Attach.1 - Performance Work Statement.pdf
PDF 918 KB Posted
- Attached to
- Elevator Maintenance
- Solicitation number
- FA462025RA904
About this file
This Performance Work Statement (PWS) details vertical transportation equipment (VTE) maintenance services for Fairchild Air Force Base, Washington. The contract requires a full-service maintenance provider to maintain, repair, and inspect 15 elevators across various base buildings, including passenger and cargo elevators from manufacturers like Schindler, Dover, ThyssenKrupp, and Millar. The equipment ranges from older units installed in 1984 to more recent installations in 2014, with capacity ratings between 1,200 and 11,400 pounds.
The contractor will be responsible for comprehensive maintenance, including all inspections, repairs, and emergency service calls, while adhering to American Society of Mechanical Engineers (ASME) safety codes and other regulatory standards. Key requirements include developing an annual Maintenance Control Program, conducting initial and ongoing equipment inspections, providing timely repair responses (within 1-3 business days depending on service type), and maintaining detailed documentation. The contract specifies normal operating hours as 0730-1630, Monday through Friday, with emergency service provisions, and requires all contractor personnel to be U.S. citizens with appropriate base access credentials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 Elevators.pdf | ||
| Attach.2 Amendment 0002 - Pricing Schedule.xlsx | XLSX spreadsheet | |
| Amendment 0001.pdf | ||
| Attach.4 - FAFB OPSEC 0 Measures.pdf | ||
| Attach.3 - Wage Determination 2015-5537 Rev. 24.pdf | ||
| Attach.5 - Past Performance Questionnaire.pdf | ||
| FA462025RA904 Combo.pdf | ||
| Attach.2 Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
VERTICAL TRANSPORTATION EQUIPMENT
MAINTENANCE, REPAIR, & INSPECTION
SERVICES
FAIRCHILD AIR FORCE BASE, WA
3 Mar 25
FA462025RA904
Attachment 1 PWS
1. DESCRIPTION OF SERVICES. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Fairchild Air Force Base (FAFB), WA in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph 2). The VTE and their locations will be listed in Appendix A.
NOTE: The term “VTE” in this PWS includes all equipment listed in Appendix A: freight and passenger elevators, escalators, and may include wheelchair/stair lifts, dock levelers, and dumbwaiters.
1.1. This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly CLIN includes all inspections, maintenance, repairs, including replacing lights, and routine and emergency service calls. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.
1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1 Safety Code for Elevators and Escalators (ASME A17.1); ASME A17.2Guide for Inspection of Elevators, Escalators, and Moving Walks (ASME A17.2); ASME A17.3Safety Code for Existing Elevators and Escalators; National Fire Protection Association Standards (ASME A17.3)); Unified Facilities Criteria (UFC) 3-600-01; Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer (OEM). All codes shall be applicable to the both the equipment and the year of in-service. A complete list of references and websites is available in Appendix B
2. ADDITIONAL SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:
2.1. Alterations (a.k.a., modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)
2.2. Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in the contract.
2.3. Additional items excluded are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.
FA462025RA904
2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service.
2.5. In the event that the Contractor encounters an item of work included in paragraph 2.1 through 2.4, the Contractor will report the situation to the Contracting Officer’s Representative (COR).
The report will include the work location, a detailed scope of the required work, justification for Contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE:
Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.
3. DEFINITIONS:
3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. See ASME A17.1 for requirements.
3.2 Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization will be covered on an over and above Contract Line Item or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.
4. MAINTENANCE AND INSPECTION SERVICE CALLS:
4.1. The Contractor) shall conduct an initial inspection of all VTE listed in Appendix A within thirty (30) calendar days of contract award and provide a report to the COR. The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the Contractor to replace the missing items, accomplish the repair, and reimburse the Contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3. The Contractor and the CO shall certify their agreement as to the working order of the equipment. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer
4.2. The Contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, identify required inspections, timelines and maintenance to be performed. The Contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements.
4.3. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with this PWS, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.
4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, and repairs are required.
4.5. The Contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector. The first annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators regardless of due date. The three- (3) - year test shall be scheduled in conjunction with the annual test two years later from the first annual test.
Annual safety inspection test certificates will be displayed in the cab of the elevator. The certificate will show the month the test was completed and when the next test is due. Digital and paper copies will be provided to the COR.
4.6. The Government may perform inspections of the VTE at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.
4.7. The Contractor shall prepare and submit a written report within two (2) business days of work.
The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.
4.8. The Contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR within one (1) business day of request
4.9. The Contractor will coordinate with the FAFB Fire Department within 30 days after award to ensure that the Fire Department has all fire keys for elevators located on FAFB.
5. REPAIR SERVICE CALLS. Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace covered components of the VTE at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency.
The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 00.00 20 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, and UFGS 14 2 00 Hydraulic Elevators for guidance.
5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.
5.1.1. In the event that an elevator, dumbwaiter, handicapped lift, or chairlift fails or malfunctions, the contractor shall be notified by the COR.
5.1.2. The Contractor shall respond in-person to the VTE and begin work on routine service calls at no additional cost to the Government within three (3) business days after receipt of the call on regular scheduled work days/hours.
5.1.3. The Contractor shall report to the work location, survey the repair, and provide the COR an estimate of time and cost of any repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the COR. The Contractor shall prepare and submit to the COR a written report within two business days. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.
5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.
5.2.1. In the event that an elevator, dumbwaiter, handicapped lift, or chairlift fails or malfunctions, the contractor shall be notified by the COR
5.2.2. The Contractor shall respond in person to the VTE and begin work on emergency service calls within (1) business day after receipt of the call.
5.2.3. The Contractor shall report to the work location, survey the repair, and provide the COR an estimate of time and cost of any repairs not covered in the basic full maintenance service contract but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.6. SERVICES SUMMARY.
The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose. Exceeding performance thresholds may…
Performance Objective PWS Paragraph
Performance Threshold
Method of Surveillance
Remedy
1. Written Maintenance Control Program (MCP) for each VTE for all equipment. MCP shall identify all maintenance
4 MCP in accordance with ASME A17.1 delivered to CO in 30 calendar days of contract award.
Random sampling, periodic inspection and/or validated customer complaint
Re-perform with 3 business days
FA462025RA904
intervals including safety inspections.
2. VTE Service Availability 4 VTE availability is
95%. Calculation = ((sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)).
Random sampling, periodic inspection and/or validated customer complaint
Re-perform within 1 business day
3. Repair Service Call Routine – Response Time
5 Response to routine service call are on-time 100% of the time on a monthly basis
Random sampling, periodic inspection and/or validated customer complaint
Re-perform within 2 business days
4. Repair Service Call Emergency – Response Time
5 Response to emergency service all are on-time 100% of the time on a monthly basis
Random sampling, periodic inspection and/or validated customer complaint
Re-perform same business day
5. Service call Repairs – Repair Quality
5 Only two call back of the same problem (same instance) each month
Random sampling, periodic inspection and/or validated customer complaint
Contractor identifies and corrects unreliable parts or repair methods
6. Inspection – MCP Adherence
4.2, 4.3 Conducts Inspection
IAW MCP 100%
Random sampling, periodic inspection and/or validated Hocustomer complaint
Any deviation of revisions must have
CO
Approval
7.Preventative Maintenance
– MCP Adherence
4.7, Preventative maintenance performed to MCP 100%
Random sampling, periodic inspection and/or validated customer complaint
Re-perform within 1 business day
8.Reporting including annual inspection certificates
2,4,5, 7 Submit reports in a manner consistent with PWS 100% of the time
Random sampling, periodic inspection and/or validated customer complaint
Re-perform within 1 business day
RESERVED
8. GENERAL INFORMATION.
8.1. Quality Control Contractor shall develop and maintain a quality control program (QCP) within each MCP to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in PWS paragraph 6, Service Summary. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance. The Contractor shall maintain the QCP throughout the period of performance of the contract. The COR will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individuals responsible including current certifications, VTE MCP identified in PWS para 4.2, and identify the procedures for maintaining accurate inspection records and key control logs. The QCP shall be available to the government within one (1) business day upon request. The QCP will have the sample inspection forms, templates, and records which will be used for the service. The Contractor will provide a current contact list to the COR which identifies personnel to notify in case of customer complaints and service requests.
8.2. QUALITY ASSURANCE. The Government will periodically evaluate the Contractor’s performance in accordance with the MCP.
8.3. HOURS OF OPERATION. Hours of Operation. The contractor shall perform VTE maintenance services during normal duty hours which are 0730-1630, Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the CO.
The contractor is not required to provide service on federal holidays, except in emergency situations. Federal holidays are as follows:
New Year’s Day 1 January Martin Luther King Day 3rd Monday in January Washington’s Birthday 3rd Monday in February Memorial Day last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day 11 November Thanksgiving Day 4th Thursday in November Christmas Day 25 December
8. . SECURITY REQUIREMENTS. All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. In addition, all vehicles described above must be registered through the Security Forces Squadron, Pass and Registration and will comply with Fairchild AFB directives. After award of contract, the contractor shall request through the COR, CO and Security Forces to be issued base passes and identification badges for employees and work vehicles.
8.5. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES
DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR
OVERSEAS COMBATANT COMMANDER. This service does not meet the criteria for continuation of performance during a crisis.
8.6. SPECIAL QUALIFICATIONS. The Contractor will be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in maintenance of VTE.
8.7. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the COR. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.
8.8. Base Closures. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.
8.9. Contractor/Employee Base Pass and Identification, Special Clearances and Vehicle Passes. All documentation needed for base passes shall be submitted at the Pre-Performance Conference.
8.10. ENVIRONMENTALLY PREFERABLE PURCHASING. In order to comply with federally mandated environmental preference programs and Department of Defense (DOD) “Sustainable Procurement Program” policy, FAFB requires the use of environmentally preferable products and services. These program elements include: recovered material products, energy and water efficient products, alternative fuels and fuel efficiency, bio-based products, products which are non-ozone depleting or are non-toxic or less toxic alternatives and environmentally preferable products. These program elements are described on the Fed Center website at https://www.fedcenter.gov/programs/buygreen/. The Green Procurement Compilation website (http://sftool.gov/greenprocurement) provides a comprehensive green purchasing resource and identifies all product types covered by mandatory federal environmental programs.
8.10.1. PRODUCTS AND MATERIALS. If it is determined that if a product does not meet Government performance requirements, the contractor shall submit a proposed alternative that would meet the performance requirements with the lowest environmental impact for evaluation and acceptance. Products that fall under the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) shall meet the minimum recovered (recycled) content. Bio-based products shall meet the requirements of the biobased product listing from the United States Department of Agriculture (http://www.biopreferred.gov/). The contractor shall purchase and use Energy Star or other energy-efficient items listed on the Department of Energy’s Federal Energy Management Program Product Energy Efficiency Recommendations product list. Supplements or
FA462025RA904
Attachment 1 PWS https://www.fedcenter.gov/programs/buygreen/ http://sftool.gov/greenprocurement https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program http://www.biopreferred.gov/ amendments to listed publications from any organizational level may be issued during the life of the contract.
Before implementing any change that results from amendments to these listed publications that will result in a change to the contract price, the contractor shall submit to the Contracting Officer a price proposal within 30 calendar days following receipt of the change. An equitable adjustment (increase or decrease) shall be negotiated.
8.11. CONTRACTOR HAZARDOUS MATERIALS (HM). In accordance with AFMAN 32- 7002 Hazardous Materials Management, a HM includes all items covered under The Emergency Planning and Community Right-to-Know Act (EPCRA) tracking requirements, the OSHA HAZCOM standard, and all Class I and II Ozone Depleting Substances. The Contractor shall be responsible for the proper storage, management, and disposal of any HM brought on Base for contractor use.
8.12. HM STORAGE. For any single HM stored on-site in a quantity equal to or exceeding 55-gallons at any time, the contractor shall provide secondary containment for the entire quantity of that HM. HM shall be stored within a locked secure area not accessible to the base populace after hours. All containers of HM shall be clearly and properly labeled; closed when not in use; and stored in an upright, secure position. Contractor may store HM at the direction of the COR.
8.13. HM AUTHORIZATION. The Contractor shall submit to the COR, prior to using hazardous materials (HM), a Contractor HM Work Sheet and corresponding Safety Data Sheet (SDS) for each HM to be brought onto the base during the performance of the contract. This work sheet and SDS shall be completed for every HM to be used. If during the course of the contract, items not previously identified are to be brought on the base, the Contractor shall submit a Work Sheet and SDS for approval prior to bringing the HM onto the base.
8.14. HM USAGE. Within seven calendar days of the end of every month, the Contractor shall submit to COR, the quantities of each HM actually used on the base during the month, utilizing and annotating the government-provided chemical authorization list. List can be obtained from 92 CES/CEIE via the COR. This information should be included in the monthly report described above.
8.15. HM REMOVAL. No HM shall be left on-site at the end of a contract.
8.16. COSTS OR FINES. Any costs or fines levied against the installation for the contractor’s failure to comply with applicable Federal, State, or local laws shall be borne by the contractor.
8.17. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL
CLEARANCES AND VEHICLE PASSES. All documentation needed for base passes shall be submitted at the Pre-Performance Conference. Due to the nature of the work only US nationals or verified Green Card holders are eligible to enter FAFB and all personnel must have a pictured ID that is compliant with the REAL ID Act of 2005 . Due to the sensitive nature of the mission performed at Fairchild all contractors performing work under this contract must be U.S. Citizens.
FA462025RA904
8.18. COMPLIANCE WITH LAWS AND REGULATIONS. The contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection.
8.19. WEAPONS, FIREARMS, AND AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately-owned vehicle while on FAFB.
8.20. REPORTING REQUIREMENTS. Contractor personnel shall report any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information.to the Law Enforcement (LE) Desk at (509) 247-5494.
8.21. PHYSICAL SECURITY. The contractor shall be responsible for safeguarding all Government property provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
8.22. PERSONNEL APPEARANCE. Contractor personnel shall present a neat appearance.
Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, bearing the company name or logo that is visible at all times. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
8.23. KEY CONTROL. The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR any occurrences of lost or duplicated keys. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon determination by the Contracting Officer, to re-key or replace the affected lock(s) at no cost to the government. The government reserves the right to self-perform any re-keying and ??? In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system at the contractor’s expense.
8.24. RESTRICTIONS. The Government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.
8.25. NON-PERSONAL SERVICES AND/OR INHERENTLY GOVERNMENTAL
SERVICES. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the CO immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All
FA462025RA904
decisions relative to programs supported by the contractor shall be the sole responsibility of the government.
APPENDICES.
A. VTE Equipment Listing B. Publications
Appendix A: VTE Equipment Listing
Item Type of VTE Location of VTE/Stops Manufacturer
Capacity
(LBS)
S/N# Year
Installed
Geared Passenger
Bldg 1204, Air Traffic Control Tower 8 Stops
Schindler Haughton, 1984
1200 lbs
18359
Selective/Collective Hydraulic Passenger
Bldg 1252, Survival Inn Billeting 3 Stops
Millar
3500 lbs
61643
Bldg 2005, 2 Stops
Dover
2500 lbs
EG3760
Bldg 2007, 92
OSS
EJ3118
Bldg 2090, 92 ARS, Squadron Operations
Dover 2500 lbs
EJ3118
Bldg 2097, 92
AMXS
2 Stops
Montgomery
KONE
90039
Hydraulic Rotary
Bldg 2245, 92
CPTS, 92/141 CS
2 Stops
Montgomery
KONE, 1988
60250
Bldg 2380, Education Center/Library
EK8957
Bldg 2045, Logistics Readiness Sq
Schindler
866A365H02
Hydraulic Cargo
Bldg 2045, Logistics Readiness SQ
ACUA
11400
EY4890
FA462025RA904
Item Type of VTE Location of VTE/Stops Manufacturer
Capacity
(LBS)
S/N# Year
Installed
11 Traction Passenger
Bldg 2187 92
ARW HQ
2 stops
ThyssenKrupp Synergy 85S
3000 lbs
P-1 CBU275
Bldg 12 68 SERE
HQ
2 Stops Schindler
Bldg 12 68 SERE
HQ
2 Stops ThyssenKrupp
EBU975
Bldg 2379 Fittness Center 2 Stops ThyssenKrupp
EAT590
Bldg 4400, Army Reserve Center
ThyssenKrupp Tac-20
EY4890
Appendix B – PUBLICATIONS LIST In addition to all applicable federal, state, and local laws and regulations, the following instructions, forms, and guidance shall be followed in the performance of this contract. Copies can be viewed at the following websites:
a) http://www.e-publishing.af.mil/
b) http://www.dtic.mil/whs/directives/infomgt/forms/index.htm, andDoD
c) http://www.dtic.mil/whs/directives/corres/ins1.html
d) https://www.gsa.gov/reference/forms#
e) https://www.esd.whs.mil/Directives/forms/
f) https://www.fedcenter.gov/programs/buygreen/
g) https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
h) http://www.biopreferred.gov/
PUBLICATION/FORM TITLE DATE
Pub.L. 109-13, 119 Stat. 302 Real ID Act 2005
DODM5220.22V2_AFMAN16-
1406V2
NATIONAL INDUSTRIAL
SECURITY PROGRAM:
INDUSTRIAL
SECURITY PROCEDURES FOR
GOVERNMENT ACTIVITY
8 May 2020
AFI 17-130 Cyber Security Management 12 FEB 2020 AFMAN 32-70 eEnvironmental Compliance and
Pollution Prevention 04 Feb 2020
AFI 33-322 Records Management Program 22 MAR 2020 AFI 33-332 Air Force Privacy and Civil
Liberties Program
9 MAR 2020
DAFI63-101_20-101 Integrated Life Cycle Management 15 FEB 2024 DAFI 63-138 Service Acquisition 1 JAN 2024 DAFI 71-101V1 Criminal Investigations Program 23 JAN 2025 AFI 71-101V2 Protective Service Matters 20 MAY 2019 AFPD 33-3 Information Management 07 Sep 2011 AFI 33-322 Records Management and
Information Governance Program
23 MAR 20
DODI 1100.22 Policy and Procedures for Determining Workforce Mix
01 Dec 2017
DODM5200.1V1-3_AFMAN16-
1404V1-3
DOD Information Security Program 5 Apr 2022
DODM5200.02_DAFMAN16-1405 Air Force Personnel Security Program
31 jul 2018
DODI 5220.31
DODI 5200.02
National Industrial Security Program DOD Personnel Security Program
9 MAY 2023
24 Sep 2020
DODI 5200.46 DOD Investigative and Adjudicative Guidance for Issuing the Common Access Card
02 Nov 2020
DOD 6025.18 DOD Health Information Privacy Regulation
13 Mar 2019
FA462025RA904
Attachment 1 PWS https://www.gsa.gov/reference/forms https://www.fedcenter.gov/programs/buygreen/ https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program http://www.biopreferred.gov/
ASME A17.1-2016 Safety Code for Elevators and Escalators, 17 Nov 2016
ASME A17.1, Appendix N Using a Qualified Elevator Inspector 17 Nov 2016 ANSI/ASME A17.2 Guide for Inspection of Elevators, Escalators and Moving Walkways
UFC 3-600-01 Fire Protection Engineering for Facilities
Change 3, 10 May 2019
UFGS 14.21.13 Electric Traction Freight Elevators 1 May 2015 UFGS 14.21.23 Electric Traction Passenger
Elevators 1 May 2015
UFGS 14.24.13 and 23 Hydraulic Elevators Passenger/Freight
1 May 2015
PERFORMANCE WORK STATEMENT (PWS)
File details come from the government source that posted it. Updated .