21R1001 Combined As-builts s-6.pdf
PDF 9 MB Posted
- Attached to
- Whiteman Building Demolition (S6)
- Solicitation number
- FA462521R1001
About this file
This solicitation package includes plans and specifications for the demolition of Building S6 at Whiteman Air Force Base. The solicitation seeks proposals for the complete demolition of the building down to the foundation slab, including removal of all mechanical, electrical and plumbing systems, fixtures and equipment. Offerors are to provide a lump sum firm fixed price to complete all work in accordance with the attached as-built drawings by the completion date of September 30, 2022. This is a 100% small business set-aside solicitation issued by the Department of the Air Force Global Strike Command. The NAICS code for remediation services applies and the small business size standard is $22 million.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET_000--0 INDEX SHEET, COVER PAGE
| SHEET_001--C-1 FOUNDATION DRAIN PLAN |
| SHEET_002--C-2 FOUNDATION DRAIN DETAILS |
| SHEET_003--A-1 DEMOLITION - CEILING PLAN |
| SHEET_004--A-2 REFLECTED CEILING PLAN - UPPER LEVEL |
| SHEET_005--A-3 PARTIAL REFLECTED CEILING PLAN - LOWER LEVEL |
| SHEET_006--A-4 PARTIAL REFLECTED CEILING PLAN - LOWER LEVEL |
| SHEET_007--A-4A PARTIAL REFLECTED CEILING PLAN - LOWER LEVEL |
| SHEET_008--S-1 MECHANICAL ROOM - DEMOLITION PLAN |
| SHEET_009--S-2 MECHANICAL ROOM - PROPOSED PLAN |
| SHEET_010--S-3 ROOF PLAN |
| SHEET_011--M-1 MECHANICAL LEGEND |
| SHEET_012--M-2 LOWER FLOOR HVAC-PLUMBING-YARD DEMOLITION |
| SHEET_013--M-3 LOWER FLOOR HVAC-PLUMBING-YARD DEMOLITION |
| SHEET_014--M-4 UPPER FLOOR HVAC-PLUMBING-YARD DEMOLITION |
| SHEET_015--M-5 ROOF PLAN DEMOLITION |
| SHEET_016--M-6 LOWER FLOOR NEW HVAC-PLUMBING-YARD PLAN |
| SHEET_017--M-7 LOWER FLOOR NEW HVAC-PLUMBING-YARD PLAN |
| SHEET_018--M-7A LOWER FLOOR NEW HVAC-PLUMBING-YARD PLAN |
| SHEET_019--M-8 UPPER FLOOR NEW HVAC-PLUMBING-YARD PLAN |
| SHEET_020--M-9 ROOF PLAN - NEW HVAC |
| SHEET_021--M-10 MECHANICAL ROOM PLAN SECTIONS & DETAILS NEW HVAC |
| SHEET_022--M-11 REGISTER, DIFFUSER & EQUIPMENT SCHEDULE |
| SHEET_023--M-12 STD. MECHANICAL DETAILS & SCHEDULES |
| SHEET_024--M-13 HVAC FLOW DIAGRAM |
| SHEET_025--M-14 SEQUENCE OF OPERATION, CONTROL DIAGRAMS & P.I.D. |
| SHEET_026--E-1 ELECTRICAL LEGEND |
| SHEET_027--E-2 DEMOLITION PLAN - UPPER LEVEL |
| SHEET_028--E-3 PARTIAL DEMOLITION PLAN - LOWER LEVEL |
| SHEET_029--E-4 PARTIAL DEMOLITION PLAN - LOWER LEVEL |
| SHEET_030--E-5 ENLARGED PLANS - MECH ROOM & TRANSFORMER AREA - DEMOLITION PLAN |
| SHEET_031--E-6 POWER PLAN - UPPER LEVEL |
| SHEET_032--E-7 PARTIAL POWER PLAN - LOWER LEVEL |
| SHEET_033--E-8 PARTIAL POWER PLAN - LOWER LEVEL |
| SHEET_034--E-9 LIGHTING PLAN - UPPER LEVEL |
| SHEET_035--E-10 PARTIAL LIGHTING PLAN - LOWER LEVEL |
| SHEET_036--E-11 PARTIAL LIGHTING PLAN LOWER LEVEL |
| SHEET_037--E-11A PARTIAL LIGHTING PLAN LOWER LEVEL |
| SHEET_038--E-12 ENLARGED PLAN - MECHANICAL ROOM & XFMR AREA |
| SHEET_039--E-13 480V ONE-LINE DIAGRAM & ELECTRICAL RISER DIAGRAM |
| SHEET_040--E-14 FIRE ALARM RISER DIAGRAM |
File details come from the government source that posted it. Updated .