2.Submittal Schedule - Replace Electrical.docx

DOCX document 23 KB Posted

Attached to
RECOVERY-- NZAS062003 - Repair Electrical Service, 30 Wing 1 Launch Facilitys
Solicitation number
FA4626-09-R-0014
Issued by

About this file

2. Submittal Schedule

View the file

Other files

File Type Posted
Amend 6.doc DOC document
Amend 5.doc DOC document
Proposal Schedule Replace Electrical.docx DOCX document
S-100.doc DOC document
Amend 4.doc DOC document
Question #10 Clarification.docx DOCX document
Recovery Act - 09-R-0014, Rep LF Electrical, Amend 0003.doc DOC document
Site Pictures.zip ZIP file
LSB Photos.zip ZIP file
Site Mileages.pdf PDF
Contractor Questions.docx DOCX document
Amend 2.doc DOC document
AMEND 1.doc DOC document
01000 amendment 1.docx DOCX document
1.Specifications.zip ZIP file
6.attch 6 Past Performance.docx DOCX document
3.Schedule of Drawings - Replace Electrical.docx DOCX document
5.Wage Det 3-27-09.docx DOCX document
4.PDF Drawings.zip ZIP file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2FA4626-09-R-0014
SUBMITTAL SCHEDULE

Replace Electrical Services, Wing 1 LF’s

SCHEDULED DATES

1
2
3
4
5
6
7
8
9
10
11
Sub.
Spec. Sec.-
Type
No. of
Date
Date
Date
To Contr.
Resubmittal
ID
Page No. &
of
Description of Material
Sub
Rec. Fr.
to
Ret Fr
Approved/
Due From
Remarks
No.
Para. No.
Submittal
Days
Contr.
CEL
CEL
Disapproved
Contracting
1
1000-8
Letter
Qual. Cont Pln
10 after NTP

Para 3.14-B

1000-12 Para 3.17-D

1001-1 Para 3.1-B Drawings & elec media

Data list AS-Built Drawings

Entry Authority List 10 WD after Final Inspection

10 Days before site work started

4
1360-11 Para 12.1
Filled in form
Qty of recycled products used on project
10 WD before final acceptance
5
2225-4-1
Data
Aggregate gradation and Plasticity Index
10 PSW

Para 1.2.1

6
2225-4-1
Cut sheets
Manufacturer data
10 PSW

Para. 1.2.2

7
2225-4-1
Work clear. Rqst
Digging Permit
10 PSW

Para 3.1

2225-4-3 Para 4.1

16110-1 Para 1.2.A.

Mix design

Cut sheet soil-crete/lean-crete mix

Conduits, Fittings and Waterproofing

10 PSW

10 PSW

16120-1 Para 1.2.A.

Cut sheet
Conductors
10 PSW
11
16120-2 Para 3.2
Test results
Insulation Resistance Test from each site
5 WD prior to each site acceptance inspection
12
16130-1

Para 1.2.

Cut sheet
Boxes
10 PSW
CDR = Calendar Days after ReceiptPSW = Prior to Start of WorkATOS = After Taking SamplePFA = Prior to Final Acceptance
ANTP = After Notice to ProceedPTS = Prior To ShipmentPTI = Prior To Installation