Section 1B J-WING BJ-1J.pdf

PDF 94 KB Posted

Attached to
RECOVERY - SGBP970107 - Repair J-Wing Elec, Strat
Solicitation number
FA4600-09-B-0006
Issued by

About this file

Attachment 1 Specs

View the file

Other files

File Type Posted
QA 2 Repair J Wing Electrical RFI.doc DOC document
QA RECOVERY Repair J Wing Electrical RFI.doc DOC document
OFF-B-6073 Sheet 02 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 04 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0006-0003.pdf PDF
OFF-B-6074 Sheet 03 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 05 - Amendment 1 - May 09.dwf DWF file
OFF-B-6074 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 06 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 01 - Amendment 1 - May 09.dwf DWF file
amend 0002.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
08100.pdf PDF
Section 1A J-WING BJ-1J.pdf PDF
Sheet 05-5.dwf DWF file
09650.pdf PDF
Section 1C J-WING BJ-1J.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 04-4.dwf DWF file
09000.pdf PDF
Sheet 06-6.dwf DWF file
Sheet 07-7.dwf DWF file
02110.pdf PDF
Sheet 05-5.dwf DWF file
16452 Final Grounding.pdf PDF
16135 Final Electrical Boxes and Fittings.pdf PDF
Sheet 02-2.dwf DWF file
09900.pdf PDF
Sheet 09-Layout.dwf DWF file
16361 Final Secondary Unit Substations.pdf PDF
09250.pdf PDF
16470 Final Panelboards.pdf PDF
Sheet 07-7.dwf DWF file
16120 Final Wires and Cables.pdf PDF
Section 1 AF66 J-WING bj-1j.xls XLS spreadsheet
16190 Final Supporting Devices.pdf PDF
Sheet 03-3.dwf DWF file
Sheet 01-01.dwf DWF file
16482 Final Motor Control Centers.pdf PDF
06300.pdf PDF
Sheet 04-4.dwf DWF file
16110 Final Raceways.pdf PDF
Sheet 06-6.dwf DWF file
16124 Final Medium Voltage Cables.pdf PDF
Atch 4 General Decision Number.doc DOC document
07200.pdf PDF
Atch 5 offeror checklist.doc DOC document
TOC - Repair Electrical J-Wing Stratcom Floors BJ 1J.pdf PDF
Sheet 08-8.dwf DWF file
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT PROJECT NO: SGBP 97-0107 DEC 2007

TITLE: Repair Electrical J-Wing STRATCOM

1B - 1

SECTION 1B

GENERAL CONDITIONS - SHOP DRAWINGS/SUBMITTALS

INDEX

1. Shop Drawings 5. Record Shop Drawings/Guarantees

2. Deviations 6. Transfer and Acceptance of Military Real

3. Submittals Property DD Form 1354

4. As-Constructed Drawings 7. Contractor Provided Specifications

1. SHOP DRAWINGS: In accordance with the CONTRACT PROVISIONS, and within 30 days after Notice to Proceed, the Contractor shall submit to the Contracting Officer for approval, in the quantities indicated on AF Form 66 Schedule of Material of Submittals, complete shop drawings of materials and equipment to be incorporated in the work. Shop drawings shall include catalog number, cuts, diagrams, drawings and such other descriptive data as may be required by the Contracting Officer. Shop drawings on component items forming a system, or that are interrelated, shall be submitted at one time as a single submittal in order to demonstrate the items have been properly coordinated and will function properly as a system. A notation shall be made on each shop drawing submitted as to the item's specific use, either by the particular type number reference on the drawings; or in the specifications: by a reference to the applicable paragraph of the specifications, or by a description of its specific location.

2. DEVIATIONS: Shop drawings shall represent the equipment and material requirements as specified herein and on the drawings. Where shop drawings deviate from the specifications or drawings, the Contractor shall inform the Contracting Officer in writing and clearly indicate the deviations and the reasons therefore. Such deviations shall be evaluated and, if accepted, will be processed as a modification to the contract. The contract specifications and drawings shall govern over shop drawings, even though approved by the Government, where the Contractor has not identified a deviation to the Contracting Officer. In such cases, the Contractor will be required to comply with the contract specifications and drawings at no additional cost to the Government.

3. SUBMITTALS: Shop drawings, samples, letters, certificates, etc., shall be submitted for, but not limited to the items listed in each section of the specifications. Submittals in addition to those listed, may be required by the Contracting Officer. The AF form 66 summarizes contained within the construction documents summarizes the required project submittal items, but may not be complete.

4. AS-CONSTRUCTED DRAWINGS: The contractor shall maintain, and have on site for review at all times, a separate set of full-scale Contract Drawings marked-up to fully indicate as-constructed conditions. All variations from the Contract Drawings, for whatever reason, including those resulting from the use of optional materials, shall be indicated. These variations shall be shown in the same general detail utilized in the initial Contract Drawings. The marked-up drawings shall be furnished to the government not later than 10 calendar days after the work is completed. Government personnel shall review the as-constructed drawings to determine whether they are correct and complete. If not, they shall be returned to the contractor for additional updating until they are satisfactory to the government. Final payment shall not be made prior to satisfactory completion.

OFFUTT PROJECT NO: SGBP 97-0107 DEC 2007

TITLE: Repair Electrical J-Wing STRATCOM

1B - 2

5. RECORD SHOP DRAWINGS/GUARANTEES: Record shop drawings submitted upon completion of the work under this contract shall be suitably bound and labeled with project name and number. Include therein a list of all equipment items specified to be guaranteed or which have separate manufacturer's guarantees accompanied by a copy of each specific guarantee and the name, address and telephone number for the manufacturer, supplier/distributor and installer.

6. TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY DD FORM 1354: The contractor shall accurately complete and provide a DD Form1354 current edition for the project. A draft copy shall be submitted for review 30 days prior to project completion. After review, a copy will be returned to the contractor to incorporate any comments and to produce the Interim 1354. The Interim 1354 must be complete to schedule the final inspection and the Government shall receive a copy at the conclusion of the final inspection. The contractor has 30 days after the final inspection to complete the final 1354 and submit it to the government. He shall do this both electronically and in hard copy. The DD Form 1354 is a form to document quantities and transfer military real property from contractor control to the government control. The 55CES/CEC Project Manager can provide a sample of a previously completed form upon request.

7. CONTRACTOR PROVIDED SPECIFICATIONS: In the event that there is a disagreement regarding referenced specifications (such as by ASTM, AWWA, AASHTO, NSF, ANSI, UBC, etc.) it shall be the responsibility of the contractor to purchase and submit copies of the specifications over which there is disagreement.

8. CONTRACTOR PROVIDED DOCUMENTS for LBP AND ASBESTOS: Contractor will be required to submit all relative documents for corrective action when Lead Base Paint or Asbestos is scheduled to be removed from the respective project.

File details come from the government source that posted it. Updated .