Solicitation Amendment - FA460026B00040001.pdf

PDF 696 KB Posted

Attached to
Construct South Lot 3
Solicitation number
FA460026B0004
Issued by

About this file

This is an Invitation for Bids (IFB) for construction services issued by the U.S. Air Force for a sealed bid solicitation.

The solicitation is for the construction of a new asphalt parking lot addition (South Lot 3) south of Building B1000 at Offutt Air Force Base in Nebraska. The scope of work includes demolition, earthwork, new asphalt paving, concrete curbs and gutters, and storm drainage utilities. The contract is a firm fixed-price arrangement with two line items: a base bid and an alternate bid, each valued as a single "each" unit. The project is designated as 100% small business set-aside with NAICS code 237310 and a size standard of USD 45,000,000 in annual receipts. The contract is administered by the Air Force FA4600 Contracting Office at Offutt AFB, Nebraska, with contracting officer Guillermo Espinoza and administrative contact Laura Stemick.

Bidders must submit electronic bids only via email by 02:00 PM local time on September 8, 2026, with a mandatory site visit scheduled for August 17, 2026 at 1:00 PM CST. Interested offerors without base access must request NCIC screening passes by August 10, 2026. Performance must begin within 10 calendar days of award and be completed within 200 calendar days from receipt of notice to proceed. A bid guarantee of 20 percent of the bid price or USD 3,000,000, whichever is less, is required. Performance and payment bonds must be furnished within 10 calendar days after award. Questions must be submitted by August 24, 2026, with bid opening conducted via teleconference the business day following submission. All offers must provide at least 60 calendar days for Government acceptance.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION

NUMBER

FA460026B00040001

2. TYPE OF SOLICITATION

SEALED BID (IFB) INVITATION

FOR BID

NEGOTIATED (RFP) REQUEST

FOR PROPOSAL

3. DATE ISSUED

03 Aug 2026

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

24-0018

7. ISSUED BY CODE: FA4600

FA4600 55 CONS PKP

BLDG 323C CP 402 232 6459, 106 PEACEKEEPER DR STE 2N3

OFFUTT AFB, NE 68113

UNITED STATES

Guillermo Espinoza, Email: guillermo.espinoza@us.af.mil Telephone: 0000000 LAURA STEMICK, Email: laura.stemick@us.af.mil Telephone: 402-232-6914

8. ADDRESS OFFER TO

FA4600 55 CONS PKP

ADMIN ONLY NO REQTN CP 402 232 6459, 106 PEACEKEEPER DR BLDG 3 STE 2N3

OFFUTT AFB, NE 68113

UNITED STATES

9. FOR

INFORMATION

CALL:

a. NAME Guillermo Espinoza

b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 0000000

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Project Title: Construct South Lot 3 Project Location: Offutt AFB, NE

**ELECTRONIC BID SUBMISSIONS ONLY. SUBMIT VIA EMAIL AS DETAILED IN ATTACHMENT 01 - BID SUBMISSION AND OPENING INFORMATION. FAX AND HARDCOPY BIDS

WILL BE REJECTED**

1. SITE VISIT: 17 August 2026, 1:00 PM CST at bldg 1000, Offutt AFB, NE. Interested offerors that currently don't have base access must submit the completed Attachment 02 - 55 SFS Contractor/Vendor NCIC Screening Pass Request spreadsheet to Laura Stemick at laura.stemick@us.af.mil by 10 August 2026 10:00 AM CST.

2. Questions regarding this solicitation must be submitted via email to the Contracting Officer no later than 24 August 2026, 10:00 AM CST. An amendment addressing these questions will be issued subsequently.

Bid opening (announcement of bids) will be conducted via teleconference the business day following the bid submission deadline. See attached guidelines.

SOLICITATION AND ALL INFORMATION, NOTICES, AMENDMENTS FOR THIS SOLICITATION WILL BE POSTED AT HTTPS://SAM.GOV.

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 10 200 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 1 02:00 PM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 08 Sep 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 60

Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)

Created On:

25 Aug 2026, 10:31 AM Central Daylight Time

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED

STATES CODE AT

10 U.S.C 3204(a) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document

Contractor agrees to furnish and return copies to issuing office.)

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK

Section A - Solicitation/Contract Form Construct South Lot 3

NAICS: 237310

Size Standard: USD 45,000,000.00 Annual receipts

Small Business Type: Small Business Set Aside Percent: 100

Product Service Code: Y1LZ

FA460026B00040001

Section B - Supplies or Services & Prices or Costs Additional Information/Notes

Item Supplies / Services Quantity Unit Unit Price Amount

Provide all labor, transportation, tools, equipment, permits, supervision necessary to construct the south parking lot BASE BID in accordance with the attached DRAWINGS andSPECIFICATIONS

Product Service Code: Y1LZ Pricing Arrangement: Firm Fixed Price

1 Each

Provide all labor, transportation, tools, equipment, permits, supervision necessary to construct the south parking lot ALTERNATE BID in accordance with the attached DRAWINGS andSPECIFICATIONS

Product Service Code: Y1LZ Pricing Arrangement: Firm Fixed Price

1 Each

Section C - Description/Specifications/Statement of Work

Requirements This requirement is for the construction of a new asphalt parking lot addition south of Building B1000 at Offutt Air Force Base. The scope includes demolition, earthwork, new asphalt paving, concrete curbs and gutters, and storm drainage utilities.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-12 Inspection of Construction. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984 Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F3H3G2 CountryCode: USA

55 CES CEC

AF BPN NO MILSBILLS PROCESSES, 106 PEACEKEEPER DR STE 2N3

OFFUTT AFB, NE 68113-4019

UNITED STATES

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F3H3G2 CountryCode: USA

55 CES CEC

AF BPN NO MILSBILLS PROCESSES, 106 PEACEKEEPER DR STE 2N3

OFFUTT AFB, NE 68113-4019

UNITED STATES

Section F - Deliveries or Performance Overall Contract Delivery Period

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to delivery 200 Calendar Days Date of Notice to Proceed Receipt

1 Each Place of Performance DoDAAC: F3H3G2 CountryCode: USA

55 CES CEC

AF BPN NO MILSBILLS PROCESSES, 106 PEACEKEEPER DR STE 2N3

OFFUTT AFB, NE 68113-4019

UNITED STATES

Delivery Schedule From date of lead time event to delivery 200 Calendar Days Date of Notice to Proceed Receipt

1 Each Place of Performance DoDAAC: F3H3G2 CountryCode: USA

55 CES CEC

AF BPN NO MILSBILLS PROCESSES, 106 PEACEKEEPER DR STE 2N3

OFFUTT AFB, NE 68113-4019

UNITED STATES

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.247-34 F.o.b. Destination. Jan 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

252.231-7000 Supplemental Cost Principles Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Electronic invoicing.

Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before WAWF training.

submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. WAWF methods of document submission.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions.

or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Construction Invoice

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment Document routing.

requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC FA4600

Admin DoDAAC FA4600

Inspect By DoDAAC F3H3G2

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) F3H3G2

Service Acceptor (DoDAAC) F3H3G2

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the Payment request.

payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

laura.stemick@us.af.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Section I - Contract Clauses

52.232-18 Availability of Funds.

As prescribed in , insert the following clause:(a)32.706-1

Availability of Funds (Apr 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment arise until funds are made available to the for this contract and may Contracting Officer until the Contractor receives notice of such availability, to be confirmed by the .in writing Contracting Officer

(End of clause)

5352.201-9101 ACC Ombudsman 2019-10

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB CircularA-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Deputy Director of Contracting, AFICC/KC (OL-ACC), 114 Thompson Street, Bldg. 586,Room 129, Langley AFB, VA 23665, telephone (757) 764-5372 (DSN 574-5372) email:acc.a7k1@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330- 1060, phone number (571) 256-2395,facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.

(End of clause)

Commencement, Prosecution, and Completion of Work

If the completion date is expressed as a specific calendar date, computed on the basis of the contractor receiving the notice to proceed by a certain day, add the following paragraph to the basic clause:

FA460026B00040001

https://www.acquisition.gov/far/part-32#FAR_32_706_1

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 21 days from award. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

FAR Clauses Incorporated By Reference

NUMBER TITLE

52.203-5 Covenant Against Contingent Fees

52.203-7 Anti-Kickback Procedures

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

52.203-10 Price of Fee Adjustment for Illegal or Improper Activity

52.204-2 Security Requirements

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

52.204-18 Commercial and Government Entity Code Maintenance

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

52.204-27 Prohibition on a ByteDance Covered Application

52.211-13 Time Extensions

52.214-26 Audit and Records-Sealed Bidding

52.215-15 Pension Adjustments and Asset Reversions

52.215-17 Waiver of Facilities Capital Cost of Money

52.216-7 Allowable Cost and Payment

52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation

52.223-5 Pollution Prevention and Right to Know Information

52.225-13 Restrictions on Certain Foreign Purchases

52.226-7 Drug-Free Workplace

52.228-11 Individual Surety-Pledge of Assets

52.232-23 Assignment of Claims

52.232-39 Unenforceability of Unauthorized Obligations

52.233-1 Disputes

52.236-14 Availability and Use of Utility Services

52.243-4 Changes

DFARS Clauses Incorporated by Reference

NUMBER TITLE

252.203-7001 Prohibition on Persons Convicted of Fraud of Other Defense-Contract-Related Felonies

252.204-7020 NIST SP 800-171 DoD Assessment Requirement

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreement

252.225-7048 Export- Controlled Items

252-237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel

252.244-7000 Subcontracts for Commercial Products or Commercial Services

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-6 Restrictions on Subcontractor Sales to the Government. (Alternate I) Jun 2020 Alternate I Nov 2021 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026-O0038) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026-O0038) Feb 2026 52.214-29 Order of Precedence-Sealed Bidding. Jan 1986 52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026-O0038) Feb 2026 52.219-8 Utilization of Small Business Concerns. (Deviation 2026-O0038) Feb 2026 52.219-33 Nonmanufacturer Rule. (Deviation 2026-O0038) Feb 2026 52.222-1 Notice to the Government of Labor Disputes. (Deviation 2026-O0038) Feb 2026 52.222-3 Convict Labor. (Deviation 2026-O0038) Feb 2026 52.222-6 Construction Wage Rate Requirements. (Deviation 2026-O0038) Feb 2026 52.222-7 Withholding of Funds. (Deviation 2026-O0038) Feb 2026 52.222-8 Payrolls and Basic Records. (Deviation 2026-O0038) Feb 2026 52.222-9 Apprentices and Trainees. (Deviation 2026-O0038) Feb 2026 52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026-O0038) Feb 2026 52.222-11 Subcontracts (Labor Standards). (Deviation 2026-O0038) Feb 2026 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. (Deviation 2026-O0038) Feb 2026 52.222-15 Certification of Eligibility. May 2014 52.222-35 Equal Opportunity for Veterans. (Deviation 2026-O0038) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-O0038) Feb 2026 52.222-37 Employment Reports on Veterans. (Deviation 2026-O0038) Feb 2026 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.222-54 Employment Eligibility Verification. (Deviation 2026-O0038) Feb 2026 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038) Feb 2026 52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026-O0038) Feb 2026 52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0040, Revision 1) Apr 2026 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (Deviation 2026-O0038) Feb 2026 52.223-23 Sustainable Products. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.227-1 Authorization and Consent. Jun 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. Jun 2020 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.228-15 Performance and Payment Bonds-Construction. Jun 2020 52.229-3 Federal, State, and Local Taxes. Feb 2026 52.229-12 Tax on Certain Foreign Procurements. (Deviation 2026-O0038) Feb 2021 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-17 Interest. May 2014 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.236-2 Differing Site Conditions. (Deviation 2026-O0038) Feb 2026 52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038) Feb 2026 52.236-5 Material and Workmanship. (Deviation 2026-O0038) Feb 2026 52.236-6 Superintendence by the Contractor. (Deviation 2026-O0038) Feb 2026 52.236-7 Permits and Responsibilities. (Deviation 2026-O0038) Feb 2026 52.236-8 Other Contracts. (Deviation 2026-O0038) Feb 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-

O0038) Feb 2026

52.236-10 Operations and Storage Areas. (Deviation 2026-O0038) Feb 2026 52.236-11 Use and Possession Prior to Completion. (Deviation 2026-O0038) Feb 2026 52.236-12 Cleaning Up. (Deviation 2026-O0038) Feb 2026 52.236-13 Accident Prevention. (Alternate I) Feb 2026 Alternate I Nov 1991 52.236-15 Schedules for Construction Contracts. (Deviation 2026-O0038) Feb 2026 52.236-17 Layout of Work. (Deviation 2026-O0038) Feb 2026 52.236-21 Specifications and Drawings for Construction. (Deviation 2026-O0038) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. (Deviation 2026-O0038) Feb 2026 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038) Apr 2026 52.246-21 Warranty of Construction. (Alternate I) Mar 1994 Alternate I Apr 1984 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Alternate I) Apr 2012 Alternate I Sep 1996 52.249-10 Default (Fixed-Price Construction). Apr 1984 52.253-1 Computer Generated Forms. (Deviation 2026-O0038) Feb 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State

Sponsor of Terrorism.

May 2019

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small

Business Concerns.

Jan 2023

252.232-7010 Levies on Contract Payments. Dec 2006 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010

FAR Clauses Incorporated by Full Text

52.219-14 Limitations on Subcontracting. (Deviation 2026-O0038) (Feb 2026)

Limitations on Subcontracting (Feb 2026) (Deviation 2026-O0038)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to-

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with sections 19.105, 19.106, 19.107, and 19.108;

(4) Orders expected to exceed the simplified acquisition threshold and that are set aside for small business concerns under multiple-award contracts, as described in 8.4 and 16.5;

(5) Orders, regardless of dollar value, that are set aside in accordance with sections 19.105, 19.106, 19.107, and 19.108 under multiple-award contracts, as described in

8.4 and 16.5; and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for-

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-

[Contracting Officer check as appropriate.]

[ ] By the end of the base term of the contract and then by the end of each subsequent option period; or

[ ] By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

(End of clause)

52.219-28 Postaward Small Business Program Rerepresentation. (Deviation 2026-O0038) (Alternate I) (Feb 2026) Alternate I (Feb 2026)

Alternate I . As prescribed in , substitute the following paragraph (g)(1) for paragraph (g)(1) of the basic clause:(Feb 2026) (Deviation 2026-O0038) 19.101(a)(2)(iii)(B)

(g)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.

NAICS Code Small business concern (yes/no)

237310 Yes

[ ]Contracting Officer to insert NAICS codes.

52.223-3 Hazardous Material Identification and Safety Data. (Deviation 2026-O0038) (Feb 2026)

Hazardous Material Identification and Safety Data (Feb 2026) (Deviation 2026-O0038)

(a) Hazardous material, as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Safety Data Sheet submitted under this contract.

Material (If none, insert None) Identification No.

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to-

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(End of clause)

52.225-9 Buy American-Construction Materials. (Deviation 2026-O0038) (Feb 2026)

Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)

(a) . As used in this clause-Definitions

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work.

The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph

(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) .For domestic construction material that is not a critical item or does not contain critical components

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A) of this clause.(1)

(3) The procedures in paragraph (b)(3)(i)(A) of this clause will no longer apply as of January 1, 2030.(2)

(B) .For domestic construction material that is a critical item or contains critical components

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B) of this clause.(1)

(3) The procedures in paragraph (b)(3)(i)(B) of this clause will no longer apply as of January 1, 2030.(2)

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.

(d) . To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any Data applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars)*

Item 1:

Foreign construction material. ____ ____ ____

Domestic construction material. ____ ____ ____

Item 2:

Foreign construction material. ____ ____

Domestic construction material. ____ ____ ____

[* ].Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)

[ ]List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

[ ]Include other applicable supporting information.

(End of clause)

52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014)

Payments under Fixed-Price Construction Contracts (May 2014)

(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.

(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.

(1) The Contractor's request for progress payments shall include the following substantiation:

(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.

(ii) A listing of the amount included for work performed by each subcontractor under the contract.

(iii) A listing of the total amount of each subcontract under the contract.

(iv) A listing of the amounts previously paid to each such subcontractor under the contract.

(v) Additional supporting data in a form and detail required by the Contracting Officer.

(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration.