FA4610-12-R-0019_RFQ.doc
DOC document 667 KB Posted
- Attached to
- Base-Wide Appliances Federal contract opportunity
- Solicitation number
- FA4610-12-R-0019
About this file
Request for Quotation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Rev_3_Appliances_SOW_2013-03-12.doc | DOC document | |
| FA4610-12-R-0019-0003_Conformed_Solicitation.doc | DOC document | |
| FA4610-12-R-0019-0003_Amendment.doc | DOC document | |
| Q_ _As _Rev_2 _2013-03-12.docx | DOCX document | |
| FA4610-12-R-0019-0002_Conformed.doc | DOC document | |
| Attachment_1 _Rev_2 _Appliances_SOW_2013-03-06.doc | DOC document | |
| Q_ _As_dtd_6_March_2013.docx | DOCX document | |
| FA4610-12-R-0019-0001_Amendment.doc | DOC document | |
| FA4610-12-R-0019-0001_Conformed_Solicitation.doc | DOC document | |
| Attachment_1 _Rev_1 _Appliances_SOW_2013-02-27.doc | DOC document | |
| Q_ _As_dtd_27_February_13.docx | DOCX document | |
| Attachment_1_Appliances_SOW _2013-02-14.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Basewide Appliances
FFP
Contractor shall provide leased washers and dryers in accordance with Attachment 1, Statement of Work (SOW). Salient characteristics for washers and dryers are provided in Appendix A to the SOW.
Contractor shall provide all management, personnel, equipment, tools, materials, supervision, labor and all other items and services to perform service calls, to include appliance installation, maintenance, repair, replacement, removal, and disposal in accordance with the SOW.
**This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs 0001 - 0010.**
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NSN: W072-00-000-0000
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
Appliance Service Call
Routine, normal duty hours
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each |
Ice Dispenser Service Call
Routine, normal duty hours
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
Emergency Service Call
Emergency, outside normal duty hours
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
Relocation Service Call
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Stackable Commercial Washer
Washer: Electric, stackable, front-load, (Energy Star Qualified)
MFG: Whirlpool
Model: WFW9400S or equal
Unit Price $__________ x 13 Each = $____________ per month
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Standard Commercial Washer
Washer: Electric, Size A&B (Energy Star Qualified)
Size A MFG: Speed Queen
Size A Model: LWS02NW or equal
Size B MFG: Crosley
Size B Model: CAWB522SQ or equal
Unit Price $__________ x 140 Each = $____________ per month
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Standard Commercial Dryer
Dryer: Electric/Gas, standard (Energy Star Qualified)
Electric MFG: Speed Queen
Electric Model: LES37AWF or equal
Gas MFG: Speed Queen
Gas Model: LGS37AWF or equal
Unit Price $__________ x 113 Each = $____________ per month
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Stackable Commercial Dryer
Dryer: Electric/Gas, stackable (Energy Star Qualified)
Gas MFG: Speed Queen
Gas Model: KGS17AWF or equal
Gas MFG: Whirlpool
Gas Model: WGD9400S or equal
Electric MFG: Speed Queen
Electric Model: KES17AWF or equal
Unit Price $__________ x 51 Each = $____________ per month
Basic Period: 1 Apr 2013 - 31 Mar 2014
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Dollars, U.S.
Reimbursable Parts
COST
Basic Period: 1 Apr 2013 - 31 Mar 2014
Government-provided estimate: $5,000.00 / year
FOB: Destination
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Basewide Appliances OY1 |
FFP
Contractor shall provide leased washers and dryers in accordance with Attachment 1, Statement of Work (SOW). Salient characteristics for washers and dryers are provided in Appendix A to the SOW.
Contractor shall provide all management, personnel, equipment, tools, materials, supervision, labor and all other items and services to perform service calls, to include appliance installation, maintenance, repair, replacement, removal, and disposal in accordance with the SOW.
**This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs 1001 - 1010.**
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
| OPTION |
| Appliance Service Call OY1 |
FFP
Routine, normal duty hours
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each |
| OPTION |
| Ice Dispenser Service Call OY1 |
FFP
Routine, normal duty hours
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| Emergency Service Call OY1 |
FFP
Emergency, outside normal duty hours
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| Relocation Service Call OY1 |
FFP
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Washer OY1 |
FFP
Washer: Electric, stackable, front-load, (Energy Star Qualified)
MFG: Whirlpool
Model: WFW9400S or equal
Unit Price $__________ x 13 Each = $____________ per month
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Washer OY1 |
FFP
Washer: Electric, Size A&B (Energy Star Qualified)
Size A MFG: Speed Queen
Size A Model: LWS02NW or equal
Size B MFG: Crosley
Size B Model: CAWB522SQ or equal
Unit Price $__________ x 140 Each = $____________ per month
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Dryer OY1 |
FFP
Dryer: Electric/Gas, standard (Energy Star Qualified)
Electric MFG: Speed Queen
Electric Model: LES37AWF or equal
Gas MFG: Speed Queen
Gas Model: LGS37AWF or equal
Unit Price $__________ x 113 Each = $____________ per month
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Dryer OY1 |
FFP
Dryer: Electric/Gas, stackable (Energy Star Qualified)
Gas MFG: Speed Queen
Gas Model: KGS17AWF or equal
Gas MFG: Whirlpool
Gas Model: WGD9400S or equal
Electric MFG: Speed Queen
Electric Model: KES17AWF or equal
Unit Price $__________ x 51 Each = $____________ per month
Option Year 1: 1 Apr 2014 - 31 Mar 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Dollars, U.S.
| OPTION |
| Reimbursable Parts OY1 |
COST
Option Year 1: 1 Apr 2014 - 31 Mar 2015
Government-provided estimate: $5,000.00 / year
FOB: Destination
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Basewide Appliances OY2 |
FFP
Contractor shall provide leased washers and dryers in accordance with Attachment 1, Statement of Work (SOW). Salient characteristics for washers and dryers are provided in Appendix A to the SOW.
Contractor shall provide all management, personnel, equipment, tools, materials, supervision, labor and all other items and services to perform service calls, to include appliance installation, maintenance, repair, replacement, removal, and disposal in accordance with the SOW.
**This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs 2001 - 2010.**
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
| OPTION |
| Appliance Service Call OY2 |
FFP
Routine, normal duty hours
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each |
| OPTION |
| Ice Dispenser Service Call OY2 |
FFP
Routine, normal duty hours
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| Emergency Service Call OY2 |
FFP
Emergency, outside normal duty hours
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| Relocation Service Call OY2 |
FFP
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Washer OY2 |
FFP
Washer: Electric, stackable, front-load, (Energy Star Qualified)
MFG: Whirlpool
Model: WFW9400S or equal
Unit Price $__________ x 13 Each = $____________ per month
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Washer OY2 |
FFP
Washer: Electric, Size A&B (Energy Star Qualified)
Size A MFG: Speed Queen
Size A Model: LWS02NW or equal
Size B MFG: Crosley
Size B Model: CAWB522SQ or equal
Unit Price $__________ x 140 Each = $____________ per month
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Dryer OY2 |
FFP
Dryer: Electric/Gas, standard (Energy Star Qualified)
Electric MFG: Speed Queen
Electric Model: LES37AWF or equal
Gas MFG: Speed Queen
Gas Model: LGS37AWF or equal
Unit Price $__________ x 113 Each = $____________ per month
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Dryer OY2 |
FFP
Dryer: Electric/Gas, stackable (Energy Star Qualified)
Gas MFG: Speed Queen
Gas Model: KGS17AWF or equal
Gas MFG: Whirlpool
Gas Model: WGD9400S or equal
Electric MFG: Speed Queen
Electric Model: KES17AWF or equal
Unit Price $__________ x 51 Each = $____________ per month
Option Year 2: 1 Apr 2015 - 31 Mar 2016
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Dollars, U.S.
| OPTION |
| Reimbursable Parts OY2 |
COST
Option Year 2: 1 Apr 2015 - 31 Mar 2016
Government-provided estimate: $5,000.00 / year
FOB: Destination
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Basewide Appliances OY3 |
FFP
Contractor shall provide leased washers and dryers in accordance with Attachment 1, Statement of Work (SOW). Salient characteristics for washers and dryers are provided in Appendix A to the SOW.
Contractor shall provide all management, personnel, equipment, tools, materials, supervision, labor and all other items and services to perform service calls, to include appliance installation, maintenance, repair, replacement, removal, and disposal in accordance with the SOW.
**This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs 3001 - 3010.**
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
| OPTION |
| Appliance Service Call OY3 |
FFP
Routine, normal duty hours
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each |
| OPTION |
| Ice Dispenser Service Call OY3 |
FFP
Routine, normal duty hours
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| Emergency Service Call OY3 |
FFP
Emergency, outside normal duty hours
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| Relocation Service Call OY3 |
FFP
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Washer OY3 |
FFP
Washer: Electric, stackable, front-load, (Energy Star Qualified)
MFG: Whirlpool
Model: WFW9400S or equal
Unit Price $__________ x 13 Each = $____________ per month
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Washer OY3 |
FFP
Washer: Electric, Size A&B (Energy Star Qualified)
Size A MFG: Speed Queen
Size A Model: LWS02NW or equal
Size B MFG: Crosley
Size B Model: CAWB522SQ or equal
Unit Price $__________ x 140 Each = $____________ per month
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Dryer OY3 |
FFP
Dryer: Electric/Gas, standard (Energy Star Qualified)
Electric MFG: Speed Queen
Electric Model: LES37AWF or equal
Gas MFG: Speed Queen
Gas Model: LGS37AWF or equal
Unit Price $__________ x 113 Each = $____________ per month
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Dryer OY3 |
FFP
Dryer: Electric/Gas, stackable (Energy Star Qualified)
Gas MFG: Speed Queen
Gas Model: KGS17AWF or equal
Gas MFG: Whirlpool
Gas Model: WGD9400S or equal
Electric MFG: Speed Queen
Electric Model: KES17AWF or equal
Unit Price $__________ x 51 Each = $____________ per month
Option Year 3: 1 Apr 2016 - 31 Mar 2017
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Dollars, U.S.
| OPTION |
| Reimbursable Parts OY3 |
COST
Option Year 3: 1 Apr 2016 - 31 Mar 2017
Government-provided estimate: $5,000.00 / year
FOB: Destination
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Basewide Appliances OY4 |
FFP
Contractor shall provide leased washers and dryers in accordance with Attachment 1, Statement of Work (SOW). Salient characteristics for washers and dryers are provided in Appendix A to the SOW.
Contractor shall provide all management, personnel, equipment, tools, materials, supervision, labor and all other items and services to perform service calls, to include appliance installation, maintenance, repair, replacement, removal, and disposal in accordance with the SOW.
**This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs 4001 - 4010.**
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
| OPTION |
| Appliances Service Call OY4 |
FFP
Routine, normal duty hours
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each |
| OPTION |
| Ice Dispenser Service Call OY4 |
FFP
Routine, normal duty hours
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5 |
| Each |
| OPTION |
| Emergency Service Call OY4 |
FFP
Emergency, outside normal duty hours
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 20 |
| Each |
| OPTION |
| Relocation Service Call OY4 |
FFP
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Washer OY4 |
FFP
Washer: Electric, stackable, front-load, (Energy Star Qualified)
MFG: Whirlpool
Model: WFW9400S or equal
Unit Price $__________ x 13 Each = $____________ per month
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Washer OY4 |
FFP
Washer: Electric, Size A&B (Energy Star Qualified)
Size A MFG: Speed Queen
Size A Model: LWS02NW or equal
Size B MFG: Crosley
Size B Model: CAWB522SQ or equal
Unit Price $__________ x 140 Each = $____________ per month
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Standard Commercial Dryer OY4 |
FFP
Dryer: Electric/Gas, standard (Energy Star Qualified)
Electric MFG: Speed Queen
Electric Model: LES37AWF or equal
Gas MFG: Speed Queen
Gas Model: LGS37AWF or equal
Unit Price $__________ x 113 Each = $____________ per month
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Stackable Commercial Dryer OY4 |
FFP
Dryer: Electric/Gas, stackable (Energy Star Qualified)
Gas MFG: Speed Queen
Gas Model: KGS17AWF or equal
Gas MFG: Whirlpool
Gas Model: WGD9400S or equal
Electric MFG: Speed Queen
Electric Model: KES17AWF or equal
Unit Price $__________ x 51 Each = $____________ per month
Option Year 4: 1 Apr 2017 - 31 Mar 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Dollars, U.S.
| OPTION |
| Reimbursable Parts OY4 |
COST
Option Year 4: 1 Apr 2017 - 31 Mar 2018
Government-provided estimate: $5,000.00 / year
FOB: Destination
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Basewide Appliances 6-mo ext |
FFP
Contractor shall provide leased washers and dryers in accordance with Attachment 1, Statement of Work (SOW). Salient characteristics for washers and dryers are provided in Appendix A to the SOW.
Contractor shall provide all management, personnel, equipment, tools, materials, supervision, labor and all other items and services to perform service calls, to include appliance installation, maintenance, repair, replacement, removal, and disposal in accordance with the SOW.
**This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs 5001 - 5010.**
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Appliance Service Call 6-mo ext |
FFP
Routine, normal duty hours
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3 |
| Each |
| OPTION |
| Ice Dispenser Service Call 6-mo ext |
FFP
Routine, normal duty hours
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3 |
| Each |
| OPTION |
| Emergency Service Call 6-mo ext |
FFP
Emergency, outside normal duty hours
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
| OPTION |
| Relocation Service Call 6-mo ext |
FFP
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Stackable Commercial Washer 6-mo ext |
FFP
Washer: Electric, stackable, front-load, (Energy Star Qualified)
MFG: Whirlpool
Model: WFW9400S or equal
Unit Price $__________ x 13 Each = $____________ per month
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Standard Commercial Washer 6-mo ext |
FFP
Washer: Electric, Size A&B (Energy Star Qualified)
Size A MFG: Speed Queen
Size A Model: LWS02NW or equal
Size B MFG: Crosley
Size B Model: CAWB522SQ or equal
Unit Price $__________ x 140 Each = $____________ per month
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Standard Commercial Dryer 6-mo ext |
FFP
Dryer: Electric/Gas, standard (Energy Star Qualified)
Electric MFG: Speed Queen
Electric Model: LES37AWF or equal
Gas MFG: Speed Queen
Gas Model: LGS37AWF or equal
Unit Price $__________ x 113 Each = $____________ per month
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Months |
| OPTION |
| Stackable Commercial Dryer 6-mo ext |
FFP
Dryer: Electric/Gas, stackable (Energy Star Qualified)
Gas MFG: Speed Queen
Gas Model: KGS17AWF or equal
Gas MFG: Whirlpool
Gas Model: WGD9400S or equal
Electric MFG: Speed Queen
Electric Model: KES17AWF or equal
Unit Price $__________ x 51 Each = $____________ per month
6-month extension: 1 Apr 2018 - 30 Sep 2018
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Dollars, U.S.
| OPTION |
| Reimbursable Parts 6-mo ext |
COST
6-month extension: 1 Apr 2018 - 30 Sep 2018
Government-provided estimate: $2,500.00 / 6 months
FOB: Destination
ESTIMATED COST
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0008 |
| Destination |
| Government |
| Destination |
| Government |
| 0009 |
| Destination |
| Government |
| Destination |
| Government |
| 0010 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 1003 |
| Destination |
| Government |
| Destination |
| Government |
| 1004 |
| Destination |
| Government |
| Destination |
| Government |
| 1005 |
| Destination |
| Government |
| Destination |
| Government |
| 1006 |
| Destination |
| Government |
| Destination |
| Government |
| 1007 |
| Destination |
| Government |
| Destination |
| Government |
| 1008 |
| Destination |
| Government |
| Destination |
| Government |
| 1009 |
| Destination |
| Government |
| Destination |
| Government |
| 1010 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 2003 |
| Destination |
| Government |
| Destination |
| Government |
| 2004 |
| Destination |
| Government |
| Destination |
| Government |
| 2005 |
| Destination |
| Government |
| Destination |
| Government |
| 2006 |
| Destination |
| Government |
| Destination |
| Government |
| 2007 |
| Destination |
| Government |
| Destination |
| Government |
| 2008 |
| Destination |
| Government |
| Destination |
| Government |
| 2009 |
| Destination |
| Government |
| Destination |
| Government |
| 2010 |
| Destination |
| Government |
| Destination |
| Government |
| 3001 |
| Destination |
| Government |
| Destination |
| Government |
| 3002 |
| Destination |
| Government |
| Destination |
| Government |
| 3003 |
| Destination |
| Government |
| Destination |
| Government |
| 3004 |
| Destination |
| Government |
| Destination |
| Government |
| 3005 |
| Destination |
| Government |
| Destination |
| Government |
| 3006 |
| Destination |
| Government |
| Destination |
| Government |
| 3007 |
| Destination |
| Government |
| Destination |
| Government |
| 3008 |
| Destination |
| Government |
| Destination |
| Government |
| 3009 |
| Destination |
| Government |
| Destination |
| Government |
| 3010 |
| Destination |
| Government |
| Destination |
| Government |
| 4001 |
| Destination |
| Government |
| Destination |
| Government |
| 4002 |
| Destination |
| Government |
| Destination |
| Government |
| 4003 |
| Destination |
| Government |
| Destination |
| Government |
| 4004 |
| Destination |
| Government |
| Destination |
| Government |
| 4005 |
| Destination |
| Government |
| Destination |
| Government |
| 4006 |
| Destination |
| Government |
| Destination |
| Government |
| 4007 |
| Destination |
| Government |
| Destination |
| Government |
| 4008 |
| Destination |
| Government |
| Destination |
| Government |
| 4009 |
| Destination |
| Government |
| Destination |
| Government |
| 4010 |
| Destination |
| Government |
| Destination |
| Government |
| 5001 |
| Destination |
| Government |
| Destination |
| Government |
| 5002 |
| Destination |
| Government |
| Destination |
| Government |
| 5003 |
| Destination |
| Government |
| Destination |
| Government |
| 5004 |
| Destination |
| Government |
| Destination |
| Government |
| 5005 |
| Destination |
| Government |
| Destination |
| Government |
| 5006 |
| Destination |
| Government |
| Destination |
| Government |
| 5007 |
| Destination |
| Government |
| Destination |
| Government |
| 5008 |
| Destination |
| Government |
| Destination |
| Government |
| 5009 |
| Destination |
| Government |
| Destination |
| Government |
| 5010 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| N/A |
FOB: Destination
| 0002 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| F4D3D9 - 30 CES |
WILLIAM DEEM
1172 ICELAND AVE, BLDG 11439
VANDENBERG AFB CA 93437
805-606-2330
F4D3D9
| 0003 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0004 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0005 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0006 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0007 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0008 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0009 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 0010 |
| POP 01-APR-2013 TO |
31-MAR-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1001 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| N/A |
| 1002 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| F4D3D9 - 30 CES |
WILLIAM DEEM
1172 ICELAND AVE, BLDG 11439
VANDENBERG AFB CA 93437
805-606-2330
F4D3D9
| 1003 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1004 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1005 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1006 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1007 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1008 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1009 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 1010 |
| POP 01-APR-2014 TO |
31-MAR-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2001 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| N/A |
| 2002 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| F4D3D9 - 30 CES |
WILLIAM DEEM
1172 ICELAND AVE, BLDG 11439
VANDENBERG AFB CA 93437
805-606-2330
F4D3D9
| 2003 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2004 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2005 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2006 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2007 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2008 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2009 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 2010 |
| POP 01-APR-2015 TO |
31-MAR-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3001 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| N/A |
| 3002 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| F4D3D9 - 30 CES |
WILLIAM DEEM
1172 ICELAND AVE, BLDG 11439
VANDENBERG AFB CA 93437
805-606-2330
F4D3D9
| 3003 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3004 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3005 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3006 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3007 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3008 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3009 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 3010 |
| POP 01-APR-2016 TO |
31-MAR-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4001 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| N/A |
| 4002 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| F4D3D9 - 30 CES |
WILLIAM DEEM
1172 ICELAND AVE, BLDG 11439
VANDENBERG AFB CA 93437
805-606-2330
F4D3D9
| 4003 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4004 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4005 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4006 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4007 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4008 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4009 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 4010 |
| POP 01-APR-2017 TO |
31-MAR-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5001 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| N/A |
| 5002 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| F4D3D9 - 30 CES |
WILLIAM DEEM
1172 ICELAND AVE, BLDG 11439
VANDENBERG AFB CA 93437
805-606-2330
F4D3D9
| 5003 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5004 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5005 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5006 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5007 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5008 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5009 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
| 5010 |
| POP 01-APR-2018 TO |
30-SEP-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F4D3D9
CLAUSES INCORPORATED BY REFERENCE
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-6 Alt I |
| Restrictions On Subcontractor Sales To The Government (Sep 2006) -- Alternate I |
| OCT 1995 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-7 |
| Central Contractor Registration |
| DEC 2012 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| AUG 2012 |
| 52.204-13 |
| Central Contractor Registration Maintenance |
| DEC 2012 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| DEC 2010 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| FEB 2012 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| JAN 2011 |
| 52.219-14 |
| Limitations On Subcontracting |
| NOV 2011 |
| 52.219-28 |
| Post-Award Small Business Program Rerepresentation |
| APR 2012 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| MAR 2012 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| SEP 2010 |
| 52.222-36 |
| Affirmative Action For Workers With Disabilities |
| OCT 2010 |
| 52.222-37 |
| Employment Reports on Veterans |
| SEP 2010 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| FEB 2009 |
| 52.222-54 |
| Employment Eligibility Verification |
| JUL 2012 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-12 |
| Refrigeration Equipment and Air Conditioners |
| MAY 1995 |
| 52.223-15 |
| Energy Efficiency in Energy-Consuming Products |
| DEC 2007 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.232-18 |
| Availability Of Funds |
| APR 1984 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.232-99 (Dev) |
| Providing Accelerated Payment to Small Business Subcontractors (Deviation) |
| AUG 2012 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.237-1 |
| Site Visit |
| APR 1984 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| JAN 2009 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| Central Contractor Registration Alternate A |
| SEP 2007 |
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
| 252.209-7001 |
| Disclosure of Ownership or Control by the Government of a Terrorist Country |
| JAN 2009 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country |
| DEC 2006 |
| 252.223-7001 |
| Hazard Warning Labels |
| DEC 1991 |
| 252.223-7006 |
| Prohibition On Storage And Disposal Of Toxic And Hazardous Materials |
| APR 2012 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| MAY 2011 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program |
| DEC 2012 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (AUG 2012) (DEVIATION)
(a) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (a) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(b)(1) Notwithstanding the requirements of any other clause in this contract, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (b)(i) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note).
(ii) 52.219-8, Utilization of Small Business Concerns (DEC 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) Reserved.
(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
(vi) 52.222-36, Affirmative Action for Workers with Disabilities (JUN 1998) (29 U.S.C. 793).
(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
N/A Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.).
(xii) 52.222-54, Employment Eligibility Verification (JUL 2012).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months.
(End of clause)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acq.osd.mil/dpap/dars/dfars/index.htm http://www.arnet.gov/far/ http://farsite.hill.af.mil/ (End of clause)
252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (DEC 2010) (DEVIATION)
(a) In addition to the clauses listed in paragraph (b) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5) (OCT 2010) (DEVIATION), the Contractor shall include the terms of the following clause, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:
252.237-7010
252.237-7019 Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84).
Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).
| 252.247-7003 |
| Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (JUL 2009) (Section 884 of Public Law 110-417) |
| 252.247-7023 |
| Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631) |
| 252.247-7024 |
| Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631) |
(End of clause)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
2-in 1 Invoice
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
FA4610
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
F03000 Issue By DoDAAC
FA4610
Admin DoDAAC
Inspect By DoDAAC
Ship To Code
Ship From Code
Mark For Code
Service Approver (DoDAAC)
F4D3D9 Service Acceptor (DoDAAC)
F4D3D9 Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Jenna Akers, 805-606-2330, jenna.akers.1@us.af.mil Bill Gile, 805-606-2330, william.gile@us.af.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Contract Specialist: SrA Stephen Hernandez, 805-605-7040, stephen.hernandez.1@us.af.mil Contracting Officer: Sandra odem, 805-605-0488, sandra.odem@us.af.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION (MAY 2006)
(a) Contract line item(s) TBD through TBD are incrementally funded. For these item(s), the sum of $ TBD of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For items(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit and estimated termination settlement costs for those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least thirty days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause, or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT".
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraph (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "disputes."
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph (a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "DEFAULT." The provisions of this clause are limited to work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract if fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) or (e) of this clause.
(h) Nothing in this clause affects the right of the Government to this contract pursuant to the clause of this contract entitled "TERMINATION FOR CONVENIENCE OF THE GOVERNMENT."
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
On execution of contract on or about 1 Apr 2013: $ TBD
1 Jul 2013: $ TBD
1 Oct 2013: $ TBD
1 Jan 2014: $TBD
(End of clause)
5352.201-9101 OMBUDSMAN (APR 2010)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM or AFISRA ombudsmen, AFSPC/A7K, 150 Vandenberg Street, Peterson AFB CO 80914, (P) 719-554-5300, (F) 719-554-5299, A7K.wf@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU or ARISRA level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
(End clause)
5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (JUN 1997)
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Comply with the specific health and safety requirements established by this contract;
(2) Comply with the health and safety rules of the Government installation that concern related activities not directly addressed in this contract;
(3) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(4) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(b) The contracting officer may, by written order, direct Air Force Occupational Safety and Health Standards (AFOSH) and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUGUST 2007)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .