d ANTP
92VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 48 - 1.5B (Project Record Documents)345d AFI
93IDENTIFICATION FOR HVAC PIPING & EQUIPMENT 23 05 53 - 1.3B315d ANTP
94IDENTIFICATION FOR HVAC PIPING & EQUIPMENT 23 05 53 - 1.4B (Project Record Documents)345d AFI
95TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.3B (Current Calibration Date Report)315d ANTP
96TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.3C, D, E, F (Reports)37d PTFI
97TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.4.B (Project Record Documents)345d AFI
98TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.4C (Operation & Maintenance Data)315d PTFI
99HVAC INSULATION 23 07 00 - 1.3B3315d ANTP
100DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8G3330d ANTP
101DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Training Manuals)36 wks PTCW
102DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Startup Testing Plan)315d PTFI
103DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Startup Test Report)315d PTFI
104DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Performance Verification Testing Plan)315d PTFI
105DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(AS-Builts)345d AFI
106DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(Operation and Maintenance Manuals)315d PTFI
107DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(Software)345d AFI
108DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(Firmware)345d AFI
109DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(PVT Report)345d AFI
110DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8C(Equipment Booklets)330d ANTP
111DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8F(Software Files)345d AFI
112DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.3E330d ANTP
113DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.4 B (Project Record Documents)345d AFI
114DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.4C (Operation & Maintenance Data)315d PTFI
115SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 09 93 - 1.2B330d ANTP
116SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 09 93 - 1.3B (Project Record Documents)345d AFI
117FACILITY NATURAL GAS PIPING 23 11 233315d ANTP
118FACILITY NATURAL GAS PIPING 23 11 23 - 1.45B (Project Record Documents)345d AFI
119FACILITY NATURAL GAS PIPING 23 11 23 - 1.B C (Operation & Maintenance Data)315d PTFI
120HYDRONIC PIPING 23 21 13 - 1.4B315d ANTP
121HYDRONIC PIPING 23 21 13 - 1.5B (Project Record Documents)345d AFI
122HYDRONIC PIPING 23 21 13 - 1.5C (Operation & Maintenance Data)315d PTFI
123HYDRONIC PIPING SPECIALTIES 23 21 16 - 1.4B3315d ANTP
124HYDRONIC PIPING SPECIALTIES 23 21 16 - 1.5B (Operation & Maintenance Data)315d PTFI
125HYDRONIC PUMPS 23 21 23 - 1.4B333315d ANTP
126HYDRONIC PUMPS 23 21 23 - 1.5B (Operation & Maintenance Data)315d PTFI
127HVAC WATER TREATMENT 23 25 00 1.3B315d ANTP
128HVAC WATER TREATMENT 23 25 00 1.4B (Project Record Documents)345d AFI
129HVAC WATER TREATMENT 23 25 00 1.4C (Operation & Maintenance Data)315d PTFI
130HVAC DUCTS & CASINGS 23 31 00 - 1.4B315d ANTP
131HVAC DUCTS & CASINGS 23 31 00 - 1.5B (Project Record Documents)345d AFI
132AIR DUCT ACCESSORIES 23 33 00315d ANTP
133AIR DUCT ACCESSORIES 23 33 00 - 1.4B (Project Record Documents)345d AFI
134AIR DUCT ACCESSORIES 23 33 00 - 1.4C (Operation & Maintenance Data)315d PTFI
135HVAC FANS 23 34 00 - 1.4B315d ANTP
136HVAC FANS 23 34 00 - 1.5B (Operation & Maintenance Data)315d PTFI
137AIR OUTLETS & INLETS 23 37 00 - 1.3B3315d ANTP
138AIR OUTLETS & INLETS 23 37 00 - 1.4B (Project Record Documents)345d AFI
139BREECHINGS, CHIMNEYS & STACKS 23 51 00 - 1.4B315d ANTP
140FINNED WATER TUBE BOILERS 23 52 34 - 1.3B3315d ANTP
141FINNED WATER TUBE BOILERS 23 52 34 - 1.3C (Test Reports)310d SRO
142FINNED WATER TUBE BOILERS 23 52 34 - 1.4B (Operation & Maintenance Data)315d PTFI
143AIR-COOLED REFRIGERANT CONDENSERS 23 63 133315d ANTP
144AIR-COOLED REFRIGERANT CONDENSERS 23 63 13- 1.4B (Operation & Maintenance Data)315d PTFI
145PACKAGED OUTDOOR CENTRAL STATION AIR-HANDLING UNITS 23 74 133315d ANTP
146PACKAGED OUTDOOR CENTRAL STATION AIR-HANDLING UNITS 23 74 13 - 1.4B (Operation & Maintenance Data)315d PTFI
147CONVECTION HEATING & COOLING UNITS 23 82 003315d ANTP
148CONVECTION HEATING & COOLING UNITS 23 82 00 - 1.4B (Project Record Documents)345d AFI
149CONVECTION HEATING & COOLING UNITS 23 82 00 - 1.4C (Operation & Maintenance Data)315d PTFI
150COMMON WORK RESULTS FOR ELECTRICAL 26 05 00 - 1.14A33315d ANTP
151COMMON WORK RESULTS FOR ELECTRICAL 26 05 00 - 1.17A (AS-BUILTS)345d AFI
152EQUIPMENT WIRING CONNECTIONS 26 05 033315d ANTP
153EQUIPMENT WIRING CONNECTIONS 26 05 03 - 1.4B (PROJECT RECORD DOCUMENTS)345d AFI
154LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.5B315d ANTP
155LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.5C (DESIGN DATA)345d AFI
156LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.5D (TEST REPORTS)315d PTFI
157LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.6B (PROJECT RECORD DOCUMENTS)345d AFI
158GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.5B315d ANTP
159GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.5C (TEST REPORTS)315d PTFI
160GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.5D315d PTFI
161GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.6B (PROJECT RECORD DOCUMENTS)345d AFI
162HANGERS & SUPPORTS 26 05 293333315d ANTP
163HANGERS & SUPPORTS 26 05 29 - 1.6H (ENGINEERING JUDGMENTS)330d ANTP
164RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 333315d ANTP
165RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 1.6B (PROJECT RECORD DOCUMENTS)345d AFI
166IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 1.2B3315d ANTP
167IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 1.3B (PROJECT RECORD DOCUMENTS)345d AFI
168MEDIUM VOLTAGE CABLE 26 05 16 - 1.3B315d ANTP
169MEDIUM VOLTAGE CABLE 26 05 16 - 1.3C (TEST REPORTS)315d PTFI
170LIGHTING CONTROL DEVICES 26 09 2333315d ANTP
171LIGHTING CONTROL DEVICES 26 09 23 - 1.5B (PROJECT RECORD DOCUMENTS)345d AFI
172LIGHTING CONTROL DEVICES 26 09 23 - 1.5C315d PTFI
173PANELBOARDS 26 24 163315d ANTP
174PANELBOARDS 26 24 16 - 1.4B (PROJECT RECORD DOCUMENTS)345d AFI
175PANELBOARDS 26 24 16 - 1.4C315d PTFI
176ELECTRICAL CABINETS AND ENCLOSURES 26 27 16 - 1.3B3315d ANTP
177WIRING DEVICES 26 27 26 - 1.3B315d ANTP
178FUSES 26 28 13 - 1.5B315d ANTP
179FUSES 26 28 13 - 1.6B (PROJECT RECORD DOCUMENTS)345d AFI
180ENCLOSED SWITCHES 26 28 19 - 1.3B315d PTFI
181ENCLOSED SWITCHES 26 28 19 - 1.4B (PROJECT RECORD DOCUMENTS)345d AFI
182INTERIOR LIGHTING 26 51 003315d ANTP
183EMERGENCY LIGHTING 26 52 00315d ANTP
184EXTERIOR LIGHTING 26 56 003315d ANTP
185TELECOMMUNICATIONS REQUIREMENTS 27 00 003315d ANTP
186TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.6D (TEST REPORTS)315d PTFI
187TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.6E (MANUFACTURER FIELD REPORTS)315d PTFI
188TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.6F (SYSTEM WARRANTY)315d PTFI
189TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.7B (PROJECT RECORD DOCUMENTS)345d AFI
190TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.7C315d PTFI
191FIRE ALARM 28 31 00-1.4.F - Computer Software and Programming/Addresses314d PTSW
192FIRE ALARM 28 31 00 - 1.9 - Training Data314d AFI
193FIRE ALARM 28 31 00 - 3.5.G - Test Reports35d

AFI

194FIRE ALARM 28 31 00- 1.4.E - Qualifications Certificates314d PTSW
195FIRE ALARM 28 31 00 - 1.4.D - Manufacturer's Certification -314d PTSW
196FIRE ALARM 28 31 00 - 1.7 - Operation and Maintenance Manuals314d AFI
197FIRE ALARM 28 31 00 - 1.6 - As-Built Drawings310d AWC
198FIRE ALARM 28 31 00 - 1.10 - Guarantees314d AFI
199SITE GRADING, EXCAVATION AND EMBANKMENT 31 22 00 - 1.02.4 (Fill Material Compaction Results)315d SRO
200TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.1 (Work Clearance Request Form)315d PTSW
201TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.2 (Type 1 Bedding Sieve & Proctor)315d SRO
202TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.3 (Type 2 Bedding Sieve & Proctor)315d SRO
203TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.4 (Import Backfill Sieve & Proctor)315d SRO
204TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.5 (Plastic Marking Tape)315d ANTP
205TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.6 (Compaction Test Results)315d SRO
206DRILLED FOUNDATION CAISSONS 31 63 2633315d SRO
207GEOTEXTILE USED IN CONSTRUCTION APPLICATIONS 32 05 19 - 1.04.A.1315d ANTP
208ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 1.01.1 (Gravel Base Course Sieve)315d ANTP
209ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 1.01.2 (Gravel Base Course Proctor)315d SRO
210ASPHALTIC CONCRETE PAVEMENT 32 10 00315d ANTP
211ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 1.01.8 (Quality Control Tests)315d SRO
212ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 3.03 (Certified Test Reports & Weight Tickets)315d SRO
213ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 3.03 (Admixtures)315d ANTP
214PAVEMENT MARKINGS 32 17 23 - 4.06315d ANTP
215CHAIN LINK FENCES & GATES 32 31 133315d ANTP
216CHAIN LINK FENCES & GATES 32 31 13 - 1.5D (Project Record Documents)315d AFI
217CHAIN LINK FENCES & GATES 32 31 13 - 1.5E (Operation & Maintenance Data)315d AFI
218PLANTING IRRIGATION 32 84 0033315d ANTP
219PLANTING IRRIGATION 32 84 00 - 1.4J (Operation & Maintenance Data)315d AFI
220PLANTING IRRIGATION 32 84 00 - 1.4K (As-built Drawings)315d AFI
221SOIL PREPARATION 32 91 13 - 1.4B315d ANTP
222SOIL PREPARATION 32 91 13 - 1.5B (Operation & Maintenance Data)315d AFI
223TURF & GRASSES 32 92 003315d ANTP
224TURF & GRASSES 32 92 00 - 1.3G (Maintenance Instructions)315d AFI
225PLANTS 32 93 0033315d ANTP
226PLANTS 32 93 00 - 1.4F (Maintenance Instructions)315d AFI
227POLYVINYL CHLORIDE WATER MAIN AND DUCTILE IRON FITTINGS 33 11 13 - 1.023315d ANTP
228POLYVINYL CHLORIDE WATER MAIN AND DUCTILE IRON FITTINGS 33 11 13 - 1.04.5 (Hydrostatic Test Results)315d SRO
229POLYVINYL CHLORIDE WATER MAIN AND DUCTILE IRON FITTINGS 33 11 13 - 1.04.6 (Bacteriological Tests)315d SRO
230WATER SERVICE LINES 33 11 16315d ANTP
231UNDERGROUND GATE VALVES 33 12 16 - 1.02.1 (Gate Valve & Valve Boxes)315d ANTP
232GRAVITY SANITARY SEWERS 33 30 00 - 1.02315d ANTP
233CULVERTS 33 42 00315d ANTP
234CULVERTS 33 42 00 - 4.03 (Inspection Reports)315d SRO
235NATURAL GAS PIPING SYSTEMS 33 51 13315d ANTP
236NATURAL GAS PIPING SYSTEMS 33 51 13 - 1.02.4 (Tracer Wire Test Results)315d SRO
237NATURAL GAS PIPING SYSTEMS 33 51 13 - 1.02.5 (Leakage Test Results)315d SRO
Schedule of Abbreviations:
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract AwardPSS=Per Submittal Schedule

&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12Replace MWD Kennel Facility&R&"Times New Roman,Regular"&12FA4626-11-R-0003 &L&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D&C&"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS