Question #
| Section |
| Comment/Question |
| Response |
| A2.1 |
| Page Counts, Section L Table 2.0 |
| Per Table 2.0 in section L2.0 the Pre-priced Optional Task Order is limited to 20 pages and does not count towards the page count of volume II, Technical Approach and Proposal Risk. Are the 20 pages of the Pre-priced Optional Task Order inclusive of the PWS, Technical Volume and the Cost Volume called out in L4.6.1? Or just the “Technical Volume?” Is the 20 page Pre-priced Optional Task Order called out in table 2.0 of section L2.0 and the “Technical Volume” identified in the L4.6.1 intended to be the same document? If not how are they different? |
Same question for the Development Approach in table 2.0 of section L2.0 and the section L4.7.4?
The two (2) Pre-Priced Optional Task Orders have a 20 page limit inclusive of the PWS and Technical Volume. To clarify, added a statement to L4.6.1(3) and L4.7.1(3), "The Cost Volume will be included in the Cost/Price Volume IV."
| A2.2 |
| MPACS Price Model issued 11 June 2012 |
| Draft RFP#1 and #2 industry Q&A responses confirmed that ODCs are accurate in Section L, and the Grand Total tab of the MPACS Price Model. Please note that the MPACS Price Model instructions tab still references the old, incorrect ODC values. |
| Refer to amounts changed in Amendment 1 and the Pricing Model posted on FedBizOps on 12 Jun 12. |
| A2.3 |
| Subfactors 4 & 5 |
| Subfactors 4 and 5 require the offerer to submit separate PWS, Technical Volume, and Cost Volumes. Does this requirement go against page count? Recommend adding this requirement as an attachment. |
| The two (2) Pre-Priced Optional Task Orders have a 20 page limit inclusive of the PWS and Technical Volume. To clarify, added a statement to L4.6.1(3) and L4.7.1(3) "The Cost Volume will be included in the Cost/Price Volume IV." |
| A2.4 |
| Section B, CLIN 0010 |
| Section B CLIN 0010 description reflects 6.5% target fee and further states this is considered development under the Incentive Plan. L6.7 (page 250) also reflects target fee at 6.5% and is considered development. Per Incentive Plan, target fee is 10%. Please clarify. |
| CLIN 0010, Development Pre-Priced Option Task should be 10%. Sec B and the Pricing Model will be changed to reflect the change from 6.5% to 10%. |
| A2.5 |
| MPACS Price Model issued 11 June 2012 |
| Line 50 of the 'Directions' tab under the Price Model Checklist references a Sub ODCs tab that is not included in the MPACS Price Model. Please clarify this checklist direction. |
| Correct there are no Sub ODCs tab in the Price Model. References to a Sub ODC tab is deleted from the Directions Tab. |
| A2.6 |
| MPACS Price Model issued 11 June 2012 |
| In Sec J, Atch 14, MPACS Pricing Model, Dated 11-Jun, the tab "Grand Total", Cell C144 has a hard coded value of $360,000. It appears this value was added on the 11 June 2012 version. Please clarify where this value came from. |
| $360,000 is removed from Clin 9 calculation of Grand Totals Tab. |