CDRLs PMEAS.doc

DOC document 267 KB Posted

Attached to
PMEAS
Solicitation number
FA4600-10-R-0008
Issued by

About this file

CDRLs for RFP FA4600-10-R-0008 PMEAS

View the file

Other files

File Type Posted
Q A 3.doc DOC document
FA4600-10-R-0008 Amendment 0002.doc DOC document
FA4600-10-R-0008 Amendment 0001.doc DOC document
Q A 2.doc DOC document
Q A 1.doc DOC document
Draft DD254_PMEAS.doc DOC document
FA4600-10-R-0008.doc DOC document
Draft Documents Q A 1.doc DOC document
Draft Additional Terms Conditions.doc DOC document
Draft PWS for PMEAS.doc DOC document
Draft Instructions to Offerors.doc DOC document
Draft Evaluation Factors.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

PROGRAM MANAGEMENT, ENGINEERING and ACQUISITION SUPPORT(PMEAS)

E. CONTRACT/PR NO.

Contract No.

TBD

F. CONTRACTOR

1. Data Item No.

A001

2. Title of Data Item:

Non-Disclosure Statement

3. Subtitle

4. Authority (Data Acquisition Document No.)

DI-MGMT-81596

5. Contract Reference

PWS Para 1.10

6. Requiring Office

850th ELSG/NQ

7. DD 250 Req

NO

9. Dist Statement

10. Frequency

As Required

12. Date of First Submission

See Block 16

14. Distribution

a. Addressee

b. Copies

8. APP CODE

11. As of Date

Publication Date

13. Date of subsequent Submission

Draft

Final

Reg
Repro

16. Remarks

Block 4. Prior to starting work under this contract, each contractor employee shall be required to sign a Non-Disclosure Statement. At a minimum the NDA must include acknowledgement of the employee’s responsibilities to protect government/proprietary/classified information, the duration of the responsibility, and consequences of unauthorized disclosure.

Block 12. Provide copy of the signed statements for each employee within 5 business days after the NDA is signed.

Block 14. Electronic submissions to the J81, Program Manager, and 55 CONS shall be made via email.

Contractor Format W/Govt Approval

Electronic Copy:

850 ELSG/NQ

55th CONS/LGCZ

15. Tot

G. PREPARED BY

Amber McDaniel, Capt, USAF

H. DATE

12 May 10

I. APPROVED BY

Amber McDaniel, Capt, USAF

J. DATE

12May10

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___1___ OF ___7___ PAGES

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

All

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

Contract No.

F. CONTRACTOR

1. Data Item No.

A002

2. Title of Data Item

Agendas/Meetings Minutes/Trip Reports

3. Subtitle

4. Authority (Data Acquisition Document No.)

DI-ADMN-81505

5. Contract Reference

See Item 16

6. Requiring Office

850th ELSG/NQ

7. DD 250 Req

9. Dist Statement

10. Frequency

12. Date of First Submission

See Item 16

14. Distribution

a. Addressee

b. Copies

8. APP CODE

A

11. As of Date

Publication Date

13. Date of subsequent Submission

Draft

Final

Reg
Repro

16. Remarks

Block 5. Performance Work Statement Para 1.3.1.8, 1.3.1.10, 1.3.1.14, 1.3.4.21, 1.3.1.21 Block 12. Agendas will be published at least 3 working days prior to scheduled meeting and Minutes/Trip reports will be published at least 5 working days after scheduled meeting or at a Government/contractor agreed upon schedule.

Block 14. Electronic submissions shall be made via email.

Electronic Copy:

Respective PM

15. Tot

G. PREPARED BY

H. DATE

12 May 10

I. APPROVED BY

Amber McDaniel, Capt, USAF

J. DATE

12 May 10

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___2___ OF ___7___ PAGES

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

Contract No.

F. CONTRACTOR

1. Data Item No.

A003

2. Title of Data Item

Activity/Project Schedules/Reports

3. Subtitle

4. Authority (Data Acquisition Document No.)

DI-FNCL-80331A

5. Contract Reference

See Item 16

6. Requiring Office

850th ELSG/NQ

7. DD 250 Req

9. Dist Statement

10. Frequency

12. Date of First Submission

14. Distribution

a. Addressee

b. Copies

8. APP CODE

11. As of Date

13. Date of subsequent Submission

Draft

Final

Reg
Repro

16. Remarks

Block 4. Will utilize software programs that are supported by USSTRATCOM.

Block 5. Performance Work Statement Para 1.3.1.5, 1.3.1.7, 1.3.1.10, 1.3.1.14, 1.3.1.20, 1.3.3.1, 1.3.3.5, 1.3.3.15, 1.3.4.1, 1.3.4.2, 1.3.4.3, 1.3.4.7, 1.3.4.8, 1.3.4.10, 1.3.4.13, 1.3.4.14, 1.3.4.15, 1.3.4.20, & 1.3.4.24 Block 14. Electronic submissions shall be made via email.

Electronic Copy:

Respective PM

15. Tot

G. PREPARED BY

H. DATE

12 May 10

I. APPROVED BY

Amber McDaniel, Capt, USAF

J. DATE

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___3___ OF ___7___ PAGES

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

Contract No.

F. CONTRACTOR

1. Data Item No.

A004

2. Title of Data Item

Decision Papers/Briefings/Program Reviews

3. Subtitle

4. Authority (Data Acquisition Document No.)

DI-MISC-80508B

5. Contract Reference

See Item 16

6. Requiring Office

850th ELSG/NQ

7. DD 250 Req

9. Dist Statement

10. Frequency

12. Date of First Submission

14. Distribution

a. Addressee

b. Copies

8. APP CODE

11. As of Date

13. Date of subsequent Submission

Draft

Final

Reg
Repro

16. Remarks

Block 5. Performance Work Statement Para 1.3.1.8, 1.3.1.12.7, 1.3.1.17, 1.3.4.2, 1.3.4.13, 1.3.4.14, 1.3.4.15, & 1.3.4.21 Block 14. Electronic submissions shall be made via email.

Respective PM

15. Tot

G. PREPARED BY

H. DATE

12 May 10

I. APPROVED BY

Amber McDaniel, Capt, USAF

J. DATE

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___4___ OF ___7___ PAGES

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

Contract No.

F. CONTRACTOR

1. Data Item No.

A005

2. Title of Data Item

Financial Management/Acquisition Reports & Plans

3. Subtitle

4. Authority (Data Acquisition Document No.)

5. Contract Reference

See Item 16

6. Requiring Office

850th ELSG/NQ

7. DD 250 Req

9. Dist Statement

10. Frequency

12. Date of First Submission

14. Distribution

a. Addressee

b. Copies

8. APP CODE

A

11. As of Date

Publication Date

13. Date of subsequent Submission

Draft

Final

Reg
Repro

16. Remarks

Block 5. Performance Work Statement Para 1.3.1.17, 1.3.1.20, 1.3.2.2, 1.3.2.3, 1.3.3.15, 1.3.4.10, 1.3.4.14, & 1.3.4.24 Block 14. Electronic submissions shall be made via email.

Electronic Copy:

Respective PM

15. Tot

G. PREPARED BY

H. DATE

12 May 10

I. APPROVED BY

Amber McDaniel, Capt, USAF

J. DATE

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___5___ OF ___7___ PAGES

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

Contract No.

F. CONTRACTOR

1. Data Item No.

A006

2. Title of Data Item

Independent Assessment & Evaluation of Concepts

3. Subtitle

4. Authority (Data Acquisition Document No.)

5. Contract Reference

PWS Para 1.3.1.15

6. Requiring Office

850th ELSG/NQ

7. DD 250 Req

9. Dist Statement

10. Frequency

12. Date of First Submission

14. Distribution

a. Addressee

b. Copies

8. APP CODE

A

11. As of Date

Publication Date

13. Date of subsequent Submission

Draft

Final

Reg
Repro

16. Remarks

Block 14. Electronic submissions shall be made via email.

Respective PM

15. Tot

G. PREPARED BY

H. DATE

12 May 10

I. APPROVED BY

Amber McDaniel, Capt, USAF

J. DATE

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___6___ OF ___7___ PAGES

CONTRACT DATA REQUIREMENTS LIST

( 1 Data Item ) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing date sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

Contract No.

F. CONTRACTOR

1. Data Item No.

A007

2. Title of Data Item

Inventory of Contracts for Services

3. Subtitle

4. Authority (Data Acquisition Document No.)

DI-ADMIN-80447A

5. Contract Reference

PWS Para 1.4

6. Requiring Office

55 CONS

7. DD 250 Req

9. Dist Statement

10. Frequency

Annually

12. Date of First Submission

15May2011

14. Distribution

a. Addressee

b. Copies

8. APP CODE

A

11. As of Date

N/A

13. Date of subsequent Submission

15May20XX

Draft

Final

Reg
Repro

16. Remarks

Block 14. Unless otherwise specified, submission will be provided electronically (soft Copy) to 55 CONS/LGCZ.

Contractor Format W/Govt Approval Contractor will provide an Inventory of Contracts for Services report including the following information:

Contract Number/Task Order Number

Functions and missions performed by the contractor under each task order

The contracting organization administering the task order

The organization whose requirements are being met through contractor performance of the function

The funding source for the task order under which the function is performed

Period of performance of the task order

The number of full-time contractor employees (or its equivalent) paid for the performance of the activity

55 CONS/LGCZ

15. Tot

G. PREPARED BY

Cheryl L Haun

H. DATE

17 May 10

I. APPROVED BY

Cheryl L. Haun

J. DATE

17 May 10

DD Form 1423-1 APR 89 PREVIOUS EDITIONS ARE OBSOLETE PAGE ___7___ OF ___7___ PAGES

File details come from the government source that posted it. Updated .