Amendment 4.pdf

PDF 32 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4621-11-R-0010
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
PRQE 080149 SOW_Repair Fire Station Living and Rec Areas Bldg 1200 26 Jul 11.pdf PDF
PRQE 080149 SOW_Repair Fire Station Living and Rec Areas Bldg 1200 26 Jul 11.pdf PDF
Updated Project Drawings.pdf PDF
Question and Answers.pdf PDF
Preproposal Conference Slides.pdf PDF
dwg to pdf.pdf PDF
Amendment 3.pdf PDF
Roster of Participants.pdf PDF
PRQE 080149 SOW_Repair Fire Station Living and Rec Areas Bldg 1200 22 Jul 11.pdf PDF
PRQE 08-0149 Schedule of Material Submittals Pg 1.pdf PDF
Preproposal Conference Slidesl.pdf PDF
Repair Building 1200 As Builts.zip ZIP file
MACC Amendment 2.pdf PDF
Repair Building 1200 As Builts.zip ZIP file
MACC Amendment 1.pdf PDF
Pricing Schedule.docx DOCX document
MACC Amendment 1.pdf PDF
Pre Proposal Conference Notice.pdf PDF
Request for BC_MACC_McConnell.xml XML file
WD Highway.pdf PDF
MACC Default Specs 22 MAR 2011.pdf PDF
WD Residential.pdf PDF
Past Performance Questionnaire.doc DOC document
MAFB Section 01000-09MAR2011 —
Project Drawings.pdf PDF
WD Heavy.pdf PDF
WD Heavy Sewer.pdf PDF
WD Building.pdf PDF
RFP Final.pdf PDF
Schedule of Material Submittals.pdf PDF
MACC Seed SOW Repair Fire House.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Modify FAR 52.211-12 Liquidated Damages

2. Attach an updated Attachment 2 Statement of Work extending the Period of Performance from 180 days to 200 days.

3. Attach an updated set of Project Draw ing reflecting the changes to the doors in the w eight room.

4. Attach the corrected Pre-Proposal Conference Slides restating that this acquisition is set aside 100% Small Business.

5. Attach the Questions and Answ ers See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4621-11-R-0010

X 9B. DATED (SEE ITEM 11)

01-Jul-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jul-2011

CODE

22D CONTRACTING SQUADRON - FA4621

53384 KANSAS ST STE 121

MCCONNELL AFB KS 67221-3606

FA4621 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4621-11-R-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the task order, the Contractor shall pay liquidated damages in an amount as set out in each task order, for each calendar day of delay until the work is completed or accepted. Liqiudated damages for PRQE 08-0149 Repair Fire Station Living and Rec Areas, Bldg 1200 (seed project) may be assessed in the amount of $320.15 for the first calendar day of delay and $291.28 for each calendar day of delay thereafter for failure to complete the project within 200 days after the Notice to Proceed,

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 MACC Default

Specifications

844 22-MAR-2011

Attachment 03 Repair Bldg 1200 General Conditions

22 09-MAR-2011

Attachment 06 Bldg 1200 "As Builts" 183 27-JUN-2011 Attachment 07 Past and Present

Performance Questionnaire

4 29-JUN-2011

Attachment 08 Wage Determination Building KS100008

4 03-JUN-2011

Attachment 09 Wage Determination Heavy Construction

KS100017

3 12-MAR-2010

Attachment 10 Wage Determination Heavy Water and Sewer

KS100019

2 12-MAR-2010

Attachment 11 Wage Determination Highway KS100020

5 23-APR-2010

Attachment 12 Wage Determination Residential KS10002

3 27-MAY-2011

Attachment 13 MACC Pricing Schedule 1 06-JUL-2011

FA4621-11-R-0010

Attachment 14 As Builts in .pdf format 196 25-JUL-2011 Attachment 2 Revised Statement of

Work

14 22-JUL-2011

Attachment 4 Updated Project Drawings 4 21-JUL-2011 Attachment 5 Revised Schedule of

Materials

2 22-JUL-2011

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 MACC Default

Specifications

844 22-MAR-2011

Attachment 03 Repair Bldg 1200 General Conditions

22 09-MAR-2011

Attachment 06 Bldg 1200 "As Builts" 183 27-JUN-2011 Attachment 07 Past and Present

Performance Questionnaire

4 29-JUN-2011

Attachment 08 Wage Determination Building KS100008

4 03-JUN-2011

Attachment 09 Wage Determination Heavy Construction

KS100017

3 12-MAR-2010

Attachment 10 Wage Determination Heavy Water and Sewer

KS100019

2 12-MAR-2010

Attachment 11 Wage Determination Highway KS100020

5 23-APR-2010

Attachment 12 Wage Determination Residential KS10002

3 27-MAY-2011

Attachment 13 MACC Pricing Schedule 1 06-JUL-2011 Attachment 14 As Builts in .pdf format 196 25-JUL-2011 Attachment 15 Updated Pre-Proposal

Conference Slides

10 26-JUL-2011

Attachment 16 Questions and Answers 7 26-JUL-2011 Attachment 2 Attachment 2 Revised

Statement of Work

14 26-JUL-2011

Attachment 4 Updated Attachment 4 Seed Project Drawings

4 21-JUL-2011

Attachment 5 Revised Schedule of Materials

2 22-JUL-2011

(End of Summary of Changes)