Attachment_5,_List_of_Disciplines.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- FY18 A-E IDIQ Federal contract opportunity
- Solicitation number
- FA462018RB001
About this file
Attachment 5, List of Disciplines in Excel
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_5,_Amend_1,_List_of_Disciplines_Revised.pdf | ||
| FA4620-18-R-B001_FY18_A&E_Amend_1.pdf | ||
| Attachment_2,_A-E_Statement_of_Work.pdf | ||
| Attachment_3,_2018_Base_Design_Standards_(BDS).PDF | ||
| Attachment_1,_SF330_Part_I-II.pdf | ||
| Attachment_5,_List_of_Disciplines.pdf | ||
| Attachment_4,_Architectural_Compatability_Standards_(ACP).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| DISCIPLINES - Hourly Rates |
| Principal Engineer/Architect |
| Project Manager |
| Sr. Architect/Engineer |
| Architect/Engineer/Designer |
| Fire Protection Engineer |
| Engineer Tech |
| Landscape Architect |
| Sr. CADD/Technician |
| Jr. CADD/Technician |
| Staff Construction Inspector |
| Specifications Writer |
| Cost Estimator |
| Word Processing |
| Staff Environmental |
| Environmental Technician |
| Toxic/Hazardous Materials Specialist |
| Certified Industrial Hygienist |
| AHERA Inspector |
| EPA Certified Lead Inspector |
| Geotechnical/Soils Engineer |
| Geotechnical/Technician |
| SURVEYS |
| Professional Land Surveyor |
| Party Chief |
| Field Technician |
| Survey Technician |
| Survey - 3 person crew/hour |
| Party Chief, Field Technician, Survey Technician |
| Survey - 2 person crew/hour |
| Party Chief, Survey Technician |
| GPS Equipment / hour |
| Utility Locate Technician / day |
| Vacuum Truck & Crew / day |
| Technologies) |
| Sewer/Storm Locate & Insp. Equip. & Labor/ |
| Includes labor for one operator, materials, equipment, and mobilization |
| Asphalt / Concrete Coring / day |
| Includes labor for one operator, materials, equipment, and mobilization |
| Exploratory Excavation, 1/2 day minimum |
| Includes labor for one operator, mobilization, equipment and fuel. |
| Mobilize Vacuum Crew / hour |
| Mobilize Locate Technician / trip |
| SAMPLING & ANALYSIS (Per Sample) |
| TCLP Sample and Testing |
| RCRA-8 Metal Testing |
| SAMPLING & ANALYSIS (Per Sample) ASBESTOS |
| Asbestos Bulk 1-Week Turnaround |
| Air, 1-Week Turnaround (TEM) |
| Air, 1-Week Turnaround (NIOSH 7400) |
| SAMPLING & ANALYSIS (Per Sample) LEAD |
| Lead XRF Testing Survey (per hour) |
| For use of XRF Gun only, operator rate included elsewhere. |
| Lead Swab Test |
| Paint Chip 1-Week Turnaround |
| Total Lead EPA SW846 |
| Total Lead Soil 1-Week |
| REPRODUCTION |
| Prints - Full Size |
| Prints - 11 x 17 Color Copies |
| Prints - 11 x 17 B/W Copies |
| Prints - 8.5 x 11 Color Copies |
| Prints - 8.5 x 11 B/W Copies |
| Binders & Covers |
| Card stock covers and backs, plastic comb binders (gbc type) |
| Color Board Books |
| CDs/DVDs |
| Note: All travel expenses shall be for actual costs incurred and in accordance with the Joint Travel Regulations. AE shall submit |
| supporting expense data/receipts when billing for travel. |
Sheet1
| DISCIPLINES - Hourly Rates | WA | UT | MT1 | MT2 | OR1 | OR2 | CO | WY | AZ | Average | Adjusted |
| Principal Architect/Engineer | $ 169.04 | $ 133.00 | $ 159.32 | $ 151.62 | $ 168.74 | $ 105.40 | $ 141.52 | $ 146.95 | $ 153.87 | ||
| Project Manager | $ 139.68 | $ 113.11 | $ 115.25 | $ 115.71 | $ 146.78 | $ 135.60 | $ 129.53 | $ 127.95 | |||
| Sr. Architect/Engineer | $ 108.32 | $ 101.93 | $ 115.25 | $ 115.71 | $ 168.74 | $ 106.02 | $ 165.08 | $ 125.86 | $ 109.45 | ||
| Engineer/Sr. Designer | $ 85.95 | $ 83.00 | $ 101.93 | $ 90.24 | $ 107.73 | $ 136.07 | $ 82.63 | $ 111.52 | $ 97.35 | $ 99.60 | $ 95.04 |
| Engineer Tech | $ 78.31 | $ 75.69 | $ 57.02 | $ 76.88 | $ 71.98 | ||||||
| Construction Manager | $ 106.13 | $ 156.01 | $ 132.95 | $ 131.70 | |||||||
| Construction Inspector | $ 85.95 | $ 83.00 | $ 74.58 | $ 82.71 | $ 105.00 | $ 86.25 | |||||
| Sr. CADD Tech | $ 84.52 | $ 82.71 | $ 83.62 | ||||||||
| Jr. CADD Tech | $ 70.00 | $ 74.00 | $ 70.62 | $ 67.83 | $ 61.46 | $ 59.83 | $ 67.29 | ||||
| CAD/Designer | $ 57.61 | $ 55.00 | $ 55.93 | $ 53.53 | $ 52.66 | $ 54.95 | |||||
| Clerical | $ 48.06 | $ 53.68 | $ 62.27 | $ 85.65 | $ 34.10 | $ 70.31 | $ 59.01 | ||||
| Licensed Surveyor | $ 99.00 | $ 99.00 | |||||||||
| Sr.Field Technician | $ 68.60 | $ 68.60 | |||||||||
| Field Technician | $ 48.16 | $ 48.16 | |||||||||
| Cost Estimator | $ 78.18 | $ 151.62 | $ 100.45 | $ 110.08 | |||||||
| Graphic Designer | $ 44.75 | $ 44.75 | |||||||||
| Contract Administrator | $ 83.79 | $ 83.79 | |||||||||
| Principal Environmental | $ 148.36 | $ 148.36 | |||||||||
| Staff Environmental | $ 101.34 | $ 101.34 | |||||||||
| Environmental Technician | $ 82.71 | $ 82.71 |
| Principal Civil Engineer |
| Civil Project Engineer |
| Civil Engineer-in-Training |
| Civil Designer |
| Principal Structural Engineer |
| Structural Project Engineer |
| Structural Designer |
| Structural Drafter |
| Principal Mechanical Engineer |
| Mechanical Project Engineer |
| Mechanical Designer |
| Mechanical Drafter |
| Principal Fire Protection Engineer |
| Fire Protection Engineer |
| Fire Protection Designer |
| Fire Protection CADD / Technician |
| Principal Electrical Engineer |
| Electrical Project Engineer |
| Electrical Designer |
| Electrical Drafter |
| Specifications Writer |
| Word Processing |
| Principal Environmental |
| Staff Environmental |
| Environmental Technician |
| Toxic/Hazardous Materials Specialist |
| Certified Industrial Hygienist |
| AHERA Inspector |
| EPA Certified Lead Inspector |
| Geologist |
| Geohydro/Groundwater Specialist |
| Geotechnical/Associate |
| Geotechnical/Project Manager |
| Geotechnical/Soils Engineer |
| Geotechnical/Technician |
| SURVEYS | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 |
| Survey Manager | $ 95.00 | $ 98.00 | $ 101.00 | $ 104.00 | $ 104.00 | $ 104.00 | $ 104.00 | $ 104.00 | $ 104.00 |
| Professional Land Surveyor | $ 121.00 | $ 125.00 | $ 129.00 | $ 133.00 | $ 133.00 | $ 133.00 | $ 133.00 | $ 133.00 | $ 133.00 |
| Party Chief | $ 88.00 | $ 90.00 | $ 93.00 | $ 96.00 | $ 96.00 | $ 96.00 | $ 96.00 | $ 96.00 | $ 96.00 |
| Field Technician | $ 79.00 | $ 81.00 | $ 84.00 | $ 86.00 | $ 86.00 | $ 86.00 | $ 86.00 | $ 86.00 | $ 86.00 |
| Survey Technician | $ 69.00 | $ 71.00 | $ 73.00 | $ 75.00 | $ 75.00 | $ 75.00 | $ 75.00 | $ 75.00 | $ 75.00 |
| Survey - 3 person crew/hour | $ 236.00 | $ 243.00 | $ 250.00 | $ 258.00 | $ 258.00 | $ 258.00 | $ 258.00 | $ 258.00 | $ 258.00 |
| Party Chief, Field Technician, Survey Technician | |||||||||
| Survey - 2 person crew/hour | $ 157.00 | $ 162.00 | $ 166.00 | $ 171.00 | $ 171.00 | $ 171.00 | $ 171.00 | $ 171.00 | $ 171.00 |
| Party Chief, Survey Technician | |||||||||
| GPS Equipment / hour | $ 16.00 | $ 16.00 | $ 17.00 | $ 17.00 | $ 17.00 | $ 17.00 | $ 17.00 | $ 17.00 | $ 17.00 |
| Utility Locate Technician / day | $ 453.00 | $ 466.00 | $ 480.00 | $ 495.00 | $ 495.00 | $ 495.00 | $ 495.00 | $ 495.00 | $ 495.00 |
| Vacuum Truck & Crew / day | $ 1,689.00 | $ 1,739.00 | $ 1,792.00 | $ 1,845.00 | $ 1,845.00 | $ 1,845.00 | $ 1,845.00 | $ 1,845.00 | $ 1,845.00 |
| Technologies) | |||||||||
| Sewer/Storm Locate & Insp. Equip. & Labor/ | $ 1,339.00 | $ 1,379.00 | $ 1,420.00 | $ 1,463.00 | $ 1,463.00 | $ 1,463.00 | $ 1,463.00 | $ 1,463.00 | $ 1,463.00 |
| Includes labor for one operator, materials, equipment, and mobilization | |||||||||
| Asphalt / Concrete Coring / day | $ 1,143.00 | $ 1,177.00 | $ 1,212.00 | $ 1,249.00 | $ 1,249.00 | $ 1,249.00 | $ 1,249.00 | $ 1,249.00 | $ 1,249.00 |
| Includes labor for one operator, materials, equipment, and mobilization | |||||||||
| Exploratory Excavation, 1/2 day minimum | $ 882.00 | $ 909.00 | $ 936.00 | $ 964.00 | $ 964.00 | $ 964.00 | $ 964.00 | $ 964.00 | $ 964.00 |
| Includes labor for one operator, mobilization, equipment and fuel. | |||||||||
| Mobilize Vacuum Crew / hour | $ 144.00 | $ 148.00 | $ 152.00 | $ 157.00 | $ 157.00 | $ 157.00 | $ 157.00 | $ 157.00 | $ 157.00 |
| Mobilize Locate Technician / trip | $ 128.00 | $ 132.00 | $ 136.00 | $ 140.00 | $ 140.00 | $ 140.00 | $ 140.00 | $ 140.00 | $ 140.00 |
| SAMPLING & ANALYSIS (Per Sample) | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 |
| TCLP Sample and Testing | $ 100.00 | $ 103.00 | $ 106.00 | $ 110.00 | $ 110.00 | $ 110.00 | $ 110.00 | $ 110.00 | $ 110.00 |
| RCRA-8 Metal Testing | $ 136.00 | $ 140.00 | $ 144.00 | $ 148.00 | $ 148.00 | $ 148.00 | $ 148.00 | $ 148.00 | $ 148.00 |
| SAMPLING & ANALYSIS (Per Sample) ASBESTOS | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 |
| Asbestos Bulk 1-Week Turnaround | $ 9.00 | $ 9.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 |
| Air, 1-Week Turnaround (TEM) | $ 65.00 | $ 67.00 | $ 69.00 | $ 71.00 | $ 71.00 | $ 71.00 | $ 71.00 | $ 71.00 | $ 71.00 |
| Air, 1-Week Turnaround (NIOSH 7400) | $ 9.00 | $ 9.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 | $ 10.00 |
| SAMPLING & ANALYSIS (Per Sample) LEAD | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 |
| Lead XRF Testing Survey (per hour) | $ 25.00 | $ 26.00 | $ 27.00 | $ 28.00 | $ 28.00 | $ 28.00 | $ 28.00 | $ 28.00 | $ 28.00 |
| For use of XRF Gun only, operator rate included elsewhere. | |||||||||
| Lead Swab Test | $ 23.00 | $ 24.00 | $ 25.00 | $ 26.00 | $ 26.00 | $ 26.00 | $ 26.00 | $ 26.00 | $ 26.00 |
| Paint Chip 1-Week Turnaround | $ 35.00 | $ 36.00 | $ 37.00 | $ 38.00 | $ 38.00 | $ 38.00 | $ 38.00 | $ 38.00 | $ 38.00 |
| Total Lead EPA SW846 | $ 21.00 | $ 21.00 | $ 22.00 | $ 23.00 | $ 23.00 | $ 23.00 | $ 23.00 | $ 23.00 | $ 23.00 |
| Total Lead Soil 1-Week | $ 35.00 | $ 36.00 | $ 37.00 | $ 38.00 | $ 38.00 | $ 38.00 | $ 38.00 | $ 38.00 | $ 38.00 |
| REPRODUCTION | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 | Option Year 4 |
| Prints - Full Size | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 |
| Prints - 11 x 17 Color Copies | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 | $ 1.00 |
| Prints - 11 x 17 B/W Copies | $ 0.10 | $ 0.10 | $ 0.10 | $ 0.10 | $ 0.10 | $ 0.10 | $ 0.10 | $ 0.10 | $ 0.10 |
| Prints - 8.5 x 11 Color Copies | $ 0.60 | $ 0.60 | $ 0.60 | $ 0.70 | $ 0.70 | $ 0.70 | $ 0.70 | $ 0.70 | $ 0.70 |
| Prints - 8.5 x 11 B/W Copies | $ 0.04 | $ 0.04 | $ 0.04 | $ 0.05 | $ 0.05 | $ 0.05 | $ 0.05 | $ 0.05 | $ 0.05 |
| Binders & Covers | $ 0.30 | $ 0.30 | $ 0.30 | $ 0.30 | $ 0.30 | $ 0.30 | $ 0.30 | $ 0.30 | $ 0.30 |
| Card stock covers and backs, plastic comb binders (gbc type) | |||||||||
| Color Board Books | $ 15.00 | $ 15.00 | $ 16.00 | $ 16.00 | $ 16.00 | $ 16.00 | $ 16.00 | $ 16.00 | $ 16.00 |
| CDs/DVDs | $ 10.00 | $ 10.00 | $ 10.00 | $ 11.00 | $ 11.00 | $ 11.00 | $ 11.00 | $ 11.00 | $ 11.00 |
| Note: All travel expenses shall be for actual costs incurred and in accordance with the Joint Travel Regulations. AE shall submit | |||||||||
| supporting expense data/receipts when billing for travel. |
Sheet2
| DISCIPLINES - Hourly Rates | WA | UT | MT1 | MT2 | OR1 | OR2 | CO | WY | AZ |
| Principal Architect/Engineer | $ 169.04 | $ 133.00 | $ 159.32 | $ 151.62 | $ 168.74 | $ 150.40 | $ 141.52 | ||
| Quals | BA/BS; Senior PM; 20 yrs | BA/BS; Senior PM; 10 yrs | BA/BS; Senior PM; 15 yrs | BA/BS; Senior PM; 20 yrs | BA/BS; Senior PM; 15 yrs | MBA/MS; 10 yrs | BA/BS; Senior PM; 15 yrs | ||
| Project Manager | $ 139.68 | $ 130.78 | $ 113.11 | $ 115.25 | $ 127.68 | $ 146.78 | $ 93.96 | $ 135.60 | $ 129.53 |
| Quals | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 7 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 10 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 8 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 8 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 10 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 10 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 16 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 10 yrs | BA/BS; Sr Eng/Arch/CM; Customer POC; Cost, schedule and tech adequacy of projects; 12 yrs |
| Sr. Architect/Engineer | $ 108.32 | $ 101.93 | $ 115.25 | $ 115.71 | $ 136.07 | $ 89.43 | $ 111.52 | ||
| Quals | BA/BS; 5 yrs | BA/BS; 6 yrs | BA/BS; 8 yrs | BA/BS; 5 yrs | BA/BS; 10 yrs | BA/BS; 10 yrs | BA/BS; 7 yrs | ||
| Engineer/Sr. Designer | $ 85.95 | $ 83.00 | $ 101.93 | $ 90.24 | $ 107.73 | $ 92.74 | $ 59.78 | $ 88.95 | $ 97.35 |
| BA/BS; Entry Level; 3 yrs | BA/BS; Entry Level; 5 yrs | BA/BS; Entry Level; 4 yrs | BA/BS; Entry Level; 5 yrs | BA/BS; Entry Level; 4 yrs | BA/BS; Entry Level; 4 yrs | BA/BS; Entry Level; 4 yrs | BA/BS; Entry Level; 4 yrs | BA/BS; Entry Level; 7 yrs | |
| Engineer Tech | $ 77.59 | $ 78.31 | $ 108.14 | $ 57.02 | $ 76.88 | ||||
| BA/BS; 1 yr | BA/BS; 2 yrs | BA/BS; 2 yrs | BA/BS; 3 yrs | AA; 6 yrs | |||||
| Construction Manager | $ 106.13 | $ 142.78 | $ 132.95 | ||||||
| BA/BS; 10 yrs | BA/BS; 10 yrs | HS/GED; 20 yrs | |||||||
| Construction Inspector | $ 85.95 | $ 74.58 | $ 75.69 | $ 105.00 | |||||
| BA/BS; 3 yrs | HS/GED; 5 yrs | HS/GED; 12 yrs | HS/GED; 16 yrs | ||||||
| Sr. CAD | $ 75.69 | ||||||||
| HS/GED; 12 yrs | |||||||||
| CAD IV | $ 70.00 | $ 84.52 | $ 70.62 | $ 67.83 | $ 56.24 | $ 52.66 | |||
| AA; 5 yrs | HS/GED; 5 yrs | AA; 10 yrs | BA/BS; 10 yrs | HS/GED; 5 yrs | BA/BS; 16 yrs | ||||
| CAD III | $ 57.61 | $ 55.00 | $ 74.58 | $ 48.99 | $ 40.67 | ||||
| HS/GED; 3 yrs | AA; 2 yrs | HS/GED; 2 yrs | HS/GED | HS/GED; 8 yrs | |||||
| Clerical | $ 48.06 | $ 50.15 | $ 53.68 | $ 62.27 | $ 83.79 | $ 60.50 | $ 25.89 | $ 70.31 | |
| HS/GED; 3 yrs | HS/GED; 2 yrs | HS/GED; 5 yrs | HS/GED; 1 yr | AA; 5 yrs | AA; 4 yrs | AA; 8 yrs | AA; 7 yrs | ||
| Licensed Surveyor | $ 99.00 |
| Sr.Field Technician | $ 68.60 | ||||
| HS/GED; 5 yrs | |||||
| Field Technician | $ 48.16 | ||||
| HS/GED; 2 yrs | |||||
| Cost Estimator | $ 151.62 | $ 139.98 | |||
| BA/BS; Senior PM; 20 yrs | BA/BS; Senior PM; 8 yrs | ||||
| Graphic Designer | $ 44.75 | ||||
| BA/BS; 3 yrs | |||||
| Contract Administrator | $ 83.79 | ||||
| AA; 10 yrs | |||||
| Principal Environmental | $ 168.74 | $ 176.71 | |||
| BA/BS; Senior PM; 15 yrs | BA/BS; Senior PM; 15 yrs | ||||
| Staff Environmental | $ 92.74 | $ 97.40 | |||
| BA/BS; Entry Level; 4 yrs | BA/BS; Senior PM; 15 yrs | ||||
| Environmental Technician | $ 75.69 | $ 42.05 | |||
| HS/GED; 12 yrs | AA; 7 yrs |