Atch 1 SOW DWDM Expansion Track Changes 20220908.docx

DOCX document 133 KB Posted

Attached to
FA461022R0014 Dense Wavelength Division Multiplexing (DWDM) Expansion at Vandenberg SFB, CA
Solicitation number
FA461022R0014
Issued by

About this file

This statement of work outlines requirements for a Dense Wavelength Division Multiplexing (DWDM) expansion project at Vandenberg Space Force Base in California. The scope includes expanding the existing DWDM/OTN network through additional core and spur nodes, with phases for initial expansion and additions to support the Sentinel program. Response is required for labor, materials, testing, documentation, training, and cybersecurity compliance. The period of performance is 24 months from notice to proceed. A pre-proposal conference will be held on specified dates in August 2022, and quotes are due by September 2022. The contract will have firm fixed pricing and is set aside for small businesses. The Department of the Air Force Space Command is the issuing agency. Deliverables include engineering plans, inventory lists, test results, training records, and artifacts demonstrating compliance with security requirements for the expanded DWDM/OTN system.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

(SOW)

Vandenberg SFB, CA

Dense Wavelength Division Multiplexing (DWDM) Expansion

8 September 2022

VANDENBERG SFB, CA

Table of Contents

1.BACKGROUND3
2.GENERAL REQUIREMENTS4
2.1Period of Performance4
2.2Working Hours4
2.3Schedule4
2.4Design Survey4
2.5Documentation6
2.6Project Management6
2.7Personnel Identification6
2.8Training7
2.9Timing7
2.10Circuit Cutovers7
2.11Network Management7
2.12Power Control and Alarms7
2.13Additional Allied Support7
2.14System Salient Characteristics8
3.PHASE 3 REQUIREMENTS10
3.1Scope10
3.2CLINS10
3.3Turnkey Solution11
3.4Power15
3.5Reserved15
4.SENTINEL REQUIREMENTS16
4.1Scope16
4.2CLINS16
4.3Turnkey Solution16
4.4Installation Schedule19
4.5Power20
4.6Ciena Equipment20
4.7Additional Allied Support21
5.OPTION: RESERVED22
6.SECURITY REQUIREMENTS22
6.1Electronic, Bluetooth, WiFi Devices22
6.2Compliance22
6.3Base Access23
6.4Facility Access Requirements23
6.5Contractor Personnel24
6.6Physical Security25
7.LAUNCH FRAMELIGHT25
8.INSTALLER QUALIFICATIONS26
9.TESTING AND TEST RESULTS26
10.INDUSTRY STANDARDS IMPLEMENTATION27
11.AS-BUILT DOCUMENTATION/ DELIVERABLES27
12.WARRANTY29
13.CYBERSECURITY ACCREDITATION29
14.ENVIRONMENTAL MANAGEMENT30
15.FINAL INSPECTION30
16.CONTRACT ADMINISTRATION/POINTS OF CONTACT31

1. BACKGROUND

Vandenberg Space Force Base (VSFB), CA has a requirement to expand the current Ciena DWDM/OTN architecture of 18 current sites to numerous other locations on the base. The growing architecture is critical to the high speed data transport of Command & Control, voice, video, telemetry, timing, and security data that directly support the current base Space Operations mission and to Range of the Future initiatives. The recently installed configuration is identified in Diagram 1. The Vandenberg base fiber between current and required expansion nodes is saturated, and a high-reliability multiplexing system is needed to expand the ability to transport fiber optic (FO) signals across the installation using multiplex technology to use the existing fiber to provide additional transport capability without installing new OSP fiber. This statement of work accomplishes two (2) objectives:

a. Phase 3 expands VSFB DWDM/OTN by adding up to 18 OTN spurs and expanding existing core nodes to meet growing needs.

b. Sentinel installs 6 new spur Packet/OTN nodes to the existing architecture in support of the Sentinel program.

2. GENERAL REQUIREMENTS

2.1 Period of Performance

The Period of Performance is 24 months from NTP (Notice to Proceed). This PoP is intended to account for currently increasing lead times for network and power components and related delayed delivery expectations. Given these specific delays, the Contractor shall schedule project activities to achieve an efficient and timely installation.

2.2 Working Hours

Installation shall be accomplished during duty hours (0730-1630). Most routine installation work cannot be accomplished during weekends, after hours, and Government holidays. The exception may be service interruptions. Any effort that may result in service interruptions must be coordinated with the 30 SCS Project Manager (30 SCS PM) a minimum of five business days in advance, and may be required to be performed after duty hours (2000 hrs-0600 hrs) unless otherwise agreed to by the 30 SCS PM.

2.3 Schedule

The Contractor shall provide an integrated master schedule and installation work plan (can be a single Integrated Master Schedule) to the Government that separately addresses Phase 3 and Sentinel requirements. The Contractor shall provide updates to the plan as activities are completed or as dates and deliverables may shift based on Government driven delays or vendor related issues affecting the timeline. This plan shall show critical milestones and include procurement, installation, configuration, testing, training and deliverables aspects.

The Contractor shall submit the formal draft of the integrated master schedule and installation work plan within 30 days of contract award for Government review and approval.

Schedule updates shall be provided to 30 SCS PM at weekly Integrated Process Team (IPT) meetings.

The Contractor shall track Government holidays and will be provided Launch Frame Light planning to schedule around these activities. See Launch Frame Light Paragraph 6.

2.4 Design Survey

The Contractor shall perform design surveys for each site. The Contractor shall provide a design and solution (including proposed installation activities) based on the results of the design survey required for this SOW and the RFP. The Design Survey shall be no later than 60 days after contract award. The design/solution shall be due to the Government for approval within 75 days after the survey.

Prior to any component requisition, the Contractor shall provide List of Material specifications to 30 SCS for review/approval.

The design solution for each site shall, at a minimum, include but is not limited to the List of Materials, floor diagrams and power single line drawings. The engineering floor drawings show rack, cabinet and equipment placement. Floor diagrams shall also show power panel connections from power panels, power runs, and, if site requires, new subpanel and transformers. AC and DC power single line drawings show power connections from DC rectifiers and batteries to new Ciena equipment. These drawings are critical for the base CES 332 process and Range approvals authorizing the installation such that efforts are not held up for Authorization to Proceed. Design Solution acceptance yields the Final Design which shall be in place 15 days before installation begins.

Project Support Agreement. The Contractor shall, as part of the Design Survey(s), finalize the design of the system expansions within 75 days after contract award. The Contractor shall develop and provide a Project Support Agreement (PSA) within 30 days after completion of the post award survey. Any design changes shall be coordinated with 30 SCS PM.

PSA Assumptions: at a minimum, 30 SCS will provide secured warehouse storage for project materials, overnight parking for utility vehicles, rack/cabinet designators, Contractor Project Manager (CPM) office space and IP Address schemes for DWDM nodes.

The Integrated Master Schedule, System Installation Plan & Project Support Agreement and Final Design deliverables require Government concurrence or acceptance. If that acceptance is not received via email within 15 days of submission, then acceptance is implied.

# Days after Authority To Proceed (ATP) Deliverable

30
Integrated Master Schedule
60
Design Survey
75
Design Solution
90
System Installation Plan & Project Support Agreement
15 days before installation begins
Final Design

VSFB requires CES 332 review and approval. Launch and Test Range Systems (LTRS) changes must follow Engineering Change Proposal (ECP), Installation Readiness Review (IRR) and Readiness Review Board processes. The contractor shall assume responsibility for or otherwise support Government efforts involved in these processes and creation of related artifacts.

2.5 Documentation

All documentation (contract deliverables, reports, plans, project master schedule, and instruction/operation/troubleshooting manuals) shall be provided electronically in Microsoft Office 2016 editable formats (Word, Excel, Visio, PowerPoint, Microsoft Project) or pdf when final. Additionally, provide Redline Floor Diagram, Rack-Elevations and Power Single Line Diagram in DXF format in AutoCAD (see para 11). Photographs shall be in .jpg format. In addition to other contract deliverables listed herein, the Contractor shall provide As-Builts as outlined in para 11.

2.6 Project Management

Contractor shall provide one full-time on-site Contractor Project Manager (CPM) to coordinate all aspects of the site survey, engineering solution, installation, testing, and acceptance certification. CPM shall be responsible for all supervision and labor/resource management activities. The Contractor shall identify by name in the Contractor’s proposal a CPM responsible as the single POC for the duration of this task order. The CPM must be a prime contractor employee, have authority to make decisions, signatory authority, and ability to commit the firm. The CPM shall be on site (VSFB) for any on-base project activity. The CPM shall be responsible for scheduling, organizing, and leading weekly meetings to track planning and progress of the project from planning stages through completion and Government acceptance. The CPM shall be responsible for providing a weekly status report deliverable in Contractor format. The CPM shall be responsible for supervision of all contract personnel and performance of all Contractor-related functions.

The CPM shall coordinate the timing of all contract and subcontract activities to ensure smooth synchronized installation by all contract teams. The effect of the CPM effort shall minimize Government involvement. (For example: timing the rack installation, power installation, node installation, fiber connections, and node configuration). This coordination includes, but is not limited to, coordinating with Government offices for site access, coordinating Government provided escorts, electronic laptop access, new rack/cabinet installation approvals, outside plant fiber connections, and final quality assurance inspections.

CPM shall consolidate and present design, single lines, and floor diagrams for approvals. CPM shall be able to brief project details and answer detailed questions about all facets of the project that might affect each site. CPM shall attend range approval and range scheduling meetings to deconflict against critical launch activities and schedules. During these meetings, CPM shall brief project status when requested.

The CPM shall assist the Government with completing any site approval forms with design specific information so as to garner final approval for installation. Such forms may require, but are not limited to: site component make, model, rack elevation, floor diagram, power single lines, power surge data and ambient power data.

2.7 Personnel Identification

Contractor personnel shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and by displaying distinguishing badges or other visible identification for meetings with Government personnel. Contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, including individual email signature lines.

2.8 Training

Within 90 days of award, the contractor shall have provided formal certification training appropriate for on-site O&M personnel supporting 3926 and 5142 equipment. On-site training is not required. Instructor led virtual training, instructor led at a Ciena site or the most appropriate options are acceptable. If training is to occur off-base, the contractor shall pay the reasonable travel expenses of the two students including but not limited to airfare, rental car, hotel and per diem. The class(es) shall be attended by 2 students. The training shall include, but not be limited to, equipment installation and maintenance, circuit provisioning and network administration and management.

2.9 Timing

Existing GPS timing source is available and can be used from either B10525 or B475, but must be transported within the DWDM architecture—not on another network nor on dedicated fiber. No other timing sources are available across VSFB for the DWDM/OTN architecture. If existing VSFB timing source is not adequate for channel synchronization, the Contractor shall design, procure, install, and connect node timing source only where required to synchronize with nodes across the DWDM architecture as identified in Diagram 2. If required, the Contractor shall install timing source in the same cabinet/rack or adjacent to the newly installed node.

2.10 Circuit Cutovers

30 SCS will perform circuit cutovers. When new node is inserted into the subtending ring, the Contractor shall work with 30 SCS to alt-route live circuits at the insertion of the new node as may be required to minimize downtime time to active circuits.

2.11 Network Management

The new DWDM/OTN nodes shall be networked within the existing Manage, Control and Plan (MCP) for management services through the overhead General Service channel (release version existing at VSFB).

2.12 Power Control and Alarms

4.4.8.1 Each new Sageon Plant shall be programmed with an IP address, provided by 30 SCS prior to construction start. Sageon Plant shall be cabled to an Ethernet port designated by 30 SCS at the time of the Design Survey. Cable shall be Cat5e or better.

4.4.8.2 Each new Sageon system shall provide hard-contact relay alarms. Contractor shall connect 100 ft. of cable for the hard-contact relay to the Sageon plant and leave it coiled on top of the plant after installation. Relay far-end termination location shall be designated and connected by 30 SCS after Final Inspection.

2.13 Additional Allied Support

When existing racks or cabinets are available, and approved by 30 SCS, install equipment in existing rack/cabinet. Contractor shall procure/install new equipment seismic zone-4 rated rack or cabinet for new DWDM/OTN equipment when necessary rack/cabinet space is not available. Exact rack/cabinet placement shall be coordinated with and approved by 30 SCS Project Manager before mounting. Power contractor shall install breakers, run the correct size/color power cables, and coil loop of cablings in the rack above the Node. Node installer shall extend coiled power and terminate into the node for system energizing.

If installing a rack or cabinet, use minimum depth cabinet so as to maximize the communication room space.

Contractor shall install all new racks/cabinets that are seismic zone-4 rated. Secure racks with top of rack and false floor bracing structure as required to support load and retain or obtain seismic zone 4 rating. Contractor shall design seismic bracing based on existing top of rack and false floor support and industry standards.

For all Ciena and Power components, the Contractor shall provide critical spare cards/modules for any system DWDM single circuit point of failure. Provide minimum 10% spare components. The 10% spare components shall take into account the entire currently installed and contracted to be installed DWDM/OTN architecture along with existing spares (i.e. the Government should have 10% spares of entire DWDM/OTN Phase 1, CSPOC, 2, Phase 3 and Sentinel.

With respect to 10% Spares, items not considered single point of failure are: Sageon Controllers, DC breakers, batteries, and rectifiers (assuming N+1 or better configuration).

2.14 System Salient Characteristics

For system interfaces and capabilities as applicable, the system shall, at a minimum, also support:

· 2WAY (Bidirectional)

· 2WAYPR (Bidirectional Path Ring)

· 2WAYDPR (Dual Bidirectional Path Ring)

· DWDM capabilities with 88 possible wavelengths on the main chassis

· DS1 and lower speed TDM equipment shall support at least 16 DS1’s natively and can be a separate chassis from the main transport chassis

· The system shall support performance monitoring

· The system shall be able to support QoS, MPLS, tunable 50GHZ compliant DWDM line interface (1528.77nm to 1566.72nm)

· Facility loopback on the line facility (100Gb portion)

· Facility and terminal loopback (10G Packet/OTN interface)

· Packet switching services

· Hot pluggable XFP modules with auto detection

· Manual provisioning of XFP modules

· Multiple cross connection rates (10G Packet/OTN interface)

· 48GE SFP circuits supporting GE Ethernet signal (ETH 1G, optical 1000Base-X, and 100FX), and 850, 1310, 1490, 1550 SFP client interfaces

· MPLS: MPLS LER, MPLS-TP E-Line (VPWS) and E-LAN (VPLS) services

· OTN circuits:

· SONET/SDH monitored (with PMs and alarming) transparent clients for these rates: OC3/STM1, OC12/STM4, and OC48/STM16 SONET/SDH mapping of OC3/STM1 or OC12/STM4 to ODU0 or SONET/SDH mapping of OC48/STM16 to ODU1

· Ethernet clients: GbE (ETH): Ethernet mapping of GbE to ODU0

· Supports unprotected, 1+1 linear, 1+1 port TPT, SNCP, and ASNCP traffic protection schemes

2.14.1 No single point of failure

As it applies to core and subtending ring nodes (those which include, for example, a Ciena 6500, the proposed solution must support no single point of failure architecture for the following at a minimum:

· Redundant A + B power modules

· Each A and B bus can support 100 amps of power on each bus and is capable of powering the entire shelf even if a power module, or source power is lost on 1 breaker feed.

· 2+N Redundant Shelf cooling trays

· The individual fans in the fan trays are variable speed. In the event of a fan failure all other remaining fans speed up to maintain proper systems temperature.

· Redundant Dual CPU Shelf Processors with dual on board CPU’s and enhanced memory to ensure that no shelf processor failure would prevent the commissioning of new services on any shelf.

· Redundant Packet/OTN switch fabrics: Dual Service connections to any additional chassis supporting other services not services natively on the main transport nodes (e.g. DS1 chassis support). The connections between any supporting chassis/system and the transport system will be supported across 2 connections so as to prevent a client access connection failure in the low speed aggregation portion of the system design.

Installed components shall be fully compatible with the Vandenberg fiber optic infrastructure (the expansion Packet/DWDM/OTN system shall be capable of easily accepting, transporting, and dropping off all circuit types, at a minimum including, but not limited to, DS-1s, DS-3s, OC-48, OC-192, Ethernet interface types).

All expansion equipment shall be compatible with and shall be managed by the Ciena/ Sageon management systems currently in place at VSFB.

The system expansions must be survivable to provide high reliability service (99.999% uptime) and full redundancy in the fiber paths. The system shall have dual redundant power supplies for each chassis.

3. PHASE 3 REQUIREMENTS

3.1 Scope

The Contractor shall design, procure, install and configure DWDM/OTN components for operational transport within the subtending rings as identified in Diagram 2 and requirements outlined in this SOW. The scope of the procurement/installation shall be limited to the site components identified in the Phase 3 worksheet of Attachment 4 Table 1. Contractor shall procure Ciena 5142, Ciena 3926 transport nodes and Ciena Broadband Interfaces (9.95G-11.09G Multirate, 1550NM, SMF, 40KM XFP) as identified in columns B, C, and I of the Phase 3 worksheet. Procure and install power components to adequately support new node or spur components and existing loads identified in columns O and P or D1 and D2 of the Phase 3 worksheet. Contractor shall procure and install Ciena Broadband Interfaces for existing nodes and spurs as appropriate., and shall extend the Ciena warranty or Select Support maintenance services on existing components as required to establish a VSFB DWDM/OTN-wide common warranty end date of 30 June 2023. Thorough testing shall demonstrate full operational use of the network and the above described components. The Contractor shall deliver comprehensive As-Built deliverables to include a list of all hardware, software, design drawings, and test results.

3.2 CLINS

Acquisition activities for Phase 3 and the options as identified in this SOW. See attachment 4 Table 1.

PHASE 3

CLIN 0025 for Labor Installation, Configuration, Travel, Per Diem CLIN 0026 for Testing & As-builts CLIN 0027 for Accreditation CLIN 0028 for Materials

OPTION TO, TK, TR, for respective buildings CLIN 0009 for Labor Installation, Configuration, Travel, Per Diem CLIN 0010 for Testing and As-builts CLIN 0011 for Accreditation CLIN 0012 for Materials

OPTION TJ for building TJ CLIN 0013 for Labor Installation, Configuration, Travel, Per Diem CLIN 0014 for Testing and As-builts CLIN 0015 for Accreditation CLIN 0016 for Materials

OPTION TL, TQ for buildings TL and TQ CLIN 0017 for Labor Installation, Configuration, Travel, Per Diem CLIN 0018 for Testing and As-builts CLIN 0019 for Accreditation CLIN 0020 for Materials

OPTION TM, TN for buildings TM and TN CLIN 0021 for Labor Installation, Configuration, Travel, Per Diem CLIN 0022 for Testing and As-builts CLIN 0023 for Accreditation CLIN 0024 for Materials

3.3 Turnkey Solution

The installation of the Core node expanding equipment, 13 DWDM Spur nodes, the expansion of the 8 core nodes and, if awarded, the up to 6 optional spurs and optional decommission, removal and replacement of -48VDC power plant shall be a turnkey solution. Turnkey solution meaning the DWDM/OTN system shall be fully installed, connected, configured, powered and back-up battery powered for operational use. The results shall Fbe such that local Operations & Maintenance (O&M) technicians will be able to provision new circuits and/or cut over existing circuits onto any of the two East/West 10G channels without Contractor assistance and without acquiring any additional components, hardware, software, licensing or accreditation.

Expand the current Ciena equipment installed through previous contracts. All equipment must be new and from the Ciena product lines to ensure full compatibility with the existing equipment for operational and management purposes. Further, required power equipment shall consist of Sageon Rectifiers and C&D Technologies (C&D) or East Penn Batteries. Each power plant shall provide a minimum of 8 hours of battery backup where installed. Power plants and batteries shall provide capacity for 25% additional load. An abbreviated architectural drawing of the current DWDM network is included in Diagram 1.

Note: Diagrams 1 and 2 use two (2) character alpha references for identification purposes. Actual details will be available at and after the bidder’s conference.

The Phase 3 expansion grows core ring nodes and adds spurs to the existing DWDM network as shown in Diagram 2. One additional node, a spur in building TL, is optional. There is a power plant related option. The required and optional work is defined in column A, rows 24-30 of the Phase 3 worksheet of Attachment Table 1. Core ring nodes expansion, as reflected in rows 31-38, addresses needs to add broadband interfaces. In Phase 3, the Contractor shall install customer circuit patch panels as required. and shall extend current equipment warranties to cover VSFB-wide DWDM Ciena maintenance of network equipment until a common VSFB-wide DWDM/OTN common end date of 30 June 2023.

Diagram 1 – Current DWDM Architecture/Topology

Diagram 2 – Future Phase of the DWDM Architecture/Topology

3.4 Power

The new DWDM/OTN nodes shall be powered by -48VDC components.

The Contractor shall procure and install 50A rectifiers for new and existing loads as reflected in the Phase 3 worksheet, Attachment Table 1, column D2. Use base standard Micro Sageon or Sageon II rectifiers. Contractor shall procure and install properly sized batteries. Use base standard C&D TEL12 or C&D AT-P batteries (or East Penn Batteries Fahrenheit HT170ET or equivalent). Rectifiers and batteries shall provide 50A capacity.

Battery load sizing shall be minimum 8 hours during loss of commercial and generator power.

Install DC power distribution breaker/fusing to provide for the 50A load. Install properly sized power disconnects.

Red-colored DC power cable shall be -48VDC, and Black-colored cable shall be the return. Battery cables may be of a solid color and marked with red or black at each end.

The Contractor shall, as required, install properly sized AC circuit breaker and conduit/cabling connecting the Power Panel to rectifiers.

The power circuitry and rectifiers shall be setup such that if a primary power feed goes down, the redundant power keeps the node fully operational.

Power contractor shall be responsible for installing all new power from AC power panel to rectifiers and batteries to Ciena nodes.

Each battery string shall identify the Pilot Cell, with the Pilot Cell meaning the individual cell, or battery if a multi-cell battery, with the lowest voltage reading while on float charge.

The new DWDM/OTN nodes shall be powered by -48VDC components.

The contractor shall procure and install properly sized rectifiers for new and existing loads as reflected in the Phase 3 worksheet, Attachment Table 1, column D2. Use base standard Micro Sageon or Sageon II rectifiers. Contractor shall procure and install properly sized batteries as may be required. Use base standard C&D TEL12 or C&D AT-P batteries (or East Penn Batteries Fahrenheit HT170ET or equivalent). Rectifiers and batteries shall provide capacity to provide for 25% additional load.

Size the rectifiers and batteries to sustain existing and new load (see existing load in Attachment, Table 1, Column D1). Rectifier load sizing shall be N+1 or better, meaning, rectifiers shall cover total amperage load, and in the event one rectifier fails, the remaining rectifiers sustain entire load. In some cases, existing Micro Sageon rectifiers need to be either added to an existing rectifier in a spare slot, or replace the entire chassis with new Sageon rectifier chassis.

Battery load sizing shall be minimum 8 hours during loss of commercial and generator power. In some cases existing batteries are sufficient. In most cases, existing batteries shall be replaced. And in some cases, add to existing battery strings. At each site, batteries shall be no older than 5 years from date of contract award. Batteries to be replaced will be identified during the bidder conference.

Install DC power distribution breaker/fusing such that new DWDM/OTN and legacy loads are adequately powered for operation. Install properly sized power disconnects.

Red-colored DC power cable shall be -48VDC, and Black-colored cable shall be the return. Battery cables may be of a solid color and marked with red or black at each end.

The Contractor shall remove and dispose of the old power equipment that new components have been installed to replace. The Government reserves the right to keep any removed legacy components, except batteries more than 4 years old, to be reused elsewhere—if the Government elects this option, the Contractor will not be held responsible to disposition nor reinstall the said equipment.

The Contractor shall, as required, install properly sized AC circuit breaker and conduit/cabling connection Power Panel to rectifiers.

The power circuitry shall be setup such that if a primary power feed goes down, the redundant power keeps the node fully operational.

Power contractor shall be responsible for installing all new power from rectifiers and batteries to new Ciena nodes.

Each battery string shall identify the Pilot Cell, with the Pilot Cell meaning the individual cell, or battery if a multi-cell battery, with the lowest voltage reading while on float charge.

3.5 Option TQ and Asbestos Abatement RESERVED

Should Option TQ be activated, the Contractor shall perform Asbestos Abatement where installing new equipment racks/cabinets IAW base standards. Any work involving the disturbance of Asbestos Containing Material (ACM) shall be performed by a technician that is minimally Class III AHERA approved and in compliance with Cal OSHA, EM-385-1-1 Manual, and VAFB Spec 01000 & 01010. Asbestos Abatement shall not commence without coordination and written approval by the 30th Civil Engineering Squadron.

4. SENTINEL REQUIREMENTS

4.1 Scope

GFE is identified in the Sentinel GFE worksheet of Attachment Table 1. With that exception, the contractor shall design, procure, install and configure Packet/OTN components for operational transport within the DWDM network as shown in Diagram 1 and requirements outlined in this SOW. The scope of the procurement/installation shall be limited to installing the right equipment to support the transport of what will be the Sentinel circuits that will eventually be connected to the configured Ciena equipment. New nodes and associated power equipment shall be installed at six (6) sites. Procure (except as noted in the Sentinel GFE worksheet of Attachment Table 1) and install power components to adequately support new spur node components. The power shall support a 50A capacity. Thorough testing shall demonstrate full operational use. The contractor shall deliver comprehensive As-Built deliverables to include a list of all hardware, software, design drawings, and test results (see section 8).

4.2 CLINS

Acquisition activity CLINs:

CLIN 0011 for buildings GD and GF Sentinel Installation, Configuration, Activation, Travel, Per Diem CLIN 0012 for Testing and As-builts

CLIN 0003 for buildings GA and GB Sentinel Installation, Configuration, Activation, Travel, Per Diem CLIN 0004 for Testing and As-builts

CLIN 0005or buildings GC and GE Sentinel Installation, Configuration, Activation, Travel, Per Diem CLIN 0006 for Testing and As-builts

CLIN 0007 for Accreditation CLIN 0008 for Materials

4.3 Turnkey Solution

Expand the current VSFB DWDM network to support Sentinel transport requirements. The government is providing Government Furnished Equipment as listed in the Sentinel GFE worksheet of Attachment Table 1. The contractor shall install the GFE equipment as outlined throughout this SOW. All other equipment components needed to meet this SOW must be new. Required power equipment shall consist of Sageon Rectifiers and C&D or East Penn Batteries. Each power plant shall provide a minimum of 8 hours of battery backup where installed. An abbreviated architectural drawing of the current DWDM network is included in Diagram 3.

Note: Diagram 3 uses two (2) character alpha references for identification purposes. Actual details will be available at and after the bidder’s conference.

The contractor shall install Government Furnished Ciena 5142s at each of the six (6) Sentinel sites identified in Diagram 3. All Core Ring and Subtending Ring Nodes are configured as Reconfigurable Add/Drop Multiplexors (ROADMS). They are configured with 100G DWDM Coherent optics in the core ring and are capable of switching both OTN and Ethernet services within the same physical shelf and path.

The Sentinel installation of the 6 Packet/TDM Spur nodes shall be a Turnkey Solution. Turnkey solution meaning the DWDM/OTN extensions shall be fully installed, connected, configured, powered and back-up battery powered for operational use. The results shall be such that local Operations & Maintenance (O&M) technicians will be able to provision new circuits (outlined in Table 1) and/or cut over existing circuits onto any node without contractor assistance and without acquiring any additional components, hardware, software, licensing or accreditation.

Diagram 3 –DWDM Sentinel (GBSD) Architecture/Topology

4.4 Installation Schedule

The installation window at each site is as follows

· GD1/27/23 - 3/2/23
· GF2/17/23 -03/23/23
· GA3/11/23 - 4/12/23
· GB5/13/23 - 6/14/23
· GC6/17/23 - 7/19/23
· GE7/22/23 - 8/23/23

These windows are subject to change.

The installation at each site will not start until the window opens, primarily because renovation must complete before DWDM installation begins. The installation at each site shall complete and be operationally ready by the end of each window.

The Government will provide a site visit and/or planned Communication room drawings at the Bidders Site Visit.

4.5 Power

The new DWDM/OTN nodes shall be powered by -48VDC components.

The Contractor shall procure and install 50A rectifiers. Use base standard Micro Sageon or Sageon II rectifiers. Contractor shall procure and install properly sized batteries. Use base standard C&D TEL12 or C&D AT-P batteries (or East Penn Batteries Fahrenheit HT170ET or equivalent). Rectifiers and batteries shall provide 50A capacity.

Battery load sizing shall be minimum 8 hours during loss of commercial and generator power.

Install DC power distribution breaker/fusing to provide for the 50A load. Install properly sized power disconnects.

Red-colored DC power cable shall be -48VDC, and Black-colored cable shall be the return. Battery cables may be of a solid color and marked with red or black at each end.

The Contractor shall, as required, install properly sized AC circuit breaker and conduit/cabling connecting the Power Panel to rectifiers.

The power circuitry and rectifiers shall be setup such that if a primary power feed goes down, the redundant power keeps the node fully operational.

Power contractor shall be responsible for installing all new power from AC power panel to rectifiers and batteries to Ciena nodes.

Each battery string shall identify the Pilot Cell, with the Pilot Cell meaning the individual cell, or battery if a multi-cell battery, with the lowest voltage reading while on float charge.

4.6 Ciena Equipment

The contractor shall install Government Furnished Ciena 5142 nodes at each of the six (6) Sentinel sites identified in Diagram 1 and in the Sentinel worksheet of Attachment Table 1Nodes are configured as Reconfigurable Add/Drop Multiplexors (ROADMS).

The Contractor shall install and configure OTN optical components for insertion into the active two-channel 10G subtending ring as shown in Diagram 3. The new channels shall be activated such that 30 SCS technicians can provision new circuits through any channel to reach any node on the DWDM/OTN on the first day of system acceptance. The node shall be capable of expanding to 88-channels at a later date (different project).

Installed components shall be fully compatible with the Vandenberg fiber optic infrastructure (the expansion Packet/DWDM/OTN system shall be capable of easily accepting, transporting, and dropping off all circuit types, at a minimum including, but not limited to, DS-1s, DS-3s, OC-3 & OC-12, Ethernet interface types).

The system expansions must be survivable to provide high reliability service (99.999% uptime). The system shall have dual redundant power supplies for each chassis. It is understood by the government that there will not be additional fiber strands for a redundant path for the new Ciena node.

At each site the contractor shall procure and install fiber optic tray work consistent with the B12000 DWDM/OTN installation. The fiber tray work will connect new nodes to each other and to existing fiber optic patch panels. Use base standard Anixter FGS-MSHS-B or equivalent Fiber Guide Fiber Management System. For sites with existing tray work, match new tray work dimension with the existing tray. Tray work shall allow fiber drop off exits at each comm rack/cabinet along the tray route. Use applicable angle, ends, tops, threaded rod, cover, and hinge, auxiliary framing kits as needed for a complete installation.

Contractor shall install fiber jumpers and run through fiber tray work and coordinate with 30 SCS Outside Plant (OSP) for jumper connections at the patch panel (only 30 SCS OSP technicians are authorized in fiber patch panels). Most fiber patch panels use ST-type connectors.

The Ciena node shall be connected by a single pair of Government-provided single mode (SM) fiber ports.

Contractor shall perform Fiber Characterization necessary to successfully optimize component connection/configuration. Characterization shall be completed prior to design It shall be assumed existing Government interconnecting fiber is adequate for transport. In the event existing fiber optic cabling is inadequate, and contractor can demonstrate cable inadequacy, the Government will facilitate a cabling solution. If a solution is not readily available, the contractor shall demonstrate node transport/reception capability (loop tests with inserted db-loss attenuation), and the Government will accept the contractor’s node and resolve the fiber issue separately.

When integrating the new spur into the subtending node, there shall be no service interruption to live circuits passing through the existing subtending node. If service interruption is required the contractor shall work with 30 SCS to alt-route live circuits to minimize any downtime time to active circuits. Node shall be set up such that adding additional photonic channels at the node does not interfere with traffic on existing channels.

4.7 Additional Allied Support

When existing racks or cabinets are available, and approved by 30 SCS, install equipment in existing rack/cabinet. Contractor shall procure/install new equipment seismic zone-4 rated rack or cabinet for new DWDM/OTN equipment when necessary rack/cabinet space is not available. Exact rack/cabinet placement shall be coordinated with and approved by 30 SCS Project Manager before mounting. Power contractor shall install breakers, run the correct size/color power cables, and coil loop of cablings in the rack above the Node. Node installer shall extend coiled power and terminate into the node for system energizing.

If installing a rack or cabinet, use minimum depth cabinet so as to maximize the communication room space.

The Contractor shall procure and install new seismic zone-4 rated cabinets that can protect Ciena equipment from dust and the elements. The cabinet shall be equipped with cooling fans.

Contractor shall install all new racks/cabinets that are seismic zone-4 rated. Secure racks as required to retain or obtain seismic zone 4 rating.

4.7.1 Patch Panels

Design and install appropriately sized new patch panels to bring in new circuits identified in Table 1. Size the patch panels to add 50% growth. This shall be the demarcation point for all customer circuits.

5. RESERVED

6. SECURITY REQUIREMENTS

At all times while on VSFB premises, Contractor representatives shall comply with VSFB security requirements imposed by the Installation Commander. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at VSFB. The Contractor shall be responsible for accountability of all such media issued to Contractor personnel and these media shall be surrendered to the 30th Security Forces Squadron (30 SFS) Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment with the Contractor. The Contractor shall comply with all VSFB policies regarding entry to the installation, rules of the road, contingency operations compliance, and cell phone and photography prohibitions. Contractor representatives are authorized entry to the installation only for the purpose of work under this contract, and are not authorized in other facilities or areas without prior Government authorization.

6.1 Electronic, Bluetooth, WiFi Devices

No Electronic, Bluetooth or WiFi devices are authorized in Restricted Areas. Those areas will be identified during the bidders site visit. If a computer/laptop is required to configure the installed equipment, the Contractor shall develop and process necessary approval documents for authorizing laptops into the communication room. At a minimum, laptop operators must provide make, model, serial number of the laptop and have access to the BIOS such that authorization officials can validate that WiFi, Bluetooth, video/audio recording, and external ports are disabled (with the exception of the port needed to connect to the newly installed equipment for configuration).

Contractor shall hand carry approval documents throughout required Government approval offices prior to the issuing of the approval of the electronic device to enter a communication room.

6.2 Compliance

The Contractor shall comply with Air Force Instruction (AFI) 31-101, DoDM5220.22v2_AFMAN16-1406v2, Space Launch Delta 30 Integrated Defense Plan (IDP), local security requirements, and shall possess a valid facility clearance at the Secret or higher level issued by the Defense Security Service (DSS). Each Contractor representative must have a valid Secret security clearance and meet all of the requirements for unescorted access into the Restricted Area as well as the installation IAW the IDP. Personnel will have to complete Physical Security Training per AFI 31-101 and IDP before being processed for an Automated Entry Control Card (AECC) by the Unit Security Manager (USM). If necessary, the security escort provider will enter into an appropriate Visitor Group Security Agreement (VGSA) with VSFB IAW DoDM5220.22v2_AFMAN16-1406v2 requirements. The Contractor is responsible for ensuring all Contractor employees performing work on VSFB possess and maintain applicable/current certification(s), license(s), and permit(s) to perform required services on VSFB.

6.3 Base Access

Current security access restrictions at the Santa Maria Gate (Main Base Entry Gate) require all Contractor vehicles (which are the size of a standard bread delivery truck or larger) to enter only through the Lompoc Gate (located at intersection of Santa Lucia Road and Pine Canyon Road). There is a vehicle check pull-off area at that gate and the Contractor will be required to submit to a vehicle search prior to gaining entry to the base. Contractor should plan and allow for delays as a result of in-place security procedures.

6.3.1 Base Access Letter

To request base access, the Contractor shall send a letter to the Contracting Officer. The letter must be on company stationary and shall include: Contractor’s company address and telephone number, the contract number, names of the Contractor Program (On-site) Manager and Contractor Security Manager, and their alternates, and names of the escorts requiring access to VSFB, their social security numbers, and duty hours. After approval, this letter will be maintained on file with 30 SFS at the Visitor’s Control Center, Building 17596. Contractor shall provide this letter at the pre-performance conference and submit updated letters as changes occur. Entry requirements are subject to change, without notice, due to installation and world situations.

6.4 Facility Access Requirements

After processing the Base Access Letter, to be able to perform PWS defined responsibilities, the Contractor representative shall be a U.S. Citizen and shall hold a minimum of an active DoD Secret clearance. New requests for clearance or investigation shall not be processed.

6.4.1 AECC Processing

Access to some buildings is more restricted, requiring an Automated Entry Control Card (AECC) granting escort responsibilities.

With a Secret clearance and a completed form AF2586, granting access and escort privileges may take approximately 30 days. If the Defense Investigation System for Security (DISS) reflects a clearance, Form 2586 will be processed for a candidate to receive an AECC.

The Contractor shall not employ persons for work on this contract if such representative is identified to the Contractor by the 30 SFS as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

6.4.2 Key Control

The Contractor shall establish and implement methods of making sure all keys, key cards and key fobs issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. All references to keys herein include key cards and key fobs. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the CO.

In the event keys are lost or duplicated, the Contractor shall re-key or replace the affected lock/locks only at the direction of the CO. However, the Government may replace the affected lock/locks or perform re-keying. When the Government performs replacement of locks or re-keying as a result of Contractor key loss or duplication, the total cost of re-keying or the replacement of the lock/locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from a payment due the Contractor.

The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s representatives. The Contractor shall prohibit the opening of locked areas by Contractor representatives to permit entrance of persons other than Contractor representatives engaged in the performance of assigned work in those areas, or personnel authorized entrance by the CO.

6.4.3 Lock Combinations

The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s QCP.

6.5 Contractor Personnel

Upon employment, and after the Contractor’s base access letter is on file with the 30 SFS, all Contractor representatives shall apply for vehicle passes and individual identification badges at the VSFB 30 SFS, Visitor's Control Center, Building 17596. The PjM will assist, as required.

Passes may be picked up Monday through Friday 6:00am – 6:00pm Pacific Time. No appointment is necessary. The Contractor shall surrender all passes and identification badges to the 30 SFS on the first workday following completion or termination of the contract or termination of a Contractor representative’s employment.

6.5.1 Language

Due to safety and security, all Contractor personnel shall be able to fluently speak, read, and write English.

6.5.2 Identification of Contractor Personnel

All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. Contractor personnel will be required to obtain and wear badges in the performance of this service.

6.5.3 Facility Security Officer

Upon contract award, the Contractor shall, in writing to the Contracting Officer, identify the Contractor or subcontractor(s) Facility Security Officers (FSO). The on-site Contractor Project Manager shall be the Contractor or subcontractor(s) point of contact for all security matters. Within five (5) working days of contract award, the Contractor’s PM and FSO(s) shall meet with the 30 SCS PM and/or Unit Security Manager for assistance in satisfying Contractor personnel security requirements.

6.5.4 Security Briefings

Contractor personnel shall attend a security and OPSEC orientation under HSPD Title 12. Contractor shall schedule initial and annual refresher training (for all assigned Contractor personnel) through the 30 SCS PM.

All Contractor personnel shall be thoroughly briefed by the PjM on established security requirements and procedures as stipulated in Air Force Policy Directive (AFPD) 31-1 Physical Security Program.

The Contractor shall brief all personnel that they shall immediately leave any area upon notification by the Contracting Officer Representative (COR) constituted authority, or the 30 SFS, when directed, as occasional operational requirements, real world activities, or emergencies dictate.

6.6 Physical Security

The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use.

7. LAUNCH FRAMELIGHT

The Contractor shall be prepared to stop all work when directed by the Government during launch operations per current base “FRAMELIGHT” policy. A notice of NO Digging and NO Communications Room work will be issued during these times. This includes work in communication rooms, maintenance holes, trenches, and other associated ground work below grade. The Contractor shall plan for approximately six (6) full duty days of down time per month. The 30 SCS Project Manager will advise Contractor of upcoming FRAMELIGHT activity.

The base Frame Light policy is currently being evaluated in a case by case basis. If the work being accomplished is considered minimal risk, a waiver request completed by and approved by the government may preclude work stoppage during the Frame Light. The 30 SCS PM will provide a minimum of two weeks’ notice such that the contractor can plan accordingly to perform work when the government has authorized an approved Frame Light waiver for the contractor work.

8. INSTALLER QUALIFICATIONS

The Contractor shall be Ciena 3926, 5142, 6500 certified and have a minimum of five (5) years verifiable experience successfully installing and working with network systems. Installers must have certification to ensure warranty coverage continues for covered existing and newly installed DWDM/OTN components.

The Contractor shall be factory-certified and/or factory authorized installers on Unipower Sageon series power distribution, C&D batteries and East Penn batteries. Contractor shall have a minimum of five (5) years verifiable experience successfully installing and installing Micro Sageon rectifiers and integrating them with commercial power, battery power, and connecting to loads.

Contractor shall review B12000 DWDM/OTN and power installation and commit to installing new DWDM/OTN and power equipment with the same exact level of quality.

All contractor personnel shall be US Citizens and possess a REAL ID Driver’s License (or equivalent).

Contractor personnel shall be able to communicate solutions to customers and coordinate communication with internal Ciena organizations to resolve issues in the field, within the limitations of Government security policies.