Question #10 Clarification.docx
DOCX document 12 KB Posted
- Solicitation number
- FA4626-09-R-0014
About this file
Question # 10 Clarification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 6.doc | DOC document | |
| Amend 5.doc | DOC document | |
| Proposal Schedule Replace Electrical.docx | DOCX document | |
| S-100.doc | DOC document | |
| Amend 4.doc | DOC document | |
| Recovery Act - 09-R-0014, Rep LF Electrical, Amend 0003.doc | DOC document | |
| Site Pictures.zip | ZIP file | |
| LSB Photos.zip | ZIP file | |
| Site Mileages.pdf | ||
| Contractor Questions.docx | DOCX document | |
| Amend 2.doc | DOC document | |
| AMEND 1.doc | DOC document | |
| 01000 amendment 1.docx | DOCX document | |
| 1.Specifications.zip | ZIP file | |
| 6.attch 6 Past Performance.docx | DOCX document | |
| 3.Schedule of Drawings - Replace Electrical.docx | DOCX document | |
| 2.Submittal Schedule - Replace Electrical.docx | DOCX document | |
| 5.Wage Det 3-27-09.docx | DOCX document | |
| 4.PDF Drawings.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4626-09-R-0014
Question # 10 clarification:
After further consideration of future use and cost analysis regarding reusing the existing conduits if the old wire can be removed, it has been decided that reusing the old conduit is not a valid option and will not be approved by the government. Contractors shall bid the project as it shows on the drawings with all new conduit.
File details come from the government source that posted it. Updated .