Atch 6 Photos Bldgs TO and GC.pdf
PDF 4 MB Posted
- Attached to
- FA461022R0014 Dense Wavelength Division Multiplexing (DWDM) Expansion at Vandenberg SFB, CA
- Solicitation number
- FA461022R0014
About this file
This document includes a solicitation for a federal contract opportunity along with supporting files. The solicitation seeks quotes for Dense Wavelength Division Multiplexing (DWDM) expansion services at Vandenberg Space Force Base in California. The opportunity is a 100% small business set-aside for other computer related services with a $30 million size standard. Quotes are due no later than September 19, 2022 at 12:00 PM PDT and must be submitted electronically. A pre-proposal site visit will be held from August 31 through September 2, 2022 for prospective offerors to view existing site conditions and equipment. The contract will be firm-fixed price based on the line item structure in the attached SF1449 request for quote. The Department of the Air Force Space Command is listed as the issuing agency.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comm Room Photos for building TO
Building TO involves the use of existing power plan to supply the new network equipment. The distance from the building/comm room door is approximately 50 feet. The distance between the power and network equipment racks is standard required separation. The network equipment will go in the associated rack in RUs 3-9 and 11-15 wire wrap panel will move up to create sufficient space.
Comm Room Photos for building GC
Building GC involves the installation of two new racks, one for DC power, one for network equipment, in a new row on raised floor. The rack installation will need rack/floor bracing as appropriate to meet zone 4 requirements. The following pictures include the stairway that equipment will need to move down to the comm room; removed raised floor tiles to show the under floor for power routing, cabling and support as required; the power panel from which the DC power plant will be sourced; and others that may be useful.
The Sentinel buildings are under construction and detailed comm room layouts are currently unavailable. With the exception of building GC (shown in the photos below) each location has the power and network equipment racks side by side. The rooms are green field, empty, and the racks will be on concrete floors. AC power panel position is not readily available.