Proposal Schedule B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 6.doc | DOC document | |
| Amend 5.doc | DOC document | |
| S-100.doc | DOC document | |
| Amend 4.doc | DOC document | |
| Question #10 Clarification.docx | DOCX document | |
| Recovery Act - 09-R-0014, Rep LF Electrical, Amend 0003.doc | DOC document | |
| Site Pictures.zip | ZIP file | |
| LSB Photos.zip | ZIP file | |
| Site Mileages.pdf | ||
| Contractor Questions.docx | DOCX document | |
| Amend 2.doc | DOC document | |
| AMEND 1.doc | DOC document | |
| 01000 amendment 1.docx | DOCX document | |
| 1.Specifications.zip | ZIP file | |
| 6.attch 6 Past Performance.docx | DOCX document | |
| 3.Schedule of Drawings - Replace Electrical.docx | DOCX document | |
| 2.Submittal Schedule - Replace Electrical.docx | DOCX document | |
| 5.Wage Det 3-27-09.docx | DOCX document | |
| 4.PDF Drawings.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 FA4626-09-R-0014
SCHEDULE B CONTINUATION SHEET
Schedule B Continuation
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN
Mobilization
| 30 |
| SITE |
| ____________ |
| ____________ |
Consists of all preparatory work incurred before beginning the actual construction at each LF project site and movement between sites Fifty (50) percent to be paid when fully mobilized to begin construction and pre-construction submittals are complete and fifty percent to be paid following completion and acceptance of the work. This price shall be full compensation per site for furnishing all materials, equipment, permits, Site Safety and Health Plan, labor, equipment, tools and incidentals necessary to complete this ITEM.
ITEM NO
CLIN
SUPPLIES/SERVICES
Security Delays
QUANTITY
UNIT
CREW HOURS
UNIT PRICE
AMOUNT
Security Delays for all LF’s awarded for the Contract. Delays at one LF will not affect work at any other LF.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN
Trenching
| 300 |
| CY |
| ______________ |
| ____________ |
Provide all work necessary to complete trench excavation for new conduit and service conductors. Also includes dewatering, backfill/compaction of trench, hauling in clean sand bedding and wasting excess material by grading it onto site.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN
Exterior Conduit System
| 2,250 |
| LF |
| _____________ |
| ____________ |
Provide all work necessary to furnish and install 3 inch rigid steel conduit, in trench from Support Building to Meter on service pole at Launch Facilities. Includes waterproof coating, fittings, offsets, connectors, couplers and elbows.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN
Service Conductors
| 3,300 |
| LF |
| ______________ |
| ____________ |
Provide all work necessary to furnish service conductors and install in conduit system from Main Circuit Breaker in Support Building to Meter on service pole at Launch Facilities. Line item includes 4 #300 kcmil conductors per linear foot. Includes terminations, connections, pulling lubricant and testing.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN
Interior Conduit Systems
| 30 |
| SITE |
| ______________ |
| ____________ |
Provide all work necessary to furnish rigid steel conduit system inside of Support Building from the Main Circuit Breaker, through the exterior wall and into trench for connection to the exterior conduit system. Includes supporting systems, core-drilling, exterior water proof seal, fittings, conduit bodies, connectors, couplers, pull boxes, offsets and elbows.
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
CLIN
Demolition
| 30 |
| SITE |
| ____________ |
| ____________ |
Provide all work necessary to demolish existing conduit riser at service pole meter, cut-off, removal, capping, sealing and grouting of existing feeders and conduits at floor and at grade level for permanent abandonment.
TOTAL (EST) CLINS 1001 Through 1007 __________ (Submit this total in CLIN 0001)
NOTES:
1. CLINS 1002 through 1007 are estimated quantities. Payment will be made on actual quantities used.
1. Contract Clause FAR 52.211-18, Variation in estimated quantities, applies to all items in the schedule and continuation schedule.