This document is a comprehensive set of design plans for constructing a new parking lot (Parking Lot 3, Building B1000) at Offutt Air Force Base in Nebraska. The project, numbered SGBP 24-0018, includes detailed civil, drainage, and electrical design specifications across 32 sheets prepared by HGM Associates and BqEnn.

The base bid scope of work includes removal of existing pavement, curbing, and infrastructure; grading and site preparation; construction of approximately 850 linear feet of new asphalt pavement with 6-inch concrete curb and gutter; installation of 4-inch concrete sidewalks with paint striping; storm drainage system consisting of curb inlets, area inlets, and underground RCP piping ranging from 15 inches to 24 inches in diameter; adjustment of existing utilities including storm sewers, sanitary sewers, water lines, monitoring wells, and light poles to finished grade; and permanent stabilization including seeding and washed river rock landscaping in parking lot islands. An alternate design option is provided that includes additional pavement in Area A with an extended drainage system and modified utility adjustments. The electrical work involves site lighting with multiple light poles on 24-inch PCC bases, with photometric calculations provided. All work requires coordination with existing underground utilities, erosion control measures during construction, and compliance with Air Force Base regulations regarding contractor access via the Capehart Road Gate.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F A

IR

C H

IL

D

D R

IV

E

L A

W S

O N

IN

S

TR

U M

EN

T

R U

N W

A Y

L N

O R

TH

W

ES

T- S O

U

TH

EA

S T

R U

N W

Y

,7

X

W

S H

O U

LD

ER

S

BU

TLER

BLVD

APOLLO ROAD

LOOKING GLASS AVE.

M

IN

U T E

M

N

C

IR

C L E

S

B L

V D

O R

TH

W

ES

T- S O

U

TH

EA

S T

R U

N W

,7

X

IN

S

TR

U M

EN

T R U

N W

A Y

E

D

R U

N W

A Y

L

LA

TER

A L

C

LEA

R A N C E

LIN

E

R

TH

W

ES

T- S O

U

TH

EA

S T

R U

N W

A Y

,7

X

L

BU

TLER

BLVD.

S A C

B L

V

R

TH

W

ES

T- S O

U

TH

EA

S T

R U

N W

A Y

,7

X

IN

S

TR

U M

EN

T R U

N W

A Y

L

E

N W

A Y

L

:1

G

LID

S

LO

P E

C

L N

O R

TH

W

ES

T- S O

U

TH

EA

S T

R U

N W

A Y

,7

X

IN

S

TR

U M

EN

T

R U

N W

A Y

C

M

IS

S O

U R I

P

A C

IF

IC

.R

T

O

K

A D

Parking

Parking

PARKING

PARKING

L

IN

C O

P a r k in g

SHERMAN

TU

RN

PI

K E

L

IN

C O L N

H W

Y

C U

S T

IV

E

S

U

LEV

A R D

W A S

H

IN

G T

Q U

A R

E

S

U L E

V A

R D

P a r k in g

Pkg.

F O

O

A D

Parking

Parking

Parking

Parking

Pkg.

APOLLO DRIVE

M E

R C

U R

Y

Pkg.

LO

O

KIN

G

GLASS AVENUE

P a rk in g

LO

O

K

IN

LA

V E.

C A P

EH

A R T

R O

A D

Parking

Parking

S

U L E

V A

Pkg.

Pkg.

Pkg.

B U

R L

IN

G T O

N

BU

TLER BLVD.

Parking

P a rk in g

P a rk in g

R E C

A D

P a rk in g

P a rkin g

Pkg.

LAKE DRIVE

L A

IV

E

B U T L

V

D

ELTA

EN

TER

S O

U

H

S T

R

P

E

N W

A Y

ILS

LOCALIZER

APPROACH/DEPARTURE ZONE

LA

TER

LEA

R A N

LIN

LA

TER

A L

C

LEA

R A N C E

LIN

E

C

LEA

R

Z O

N E

APPROACH/DEPARTURE ZONE

ILS MIDDLE

MARKER

R

TH

W

ES

T

S O

U

TH

EA

N W

'7

X

W

S H

O U

LD

ER

TR

U M

EN

T

R U

N W

A Y

L

A P P R O

A C

H

D E P A R T U R E

Z O

N E

L

IM

IT

L

IN

E

C

LEA

R

Z O

N E

O L

O L

O L

O L

OL

O L

OL

OL

O L

A P P R O

A C

EP

A R

TU

R E

Z O

N E

APPROACH -

DEPARTURE ZONE LIMIT LINE

C

LEA

R

Z O

N E

C

LEA

R

Z O

N E

LA

TER

LEA

R A N

LIN

E

E

E

E

E

A R

Z

O N

E

LA

TER

A L

C

LEA

R A N C E

LIN

E

LA

TER

A L

C

LEA

R A N C E

LIN

E

LA

TER

A L

C

LEA

R A N C E

LIN

E

Q S D

Q S D

HC/

D

1.1

0,0

00LB.

LA

TER

A L

C

LEA

R A N C E

LIN

E

HOT CARGO

HOLDING PAD/

R

TH

W

ES

T

S O

U

TH

EA

S T

R U

N W

A Y

'7

X

IN

S R U

M

EN

T R U

N W

A Y

L

IM

A

E

E

E

E

E

E

E

E

E

E

E

E

OL

O L

O L

O L

OL

OL

E

E

E

EE

E

E

E

E E

E

O L

O L

BU

TLER

BLVD

E

BUTLER

C

C

LEA

R

Z O

N E

C

LEA

R

Z O

N E

BLVD.

BUTLE

BLVD.

A V

E

C O

L U

M

IA

Q S D

Q S D

P a r k in g

Parking

M

IN

U T E

M

IR

C L E

Parking

Parking

BUTLER BLVD.

P a r k in g

O L

C O

U N

C O

M S

A T

D R

IV

E

L

IN

C O

W

Y S

H E

R M

R N

P

IK

E

E

TU

M P A N E

LO

T

Parking

S H

ER

M A N

TU

R N P

IK

E

LINCOLN HWY

A

IR

M

IV

E

GOLF

BRAVO

ALPHA

DELTA

H O

T E

L

N E L S

IV

E

BERG

Q

IST

RIVE

TRAVIS DR

IR

M

IV

E

E C

S

T

Pkg.

O

N

IG

H T

W A T

E

LO

O

K

LA

E.

P a rk in g

Parking

GRANTS PASS

Parking

C U

S T

IV

X

O

O O

M x

IM

A

J-

J-

J-

C H

ARLIE

C H

ARLIE

QUEBEC

N O

V E

M B E R

M

IK

E

S

O U

IK

R T H

C-1

C

C

C

PAPA

P A P

A

T O

W

A D

O

X

,0

C L E

A R

Z

O N

E

C L E

A R

Z

O N

E

APPROACH-

DEPARTURE ZONE LIMIT LINE

C L E

A R

Z

O N

E

C L E

A R

Z

O N

E

N O

R T H

E

.R

E

GATE

GATE

GATE

GATE

GATE

GATE

E

N W

A Y

P

EA

C

EK

EEP

ER

IV

E

S

U L E

V A

RUN UP

C

LEA

R

Z O

N E

P a rkin g

N

ELS

IV

IG

IV

E

Parking

U N

IO

N E

D R

IV

E

Parking

GATE

O

O

,0

C L E

A R

Z

O N

L

O L

O

O

O

O

O

S A

W Y

E R

C T

W U

R T S

M

IT

BONNER LANE

L A

N G

L E

Y D

R

IV

E

L A

N G

L

IV

E

EAKER DRIVE

E A

K

IV

E

LANGLEY DRIVE

M

ALM

STRO

M

C

O O

O O O O O O

L

O L

O O O O O O O O

O O O O

F

E

H

F

FH

F E

E

E

E

E

E G

G

E

E

E

G

G

E F

F

E

E

E

E

G

E

E

EF

F

HF

GE

E

EE

G

E

F

A A

F

H

G

G

E

AA

EEGG

B A A A

EEFE

A A

A

A

AAAB A A

A

A

A

F

EF

EE

E

E

F

E

F

E

G

G

E

E

A

A

A

A

B

A B

B C A A

A

B

D

A

D

B B C

A

C

B

B

C

B

A

C

C

A

A

C

A

A

B

B

A

B

A

B

B

C

B

A

D

B

A

B

C

B

A

A

A

A

D

A A C

A

A

A

A

O O

O OO O

O OO O

O O

O O

E

EE

E

EE

0'

O OO O

O

O O

O O

GATE

C

E S

LO

P E

C

E S

LO

P E

X X

O O

O O

O

O O

O

P E

A C

E K

E E

P E

R

E

EE

O O

O

O

GARLAND STREET

O O O O

O

O O

O O

O O O O

O O

O O

O O

O O

O

O O

O O

O O

O O

O O

O O

X X X X

O

O O

O O

O O

O O

O O

X X

OO

O O

O O

O O

O O

O O

O O

O O

O

O

O O

O O

O O

O O

O O O O

O O O O

O O

O O

O

O

O

O

O

O

O

O

O

O

O O

O O

O

O

O

O

O

O

O O

O O

O

O

O O

O O

O

O

O

O O

O

O O

O O

O

XX

XX

O

O

O

X X

X X

X XX X

X X

X X X X

X X X X

X X X X

X XX X

X X

X X X X

X X

X X

X XX X

X X

X X X X

X

X X

X

X

X XX XX X X X X

X X

X X

X X X X

X XX X

X X

X X

X X

X X

X X X XX X X XX X X X

X X

X X

X X

X X

O O

Parking

2'98

2'

DEARM

PAD/ARM

HOLDING

HOT CARGO

HOT REFUEL/

PARKING

SAFE

DOD

HAVEN

SAFE

DOE

O OO

O

C O F F

M A N

CIR

CLE

F A

IR

C H

IL

O

M I

K E

S O

U T

H

T U

A D

O O O O

O

Parking

CELL NO.1

CELL NO.2

CELL NO.3

ARM DEARM

E C

W

S

T

F O

X T

R O

T

D E

LT

A

K I

L O

JULIET

C H

A R

LIE

NORTH WEST

BLAST

DEFLECTORS

END FIRE

HOT REFUEL/

ILS

STRATTON AVE

STRATTON AVE

CHECKPOINT

TACAN

PROJECT NO. SGBP 24-0018

OFFUTT AIR FORCE BASE, NEBRASKA

CONSTRUCT NEW PARKING LOT 3, B1000

LOCATION MAP

INDEX OF SHEETS

SHEET NO. SHEET TITLE

COVER SHEET & LOCATION PLAN

C0.1 - CONTRACTOR ACCESS & STAGING PLAN

C0.2 - TOPOGRAPHIC SURVEY

C1.2 - SITE PLAN - BASE BID

C1.3 - ENLARGED SITE PLAN AREA B - BASE BID

C1.4 - ENLARGED SITE PLAN AREA C - BASE BID

C1.5 - GRADING PLAN AREA B - BASE BID

F O R T

C

R O

O K

R O

A D

CAPEHART ROAD

H A

R

LA

N

LE

W

IS

R O

A D

BASE LAKE

ACCESS ROUTE

CONTRACTOR

CAPEHART ROAD GATE

ENTER BASE AT

CONTRACTOR TO

PROJECT LOCATION

B1000 STRATCOM

SOUTH LOT #3

& LOCATION PLAN

COVER SHEET

SJE

SJE

C1.1 - REMOVAL PLAN - BASE BID

OMAHA NEBRASKA

DODGE STREET

INTERSTATE 80

BELLEVUE NEBRASKA

MISSOURI RIVER

OFFUTT AIR FORCE BASE

25th STREET

CAPEHART ROAD

CAPEHART HSNG

HIGHWAY 370

CORNHUSKER ROAD

HIGHWAY 75

OMAHA NEBRASKA

VICINITY MAPN

FORT CROOK ROAD

KENNEDY FRWY

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

C1.6 - GRADING PLAN AREA C - BASE BID

C1.7 - DRAINAGE PLAN - BASE BID

C1.8 - EROSION CONTROL PLAN - BASE BID

C1.9 - PERMANENT STABILIZATION PLAN - BASE BID

C3.1 - PAVEMENT DETAILS

OFF-B-6524

C3.2 - STORM DRAINAGE DETAILS

C3.3 - CURB INLET DETAILS

C3.4 - CURB INLET DETAILS

C3.5 - AREA INLET DETAILS

ED1.01 - SITE - ELECTRICAL DEMOLITION

E1.01 - SITE PLAN - BASE BID ELECTRICAL

E1.02 - SITE PLAN - ALTERNATE ELECTRICAL

C2.2 - SITE PLAN - ALTERNATIVE

C2.4 - ENLARGED SITE PLAN AREA B - ALTERNATIVE

C2.5 - ENLARGED SITE PLAN AREA C - ALTERNATIVE

C2.7 - GRADING PLAN AREA B - ALTERNATIVE

C2.1 - REMOVAL PLAN - ALTERNATIVE

C2.8 - GRADING PLAN AREA C - ALTERNATIVE

C2.9 - DRAINAGE PLAN - ALTERNATIVE

C2.10 - EROSION CONTROL PLAN - ALTERNATIVE

C2.11 - PERMANENT STABILIZATION PLAN - ALTERNATIVE

C2.3 - ENLARGED SITE PLAN AREA A - ALTERNATIVE

C2.6 - GRADING PLAN AREA A - ALTERNATIVE

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

NAL C IVIL

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

E1.03 - SITE PLAN - PHOTOMETRICS32

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

O APOLLO DRIVE

& STAGING PLAN

CONTRACTOR ACCESS

C0.1

CONTRACTOR ACCESS & STAGING PLAN

SCALE: 1" = 60'

STRATTON AVE.

AREA

STAGING

CONTRACTOR

S

U L E

V A

R D

ACCESS ROUTE

CONTRACTOR

B1000

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

MH

MH

CO

CO

CO

MH

MH

WV

WV WV

MW

F E

SFES

CO

CO

MH

CO

FES

MH

MW

MH

MH

MH

TEMPORARY BENCHMARK

N 492666.27

E 2763038.65

ELEV. 980.74

CONTROL POINT #1

N 492899.60

E 2763220.98

ELEV. 984.35

TEMPORARY BENCHMARK

N 492583.85

E 2762822.96

ELEV. 976.09

8 97

7 97

MH

MH

FES

3 97

MH

NAIL

NAIL

NAIL

UNDERGROUND GAS

UNDERGROUND GAS

UNDERGROUND GAS

FLAGGED SANITARY SEWER

SW-N I.E. = 968.59

RIM = 978.09

SANITARY SEWER MANHOLE

18" PVC N-S I.E. = 968.20

RIM = 974.18

STM MANHOLE

24" RCP W-S I.E. = 968.65

RIM = 975.70

STM INLET MANHOLE

18" PVC S I.E. = 969.04

RIM = 973.39

STM INLET MANHOLE

15" PVC S I.E. = 970.20

RIM = 975.64

STM INLET MANHOLE

24" RCP S I.E. = 971.08

24" PVC E I.E. = 971.08

RIM = 977.58

STM MANHOLE

18" PVC N I.E. = 971.72

24" PVC W I.E. = 971.72

RIM = 979.27

STM MANHOLE

15" PVC SE I.E. = 973.42

RIM = 976.19

STM INLET

18" N I.E. = 970.48

24" RCP E I.E. = 969.91

RIM = 976.36

STM INLET

= 966.71I.E.

48" REP F.E.S.

I.E. = 970.23

24" F.E.S.

WELL

MONITORING

LOCATION

B-2 BORING

CLEANOUT

CLEANOUT

CLEANOUT

CLEANOUTS

DON'T KNOW WHERE IT GOES???

72" RCP NW-SE I.E. = 961.14

RIM = 976.24

STM MANHOLE

LIGHT POLE

PULL BOX

CAMERA POLE

CAMERA POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

LUMEN LIGHTS

MAIN

UNDERGROUND WATER

MAIN

UNDERGROUND WATER

VALVES

WATER

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

24" RCP S I.E. = 967.80

18" PVC N I.E. = 967.80

RIM = 974.18

STM MANHOLE

24" RCP N-S I.E. = 967.21

RIM = 973.69

STM MANHOLE

18" PVC N-S I.E. = 969.01

RIM = 975.41

MANHOLE

972.40

WEIR WALL

RIM = 977.51

FIBER OPTIC MANHOLE

OPTIC LINE

AT&T FLAGGED FIBER

OPTIC

AT&T FIBER

OPTIC LINE

AT&T FLAGGED FIBER

POWER

MARKED UNDERGROUND

POWER

MARKED UNDERGROUND

LOCATION

B-4 BORING WELL

MONITORING

LOCATION

B-3 BORING

POWER

MARKED UNDERGROUND

POWER

MARKED UNDERGROUND

POWER

MARKED UNDERGROUND

POWER

MARKED UNDERGROUND

976.52

WEIR WALL

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE

W/24" PCC BASE

LIGHT POLE W/24" PCC BASE

LIGHT POLE

RIM = 979.88

STM INLET MANHOLE

POWER

MARKED UNDERGROUND

POWER

UNDERGROUND

MARKED

POWER

UNDERGROUND

MARKED

18" PVC N-S I.E. = 968.76

RIM = 974.13

STM INLET MANHOLE

W/ PCC HEADWALL

I.E. = 973.03

15" PVC NW

PVC PIPE

I.E. = 968.94

24" RCP N

PCC HEADWALL

I.E. = 969.10

18" RCP N

PCC HEADWALL

I.E. = 966.85

24" RCP N

PCC HEADWALL

SILTED IN

I.E. = 966.78

24" RCP N

PCC HEADWALL

LOCATION

B-1 BORING

LOCATION

B-5 BORING

RIP RAP

RIP RAP

PULL BOX

FENCE

CHAINLINK

CHAINLINK FENCE

CHAINLINK FENCE

CLEANOUT

SILTED IN

54" RCP = 965.43

W/24" PCC BASE

LIGHT POLE

FLOWS SOUTH

TIES INTO 72" SOME HOW???

WIER WALL = 966.03

30" RCP W I.E. =961.93

30" RCP S-E I.E. = 960.58

RIM = 967.28

STM MANHOLE MH

UNDERGROUND POWER

WATER

SURVEY

TOPOGRAPHIC

C0.2

TOPOGRAPHIC SURVEY

SCALE: 1" = 40'

E 2763220.98

N 492899.60

ELEV. = 984.35

C.P. 1 - NAIL

CONTROL POINTS

1. THE SURVEY DRAWING IS BASED UPON TOPOGRAPHIC SURVEYS

COMPLETED ON OCTOBER 12, 2024 BY HGM ASSOCIATES.

2. THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY

FACILITIES MAY NOT BE INDICATED IN THESE PLANS. THE

EXISTING UNDERGROUND UTILITIES AND STRUCTURES THAT ARE

INDICATED ON THE DRAWINGS ARE PLACED ACCORDING TO

INFORMATION FURNISHED TO THE ENGINEER BY OTHERS. THE

ENGINEER MAKES NO GUARANTEE THAT THE UTILITIES SHOWN

COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN

SERVICE OR ABANDONED. THE CONTRACTOR SHALL MAKE

EVERY EFFORT TO LOCATE ALL EXISTING UNDERGROUND

INSTALLATIONS AND STRUCTURES IN THE VICINITY OF THE

WORK TO BE DONE BY PROSPECTING IN ADVANCE OF

EXCAVATIONS.

3. PRIOR TO PERFORMING ANY EXCAVATION ON THE SITE, THE

CONTRACTOR SHALL GET A DIGGING PERMIT FROM THE BASE

TO VERIFY UTILITIES ON SITE. SEE THE SPECIFICATIONS FOR

INFORMATION ON THE DIGGING PERMIT.

TOPOGRAPHIC SURVEY NOTES

TOPO LEGEND

FIBER OPTIC LINE

UNDER GROUND

OPTIC

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

WV

WV WV

MW

F E

SFES

MH

FES

MH

MW

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

WV

WV WV

MW

F E

SFES

MH

FES

MH

MW

MH

MH

MH

CO

CO

CO

CO

CO

CO

MH

MH

MH

MH

MH

MH

MH

MH

MH

CO

CO

CO

MH

MH

WV

WV WV

MW

F E

SFES

MH

CO

MH

MW

MH

MH

MH

REMOVAL PLAN

C1.1

DEMOLITION KEY NOTES

REMOVE PAVEMENT

DEMOLITION LEGEND

REMOVAL PLAN - BASE BID

SCALE: 1" = 40'

REMOVE EXISTING CURB AND GUTTER PAVEMENT

PROTECT INLET

ADDITIONAL INFORMATION.

SEE ELECTRICAL PLAN E1.1 FOR

REMOVE LIGHT POLE AND BASE

5 3 3 3 3 3

4 REMOVE TREE (3" DIAMETER).

STRATCOM AVE.

PIPE.

REMOVE INLET & REPLACE SEGMENT WITH 18" RCP

6 PROTECT STORM SEWER CLEANOUT

7 PROTECT MANHOLE

8 PROTECT MONITORING WELL

9 REMOVE RAIN GARDEN SUBDRAIN PIPE

DETENTION POND

2' NORTH OF CORNER

LIMIT OF CURB REMOVAL

UNDERGROUND POWER

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

MH

MH

MH

MH

MH

MH

MH

MH MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

SITE PLAN - BASE BID

SCALE: 1" = 40'

BID

SITE PLAN - BASE

C1.2

STRATCOM AVE.

DETENTION POND

(SEE SHEET C1.3)

AREA B

(SEE SHEET C1.4)

AREA C

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

MH

MW

MH

MW

MH

MH

MH

MH

MW

MH

MW

MH

MH

MH

MH

MH

CO

CO

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

ENLARGED SITE PLAN AREA B - BASE BID

SCALE: 1" = 20'

1.81%

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.4

AREA B - BASE BID

ENLARGED SITE PLAN

C1.3

9.00'

CONSTRUCTION KEY NOTES

.0

9.00'9.00'

E 2762616.09

N 492521.16

ASPHALTIC CONCRETE PAVEMENT 1

6"CONCRETE CURB & GUTTER,

SEE DETAIL ON SHEET C3.1

PAINT STRIPING (4" WIDE - WHITE)

4 4" P.C. CONCRETE SIDEWALK

ON SHEET C1.9

CURB INLET, SEE DRAINAGE PLAN

ON SHEET C1.9

AREA INLET, SEE DRAINAGE PLAN

CURVE DATA

4' R.P. N 492695.20

E 2762678.77

P.C. N 492581.77

E 2762674.77

P.T. N 492581.77

E 2762682.77

4' R.P. N 492570.77

E 2762678.77

P.C. N 492570.77

E 2762682.77

P.T. N 492570.77

E 2762674.77

4' R.P. N 492581.77

E 2762822.44

P.C. N 492581.77

E 2762818.44

P.T. N 492581.77

E 2762826.44

4' R.P. N 492570.77

E 2762822.44

P.C. N 492570.77

E 2762826.44

P.T. N 492570.77

E 2762818.44

4' R.P. N 492581.77

E 2762966.69

P.C. N 492581.77

E 2762962.69

P.T. N 492581.77

E 2762970.69

4' R.P. N 492570.77

E 2762966.69

P.C. N 492570.77

E 2762970.69

P.T. N 492570.77

E 2762962.69

E 2762678.48

N 492607.70

ON SHEET C1.9

MANHOLE, SEE DRAINAGE PLAN

3 3

2 2

8.00' 8.00'

.0

.0

8.00'

.6

38 SP @ 9.00' = 342.00

S

P

.0

.0

13.87'

.0

5' R.P. N 492616.16

E 2762630.95

P.C. N 492611.16

E 2762630.95

P.T. N 492616.16

E 2762635.95

.6

E 2762617.08

N 492611.16

8 CURB OPENING SEE DETAIL THIS SHEET

CURB OPENING DETAIL

" = 1'2

SCALE:

1'-0"

6" CURB & GUTTER

PAVEMENT

ASPHALT

6" CURB & GUTTER

MH

MH

MH

MH

MH

MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

ENLARGED SITE PLAN AREA C - BASE BID

SCALE: 1" = 20'

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.3

AREA C - BASE BID

ENLARGED SITE PLAN

C1.4

CONSTRUCTION KEY NOTES

9.00'9.00'

CURVE DATA

4' R.P. N 492581.77

E 2763115.67

P.C. N 492581.77

E 2763111.67

P.T. N 492581.77

E 2763119.67

4' R.P. N 492570.77

E 2763115.67

P.C. N 492570.77

E 2763119.67

P.T. N 492570.77

E 2763111.67

4' R.P. N 492581.77

E 2763261.03

P.C. N 492581.77

E 2763257.03

P.T. N 492581.77

E 2763265.03

5' R.P. N 492570.77

E 2763261.03

P.C. N 492570.77

E 2763265.03

P.T. N 492570.77

E 2763257.03

E 2763391.15

N 492521.21

E 2763323.35

N 492607.89

E 2763344.28

N 492632.60

ASPHALTIC CONCRETE PAVEMENT 1

6"CONCRETE CURB & GUTTER,

SEE DETAIL ON SHEET C3.1

PAINT STRIPING (4" WIDE - WHITE)

4 4" P.C. CONCRETE SIDEWALK

ON SHEET C1.9

CURB INLET, SEE DRAINAGE PLAN

ON SHEET C1.9

AREA INLET, SEE DRAINAGE PLAN

ON SHEET C1.9

MANHOLE, SEE DRAINAGE PLAN

.0

.0

8.00' 8.00'

42 SP @ 9.00' = 378.00'

'8 SP @ 9.00' = 72.00

'25.43

.5

.6

MW

MH

MW

MH

MH

MH

MH

MW

MH

MW

MH

MH

MH

MH

MH

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

GRADING PLAN AREA B - BASE BID

SCALE: 1" = 20'

.8

T

.3

7 977.86T

977.36

.6

T

.12

3.56% 1.91% 1.81%

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.6

AREA B - BASE BID

GRADING PLAN

C1.5

SEE SHEET C2.1 FOR DETAILS

PROP. ELEV. = 973.47

EXIST. ELEV. = 974.18

ADJUST MANHOLE B TO GRADE

SEE SHEET C2.1 FOR DETAILS

PROP. ELEV. = 973.85

EXIST. ELEV. = 974.55

WELL TO GRADE

ADJUST MONITORING

.0

.2

T

.7

.5

T

.0

.4

T

.9

.6

T

.17

.3

T

.8

.6

T

.10

.5

T

.0

.6

1T

.1

GRADING LEGEND

PROPOSED CONTOUR

EXISTING CONTOUR

TOP OF CURB ELEVATION

PAVEMENT SLAB ELEVATION

990.00T

990.00

.0

7 97

8 97

MH

MH

MH

MH

MH

MH

MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

GRADING PLAN AREA C - BASE BID

SCALE: 1" = 20'

GRADING LEGEND

PROPOSED CONTOUR

EXISTING CONTOUR

TOP OF CURB ELEVATION

PAVEMENT SLAB ELEVATION

990.00T

990.00

1.89%

0.

T

0.

00 976.00T

975.50

977.69T

977.19

3.47%

.5

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.5

AREA C - BASE BID

GRADING PLAN

C1.6

8.

T

7.

978.20T

977.70 981.07

980.57

1.

T

0.

MH

MH

MH

MH

WV

WV WV

F E S

MH

FES

MH MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

WV

WV WV

MW

F E S

MH

FES

MH

MW

MH

MH

MH CO

CO

CO

CO

MH

MH

MH

MH

CO

CO

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

7 97

8 97

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

MH

MH

MH

MH

MH

MH

MH

MH

MH

F E

SFES

MH

MH MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

BASE BID

DRAINAGE PLAN -

C1.7

DRAINAGE PLAN - BASE BID

SCALE: 1" = 40'

STRATCOM AVE.

NO. SIZE LENGTH MATERIAL SLOPE REMARKS

NO. TYPE NORTHING EASTING RIM ELEV. DEPTH I.E. IN I.E. OUT

STORM DRAINAGE STRUCTURES

1 492519.18 2762896.16 973.62 6.00' 967.62-

2 492519.19 2763038.17 976.31 6.80' 969.39-

3 492519.21 2763386.65 976.15 3.90' 972.25-

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.2

FLARED END SECTION

1 15" 17' RCP 1.47%

3 4

STORMWATER DRAINAGE PIPE

492519.88 2763403.68 - - 972.00-

48"

SECTION 9

CURB INLET 8 TO FLARED END

24"

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

7 97

8 97

MH

MH

MH

MH

MH

MH

WV

WV WV

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

WV

WV WV

MW

MH

MH

MW

MH

MH

MH CO

CO

CO

CO

MH

MH

MH

MH

CO

CO

MW

MW

PLAN - BASE BID

EROSION CONTROL

C1.8

EROSION CONTROL PLAN - BASE BID

SCALE: 1" = 40'

APPROVAL.

WITHOUT INSPECTOR AND APPLICABLE GOVERNMENT

EROSION CONTROL MEASURES SHALL NOT BE REMOVED 1.

STRATCOM AVE.

EROSION CONTROL NOTES

LEGEND

CONSTRUCT SILT FENCE

INLET SEDIMENT FILTER

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

MH

WV

WV WV

MH

MH MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

WV

WV WV

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

7 97

8 97

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)

BASE BID

STABILIZATION PLAN -

PERMANENT

C1.9

PERMANENT STABILIZATION PLAN - BASE BID

SCALE: 1" = 40'

LEGEND

NOTES

1.

GRADING OPERATIONS SHALL BE SEEDED.

ALL AREAS DISTURBED BY CONSTRUCTION AND

BLANKET

SEEDING WITH EROSION CONTROL

SEE DETAIL ON THIS SHEET

PARKING LOT ISLANDS

TO BE PLACED IN ALL NEW

RIVER ROCK LANDSCAPING

ISLAND DETAIL

NO SCALE

(3" MIN. DEPTH)

WASHED RIVER ROCK

" DIA.2

" - 14

GEOTEXTILE FABRIC

CURB & GUTTER

CONCRETE

2.

RIVER ROCK TO GOVERNMENT FOR APPROVAL.

CONTRACTOR TO PROVIDE SAMPLE OF WASHED

3.

MANUFACTURED BY SOLMAX OR APPROVED EQUAL.

GEOTEXTILE FABRIC SHALL BE MIAFI 140N AS

CENTERED ON CURB OPENING)

(12 FT WIDE X 16 FT LONG

APPROVED EQUAL.

BY HANES GEO COMPONENTS OR

CONTROL MAT AS MANUFACTURED

SCOUR STOP PERMANENT EROSION

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

WV

WV WV

MW

F E

SFES

MH

FES

MH

MW

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

WV

WV WV

MW

F E

SFES

MH

FES

MH

MW

MH

MH

MH

CO

CO

CO

CO

CO

CO

MH

MH

MH

MH

MH

MH

MH

MH

MH

CO

CO

CO

MH

MH

WV

WV WV

MW

F E

SFES

MH

CO

MH

MW

MH

MH

MH

ALTERNATE

REMOVAL PLAN -

C2.1

DEMOLITION KEY NOTES

REMOVE PAVEMENT

DEMOLITION LEGEND

REMOVAL PLAN - ALTERNATE

SCALE: 1" = 40'

REMOVE EXISTING CURB AND GUTTER PAVEMENT

PROTECT INLET

ADDITIONAL INFORMATION.

SEE ELECTRICAL PLAN E1.1 FOR

REMOVE LIGHT POLE AND BASE

5 3 3 3 3 3

4 REMOVE TREE (3" DIAMETER).

STRATCOM AVE.

PIPE.

REMOVE INLET & REPLACE SEGMENT WITH 18" RCP

6 REMOVE STORM SEWER CLEANOUT

7 PROTECT MANHOLE

2' EAST OF CORNER

LIMIT OF CURB REMOVAL

8 PROTECT MONITORING WELL

9 REMOVE RAIN GARDEN SUBDRAIN PIPE

10 PROTECT PULL BOX

DETENTION POND

2' NORTH OF CORNER

LIMIT OF CURB REMOVAL

UNDERGROUND POWER

11 REMOVE SIDEWALK TO NEAREST JOINT

8'

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

MH

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

SITE PLAN - ALTERNATE

SCALE: 1" = 40'

ALTERNATE

SITE PLAN -

C2.2

STRATCOM AVE.

8.00'

ON SHEET C3.1.

SEE DETAIL

FOR PAVING

FOR DETAILS.

SEE SHEET C3.1

CURB & GUTTER

DETENTION POND

(SEE SHEET C2.3)

AREA A

(SEE SHEET C2.4)

AREA B

(SEE SHEET C2.5)

AREA C

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

ENLARGED SITE PLAN AREA A - ALTERNATE

SCALE: 1" = 20'

MATCHLINE SEE SHEET C2.4

AREA A - ALTERNATE

ENLARGED SITE PLAN

C1.3

CONSTRUCTION KEY NOTES

CURVE DATA

10' R.P. N 492837.99

E 2762482.50

P.C. N 492837.94

E 2762492.50

P.T. N 492828.61

E 2762485.96

1 ' 9.59'

.6

'13.25'

STRATCOM AVE.

ON SHEET C3.1.

EXTENSION, SEE DETAIL

FOR PAVING OF SIDEWALK

E 2762491.50

N 492861.50

2' R.P. N 492735.80

E 2762543.85

P.C. N 492735.18

E 2762541.95

P.T. N 492737.80

E 2762543.85

2' R.P. N 492735.79

E 2762557.09

P.C. N 492737.79

E 2762557.10

P.T. N 492735.79

E 2762559.09

2' R.P. N 492695.20

E 2762557.08

P.C. N 492695.20

E 2762559.08

P.T. N 492694.58

E 2762555.18

E 2762462.12

N 492820.87

E 2762664.13

N 492632.97

8' ±

ASPHALTIC CONCRETE PAVEMENT 1

6"CONCRETE CURB & GUTTER,

SEE DETAIL ON SHEET C3.1

PAINT STRIPING (4" WIDE - WHITE)

4 4" P.C. CONCRETE SIDEWALK

ON SHEET C2.9

CURB INLET, SEE DRAINAGE PLAN

ON SHEET C2.9

AREA INLET, SEE DRAINAGE PLAN

ON SHEET C2.9

MANHOLE, SEE DRAINAGE PLAN

TO MANHOLE SEE SHEET C2.9

EXISTING INLET TO BE MODIFIED

MH

MH

MW

MH

MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

ENLARGED SITE PLAN AREA B - ALTERNATE

SCALE: 1" = 20'

MATCHLINE SEE SHEET C2.3

1.81%

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.5

AREA B - ALTERNATE

ENLARGED SITE PLAN

C2.4

9.00'

CONSTRUCTION KEY NOTES

.0

9.00'9.00'

E 2762491.50

N 492861.50

ASPHALTIC CONCRETE PAVEMENT 1

6"CONCRETE CURB & GUTTER,

SEE DETAIL ON SHEET C3.1

PAINT STRIPING (4" WIDE - WHITE)

4 4" P.C. CONCRETE SIDEWALK

ON SHEET C2.9

CURB INLET, SEE DRAINAGE PLAN

ON SHEET C2.9

AREA INLET, SEE DRAINAGE PLAN

CURVE DATA

4' R.P. N 492695.20

E 2762678.77

P.C. N 492581.77

E 2762674.77

P.T. N 492581.77

E 2762682.77

4' R.P. N 492570.77

E 2762678.77

P.C. N 492570.77

E 2762682.77

P.T. N 492570.77

E 2762674.77

4' R.P. N 492581.77

E 2762822.44

P.C. N 492581.77

E 2762818.44

P.T. N 492581.77

E 2762826.44

4' R.P. N 492570.77

E 2762822.44

P.C. N 492570.77

E 2762826.44

P.T. N 492570.77

E 2762818.44

4' R.P. N 492581.77

E 2762966.69

P.C. N 492581.77

E 2762962.69

P.T. N 492581.77

E 2762970.69

4' R.P. N 492570.77

E 2762966.69

P.C. N 492570.77

E 2762970.69

P.T. N 492570.77

E 2762962.69

E 2762678.48

N 492607.70

ON SHEET C2.9

MANHOLE, SEE DRAINAGE PLAN

3 3

2 2

.0

8.00'

.6

8.00'

.0

.6

.0

8.00'

MH

MH

MH

MH

MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

ENLARGED SITE PLAN AREA C - ALTERNATE

SCALE: 1" = 20'

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.4

AREA C - ALTERNATE

ENLARGED SITE PLAN

C2.5

CONSTRUCTION KEY NOTES

9.00'9.00'

CURVE DATA

4' R.P. N 492581.77

E 2763115.67

P.C. N 492581.77

E 2763111.67

P.T. N 492581.77

E 2763119.67

4' R.P. N 492570.77

E 2763115.67

P.C. N 492570.77

E 2763119.67

P.T. N 492570.77

E 2763111.67

4' R.P. N 492581.77

E 2763261.03

P.C. N 492581.77

E 2763257.03

P.T. N 492581.77

E 2763265.03

5' R.P. N 492570.77

E 2763261.03

P.C. N 492570.77

E 2763265.03

P.T. N 492570.77

E 2763257.03

E 2763391.15

N 492521.21

E 2763323.35

N 492607.89

E 2763344.28

N 492632.60

ASPHALTIC CONCRETE PAVEMENT 1

6"CONCRETE CURB & GUTTER,

SEE DETAIL ON SHEET C3.1

PAINT STRIPING (4" WIDE - WHITE)

4 4" P.C. CONCRETE SIDEWALK

ON SHEET C2.9

CURB INLET, SEE DRAINAGE PLAN

ON SHEET C2.9

AREA INLET, SEE DRAINAGE PLAN

ON SHEET C2.9

MANHOLE, SEE DRAINAGE PLAN

.0

.0

.6

8.00' 8.00'

42 SP @ 9.00' = 378.00'

'8 SP @ 9.00' = 72.00

'25.43

.5

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MW

.5

T

.0

.0

T

.5

.6

T

.16

GRADING PLAN AREA A - ALTERNATE

SCALE: 1" = 20'

0.87%

.3

GRADING LEGEND

PROPOSED CONTOUR

EXISTING CONTOUR

TOP OF CURB ELEVATION

PAVEMENT SLAB ELEVATION

990.00T

990.00

MATCHLINE SEE SHEET C2.7

AREA A - ALTERNATE

GRADING PLAN

C2.6

.2

.7

SEE SHEET C3.1 FOR DETAIL

PROP. ELEV. =976.73

EXIST. ELEV. = 976.24

ADJUST MANHOLE A TO GRADE

.3

.15

T

.6

SEE SHEET C3.2 FOR DETAIL

PROP. ELEV. = 976.58

EXIST. ELEV. = 976.36

MODIFY AREA INLET AND ADJUST

.3

T

.8

.10

T

.6

.5

T

.0

MH

MH

MW

MH

MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

GRADING PLAN AREA B - ALTERNATE

SCALE: 1" = 20'

GRADING LEGEND

PROPOSED CONTOUR

EXISTING CONTOUR

TOP OF CURB ELEVATION

PAVEMENT SLAB ELEVATION

990.00T

990.00

MATCHLINE SEE SHEET C2.6

.3

T

.8

0 977.86T

977.36

.6

T

.12

3.56% 1.91% 1.81%

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.8

AREA B - ALTERNATE

GRADING PLAN

C2.7

SEE SHEET C3.1 FOR DETAILS

PROP. ELEV. = 973.47

EXIST. ELEV. = 974.18

ADJUST MANHOLE B TO GRADE

SEE SHEET C3.1 FOR DETAILS

PROP. ELEV. = 973.85

EXIST. ELEV. = 974.55

WELL TO GRADE

ADJUST MONITORING

.0

.2

T

.7

.5

T

.0

.4

T

.9

.6

T

.17

.3

T

.8

.6

T

.10

MH

MH

MH

MH

MH

MH

MH

7 97

8 97

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

GRADING PLAN AREA C - ALTERNATE

SCALE: 1" = 20'

GRADING LEGEND

PROPOSED CONTOUR

EXISTING CONTOUR

TOP OF CURB ELEVATION

PAVEMENT SLAB ELEVATION

990.00T

990.00

1.89%

0.

T

0.

00 976.00T

975.50

977.69T

977.19

3.47%

.5

M A

T C

H L

IN

E

S E

E S

H E

E T

C

.7

AREA C - ALTERNATE

GRADING PLAN

C2.8

8.

T

7.

978.20T

977.70 981.07

980.57

1.

T

0.

MH

MH

MH

MH

F E

SFES

MH

FES

MH MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MW

F E

SFES

MH

FES

MH

MW

MH

MH

MH

MH

MH

MH

MH

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

MH

MH

MH

MH

MH

MH

MH

MH

MH

F E

SFES

MH

MH MH

MH

MH

PROJECT TITLE

SHEET OF

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

ALTERNATE

DRAINAGE PLAN -

C2.9

DRAINAGE PLAN - ALTERNATE

SCALE: 1" = 40'

NO. SIZE LENGTH MATERIAL SLOPE REMARKS

1 15" 96' 1.49%

2 15" 132'

3 18" 139' 1.59%

RCP

RCP

RCP

1.43%

NO. TYPE NORTHING EASTING RIM ELEV. DEPTH I.E. IN I.E. OUT

1 6.14' -492862.36 2762467.22

SEE DETAIL SHEET C3.5

AREA INLET

978.14 972.00

STORM DRAINAGE STRUCTURES

SEE DETAIL SHEET C3.3

CURB INLET

2 492767.30 2762479.80 977.07 6.50' 970.57-

3 492644.06 276525.36 975.69 7.00' 968.69-

4 492519.16 2762585.12 974.74 8.25' 966.49-

5 492514.89 2762631.60 975.97 11.00' 965.68965.76

6 492519.18 2762896.16 973.62 6.00' 967.62-

7 492519.19 2763038.17 976.31 6.80' 969.39-

8 492519.21 2763386.65 976.15 3.90' 972.25-

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.2

108" DIAMETER MANHOLE

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.3

CURB INLET

SEE DETAIL SHEET C3.2

FLARED END SECTION

4 24" 47' RCP 1.65%

5 15" 17' RCP 1.47%

7 8 9

STORMWATER DRAINAGE PIPE

492519.88 2763403.68 - - 972.00-

SHEET C3.2

NEW MANHOLE COVER WITH RISER, SEE DETAIL

MODIFY 30" DIAMETER NYLOPLAST INLET WITH

492519.88 2763403.68 976.58 - - -

48"

AREA INLET 1 TO CURB INLET 2

CURB INLET 2 TO CURB INLET 3

CURB INLET 3 TO CURB INLET 4

CURB INLET 4 TO MANHOLE 5

SECTION 9

CURB INLET 8 TO FLARED END

24"

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

MH

MH

MH MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

7 97

8 97

MW

MW

PLAN - ALTERNATE

EROSION CONTROL

C2.10

EROSION CONTROL PLAN - ALTERNATE

SCALE: 1" = 40'

APPROVAL.

WITHOUT INSPECTOR AND APPLICABLE GOVERNMENT

EROSION CONTROL MEASURES SHALL NOT BE REMOVED 1.

STRATCOM AVE.

EROSION CONTROL NOTES

LEGEND

CONSTRUCT SILT FENCE

INLET SEDIMENT FILTER

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

MH

MH

MH

MH

MH

MH

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MH

MW

MH

MH

MW

MH

MH

MH

MH

MH

MH

MH

7 97

8 97

PERMANENT STABILIZATION PLAN - ALTERNATE

SCALE: 1" = 40'

LEGEND

NOTES

1.

GRADING OPERATIONS SHALL BE SEEDED.

ALL AREAS DISTURBED BY CONSTRUCTION AND

BLANKET

SEEDING WITH EROSION CONTROL

SEE DETAIL ON THIS SHEET

PARKING LOT ISLANDS

TO BE PLACED IN ALL NEW

RIVER ROCK LANDSCAPING

ISLAND DETAIL

NO SCALE

(3" MIN. DEPTH)

WASHED RIVER ROCK

" DIA.2

" - 14

GEOTEXTILE FABRIC

CURB & GUTTER

CONCRETE

2.

RIVER ROCK TO GOVERNMENT FOR APPROVAL.

CONTRACTOR TO PROVIDE SAMPLE OF WASHED

3.

MANUFACTURED BY SOLMAX OR APPROVED EQUAL.

GEOTEXTILE FABRIC SHALL BE MIAFI 140N AS

ALTERNATE

STABILIZATION PLAN -

PERMANENT

C2.11

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

PAVEMENT DETAILS

C3.1

JOINT FILLER

PREFORMED NON-EXTRUDING

RESERVOIR

WIDTH OF SEALANT

0.75 TO 1.0 TIMES THE

DEPTH OF SEALANT =

WIDTH AS INDICATED ON PLANS

(TYP.)

" R4

BELOW TOP OF PAVEMENT

"4

" TO 8

RECESSED

JOINT SEALANT

EXPANSION JOINT SEALANT DETAIL

NO SCALE

INTERFACE

COURSE THICKNESS AT

MATCH EXISTING BASE

NEW BASE COURSES

NEW BITUMINOUS PAVEMENT EXISTING BITUMINOUS PAVEMENT

2'-0"

BITUMINOUS TACK COAT

BITUMINOUS TACK COAT

EXISTING ASPHALT PAVEMENT

SURFACE COURSE

NEW 3.0" BITUMINOUS

ASPHALT TO EXISTING ASPHALT INTERFACE DETAIL

NO SCALE

MILL EXISTING

PAVEMENT

T = PAVEMENT THICKNESS

6" CURB & GUTTER DETAIL

NO SCALE

T

4"

R

R

T

"2

2'

NOTE:

6' TO 8' 4' IN CENTER OF WALK

WALK

WIDTH

TRANSVERSE LONGITUDINAL

DUMMY JOINT SPACING

SIDEWALK JOINT SPACING

WALLS OR OTHER STRUCTURES.

CURB AND GUTTER, BUILDINGS AND RETAINING

ALL LOCATIONS WHERE NEW WALKS ABUT CONC.

PROVIDE 1/2" PREMOULDED EXPANSION JOINTS AT

BITUMINOUS TACK COAT

BASE COURSE

6.0" ASPHALT PAVEMENT

TYPICAL ASPHALT SECTION

NO SCALE

3.0" BITUMINOUS SURFACE COURSE

8'-0"

CURB & GUTTER

CONCRETE

W/ SEALANT

" EXPANSION JOINT2

CURB & GUTTER

6" P.C. CONCRETE

SLOPE 1/4" PER FT. MAX.

CONCRETE SIDEWALK

SIDEWALK/CURB DETAIL

NO SCALE

NO SCALE

SEE TABLE

ADJUST MANHOLE TO GRADE.

MANHOLE RISER RINGS TO

REVISE PRE-CAST CONCRETE

ASPHALT PAVEMENT

STORM MANHOLE ADJUSTMENT DETAIL

SHALL BE CAST WITH WORD "STORM".

OR AN APPROVED EQUAL. COVER

MANUFACTURED BY NEENAH FOUNDRY

FRAME SHALL BE NO. DF-1102 AS

CAST IRON MANHOLE COVER AND

BITUMINOUS TACK COAT

12" THICK COMPACTED SUBGRADE (95% MIN-ASTM D698)

BITUMINOUS PRIME COAT

12"

MIN

CONCRETE COLLAR

EXISTING MANHOLE

LOWER 0.71'B

RAISE 0.49'A

HEIGHT ADJUSTMENTMANHOLE

12' MIN12' MIN

(MAXIMUM LIFT IS 3")

ASPHALT PAVEMENT LIFTS

STAGGER COLD JOINTS BETWEEN

COMPACTED SUBGRADE

NO SCALE

ASPHALT COLD JOINT DETAIL

COVER & FRAME

MONITORING WELL

WELL COVER MIN 12"

DEPTH TO MATCH MONITORING

1'-6" X 1'-6"CONCRETE COLLAR

WELL PIPE

EXISTING MONITORING

INSTALL NEW PIPE CAP

CUT WELL PIPE AND

MONITORING WELL ADJUSTMENT DETAIL

NO SCALE

SPACER

X

SECTION VIEW

ELEVATION VIEW

UP TO 30" PIPE X=1'-6"

30" THRU 54" PIPE X=2'-0"

54" AND LARGER PIPE CONCRETE SHALL BE OPW-4000.

SUPPORTED WITH APPROVED SPACER.

6/6 WIRE MESH WRAPPED COMPLETELY AROUND THE PIPE AND

CONCRETE COLLAR TO BE 6" THICK. REINFORCING WITH 6" X 6",

ALTERNATE SHAPE

X=3'-0"

CONCRETE COLLAR DETAIL

NO SCALE

12" THICK COMPACTED SUBGRADE (95% MIN-ASTM D698)

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

DETAILS

STORM DRAINAGE

C3.2

CONCRETE

FILLET

DIAMETER AS

INDICATED ON PLAN

ECCENTRIC CONE

(TYPICAL)

COPOLYMER POLYPROPYLENE

PLASTIC COATED STEP AS

PRECAST MANHOLE

WALL. -ASTM C478

P.C.C. COLLAR

MANUFACTURED BY M.A.

INDUSTRIES, INC. MODEL

PSI-PF OR APPROVED

EQUAL 16" C-C

SECTION

ADJUSTING RINGS (MAX. 18")

GROUT IN PLACE.

MIN.

8"

MIN.

8"

6" 6"

2'-0"

H

SHALL BE CAST WITH WORD "STORM".

OR AN APPROVED EQUAL. COVER

MANUFACTURED BY NEENAH FOUNDRY

FRAME SHALL BE NO. DF-1102 AS

CAST IRON MANHOLE COVER AND

Drawing

1:10

Drawing-1

1:10

Drawing-3

1:10

STORM DRAINAGE MANHOLE

NO SCALE

E X

T E

N S

T

IO

N

I

N C

R E

M E

N T

SYSTEMS INC..

ADVANCED DRAINAGE

MANUFACTURED BY

RISER SECTION AS

30" DIAMETER NYLOPLAST

FIELD GLUE JOINT

NYLOPLAST DRAINAGE BASIN

EXISTING 30" DIAMETER

AREA INLET MODIFICATION DETAIL

NO SCALE

SYSTEMS INC.

ADVANCED DRAINAGE

MANUFACTURED BY

RISER SECTION. AS

ON TOP OF MODIFIED

SOLID COVER ASSEMBLY

INSTALL 30" NYLOPLAST

FIELD GLUE JOINT NYLOPLAST DRAINAGE BASIN

EXISTING 30" DIAMETER

FIELD VERIFY

ELEV = 976.58

ASPHALT PAVEMENT

PROPOSED 9.5"

CONCRETE COLLAR

POUR 9.5" P.C.C.

.5

1'1'

F

IE

L D

V E

R

IF

Y

.6

SECTION

CUT RISER

SEE DETAIL

NYLOPLAST RISER

END ELEVATION

SECTION "A-A"

T T

S

1/ 2" R

T

PLAN VIEW

T T

R

T T

1 1/2" R

R

T

AA

TONGUE END ON INLET END SECTION (SHOWN). GROOVE END

ON OUTLET END SECTION. (TYPICAL FOR ALL CONCRETE

FLARED END SECTIONS).

NO. 4 REINFORCING BARS

(FOR ALL SIZES OF PIPES)

NO. 4 REINFORCING BARS

(FOR ALL SIZES OF PIPES)

FOR FOOTING DETAILS

SEE SHEET 2 OF 2

FOR FOOTING DETAILS

SEE SHEET 2 OF 2

FLARED END SECTIONS (NOMINAL DIMENSIONS)

T

MIN.

2"

2 1/4"

2 1/2"

3"

3 1/2"

4"

4 1/2"

5"

5 1/2"

6"

6 1/2"

7"

2.4

S

APPROX.

R2R1

W Z

X Y

LPIPE

DIAMETER

9"

11"

1'-0"

1'-2"

1'-3"

1'-8"

1'-10"

1'-10"

2'-0"

2'-0"

2'-0"

2'-0"

12"

15"

18"

24"

30"

36"

42"

48"

54"

60"

66"

72"

6'-0 7/8"

6'-1"

6'-1"

6'-1 1/2"

6'-1 3/4"

8'-1 3/4"

8'-2"

8'-2"

8'-4"

8'-3"

8'-3"

8'-3"

2'-0"

2'-3"

2'-3"

3'-7 1/2"

4'-6"

5'-3"

5'-3"

6'-0"

5'-5"

5'-0"

6'-6"

6'-6"

4'-0 7/8"

3'-10"

3'-10"

2'-6"

1'-7 3/4"

2'-10 3/4"

2'-11"

2'-2"

2'-11"

3'-3"

1'-9"

1'-9"

4"

6"

9"

9 1/2"

1'-0"

1'-3"

1'-9"

2'-0"

2'-3"

2'-6"

2'-6"

2'-6"

2'-0"

2'-6"

3'-0"

4'-0"

5'-0"

6'-0"

6'-6"

7'-0"

7'-6"

8'-0"

9'-0"

9'-0"

1'-0 1/8"

1'-0 1/2"

1'-3 1/2"

1'-4 13/16"

1'-6 1/2"

2'-0 5/16"

2'-3 1/2"

2'-4 1/2"

2'-9 1/8"

3'-0 11/16"

3'-0 1/8"

3'-2 15/16"

FLARED END SECTION DETAILS

NO SCALE

NYLOPLAST RISER SECTION

NYLOPLAST SOLID COVER ASSEMBLY INSTALLATION

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

STORM SEWER DETAILS

C3.3

MODIFIED PRECAST M.H. SECT.OPENINGSCALE : 1" = 1'-0"SCALE : 1" = 1'-0"SCALE : 1" = 1'-0"SCALE : 3" = 1'-0"(TYP.)

SURFACE OF FILET

STEEL TROWEL FINISH

BACK OF CURB

GUTTER LINE

3/8" PREFORMED EXPANSION JOINT MATERIAL

BACK OF CURB

GUTTER LINE

3/8" PREFORMED EXPANSION JOINT MATERIAL

BAR K

PIP

LONGITUDINAL

BAR K

LOCK IN

LOCK IN

LOCK IN

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

CURB INLET DETAILS

C3.4

SHEET TITLE

REVISION BY/DATE

DESIGN FIRM

Drawing Number Facility Number

Project Number

Drafter

Designer Project Manager

Date

COORDINATION

APPROVED

SIGNATURE OFFICE

Offutt

Air Force Base

D

NAMMOCBMOC

RI

A

"SIGNING OF THE COVER SHEET

CONSTITUTES COORDINATION OF

ALL DRAWINGS IN THIS PROJECT;

SUBSEQUENT SHEETS NEED NOT

BE SIGNED."

.NI C

SURVEYING

ACOA S S I T E S

ARCHITECTUREENGINEERING

council bluffs omaha

BASE CIVIL ENGINEER

CHIEF OF ENGINEERING

PROJECT MANAGER

FIRE DEPARTMENT

ENVIRONMENTAL (CEA)

SAFTY

COMMUNICATION

USING AGENCY

CHIEF OF DESIGN

FORCE PROTECTION

PARKING LOT 3, B1000

CONSTRUCT NEW

WJG

B1000

SGBP-24-0018

6-09-26

OFF-B-6524

E-6947

GLISMANN

WILLIAM J.

P R

O F

E S

S I

G I

N E

E R

S T

A T

E

OF NEBR

A S

K A

HGM COA NE CA-0065

6-09-26

AREA INLET DETAILS

C3.5

MODIFIED PRECAST M.H. SECT.

OPENING

PLAN VIEW

SCALE : 1" = 1'-0"

SCALE : 1" = 1'-0"

SECTION A-A

SCALE : 1" = 1'-0"

SECTION B-B

A A

BB

COVER SUPPORT DETAIL

SCALE : 3" = 1'-0"(T

Y

P

NOTES

48" I.D.

5" 5"

22"

SEE NOTE 1

BARRIER BAR (OPT.)

6" OPENING

SEE NOTE 2

CONC. FILET

COVER SUPPORT

REINFORCED CONC. COVER

MANHOLE RING MANHOLE COVER

#4 BARS @ 12" CTRS. BOTHWAYS

X

#4 BARS @ 6" CTRS.#4 BARS @ 6" CTRS.

AROUND OPENING

(4) #4 BARS PLACED

MANHOLE COVER

MANHOLE RING

REINFORCED CONCRETE COVER

D

IA

.BAR (2)

#4 ANCHOR BARRIER BAR (2 PLACES)

TIE ANCHOR BAR TO

INLET OPENING (4)

12"

(TYP.)

REINFORCED CONCRETE COVER

3/4" DIA. HOLE

(2 PLACES)

PRECAST M.H. SECT.

TIE TO STEEL IN

#4 BAR 2' LONG

1. BARRIER BAR SHALL BE #4 SMOOTH BAR…