Attachment_5,_List_of_Disciplines.pdf
PDF 71 KB Posted
- Attached to
- FY18 A-E IDIQ Federal contract opportunity
- Solicitation number
- FA462018RB001
About this file
Attachment 5, List of Disciplines
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_5,_Amend_1,_List_of_Disciplines_Revised.pdf | ||
| FA4620-18-R-B001_FY18_A&E_Amend_1.pdf | ||
| Attachment_2,_A-E_Statement_of_Work.pdf | ||
| Attachment_4,_Architectural_Compatability_Standards_(ACP).pdf | ||
| Attachment_5,_List_of_Disciplines.xlsx | XLSX spreadsheet | |
| Attachment_3,_2018_Base_Design_Standards_(BDS).PDF | ||
| Attachment_1,_SF330_Part_I-II.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISCIPLINES - Hourly Rates Principal Engineer/Architect Project Manager Sr. Architect/Engineer Architect/Engineer/Designer Fire Protection Engineer Engineer Tech Landscape Architect Sr. CADD/Technician Jr. CADD/Technician Staff Construction Inspector Specifications Writer Cost Estimator Word Processing Staff Environmental Environmental Technician Toxic/Hazardous Materials Specialist Certified Industrial Hygienist AHERA Inspector EPA Certified Lead Inspector Geotechnical/Soils Engineer Geotechnical/Technician
SURVEYS
Professional Land Surveyor Party Chief Field Technician Survey Technician Survey - 3 person crew/hour
Party Chief, Field Technician, Survey Technician Survey - 2 person crew/hour
Party Chief, Survey Technician GPS Equipment / hour Utility Locate Technician / day Vacuum Truck & Crew / day Technologies) Sewer/Storm Locate & Insp. Equip. & Labor/ Includes labor for one operator, materials, equipment, Asphalt / Concrete Coring / day Includes labor for one operator, materials, equipment, Exploratory Excavation, 1/2 day minimum Includes labor for one operator, mobilization, Mobilize Vacuum Crew / hour Mobilize Locate Technician / trip
SAMPLING & ANALYSIS (Per Sample)
TCLP Sample and Testing RCRA-8 Metal Testing
SAMPLING & ANALYSIS (Per Sample)
ASBESTOS
Asbestos Bulk 1-Week Turnaround Air, 1-Week Turnaround (TEM) Air, 1-Week Turnaround (NIOSH 7400)
SAMPLING & ANALYSIS (Per Sample) LEAD
Lead XRF Testing Survey (per hour) For use of XRF Gun only, operator rate included Lead Swab Test Paint Chip 1-Week Turnaround Total Lead EPA SW846 Total Lead Soil 1-Week
REPRODUCTION
Prints - Full Size Prints - 11 x 17 Color Copies Prints - 11 x 17 B/W Copies Prints - 8.5 x 11 Color Copies Prints - 8.5 x 11 B/W Copies Binders & Covers Card stock covers and backs, plastic comb binders
Color Board Books CDs/DVDs Note: All travel expenses shall be for actual costs incurred and in accordance with the Joint Travel Regula supporting expense data/receipts when billing for travel.
ations. AE shall submit
IGE
File details come from the government source that posted it.