AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Modify FAR 52.211-12 Liquidated Damages
2. Attach an updated Attachment 2 Statement of Work extending the Period of Performance from 180 days to 200 days.
3. Attach an updated set of Project Draw ing reflecting the changes to the doors in the w eight room.
4. Attach the corrected Pre-Proposal Conference Slides restating that this acquisition is set aside 100% Small Business.
5. Attach the Questions and Answ ers See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4621-11-R-0010
X 9B. DATED (SEE ITEM 11)
01-Jul-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2011
CODE
22D CONTRACTING SQUADRON - FA4621
53384 KANSAS ST STE 121
MCCONNELL AFB KS 67221-3606
FA4621 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4621-11-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the task order, the Contractor shall pay liquidated damages in an amount as set out in each task order, for each calendar day of delay until the work is completed or accepted. Liqiudated damages for PRQE 08-0149 Repair Fire Station Living and Rec Areas, Bldg 1200 (seed project) may be assessed in the amount of $320.15 for the first calendar day of delay and $291.28 for each calendar day of delay thereafter for failure to complete the project within 200 days after the Notice to Proceed,
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 MACC Default
Specifications
844 22-MAR-2011
Attachment 03 Repair Bldg 1200 General Conditions
22 09-MAR-2011
Attachment 06 Bldg 1200 "As Builts" 183 27-JUN-2011 Attachment 07 Past and Present
Performance Questionnaire
4 29-JUN-2011
Attachment 08 Wage Determination Building KS100008
4 03-JUN-2011
Attachment 09 Wage Determination Heavy Construction
KS100017
3 12-MAR-2010
Attachment 10 Wage Determination Heavy Water and Sewer
KS100019
2 12-MAR-2010
Attachment 11 Wage Determination Highway KS100020
5 23-APR-2010
Attachment 12 Wage Determination Residential KS10002
3 27-MAY-2011
Attachment 13 MACC Pricing Schedule 1 06-JUL-2011
FA4621-11-R-0010
Attachment 14 As Builts in .pdf format 196 25-JUL-2011 Attachment 2 Revised Statement of
Work
14 22-JUL-2011
Attachment 4 Updated Project Drawings 4 21-JUL-2011 Attachment 5 Revised Schedule of
Materials
2 22-JUL-2011
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 MACC Default
Specifications
844 22-MAR-2011
Attachment 03 Repair Bldg 1200 General Conditions
22 09-MAR-2011
Attachment 06 Bldg 1200 "As Builts" 183 27-JUN-2011 Attachment 07 Past and Present
Performance Questionnaire
4 29-JUN-2011
Attachment 08 Wage Determination Building KS100008
4 03-JUN-2011
Attachment 09 Wage Determination Heavy Construction
KS100017
3 12-MAR-2010
Attachment 10 Wage Determination Heavy Water and Sewer
KS100019
2 12-MAR-2010
Attachment 11 Wage Determination Highway KS100020
5 23-APR-2010
Attachment 12 Wage Determination Residential KS10002
3 27-MAY-2011
Attachment 13 MACC Pricing Schedule 1 06-JUL-2011 Attachment 14 As Builts in .pdf format 196 25-JUL-2011 Attachment 15 Updated Pre-Proposal
Conference Slides
10 26-JUL-2011
Attachment 16 Questions and Answers 7 26-JUL-2011 Attachment 2 Attachment 2 Revised
Statement of Work
14 26-JUL-2011
Attachment 4 Updated Attachment 4 Seed Project Drawings
4 21-JUL-2011
Attachment 5 Revised Schedule of Materials
2 22-JUL-2011
(End of Summary of Changes)