Section 1B AF66 Master Oct 2008.xls

XLS spreadsheet 31 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

-

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
SIGN IN SHEET Oct 15 2010.doc DOC document
Seed project Honor guard room.pdf PDF
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Sheet 09.dwf DWF file
Sheet 17.dwf DWF file
Sheet 15.dwf DWF file
Sheet 03.dwf DWF file
Sheet 01.dwf DWF file
Sheet 07.dwf DWF file
Sheet 11.dwf DWF file
Sheet 18.dwf DWF file
Sheet 20.dwf DWF file
Sheet 06.dwf DWF file
AmendedSolicitation3.doc DOC document
Attachment_1.docx DOCX document
Final 23 05 00 Basic HVAC Materials and Methods.pdf PDF
Sheet 9-9.pdf PDF
Sheet 5-Sheet 5.pdf PDF
Sheet 12-12.pdf PDF
Sheet 16-16.pdf PDF
Sheet 11-11.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 26 27 26 Wiring Devices.pdf PDF
final 26 05 00 General Electrical.pdf PDF
final 26 05 34 Electrical Boxes and Fittings.pdf PDF
Final 23 30 00 Air Distribution.pdf PDF
TOC Final.pdf PDF
Final 03 30 00.pdf PDF
final 22 10 00 Plumbing Piping and Equipment.pdf PDF
Sheet 6-Sheet 6.pdf PDF
Sheet 15-15.pdf PDF
final 23 09 93 Sequence of Operation1.pdf PDF
Sheet 7-Sheet 6.pdf PDF
final 26 09 15 VFD.pdf PDF
Sheet 13-13.pdf PDF
final 23 21 13 Hydronic Piping and Specialties.pdf PDF
Sheet 8-8.pdf PDF
Sheet 20-Sheet 20.pdf PDF
Section 1A Master Copy June 2008.pdf PDF
final 23 09 00 Electrical Control Systems Facilities Mana.pdf PDF
final 22 05 00 Basic Plumbing Materials and Methods.pdf PDF
Ntitle.dwg DWG drawing
Rpr Wing XP.dwg DWG drawing
Attachment 5.docx DOCX document
Attachment 2.docx DOCX document
Solicitation.doc DOC document
Attachment 3.docx DOCX document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
SGBP SGBP 10-0018PROJECT NAME, BUILDING ### OFFUTT AFB, NEBRASKA
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL OR DATAOPERATING INSTRUCTIONSREQUIRED SUBMITTAL
DATEDATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGR. RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Contractor Daily Logs. Sec 1A Para 84Submit to Inspector, no AF3000
2Traffic Control Plan. Sec 1A Para 124
3Contractor Single Point of Contact, Sec 1A para 37C4
4AF Form 30641
5Contract Progress Schedule. Sec 1A Para 394
6Security - Listing of Employees. Sec 1A Para 234
7AF Form 103 - Digging Permit. Sec 1A Para 274Submit to Inspector, no AF3000
8O & M Manuals. Sec 1A Para 436
9Warranty Book. Sec 1A Para 446
10Extra Stock, Sec 1A, Para 451
11As-Constucted Drawings Para 1B Para 41
12Material Safety Data Sheets. Sec 1C, Para 1.27CEV Approval Required
13Hazardous Material Storage Plan. Sec 1C, Para 1.45CEV Approval Required
14Spill Reporting. Sec 1C, Para 1.55CEV Approval Required
15Hazardous Material Usage. Sec 1C, Para 25CEV Approval Required
16Certificate of Hazardous Waste Training. Sec 1C, Para 3.15CEV Approval Required
17Request for Disposal. Sec 1C, Para 3.45CEV Approval Required
18Test Results. Sec.1C, Para 3.45CEV Approval Required
19Petroleum Container Storage Plan. Sec 1C, Para 4.25CEV Approval Required
20Report of Waste Water Discharges. Sec 1C, Para 55CEV Approval Required
21NPDES CSW-NOI and SWPPP. Sec 1C, Para 6.15CEV Approval Required
22NPDES CSW Permit. Sec 1C, Para 6.15CEV Approval Required
23NPDES CSW Reports. Sec1C, Para 6.35CEV Approval Required
24SWPPP for <1Acre. Sec 1C, Para 6.55CEV Approval Required
25NPDES NOI Dewatering. Sec 1C Para 75CEV Approval Required
26NPDES Dewatering Permit. Sec 1C, Para 75CEV Approval Required
27NPDES Permit Requirements. Sec 1C, Para 75CEV Approval Required
28NPDES Dewatering Permit Disposal Method. Sec 1C, Para 75CEV Approval Required
29Material Delivery Receipt. Sec 1C, Para 85CEV Approval Required
30Nonhazardous Solid Waste Diversion. Sec 1C, Para 105CEV Approval Required
31Cast-In Place Concrete Sec 03 30 007
32Elastormeric Membrane Roofing Sec 07 53 0047
33Joint Sealers Sec 07 92 007
34Gypsum Board Assemblies Sec 09 21 167
35Acoustical Ceilings Sec 09 51 00147
36Painting Sec 09 91 0037
37Testing, Adusting, and Balancing Sec 23 05 937
38Electrical Control Systems Sec 23 09 0047
39Hydronic Piping and Specialties Sec 23 21 1347
40Air Distribution Sec 23 30 00447
41Fans and Roof Curbs Sec 23 34 00447
42Kitchen Ventilator Hood Systems Sec 23 38 134473
43Air Handlers Sec 23 73 134473
44Rooftop Heating and Cooling Units Sec 23 74 134473
45General Electrical Sec 26 05 007
46Variable Frequency Drive Sec 26 09 1547
47
48
49
50
51
52
53
54
55
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 7 Operations and Maintenance Manual
B - Include with line 8 Warranty Book