20260001A_30 CES_CEIE Comments.pdf
PDF 2 MB Posted
- Attached to
- XUMU 20260001A Bldg 15501 FOC Comm Install
- Solicitation number
- FA461026Q0040
About this file
This is an environmental coordination comments document for a construction project at Vandenberg Space Force Base (SFB), issued by the 30 Civil Engineer Squadron/Civil Engineer Impact Analysis (30 CES/CEIEC) on August 20, 2026. The document contains standard hazardous waste management instructions, natural resources requirements, and construction guidelines that contractors must follow.
The document outlines multiple environmental and operational requirements for the project. For hazardous waste management, contractors using directional boring must submit cutting sheets and Safety Data Sheets (SDS) for all drilling lubricants, additives, and Bentonite proposed for use. Any drilling-process wastes must be captured, contained, and shipped to an off-base permitted facility; however, if only hydrant water is used, the resulting water/sand/soil mixture may be dried in a concrete containment and disposed of off-base as non-hazardous waste. On-base deposition of dried waste drilling muds in borrow pits is prohibited. All hazardous materials must be processed through the HazMat Tracking Activity (HTA) at 30 LRS/LGRMF (805-605-3870 or 805-606-9494) prior to work commencement. The project must comply with Santa Barbara County Air Pollution Control District rules, including registration of portable equipment over 50 horsepower and certification of abrasive blast materials. For natural resources, oak tree trimming is preferred over removal and must occur January through March, with sanitized tools and no more than one-third of canopy removed at a time. Vegetation removal between February 15 and August 15 requires nesting bird surveys by a qualified biologist; the document provides contact information for biological contractors. All open trenches or holes must be properly covered with ramps or barriers to prevent animal entrapment, and weed-seed inspections of heavy equipment are mandatory before work begins. Equipment areas requiring particular attention during inspection include tires, undercarriage, brake mechanisms, and all ground-disturbing attachments.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
! Role Person Work Phone Fax Email Primary Organization
Shop Foreman
Operations Planning
Contacts
# Person Role Use Roles From Review Type
Manual Approvers (In Addition to Approval Requirements)
! Approval Status # Person Review Status Sent Completed Comment Resolved Review Type
Approved 0
Approval Reviews
! On Status Person Role Sent
Active
Status Change Notification
! Comment Type Created By Phone Number Reference Date Comment Created Date/Time
Conversation 08/20/2026 CEIE - Coord - The area east of Route 1 is within MMRP Site MU805E. Coordinate with Explosive Safety (SLD 30/SEW) to determine whether anomaly avoidance is warranted.
08/20/2026 15:22:53
Conversation 08/20/2026 CEIE - Coord - See attached "HazWaste-Directional Drilling Comments 2026" for disposal and handling of drilling fluid. 08/20/2026 15:20:37
Conversation 08/20/2026 CEIE - Coord - All hazardous materials and current Safety Data Sheets shall be processed to the HazMat Tracking Activity (HTA) prior to work beginning and must be approved and barcoded. The HTA will assist processing the hazardous material, initiate registration into EESOH-MIS, and provide training. 30 LRS/LGRMF is the OPR for the HTA and can be reached at 805-605-3870 or 805-606-9494.
08/20/2026 15:17:17
Conversation 08/20/2026
CEIE - Coord - Part 2 of 2 Air Quality Comments General Construction. The following Santa Barbara County APCD Rules apply (copies of these rules can be obtained at www.ourair.org or by contacting the 30 CES/CEIEC Air Quality Section): 201. Permits Required (contact 30 CES/CEIEC Air Quality Section to determine applicability) 302. Visible Emissions 303. Nuisance 304. Particulate Matter Northern Zone 306.
Dust and Fumes Northern Zone 311. Sulfur Content of Fuels 317. Organic Solvents 321. Solvent Cleaning Operations 323.1. Architectural Coatings 324. Disposal and Evaporation of Solvents 329. Cutback and Emulsified Asphalt Paving Materials 345. Control of Fugitive Dust from Construction and Demolition Activities 353. Adhesives and Sealants. POC
08/20/2026 15:16:40
Conversation 08/20/2026
CEIE - Coord - Part 1 of 2 Air Quality Comments General Construction. 1. Any portable equipment powered by an internal combustion engine with a rated horsepower of 50 bhp or greater used for this project must be registered in the California State-wide Portable Equipment Registration Program or have a valid Santa Barbara County Air Pollution Control District Permit to Operate. Examples of such equipment are portable generators, compressors and light-carts. 2. Offroad construction equipment must be compliant with all Federal, state and local regulations. 3. Unconfined abrasive blast materials must be certified by the California Air Resources Board. Certification statement must be on abrasive container and abrasive must be approved through the HazMat Tracking Activity/Hazmart. POC: , 08/20/2026 15:16:07
Conversation 08/20/2026
CEIE - Coord - During excavation/trenching, should you encounter any buried pipe or conduit that is anything other than uncoated metal or plastic material (e.g. cementitious or transite pipe, pipe insulation, pipe wrap, or coating applied to pipe), stop work, and contact the 30 CES/CEIEC Toxics Manager, , for assessment. Asbestos-containing material (ACM) shall not be disturbed. ACM pipe/insulated pipe can legally be abandoned in place. If removed, it must be accomplished by a Certified Asbestos Contractor.
08/20/2026 15:15:36
Conversation 08/20/2026 CEIE - Coord - Avoid removal of oaks and chaparral shrubs; trimming is preferred, see attached "NR_Oak Tree Trimming Guide" for trimming guidelines. Provide planting plan strategy if chaparral is removed south of Hwy 1. Coordinate for weed seed inspection of heavy equipment used and planting plan approval; see attached "NR_VegetationWeedSeedCleaning_PlantingPlan".
08/20/2026 15:10:16
Conversation 08/20/2026
CEIE - Coord - Any trenches or holes left open must be properly covered or have a ramp in place to prevent the entrapment of animals. See attached "NR_TrenchesAndPits" for guidance. If vegetation removal is necessary and work is conducted between 15 Feb and 15 Aug, nesting bird surveys are required and further coordination with Natural Resources. If any nesting birds are found, work will likely be delayed until the young fledged. See attached, "NR_Birds_VegTrimmingAndRemoval". POC:
l
08/20/2026 15:08:49
Conversation 08/20/2026 CEIE - Coord - No 813 required. If the project changes in any way and/or occurs a year or more from this comment, contact Environmental as our comments can change. POC:
08/20/2026 15:08:06
Comments
VANDENBERG SFB 30 CES/CEIEC
STANDARD HAZARDOUS WASTE MANAGEMENT
COMMENTS/INSTRUCTIONS
Program Manager:
Directional boring may generate CCR Title 22 regulated drilling mud-slurry mix. The Contractor is required to submit drilling lubricant/additives/Bentonite cut sheets/SDS for all chemicals proposed for use.
Contact and/or email information to . Characterization of these chemicals will determine material drying and disposal options. Drilling- process wastes using any combination of the lubricants noted above must be captured/contained and shipped to an off-base facility permitted to accept this type of waste. Waste management and disposal is the responsibility of the individual contractor, however off-base shipment of these wastes must be coordinated/approved with this office (30 CES/CEI - ).
NOTE: If the drilling process uses only hydrant-water, the resulting mix of water/sand/soil can be dried within in a typically constructed concrete-type containment/washout, for later disposal off-base as Non- Hazardous waste. Deposition of dried waste drilling muds in on-base borrow pits is prohibited.
Oak Tree Trimming Guide
From Oak Tree Trimming Guide: Best Practices and Techniques https://mcculloughtreeservice.com/tree-trimming/oak-tree-trimming-guide/
Key Items
• Oak tree trimming should preferably be done in the winter months, from January to March.
• Clean and sanitize trimming tools before use to prevent the spread of diseases.
• Encourage the growth of a dominant leader branch for structural integrity.
• Cuts should be made at proper angles and outside the branch collar to avoid damage.
• No more than a third of the canopy should be removed at a time.
Cleaning and Sanitizing Your Tools
To minimize the risk of spreading diseases between oak trees, it’s essential to thoroughly clean and sanitize your trimming tools before you begin. This involves soaking all cutting equipment such as clippers and saw blades in a solution made up of nine parts water to one part bleach. After immersing the tools in the solution, allow them to air dry before usage. This sanitization practice is one of the best practices for trimming oak trees, helping to maintain the health of your oaks and preventing the transmission of harmful pathogens.
Selecting the Proper Equipment for Trimming
Equally as important as tool sanitization is selecting the correct trimming tools for the job. The key here is to use high-quality tools that are sharp enough to make precise cuts and suitable for the size of the branches you’re intending to trim.
Choosing the right equipment for your oak tree trimming task can prevent poor healing and unnecessary damage to the tree. The ideal kit should include pruning shears for smaller branches, lopping shears for branches that are slightly out of reach, and durable saws for larger branches.
Remember, a decent trimming job starts with the right tool selection.
Trimming Tool Ideal For
Pruning Shears Trimming smaller branches and twigs
Lopping Shears Trimming branches that are slightly out of reach
Saws Trimming larger branches
Covering Trenches and Power Line Pole Holes to Avoid Safety Issues and Animal Trappings
The typical powerline pole hole size is 8- 9 ft deep and 2 ft wide.
If plywood or wood is used make sure it is thick enough to not bend or warp with the weight of dirt and gravel bags on top.
Completely cover the edges with soil, plastic, etc. so that animals cannot climb in around the edges. Cover with gravel bag and a safety cone.
This contractor used a metal rectangular cap from a roofing project to cover this hole.
You can be creative with your cover as long as it’s safe and keeps animals and people out and away.
This contractor made use of the used wire spools. This worked great because the diameter of the spool was larger than the hole. They blocked the smaller holes with tape.
For odd sized holes or trenches you can also cover the hole with plastic or landscape fabric first and then cover the hole with wood or other type of solid cover. A long piece of 2x4 (or wider) wood can be put in shallow trenches (less than 2 feet deep) for animals to climb out.
Weed Seed Inspection Guidelines General guidance on cleaning prior to bringing equipment to Vandenberg SFB
Human activities often result in the unintentional introduction of non-native species into new areas.
Vehicles, earth-moving equipment, pumps, trailers, as well as clothing, shoes, and waders can become vectors that contribute to the spread of invasive species. Inspecting work equipment is essential in preventing the spread of invasive species and is much cheaper than controlling and managing invasive species after introduction. All vehicles and equipment being brought onto installation for a project must undergo this weed-seed inspection before being brought to the work site.
Vehicle Types (including but not limited to):
• Rubber-tired land vehicles & Drill Rigs
• Tracked land vehicles
• Construction and facility equipment
To prepare for these inspections, contractors should thoroughly clean and maintain equipment offsite to the required standards to prevent delays. Vegetation, soil, mud, and loose debris that can be removed or rubbed off by hand all have a chance of containing plant cuttings or seeds. This type of material must be entirely removed to prevent introduction of weeds to work sites. Wash stations are not provided on Vandenberg SFB.
Vehicle Areas that Warrant Particular Attention
Rubber Tired Land Vehicles & Drill Rigs
• Crevices in surface and panels
• Tires, rims, and fender wells
• Spare tire mounting area (exterior)
• Bumpers
• Front and rear quarter panels
• Around and behind grills
• Undercarriage area
• Brake mechanisms
• Shock absorbers
• Front and rear axles
• Exhaust systems
• Truck Beds
• Drill bits
• Trenching and other ground disturbing attachments
Tracked Land Vehicles
• Crevices in surface and panels
• Top of axles and tensioners
• Support rollers
• Between rubber or gridded areas
• Beneath fenders
• Hatches
• Undercarriage
• Grills
• Machinery Buckets (inside and outside)
• Trenching and other ground disturbing attachments
• Tracks
• Hydraulic components
Interiors of All Vehicles
• Beneath seats
• Beneath floor mats
• Upholstery
• Beneath foot pedals
• Inside folds of gear shift cove
File details come from the government source that posted it. Updated .