final 26 51 13 Lighting Fixtures.pdf

PDF 77 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

-

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
SIGN IN SHEET Oct 15 2010.doc DOC document
Seed project Honor guard room.pdf PDF
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 05.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 13.dwf DWF file
amendment4.doc DOC document
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Sheet 09.dwf DWF file
Sheet 17.dwf DWF file
Question and Answers.docx DOCX document
amendedsolicitation2.doc DOC document
final 23 05 93 Testing Adjusting and Balancing.pdf PDF
Sheet 10-10.pdf PDF
Performance Period.pdf PDF
final 26 05 33 Raceways.pdf PDF
final 26 05 19 Wires and Cables.pdf PDF
Sheet 2-02.pdf PDF
Final 09 91 00 Painting.pdf PDF
Sheet 3-Sheet 3.pdf PDF
final 07 92 00 Joint Sealers.pdf PDF
Final 05 50 00 Metal Fabrications.pdf PDF
Sheet 11-11.pdf PDF
final 26 05 53 Electrical Identification.pdf PDF
Final 23 38 13 Kitchen Ventilator Hood Systems.pdf PDF
final 23 07 00 HVAC Insulation.pdf PDF
final 23 00 00 General Provisions.pdf PDF
Final 26 05 26 Grounding.pdf PDF
final 23 01 30 HVAC Air-Distribution Cleaning System.pdf PDF
Sheet 19-Sheet 19.pdf PDF
Final 23 05 00 Basic HVAC Materials and Methods.pdf PDF
Sheet 9-9.pdf PDF
Sheet 5-Sheet 5.pdf PDF
Sheet 12-12.pdf PDF
Section 1B AF66 Master Oct 2008.xls XLS spreadsheet
Sheet 16-16.pdf PDF
Sheet 11-11.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
SITE PLAN.dwg DWG drawing
Ntitle.dwg DWG drawing
Rpr Wing XP.dwg DWG drawing
Site Visit Sign In Sheet.pdf PDF
Preconstruction Conference Attachment 4.doc DOC document
Attachment 1.docx DOCX document
Attachment 5.docx DOCX document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT AIR FORCE BASE

(092036) 26 51 13-1 (Repair AHU O-Club, B462)

2010 by FEI

SECTION 26 51 13

LIGHTING FIXTURES

PART 1 - GENERAL

1.1 SUMMARY

A. Extent of lighting fixture work is indicated by drawings and schedules.

B. Types of lighting fixtures in this section include the following:

1. Fluorescent.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Manufacturers: The type and manufacturer of all lighting fixtures shall be as indicated on the fixture schedule and drawings.

2.2 LIGHTING FIXTURES

A. General: Provide lighting fixtures of sizes, types, and ratings indicated; complete with, but not necessarily limited to, housings, lamps, ballasts, starters, and wiring.

B. All recessed fixtures shall be provided with rubber or fiberglass gaskets or of equivalent material to prevent light leaks around flush trim. Fixtures shall be provided with proper thermal protection as required for surrounding environment.

C. No labels on fixtures shall be placed where same will be conspicuous or where same will mar the appearance of the units. The complete units and all components for fixtures shall bear the

Underwriter's Laboratories, Inc., label.

D. All fixture finishes shall be factory applied.

E. Fluorescent-Lamp Ballasts: Each fluorescent fixture shall be equipped with an electronic ballast. See drawings for additional requirements.

F. All ballasts shall have ratings suitable for the atmosphere for which they are to be installed. Fixtures installed in low ambient temperature areas shall have ballasts specifically designed for low temperature starting.

G. Linear fluorescent lamps shall be low mercury TCLP compliant.

H. Provide factory installed integral disconnecting means for fluorescent light fixtures per 2008 NEC article

410.73 (G). Note that exception No. 4 and exception No. 5 will not be accepted.

2.3 LIGHTING FIXTURE TYPES

A. General: The fixture types are designated by letters (A.B.C. etc.) near each outlet and refer to the description as listed in the Fixture Schedule.

(092036) 26 51 13-2 (Repair AHU O-Club, B462)

B. All lamps shall be of type specified on the Fixture Schedule. This Contractor shall furnish lamps for all fixtures as shown on the plans and fixture schedule. These lamps shall be new at the time of building acceptance by the Owner. Any lamps used for construction lighting shall be replaced prior to acceptance. Verify lamp color temperature with Owner’s Representative.

PART 3 - EXECUTION

3.1 INSPECTION

A. Examine areas and conditions under which lighting fixtures are to be installed and substrate which will support lighting fixtures. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer.

3.2 INSTALLATION OF LIGHTING FIXTURES

A. Install lighting fixtures at locations and heights as indicated, in accordance with fixture manufacturer's written instructions, applicable requirements of NEC, NECA's "Standard of Installation", NEMA

Standards and with recognized industry practices to ensure that lighting fixtures fulfill requirements.

B. Coordinate with other electrical work as appropriate to properly interface installation of lighting fixtures with other work.

C. Where recessed fixtures are specified, Contractor shall provide plaster frames or other framing devices to the Ceiling Contractor prior to the installation of the fixtures and shall be responsible to see that the proper fixtures are furnished for the specific ceiling used.

D. Where suspended ceilings are supported on steel angle or channel construction, outlets and fixtures shall be supported on members attached to the angle of channel framework. In no case shall any fixture be hung from plaster, plasterboard, acoustic or insulating materials.

3.3 ADJUSTING AND CLEANING

A. Clean lighting fixtures of dirt and debris upon completion of installation.

B. Protect installed fixtures from damage during construction period.

C. Aim adjustable fixtures per instructions of Owner’s Representative.

D. Burn-in lamps per manufacturer’s recommendations.

3.4 FIELD QUALITY CONTROL

A. Upon completion of installation of lighting fixtures, and after building circuitry has been energized, apply electrical energy to demonstrate capability and compliance with requirements. Where possible, correct malfunctioning units at site, then retest to demonstrate compliance; otherwise, remove and replace with new units and proceed with retesting.

(092036) 26 51 13-3 (Repair AHU O-Club, B462)

3.5 GROUNDING

A. Provide equipment grounding connections for lighting fixtures as required by NEC. Tighten connections to comply with tightening torques specified in UL Standard 486A to assure permanent and effective grounds.

END OF SECTION