Atch_5,_Amend_1,_List_of_Disciplines_Revised.pdf

PDF 41 KB Posted

Attached to
FY18 A-E IDIQ
Solicitation number
FA462018RB001
Issued by

About this file

Revised Attachment 5 PDF

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISCIPLINES - Hourly Rates Base Year Option Year

Option Year

Option Year

Option Year

Principal Associate Architect Senior Architect Staff Architect Junior Architect Interior Design Project Manager Interior Design Designer Landscape Architect Civil Principal Engineer Civil Project Engineer Civil Designer Structural Principal Engineer Structural Project Engineer Structural Staff Engineer Structural Designer Mechanical Principal Engineer Mechanical Project Engineer Mechanical Staff Engineer Mechanical Designer Project Fire Protection Engineer Fire Protection Engineer Fire Protection CADD / Technician Electrical Principal Engineer Electrical Project Engineer Electrical Staff Engineer Electrical Designer Specifications Writer Cost Estimator Administrative Assistant Project Environmental Engineer Environmental Staff Environmental Technician Certified Industrial Hygienist Industrial Hygienist AHERA Inspector Geotechnical/Soils Engineer Geohydro/Groundwater Specialist Senior Construction Inspector Construction Inspector Staff

SURVEYS

Base Year Option Year

Option Year

Option Year

Option Year

Project Manager / hour Senior Drafting/CADD Technician / hour Drafting/CADD Technician / hour Administrative Assistant / hour 2-Person Survey Party / hour 3-Person Survey Party / hour Asphalt / Concrete Coring / day SAMPLING & ANALYSIS (Per Sample)

ASBESTOS

Base Year Option Year

Option Year

Option Year

Option Year

Asbestos Bulk 24-Hour Turnaround Asbestos Bulk 1-Week Turnaround Air, 24-Hour Turnaround (TEM) Air, 1-Week Turnaround (TEM) Air, 24-Hour Turnaround (NIOSH 7400) Air, 1-Week Turnaround (NIOSH 7400) SAMPLING & ANALYSIS (Per Sample)

LEAD

Base Year Option Year

Option Year

Option Year

Option Year

Lead XRF Testing Survey Lead Swab Test Paint Chip 24-Hour Turnaround Paint Chip 1-Week Turnaround Total Lead EPA SW846 Total Lead Soil 24-Hour Total Lead Soil 1-Week

Option Years

File details come from the government source that posted it.