Attch 2 List of Submittals.xls
XLS spreadsheet 75 KB Posted
- Attached to
- Replace Military Working Dog Kennel Federal contract opportunity
- Solicitation number
- FA4626-11-R-0003
About this file
Attachment 2 Material Submittal Schedule
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 08-6006 | Replace MWD Kennel Facility | FA4626-11-R-0003 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO MISSILE ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | GENERAL REQUIREMENTS 01 00 00 - 3.5.2 As-Built Field Data / Record Drawings | 3 | 45d AFI | ||||||||||||||||||
| 2 | GENERAL REQUIREMENTS 01 00 00 - 3.10 Start of Work Notification | 3 | 6d PTSW | ||||||||||||||||||
| 3 | GENERAL REQUIREMENTS 01 00 00 - 3.11 Notice of Final Inspection | 3 | 3d PTFI | ||||||||||||||||||
| 4 | GENERAL REQUIREMENTS 01 00 00 - 3.12 Work Clearance Request (AF Form 103) | 3 | 15d PTSW | ||||||||||||||||||
| 5 | GENERAL REQUIREMENTS 01 00 00 - 3.13 Utility Outage Notice | 3 | 10d PTO | ||||||||||||||||||
| 6 | GENERAL REQUIREMENTS 01 00 00 - 3.17 Quality Control Plan | 3 | 10d ANTP | ||||||||||||||||||
| 7 | GENERAL REQUIREMENTS 01 00 00 - 3.18 Property Inventory Checklist (AF Form 1354) | 3 | 30d PTFP | ||||||||||||||||||
| 8 | GENERAL REQUIREMENTS 01 00 00 - 3.19 Construction Work Schedule | 3 | 10d ANTP | ||||||||||||||||||
| 9 | ENVIRONMENTAL PROTECTION 01 36 00 - 11.0 Waste Management Plan | 3 | 10d ANTP | ||||||||||||||||||
| 10 | ENVIRONMENTAL PROTECTION 01 36 00 - 11.3 Monthly Report of Solid Waste Disposal & Diversion | 3 | 10d SRO | ||||||||||||||||||
| 11 | ENVIRONMENTAL PROTECTION 01 36 00 - 12.4 Recovered Materials Written Determination Form | 3 | 10d SRO | ||||||||||||||||||
| 12 | ENVIRONMENTAL PROTECTION 01 36 00 - 12.5 Recycled Material Use Report | 3 | 10d SRO | ||||||||||||||||||
| 13 | PORTLAND CEMENT CONCRETE 03 01 00 | 3 | 15d ANTP | ||||||||||||||||||
| 14 | CONCRETE FORMING & ACCESSORIES 03 10 00 | 3 | 15d ANTP | ||||||||||||||||||
| 15 | PLACING & FINISHING CONCRETE 03 35 00 | 3 | 15d ANTP | ||||||||||||||||||
| 16 | PRECAST ARCHITECTURAL CONCRETE 03 45 00 | 3 | 15d ANTP | ||||||||||||||||||
| 17 | GROUT 03 60 00 | 3 | 15d ANTP | ||||||||||||||||||
| 18 | UNIT MASONRY 04 42 00 | 3 | 15d ANTP | ||||||||||||||||||
| 19 | STRUCTURAL STEEL 05 12 00 | 3 | 15d ANTP | ||||||||||||||||||
| 20 | STEEL DECK 05 31 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 21 | COLD FORMED METAL FRAMING 05 40 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 22 | COLD-FORMED STEEL TRUSSES 05 44 00 | 3 | 3 | 3 | 3 | 30d ANTP | |||||||||||||||
| 23 | METAL FABRICATIONS 05 50 00 | 3 | 15d ANTP | ||||||||||||||||||
| 24 | ROUGH CARPENTRY 06 10 00 | 3 | 15d ANTP | ||||||||||||||||||
| 25 | FINISH CARPENTRY 06 20 00 | 3 | 15d ANTP | ||||||||||||||||||
| 26 | ARCHITECTURAL WOOD CASEWORK | 3 | 3 | 15d ANTP | |||||||||||||||||
| 27 | SOLID SURFACING FABRICATIONS - 06 61 16 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 28 | BOARD INSULATION 07 21 13 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 29 | BLANKET INSULATION 07 21 16 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 30 | BLOWN INSULATION - 07 21 26 1.3B | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 31 | EXTERIOR INSULATION & FINISH SYSTEMS 07 24 00 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 32 | VAPOR RETARDERS 07 26 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 33 | AIR BARRIERS 07-27 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 34 | SHEET METAL ROOFING 07 61 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 35 | SHEET METAL FLASHING & TRIM 07 62 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 36 | FIRESTOPPING 07 84 00 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 37 | JOINT PROTECTION - 07 90 00 | 3 | 15d ANTP | ||||||||||||||||||
| 38 | STANDARD STEEL FRAMES - 08 12 14 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 39 | STANDARD STEEL DOORS 08 13 14 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 40 | FLUSH WOOD DOORS - 08 14 16 | 3 | 3 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||
| 41 | ALUMINUM-FRAMED ENTRANCES 08 41 13 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 42 | TRANSLUCENT WALL & ROOF ASSEMBLIES 08 45 00 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 43 | ALUMINUM WINDOWS 08 51 13 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 44 | DOOR HARDWARE - 08 71 00 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 45 | DOOR HARDWARE - 08 71 00 1.5A (Operation & Maintenance Data) | 3 | 15d AFI | ||||||||||||||||||
| 46 | DOOR HARDWARE - 08 71 00 1.5B (Keys) | 3 | 5d PTFI | ||||||||||||||||||
| 47 | GLAZING 08 80 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 48 | GYPSUM BOARD ASSEMBLIES 09 21 16 | 3 | 15d ANTP | ||||||||||||||||||
| 49 | FIBERGLASS REINFORCED PANELS 09 27 13 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 50 | TILING 09 30 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 51 | TILING 09 30 00 -1.4A (Operation & Maintenance Data) | 3 | 15d AFI | ||||||||||||||||||
| 52 | ACOUSTICAL PANEL CEILINGS 09 51 13 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 53 | RESILIENT FLOORING 09 65 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 54 | RESILIENT FLOORING 09 65 00 - 1.4B (Operation & Maintenance Data) | 3 | 15d AFI | ||||||||||||||||||
| 55 | FLUID-APPLIED FLOORING - 09 67 00 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 56 | FLUID-APPLIED FLOORING - 09 67 00 1.4B (Operation & Maintenance Data) | 3 | 15d AFI | ||||||||||||||||||
| 57 | TILE CARPETING 09 68 13 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 58 | TILE CARPETING 09 68 13 - 1.4B (Operation & Maintenance Data) | 3 | 15d AFI | ||||||||||||||||||
| 59 | ACOUSTICAL TREATMENTS 09 80 00 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 60 | PAINTING AND COATING 09 90 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 61 | VISUAL DISPLAY BOARDS 10 11 00 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 62 | WIRE MESH PARTITIONS 10 22 13 - 1.4B | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 63 | WALL & DOOR PROTECTION 10 26 00 - 1.2B | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 64 | TOILET & BATH ACCESSORIES 10 28 00 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 65 | TOILET & BATH ACCESSORIES 10 28 00 1.2D (Maintenance Instructions) | 3 | 15d AFI | ||||||||||||||||||
| 66 | FIRE PROTECTION SPECIALTIES 10 44 00 - 1.4B | 3 | 15d ANTP | ||||||||||||||||||
| 67 | FIRE PROTECTION SPECIALTIES 10 44 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 68 | FIRE PROTECTION SPECIALTIES 10 44 00 - 1.5B (Operation & Maintenance Data) | 3 | 15d AFI | ||||||||||||||||||
| 69 | METAL LOCKERS 10 51 13 - 1.3B | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 70 | HOISTS 14 62 00 - 1.3B | 3 | 15d ANTP | ||||||||||||||||||
| 71 | COMMON WORK RESULTS FOR PLUMBING 22 05 00 -1.5B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 72 | GENERAL DUTY VALVES FOR PLUMBING PIPING 22 05 23 | 3 | 3 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||
| 73 | HANGARS & SUPPORTS FOR PLUMBING PIPING & EQUIPMENT 22 05 29 | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 74 | IDENTIFICATION FOR PLUMBING PIPING & EQUIPMENT 22 05 53 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 75 | PLUMBING INSULATION 22 07 00 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 76 | FACILITY WATER DISTRIBUTION 22 11 00 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 77 | FACILITY WATER DISTRIBUTION 22 11 00 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 78 | FACILITY WATER DISTRIBUTION 22 11 00 - 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 79 | FACILITY SANITARY SEWERAGE 22 13 00 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 80 | FACILITY SANITARY SEWERAGE 22 13 00 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 81 | FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 82 | FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 1.4B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 83 | PLUMBING FIXTURES 22 40 00 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 84 | PLUMBING FIXTURES 22 40 00 - 1.4B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 85 | COMMON WORK RESULTS FOR HVAC 23 05 00 - 1.5B | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 86 | COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23 05 13 - 1.3B | 3 | 15d ANTP | ||||||||||||||||||
| 87 | GENERAL DUTY VALVES FOR HVAC PIPING - 23 05 23 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 88 | GENERAL DUTY VALVES FOR HVAC PIPING - 23 05 23 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 89 | GENERAL DUTY VALVES FOR HVAC PIPING - 23 05 23 - 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 90 | HANGERS & SUPPORTS FOR HVAC PIPING & EQUIPMENT 23 05 29 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 91 | VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 48 - 1.4B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 92 | VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 48 - 1.5B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 93 | IDENTIFICATION FOR HVAC PIPING & EQUIPMENT 23 05 53 - 1.3B | 3 | 15d ANTP | ||||||||||||||||||
| 94 | IDENTIFICATION FOR HVAC PIPING & EQUIPMENT 23 05 53 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 95 | TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.3B (Current Calibration Date Report) | 3 | 15d ANTP | ||||||||||||||||||
| 96 | TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.3C, D, E, F (Reports) | 3 | 7d PTFI | ||||||||||||||||||
| 97 | TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.4.B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 98 | TESTING, ADJUSTING & BALANCING FOR HVAC 23 05 93 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 99 | HVAC INSULATION 23 07 00 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 100 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8G | 3 | 3 | 30d ANTP | |||||||||||||||||
| 101 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Training Manuals) | 3 | 6 wks PTCW | ||||||||||||||||||
| 102 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Startup Testing Plan) | 3 | 15d PTFI | ||||||||||||||||||
| 103 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Startup Test Report) | 3 | 15d PTFI | ||||||||||||||||||
| 104 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8H(Performance Verification Testing Plan) | 3 | 15d PTFI | ||||||||||||||||||
| 105 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(AS-Builts) | 3 | 45d AFI | ||||||||||||||||||
| 106 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(Operation and Maintenance Manuals) | 3 | 15d PTFI | ||||||||||||||||||
| 107 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(Software) | 3 | 45d AFI | ||||||||||||||||||
| 108 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(Firmware) | 3 | 45d AFI | ||||||||||||||||||
| 109 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8I(PVT Report) | 3 | 45d AFI | ||||||||||||||||||
| 110 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8C(Equipment Booklets) | 3 | 30d ANTP | ||||||||||||||||||
| 111 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.8F(Software Files) | 3 | 45d AFI | ||||||||||||||||||
| 112 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.3E | 3 | 30d ANTP | ||||||||||||||||||
| 113 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.4 B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 114 | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23 - 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 115 | SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 09 93 - 1.2B | 3 | 30d ANTP | ||||||||||||||||||
| 116 | SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 09 93 - 1.3B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 117 | FACILITY NATURAL GAS PIPING 23 11 23 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 118 | FACILITY NATURAL GAS PIPING 23 11 23 - 1.45B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 119 | FACILITY NATURAL GAS PIPING 23 11 23 - 1.B C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 120 | HYDRONIC PIPING 23 21 13 - 1.4B | 3 | 15d ANTP | ||||||||||||||||||
| 121 | HYDRONIC PIPING 23 21 13 - 1.5B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 122 | HYDRONIC PIPING 23 21 13 - 1.5C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 123 | HYDRONIC PIPING SPECIALTIES 23 21 16 - 1.4B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 124 | HYDRONIC PIPING SPECIALTIES 23 21 16 - 1.5B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 125 | HYDRONIC PUMPS 23 21 23 - 1.4B | 3 | 3 | 3 | 3 | 15d ANTP | |||||||||||||||
| 126 | HYDRONIC PUMPS 23 21 23 - 1.5B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 127 | HVAC WATER TREATMENT 23 25 00 1.3B | 3 | 15d ANTP | ||||||||||||||||||
| 128 | HVAC WATER TREATMENT 23 25 00 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 129 | HVAC WATER TREATMENT 23 25 00 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 130 | HVAC DUCTS & CASINGS 23 31 00 - 1.4B | 3 | 15d ANTP | ||||||||||||||||||
| 131 | HVAC DUCTS & CASINGS 23 31 00 - 1.5B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 132 | AIR DUCT ACCESSORIES 23 33 00 | 3 | 15d ANTP | ||||||||||||||||||
| 133 | AIR DUCT ACCESSORIES 23 33 00 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 134 | AIR DUCT ACCESSORIES 23 33 00 - 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 135 | HVAC FANS 23 34 00 - 1.4B | 3 | 15d ANTP | ||||||||||||||||||
| 136 | HVAC FANS 23 34 00 - 1.5B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 137 | AIR OUTLETS & INLETS 23 37 00 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 138 | AIR OUTLETS & INLETS 23 37 00 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 139 | BREECHINGS, CHIMNEYS & STACKS 23 51 00 - 1.4B | 3 | 15d ANTP | ||||||||||||||||||
| 140 | FINNED WATER TUBE BOILERS 23 52 34 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 141 | FINNED WATER TUBE BOILERS 23 52 34 - 1.3C (Test Reports) | 3 | 10d SRO | ||||||||||||||||||
| 142 | FINNED WATER TUBE BOILERS 23 52 34 - 1.4B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 143 | AIR-COOLED REFRIGERANT CONDENSERS 23 63 13 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 144 | AIR-COOLED REFRIGERANT CONDENSERS 23 63 13- 1.4B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 145 | PACKAGED OUTDOOR CENTRAL STATION AIR-HANDLING UNITS 23 74 13 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 146 | PACKAGED OUTDOOR CENTRAL STATION AIR-HANDLING UNITS 23 74 13 - 1.4B (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 147 | CONVECTION HEATING & COOLING UNITS 23 82 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 148 | CONVECTION HEATING & COOLING UNITS 23 82 00 - 1.4B (Project Record Documents) | 3 | 45d AFI | ||||||||||||||||||
| 149 | CONVECTION HEATING & COOLING UNITS 23 82 00 - 1.4C (Operation & Maintenance Data) | 3 | 15d PTFI | ||||||||||||||||||
| 150 | COMMON WORK RESULTS FOR ELECTRICAL 26 05 00 - 1.14A | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 151 | COMMON WORK RESULTS FOR ELECTRICAL 26 05 00 - 1.17A (AS-BUILTS) | 3 | 45d AFI | ||||||||||||||||||
| 152 | EQUIPMENT WIRING CONNECTIONS 26 05 03 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 153 | EQUIPMENT WIRING CONNECTIONS 26 05 03 - 1.4B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 154 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.5B | 3 | 15d ANTP | ||||||||||||||||||
| 155 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.5C (DESIGN DATA) | 3 | 45d AFI | ||||||||||||||||||
| 156 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.5D (TEST REPORTS) | 3 | 15d PTFI | ||||||||||||||||||
| 157 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES - 26 05 19 - 1.6B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 158 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.5B | 3 | 15d ANTP | ||||||||||||||||||
| 159 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.5C (TEST REPORTS) | 3 | 15d PTFI | ||||||||||||||||||
| 160 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.5D | 3 | 15d PTFI | ||||||||||||||||||
| 161 | GROUNDING & BONDING FOR ELECTRICAL SYSTEMS 26 05 26 - 1.6B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 162 | HANGERS & SUPPORTS 26 05 29 | 3 | 3 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||
| 163 | HANGERS & SUPPORTS 26 05 29 - 1.6H (ENGINEERING JUDGMENTS) | 3 | 30d ANTP | ||||||||||||||||||
| 164 | RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 165 | RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 1.6B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 166 | IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 1.2B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 167 | IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 - 1.3B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 168 | MEDIUM VOLTAGE CABLE 26 05 16 - 1.3B | 3 | 15d ANTP | ||||||||||||||||||
| 169 | MEDIUM VOLTAGE CABLE 26 05 16 - 1.3C (TEST REPORTS) | 3 | 15d PTFI | ||||||||||||||||||
| 170 | LIGHTING CONTROL DEVICES 26 09 23 | 3 | 3 | 3 | 15d ANTP | ||||||||||||||||
| 171 | LIGHTING CONTROL DEVICES 26 09 23 - 1.5B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 172 | LIGHTING CONTROL DEVICES 26 09 23 - 1.5C | 3 | 15d PTFI | ||||||||||||||||||
| 173 | PANELBOARDS 26 24 16 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 174 | PANELBOARDS 26 24 16 - 1.4B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 175 | PANELBOARDS 26 24 16 - 1.4C | 3 | 15d PTFI | ||||||||||||||||||
| 176 | ELECTRICAL CABINETS AND ENCLOSURES 26 27 16 - 1.3B | 3 | 3 | 15d ANTP | |||||||||||||||||
| 177 | WIRING DEVICES 26 27 26 - 1.3B | 3 | 15d ANTP | ||||||||||||||||||
| 178 | FUSES 26 28 13 - 1.5B | 3 | 15d ANTP | ||||||||||||||||||
| 179 | FUSES 26 28 13 - 1.6B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 180 | ENCLOSED SWITCHES 26 28 19 - 1.3B | 3 | 15d PTFI | ||||||||||||||||||
| 181 | ENCLOSED SWITCHES 26 28 19 - 1.4B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 182 | INTERIOR LIGHTING 26 51 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 183 | EMERGENCY LIGHTING 26 52 00 | 3 | 15d ANTP | ||||||||||||||||||
| 184 | EXTERIOR LIGHTING 26 56 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 185 | TELECOMMUNICATIONS REQUIREMENTS 27 00 00 | 3 | 3 | 15d ANTP | |||||||||||||||||
| 186 | TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.6D (TEST REPORTS) | 3 | 15d PTFI | ||||||||||||||||||
| 187 | TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.6E (MANUFACTURER FIELD REPORTS) | 3 | 15d PTFI | ||||||||||||||||||
| 188 | TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.6F (SYSTEM WARRANTY) | 3 | 15d PTFI | ||||||||||||||||||
| 189 | TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.7B (PROJECT RECORD DOCUMENTS) | 3 | 45d AFI | ||||||||||||||||||
| 190 | TELECOMMUNICATIONS REQUIREMENTS 27 00 00 - 1.7C | 3 | 15d PTFI | ||||||||||||||||||
| 191 | FIRE ALARM 28 31 00-1.4.F - Computer Software and Programming/Addresses | 3 | 14d PTSW | ||||||||||||||||||
| 192 | FIRE ALARM 28 31 00 - 1.9 - Training Data | 3 | 14d AFI | ||||||||||||||||||
| 193 | FIRE ALARM 28 31 00 - 3.5.G - Test Reports | 3 | 5d |
AFI
| 194 | FIRE ALARM 28 31 00- 1.4.E - Qualifications Certificates | 3 | 14d PTSW | |||||||
| 195 | FIRE ALARM 28 31 00 - 1.4.D - Manufacturer's Certification - | 3 | 14d PTSW | |||||||
| 196 | FIRE ALARM 28 31 00 - 1.7 - Operation and Maintenance Manuals | 3 | 14d AFI | |||||||
| 197 | FIRE ALARM 28 31 00 - 1.6 - As-Built Drawings | 3 | 10d AWC | |||||||
| 198 | FIRE ALARM 28 31 00 - 1.10 - Guarantees | 3 | 14d AFI | |||||||
| 199 | SITE GRADING, EXCAVATION AND EMBANKMENT 31 22 00 - 1.02.4 (Fill Material Compaction Results) | 3 | 15d SRO | |||||||
| 200 | TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.1 (Work Clearance Request Form) | 3 | 15d PTSW | |||||||
| 201 | TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.2 (Type 1 Bedding Sieve & Proctor) | 3 | 15d SRO | |||||||
| 202 | TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.3 (Type 2 Bedding Sieve & Proctor) | 3 | 15d SRO | |||||||
| 203 | TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.4 (Import Backfill Sieve & Proctor) | 3 | 15d SRO | |||||||
| 204 | TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.5 (Plastic Marking Tape) | 3 | 15d ANTP | |||||||
| 205 | TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 31 23 33 - 1.02.6 (Compaction Test Results) | 3 | 15d SRO | |||||||
| 206 | DRILLED FOUNDATION CAISSONS 31 63 26 | 3 | 3 | 3 | 15d SRO | |||||
| 207 | GEOTEXTILE USED IN CONSTRUCTION APPLICATIONS 32 05 19 - 1.04.A.1 | 3 | 15d ANTP | |||||||
| 208 | ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 1.01.1 (Gravel Base Course Sieve) | 3 | 15d ANTP | |||||||
| 209 | ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 1.01.2 (Gravel Base Course Proctor) | 3 | 15d SRO | |||||||
| 210 | ASPHALTIC CONCRETE PAVEMENT 32 10 00 | 3 | 15d ANTP | |||||||
| 211 | ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 1.01.8 (Quality Control Tests) | 3 | 15d SRO | |||||||
| 212 | ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 3.03 (Certified Test Reports & Weight Tickets) | 3 | 15d SRO | |||||||
| 213 | ASPHALTIC CONCRETE PAVEMENT 32 10 00 - 3.03 (Admixtures) | 3 | 15d ANTP | |||||||
| 214 | PAVEMENT MARKINGS 32 17 23 - 4.06 | 3 | 15d ANTP | |||||||
| 215 | CHAIN LINK FENCES & GATES 32 31 13 | 3 | 3 | 15d ANTP | ||||||
| 216 | CHAIN LINK FENCES & GATES 32 31 13 - 1.5D (Project Record Documents) | 3 | 15d AFI | |||||||
| 217 | CHAIN LINK FENCES & GATES 32 31 13 - 1.5E (Operation & Maintenance Data) | 3 | 15d AFI | |||||||
| 218 | PLANTING IRRIGATION 32 84 00 | 3 | 3 | 3 | 15d ANTP | |||||
| 219 | PLANTING IRRIGATION 32 84 00 - 1.4J (Operation & Maintenance Data) | 3 | 15d AFI | |||||||
| 220 | PLANTING IRRIGATION 32 84 00 - 1.4K (As-built Drawings) | 3 | 15d AFI | |||||||
| 221 | SOIL PREPARATION 32 91 13 - 1.4B | 3 | 15d ANTP | |||||||
| 222 | SOIL PREPARATION 32 91 13 - 1.5B (Operation & Maintenance Data) | 3 | 15d AFI | |||||||
| 223 | TURF & GRASSES 32 92 00 | 3 | 3 | 15d ANTP | ||||||
| 224 | TURF & GRASSES 32 92 00 - 1.3G (Maintenance Instructions) | 3 | 15d AFI | |||||||
| 225 | PLANTS 32 93 00 | 3 | 3 | 3 | 15d ANTP | |||||
| 226 | PLANTS 32 93 00 - 1.4F (Maintenance Instructions) | 3 | 15d AFI | |||||||
| 227 | POLYVINYL CHLORIDE WATER MAIN AND DUCTILE IRON FITTINGS 33 11 13 - 1.02 | 3 | 3 | 15d ANTP | ||||||
| 228 | POLYVINYL CHLORIDE WATER MAIN AND DUCTILE IRON FITTINGS 33 11 13 - 1.04.5 (Hydrostatic Test Results) | 3 | 15d SRO | |||||||
| 229 | POLYVINYL CHLORIDE WATER MAIN AND DUCTILE IRON FITTINGS 33 11 13 - 1.04.6 (Bacteriological Tests) | 3 | 15d SRO | |||||||
| 230 | WATER SERVICE LINES 33 11 16 | 3 | 15d ANTP | |||||||
| 231 | UNDERGROUND GATE VALVES 33 12 16 - 1.02.1 (Gate Valve & Valve Boxes) | 3 | 15d ANTP | |||||||
| 232 | GRAVITY SANITARY SEWERS 33 30 00 - 1.02 | 3 | 15d ANTP | |||||||
| 233 | CULVERTS 33 42 00 | 3 | 15d ANTP | |||||||
| 234 | CULVERTS 33 42 00 - 4.03 (Inspection Reports) | 3 | 15d SRO | |||||||
| 235 | NATURAL GAS PIPING SYSTEMS 33 51 13 | 3 | 15d ANTP | |||||||
| 236 | NATURAL GAS PIPING SYSTEMS 33 51 13 - 1.02.4 (Tracer Wire Test Results) | 3 | 15d SRO | |||||||
| 237 | NATURAL GAS PIPING SYSTEMS 33 51 13 - 1.02.5 (Leakage Test Results) | 3 | 15d SRO | |||||||
| Schedule of Abbreviations: | ||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | ||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | ||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | ||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | ||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | ||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | ||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | ||||||
| PTFA | = Prior to Final Acceptance | PT | = | Prior To | ||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12Replace MWD Kennel Facility&R&"Times New Roman,Regular"&12FA4626-11-R-0003 &L&"Times New Roman,Regular"&12AF Form 66 02:
&F-&D&C&"Times New Roman,Regular"&12 SS-&P
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it. Updated .