2. Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 6.doc | DOC document | |
| Amend 5.doc | DOC document | |
| Proposal Schedule Replace Electrical.docx | DOCX document | |
| S-100.doc | DOC document | |
| Amend 4.doc | DOC document | |
| Question #10 Clarification.docx | DOCX document | |
| Recovery Act - 09-R-0014, Rep LF Electrical, Amend 0003.doc | DOC document | |
| Site Pictures.zip | ZIP file | |
| LSB Photos.zip | ZIP file | |
| Site Mileages.pdf | ||
| Contractor Questions.docx | DOCX document | |
| Amend 2.doc | DOC document | |
| AMEND 1.doc | DOC document | |
| 01000 amendment 1.docx | DOCX document | |
| 1.Specifications.zip | ZIP file | |
| 6.attch 6 Past Performance.docx | DOCX document | |
| 3.Schedule of Drawings - Replace Electrical.docx | DOCX document | |
| 5.Wage Det 3-27-09.docx | DOCX document | |
| 4.PDF Drawings.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ATTACHMENT 2 | FA4626-09-R-0014 | |
| SUBMITTAL SCHEDULE |
Replace Electrical Services, Wing 1 LF’s
SCHEDULED DATES
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| Sub. |
| Spec. Sec.- |
| Type |
| No. of |
| Date |
| Date |
| Date |
| To Contr. |
| Resubmittal |
| ID |
| Page No. & |
| of |
| Description of Material |
| Sub |
| Rec. Fr. |
| to |
| Ret Fr |
| Approved/ |
| Due From |
| Remarks |
| No. |
| Para. No. |
| Submittal |
| Days |
| Contr. |
| CEL |
| CEL |
| Disapproved |
| Contracting |
| 1 |
| 1000-8 |
| Letter |
| Qual. Cont Pln |
| 10 after NTP |
Para 3.14-B
1000-12 Para 3.17-D
1001-1 Para 3.1-B Drawings & elec media
Data list AS-Built Drawings
Entry Authority List 10 WD after Final Inspection
10 Days before site work started
| 4 |
| 1360-11 Para 12.1 |
| Filled in form |
| Qty of recycled products used on project |
| 10 WD before final acceptance |
| 5 |
| 2225-4-1 |
| Data |
| Aggregate gradation and Plasticity Index |
| 10 PSW |
Para 1.2.1
| 6 |
| 2225-4-1 |
| Cut sheets |
| Manufacturer data |
| 10 PSW |
Para. 1.2.2
| 7 |
| 2225-4-1 |
| Work clear. Rqst |
| Digging Permit |
| 10 PSW |
Para 3.1
2225-4-3 Para 4.1
16110-1 Para 1.2.A.
Mix design
Cut sheet soil-crete/lean-crete mix
Conduits, Fittings and Waterproofing
10 PSW
10 PSW
16120-1 Para 1.2.A.
| Cut sheet |
| Conductors |
| 10 PSW |
| 11 |
| 16120-2 Para 3.2 |
| Test results |
| Insulation Resistance Test from each site |
| 5 WD prior to each site acceptance inspection |
| 12 |
| 16130-1 |
Para 1.2.
| Cut sheet |
| Boxes |
| 10 PSW |
| CDR = Calendar Days after Receipt | PSW = Prior to Start of Work | ATOS = After Taking Sample | PFA = Prior to Final Acceptance |
| ANTP = After Notice to Proceed | PTS = Prior To Shipment | PTI = Prior To Installation |
| SUBMITTAL SCHEDULE – 1 | |
| MALMSTROM AIR FORCE BASE | 18 Mar 2009 |