RECOVERY - SGBP970107 - Repair J-Wing Elec, Strat
Solicitation number
FA4600-09-B-0006
Issued by

About this file

Attachment 1 Specs

View the file

Other files

File Type Posted
QA 2 Repair J Wing Electrical RFI.doc DOC document
QA RECOVERY Repair J Wing Electrical RFI.doc DOC document
OFF-B-6073 Sheet 02 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 04 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0006-0003.pdf PDF
OFF-B-6074 Sheet 03 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 05 - Amendment 1 - May 09.dwf DWF file
OFF-B-6074 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 06 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 01 - Amendment 1 - May 09.dwf DWF file
amend 0002.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
08100.pdf PDF
Section 1A J-WING BJ-1J.pdf PDF
Sheet 05-5.dwf DWF file
Section 1C J-WING BJ-1J.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 04-4.dwf DWF file
09000.pdf PDF
Sheet 06-6.dwf DWF file
Sheet 07-7.dwf DWF file
02110.pdf PDF
Sheet 05-5.dwf DWF file
16452 Final Grounding.pdf PDF
16135 Final Electrical Boxes and Fittings.pdf PDF
Sheet 02-2.dwf DWF file
09900.pdf PDF
Sheet 09-Layout.dwf DWF file
16361 Final Secondary Unit Substations.pdf PDF
09250.pdf PDF
16470 Final Panelboards.pdf PDF
Section 1B J-WING BJ-1J.pdf PDF
Sheet 07-7.dwf DWF file
16120 Final Wires and Cables.pdf PDF
Section 1 AF66 J-WING bj-1j.xls XLS spreadsheet
16190 Final Supporting Devices.pdf PDF
Sheet 03-3.dwf DWF file
Sheet 01-01.dwf DWF file
16482 Final Motor Control Centers.pdf PDF
06300.pdf PDF
Sheet 04-4.dwf DWF file
16110 Final Raceways.pdf PDF
Sheet 06-6.dwf DWF file
16124 Final Medium Voltage Cables.pdf PDF
Atch 4 General Decision Number.doc DOC document
07200.pdf PDF
Atch 5 offeror checklist.doc DOC document
TOC - Repair Electrical J-Wing Stratcom Floors BJ 1J.pdf PDF
Sheet 08-8.dwf DWF file
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

112-006 09650-1

SECTION 09650 1

RESILIENT FLOORING 2

A. GENERAL 4

QUALITY ASSURANCE 6

Provide each type of resilient flooring with accessories produced by a single manufacturer, including 8 recommended primers, adhesives, sealants, and leveling compounds. 9 The Contractor shall perform tests as necessary to determine if the concrete floor slab is within limits acceptable to 11 resilient flooring manufacturer’s recommendations for moisture and pH levels. 12

SUBMITTALS 14

Submit samples of vinyl base materials in accordance with Section 1B, Shop Drawings/Submittals. 16

DELIVERY, STORAGE AND HANDLING 18

Materials shall be delivered in unbroken, sealed packages, with manufacturer's name and brand stamped thereon. 20 Material shall not be stored in newly drywalled rooms or rooms otherwise exposed to dampness. 21

JOB CONDITIONS 23

Materials shall be maintained at a temperature of 70 deg. F for 48 or more hours before they are installed. A 25 temperature of 70 deg. F or more shall be maintained in areas receiving resilient flooring materials for a period 26 beginning 48 hours before application is begun and ending 48 hours after installation is complete. 27 Work shall not commence until after painting is completed. 29 Vinyl base shall not be installed until after painting and flooring work is completed. 31

B. PRODUCTS 33

MANUFACTURERS 35

Acceptable manufacturers of resilient flooring materials shall be as follows (or approved equal): 37 Resilient Tile and Base: 39

- Armstrong World Industries, Inc. 40

- Azrock Industries, Inc. 41

- Tarket, Inc. 42

- Mannington Mills, Inc. 43

- Fritztile 44

MATERIALS 46

See Section 09000, Color Schedule. 48 Primers, adhesives and cements shall be as approved by the manufacturer for the particular material with which 50 they are used. 51 Polish shall be as recommended by the resilient flooring manufacturer and shall conform to ASTM D 4078. 53

C. EXECUTION 55

INSPECTION AND PREPARATION 57

Contractor shall be responsible for the proper product installation, including floor preparation and moisture testing, 59

112-006 09650-2 in the areas indicated to receive resilient flooring. There shall be a minimum of three (3) calcium chloride tests 1 performed on each floor level per ASTM F1869, which includes, but is not limited to, the following requirements: 2 Heating/cooling system must be fully operating to maintain temperature and relative humidity as it will be when 3 building is fully occupied, concrete surfaces to be tested shall be cleaned with a gentle grinding prior to testing, 4 and the ground areas must be left open for 24 hours before installing the test kits. If the emission rate is over 3.0 5 lbs., the Government shall be notified. 6 Surfaces shall be free of grease, oil, paint, and foreign matter. Dust shall be removed by vacuum cleaning after a 8 light sanding with a power disk floor machine with a course emery pad. 9 Under this Section, the Contractor shall be responsible for installing fill in depressions, holes, cracks, and minor 11 variations up to and including 1/16" vertical offsets. 12 Surfaces to receive resilient flooring shall be thoroughly clean and dry. The installation of resilient flooring shall be 14 an indication of the Contractor’s acceptance of the substrates, and he will automatically assume the responsibility 15 for any unacceptable finished work caused by substrate conditions. 16

INSTALLATION OF VINYL BASE 18

Install vinyl base where scheduled, upon completion of the application of wall finishes and all flooring materials. 20 Vinyl base shall be installed in continuous lengths. Piecing will not be permitted. Miter internal corners. At 22 external corners, ‘V’ cut back of base strip to 2/3 of its thickness, heat and fold: no joints allowed within 2’-0” of 23 corners. All vinyl base shall be secured to vertical surfaces with adhesive utilizing methods and materials 24 recommended by the manufacturer. Exercise extreme care to avoid getting adhesive on exposed wall or floor 25 surfaces. Heat vinyl base and/or use contact cement at corners where the return distance is not sufficient for 26 secure and permanent anchorage. Roll with a hand roller to assure full adherence to the wall surfaces. 27

INSTALLATION OF ACCESSORIES 29

Accessories shall be located under door location, where possible. 31

CLEANING AND PROTECTION 33

Resilient base shall be cleaned thoroughly in accordance with the manufacturer's written maintenance 35 recommendations. 36

File details come from the government source that posted it. Updated .