Atch 7 Additional Questions and Answers 20220913.pdf
PDF 155 KB Posted
- Attached to
- FA461022R0014 Dense Wavelength Division Multiplexing (DWDM) Expansion at Vandenberg SFB, CA
- Solicitation number
- FA461022R0014
About this file
This document provides additional questions and answers related to a solicitation for Dense Wavelength Division Multiplexing (DWDM) expansion services at Vandenberg Space Force Base in California. The opportunity is a 100% small business set-aside issued by the Department of the Air Force Space Command as a firm fixed price contract. Key details include clarification that additional Ciena equipment does not need to be purchased; confirmation of correct CLIN numbers in the statement of work; removal of a warranty extension requirement; and confirmation that invoices can be submitted for completed CLINs. Site visits are scheduled for August 31 through September 2, 2022 to view existing network equipment, with a question deadline of September 9 and quote deadline of September 19, 2022.
The document addresses questions from potential offerors seeking clarification on technical requirements, equipment quantities, and contract terms for the federal opportunity to provide Dense Wavelength Division Multiplexing expansion services at Vandenberg Space Force Base in California.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 1 SOW DWDM Expansion 20220914.pdf | ||
| Atch 4 Table 1 Public 220913.xlsx | XLSX spreadsheet | |
| FA461022R00140002 DWDM Expansion RFQ Amend 2 20220914.pdf | ||
| Atch 1 SOW DWDM Expansion Track Changes 20220914.docx | DOCX document | |
| Atch 1 SOW DWDM Expansion Track Changes 20220908.docx | DOCX document | |
| FA461022R00140001 DWDM Expansion Amend 1 20220908.pdf | ||
| Atch 1 SOW DWDM Expansion _ 20220908.pdf | ||
| Atch 4 Table 1 Public 20220908.xlsx | XLSX spreadsheet | |
| Atch 5 DWDM Expansion Q and A 20220906.pdf | ||
| Atch 6 Photos Bldgs TO and GC.pdf | ||
| Atch 4 Table 1 Public 220811.xlsx | XLSX spreadsheet | |
| Atch 1 SOW DWDM Expansion 20220816.pdf | ||
| FA461022R0014 DWDM RFQ 20220819.pdf | ||
| Atch 3 BNJ DWDM Expansion.pdf | ||
| VSFB Access Request Form.xlsx | XLSX spreadsheet | |
| Atch 2 Wage Determination 2015-5647 Rev 17 07262022.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vandenberg SFB, CA PHASE III
# Section # Page # Question
Attachment 4 Table 1 Public 220811
TAB
“Sentin el”
The Excel Tab labeled “Sentinel” specifies 4 each 5142 for Site GF. The Excel Tab labeled “Sentinel GFE” shows 2 each 5142 available for site GF. Does this indicate that two additional Ciena 5142s will need to be purchased for Site GF? Or is this a typo?
PWS, Para
4.2 and Solicitation Document
PWS –
Page
Solicita tion
The CLIN identification for CLIN 0011 for buildings GD and GF Sentinel Installation, Configuration, Activation, Travel, Per Diem and CLIN 0012 for Testing and As-builts in the PWS do not match the CLINS in the Supplies or Services & Prices or Costs section in the solicitation. We believe the CLINS in paragraph 4.2 for buildings GD and GF for Sentinel should be CLIN 0001 and CLIN 0002. Can the Government please confirm?
PWS, Para
3.1 and 3.3
10 and
This requirement includes providing warranty extension as follows in Paragraph 3.1 “….shall extend the Ciena warranty on existing components as required to establish a VSFB DWDM/OTN-wide common warranty end date of 30 June 2023.” And as follows for Paragraph 3.3 “….shall extend the Ciena warranty on existing components as required to establish a VSFB DWDM/OTN-wide common warranty end date of 30 June 2023.” There are no separate CLINS for these warranty request items. Will the Government please provide separate CLINS for the equipment they wish to be covered as this is truly a separate requirement from all the other CLINS in the solicitation and we cannot include in any specific CLINS already identified in the solicitation as they may or may not be exercised? Recommend this part either be separated or additional CLINS provided for accurate submissions.
PWS,
paragraphs
3.3 and 4.7.1
Attachment 4, Table 1
PWS
Pages 11 and
Phase 3 and Sentine l TABS in Attach ment 4
Paragraph 3.3 addresses the requirements for patch panels for circuits. The Phase 3 TAB shows a large number of DS1 and DS3 circuits primarily. Does the Government require new patch panels for all of these DS1 and DS3 interfaces shown in the Phase 3 Tab of Attachment 4, Table 1? Also, per the requirements statements for this portion of the SOW may we assume the sizing of these particular patch panels are sufficient at the number of circuits stated rounded to the nearest panel size or numbers of panels sizing? Can the government please confirm the Government requires new patch panels for each location showing DS1 and DS3 connections on the Phase 3 tab? May be also assume these are standard copper DS1 circuit interfaces and coax DX3 interfaces?
For ethernet and OC level circuits, we are assuming no patch panels required as those can connect either directly from ethernet switch equipment or directly via fiber for OC level circuits on fiber optic patch panels we will be providing to support the Ciena equipment. Can the Government please confirm this assumption?
Also note we have identified 22 new fiber optic patch panels required. Are LC connectors on both ends of patch cords acceptable to the Government? Tundra Federal’s OEM Ciena prefers the use of LC connectors, This is a typo. The purchase of additional equipment will not be required.
Correct, CLINs 0011 and 0012 in section 4.2 should be CLINs 0001 and 0002, respectively.
There will now be no warranty extension on the currently installed network components.
No, sites where DS1 and DS3 are the only identified circuits will not require a patch panel.
Yes, rounding to the nearest panel size is acceptable.
Assumption confirmed.
Vandenberg SFB, CA PHASE III
Paragraph 4.7.1 addresses Sentinel patch panels for circuits. There are no Sentinel circuits shown on the Sentinel TAB. may we assume no circuit patch panels are required at those locations?
Solicitation, Contract Administrat ion Data, DFARS
Clauses Incorporate d by Full Text
252.232- 7006 Wide Area WorkFlow Payment Instructions . Dec 2018
Solicita tion Pages 25 and
The FAR instructions for WAWF include partial payment requests language. Can the Government please confirm payments will be made upon submission of acceptable documentation for each CLIN as delivered/provided/completed as applicable?
Yes, LC connectors on both patch cord ends are acceptable.
Please include patch panels at the Sentinel sites.
Yes, Invoices can be accepted as individual CLINs are completed.
File details come from the government source that posted it. Updated .