Section 1B AF66 Master Oct 2008.xls
XLS spreadsheet 31 KB Posted
- Attached to
- Saber Pre-solicitation notice Federal contract opportunity
- Solicitation number
- FA4600-10-R-0006
About this file
-
View the file
Other files for this federal contract opportunity
Show all 50
Saber Pre-solicitation notice has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||||
| (AF Form 66) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||||
| SGBP SGBP 10-0018 | PROJECT NAME, BUILDING ### OFFUTT AFB, NEBRASKA | ||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL OR DATA | OPERATING INSTRUCTIONS | REQUIRED SUBMITTAL | ||||||
| DATE | DATE |
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGR. RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | ||||||||||
| APPROVED | DISAPPROVED | ||||||||||
| 1 | Contractor Daily Logs. Sec 1A Para 8 | 4 | Submit to Inspector, no AF3000 | ||||||||
| 2 | Traffic Control Plan. Sec 1A Para 12 | 4 | |||||||||
| 3 | Contractor Single Point of Contact, Sec 1A para 37C | 4 | |||||||||
| 4 | AF Form 3064 | 1 | |||||||||
| 5 | Contract Progress Schedule. Sec 1A Para 39 | 4 | |||||||||
| 6 | Security - Listing of Employees. Sec 1A Para 23 | 4 | |||||||||
| 7 | AF Form 103 - Digging Permit. Sec 1A Para 27 | 4 | Submit to Inspector, no AF3000 | ||||||||
| 8 | O & M Manuals. Sec 1A Para 43 | 6 | |||||||||
| 9 | Warranty Book. Sec 1A Para 44 | 6 | |||||||||
| 10 | Extra Stock, Sec 1A, Para 45 | 1 | |||||||||
| 11 | As-Constucted Drawings Para 1B Para 4 | 1 | |||||||||
| 12 | Material Safety Data Sheets. Sec 1C, Para 1.2 | 7 | CEV Approval Required | ||||||||
| 13 | Hazardous Material Storage Plan. Sec 1C, Para 1.4 | 5 | CEV Approval Required | ||||||||
| 14 | Spill Reporting. Sec 1C, Para 1.5 | 5 | CEV Approval Required | ||||||||
| 15 | Hazardous Material Usage. Sec 1C, Para 2 | 5 | CEV Approval Required | ||||||||
| 16 | Certificate of Hazardous Waste Training. Sec 1C, Para 3.1 | 5 | CEV Approval Required | ||||||||
| 17 | Request for Disposal. Sec 1C, Para 3.4 | 5 | CEV Approval Required | ||||||||
| 18 | Test Results. Sec.1C, Para 3.4 | 5 | CEV Approval Required | ||||||||
| 19 | Petroleum Container Storage Plan. Sec 1C, Para 4.2 | 5 | CEV Approval Required | ||||||||
| 20 | Report of Waste Water Discharges. Sec 1C, Para 5 | 5 | CEV Approval Required | ||||||||
| 21 | NPDES CSW-NOI and SWPPP. Sec 1C, Para 6.1 | 5 | CEV Approval Required | ||||||||
| 22 | NPDES CSW Permit. Sec 1C, Para 6.1 | 5 | CEV Approval Required | ||||||||
| 23 | NPDES CSW Reports. Sec1C, Para 6.3 | 5 | CEV Approval Required | ||||||||
| 24 | SWPPP for <1Acre. Sec 1C, Para 6.5 | 5 | CEV Approval Required | ||||||||
| 25 | NPDES NOI Dewatering. Sec 1C Para 7 | 5 | CEV Approval Required | ||||||||
| 26 | NPDES Dewatering Permit. Sec 1C, Para 7 | 5 | CEV Approval Required | ||||||||
| 27 | NPDES Permit Requirements. Sec 1C, Para 7 | 5 | CEV Approval Required | ||||||||
| 28 | NPDES Dewatering Permit Disposal Method. Sec 1C, Para 7 | 5 | CEV Approval Required | ||||||||
| 29 | Material Delivery Receipt. Sec 1C, Para 8 | 5 | CEV Approval Required | ||||||||
| 30 | Nonhazardous Solid Waste Diversion. Sec 1C, Para 10 | 5 | CEV Approval Required | ||||||||
| 31 | Cast-In Place Concrete Sec 03 30 00 | 7 | |||||||||
| 32 | Elastormeric Membrane Roofing Sec 07 53 00 | 4 | 7 | ||||||||
| 33 | Joint Sealers Sec 07 92 00 | 7 | |||||||||
| 34 | Gypsum Board Assemblies Sec 09 21 16 | 7 | |||||||||
| 35 | Acoustical Ceilings Sec 09 51 00 | 1 | 4 | 7 | |||||||
| 36 | Painting Sec 09 91 00 | 3 | 7 | ||||||||
| 37 | Testing, Adusting, and Balancing Sec 23 05 93 | 7 | |||||||||
| 38 | Electrical Control Systems Sec 23 09 00 | 4 | 7 | ||||||||
| 39 | Hydronic Piping and Specialties Sec 23 21 13 | 4 | 7 | ||||||||
| 40 | Air Distribution Sec 23 30 00 | 4 | 4 | 7 | |||||||
| 41 | Fans and Roof Curbs Sec 23 34 00 | 4 | 4 | 7 | |||||||
| 42 | Kitchen Ventilator Hood Systems Sec 23 38 13 | 4 | 4 | 7 | 3 | ||||||
| 43 | Air Handlers Sec 23 73 13 | 4 | 4 | 7 | 3 | ||||||
| 44 | Rooftop Heating and Cooling Units Sec 23 74 13 | 4 | 4 | 7 | 3 | ||||||
| 45 | General Electrical Sec 26 05 00 | 7 | |||||||||
| 46 | Variable Frequency Drive Sec 26 09 15 | 4 | 7 | ||||||||
| 47 | |||||||||||
| 48 | |||||||||||
| 49 | |||||||||||
| 50 | |||||||||||
| 51 | |||||||||||
| 52 | |||||||||||
| 53 | |||||||||||
| 54 | |||||||||||
| 55 | |||||||||||
| NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements. | |||||||||||
| LEGEND: | |||||||||||
| A - Include with line 7 Operations and Maintenance Manual | |||||||||||
| B - Include with line 8 Warranty Book |