FA4620-18-R-B001_FY18_A&E_Amend_1.pdf

PDF 50 KB Posted

Attached to
FY18 A-E IDIQ Federal contract opportunity
Solicitation number
FA462018RB001
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment 1 Questions and Responses

View the file

Other files for this federal contract opportunity

Other files attached to FY18 A-E IDIQ, newest first.
File Type Posted
Atch_5,_Amend_1,_List_of_Disciplines_Revised.pdf PDF
Attachment_2,_A-E_Statement_of_Work.pdf PDF
Attachment_3,_2018_Base_Design_Standards_(BDS).PDF PDF
Attachment_1,_SF330_Part_I-II.pdf PDF
Attachment_5,_List_of_Disciplines.pdf PDF
Attachment_5,_List_of_Disciplines.xlsx XLSX spreadsheet
Attachment_4,_Architectural_Compatability_Standards_(ACP).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

Solicitation

FA4620-18-R-B001

1. “An SF330 is also required for each consultant or joint firm.” Are you looking for each of our consultants to provide a separate (50‐page) SF‐330 in addition to our (the prime) submission, or is all the information for us (the prime) and our subs to be in one (50‐page) submission?

RESPONSE: The prime shall submit for the members of the team.

2. “Text for each applicant is limited to 50 pages” ‐Are the Part II forms included in the page count?

‐Is the proposal cover included in the page count?

RESPONSE: Prime is limited to an overall 50 pages; consultants are supplementary additions to the prime's submittal package. Each consultant needs to convey qualifications but keep their packages to a minimum.

3. “Submit 1 electronic copy on DVD” ‐Will you accept a USB as an appropriate alternative to a DVD submission? ‐Just to confirm, you do not want any hard copies, correct.

RESPONSE:USB Drives cannot be accepted, Submit 1 electronic copy on DVD, No hard copies are required.

4. Will the DoD Interior Design UFC 3-120-10 be a required source regarding interior design qualifications? (section 2-2).

RESPONSE: Yes.

5. The Hourly Rates excel sheet does not include interior designer, can a line be added to include interior design hourly rates?

RESPONSE: Yes, See revised attachment 5.

6. Will furniture (FF&E) procurement documents be required by the interior designer under these task orders?.

RESPONSE: No

7. Are the SF330 Part 2’s excluded from the 50 page limit?

RESPONSE: Prime is limited to an overall 50 pages; consultants are supplementary additions to the prime's submittal package. Each consultant needs to convey qualifications but keep their packages to a minimum.

8. Are the cover page and cover letter excluded from the 50 page limit?

RESPONSE: No.

File details come from the government source that posted it.