09900.pdf

PDF 64 KB Posted

Attached to
RECOVERY - SGBP970107 - Repair J-Wing Elec, Strat
Solicitation number
FA4600-09-B-0006
Issued by

About this file

Attachment 1 Specs

View the file

Other files

File Type Posted
QA 2 Repair J Wing Electrical RFI.doc DOC document
QA RECOVERY Repair J Wing Electrical RFI.doc DOC document
OFF-B-6073 Sheet 02 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 04 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0006-0003.pdf PDF
OFF-B-6074 Sheet 03 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 05 - Amendment 1 - May 09.dwf DWF file
OFF-B-6074 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 06 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 01 - Amendment 1 - May 09.dwf DWF file
amend 0002.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
08100.pdf PDF
Section 1A J-WING BJ-1J.pdf PDF
Sheet 05-5.dwf DWF file
09650.pdf PDF
Section 1C J-WING BJ-1J.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 04-4.dwf DWF file
09000.pdf PDF
Sheet 06-6.dwf DWF file
Sheet 07-7.dwf DWF file
02110.pdf PDF
Sheet 05-5.dwf DWF file
16452 Final Grounding.pdf PDF
16135 Final Electrical Boxes and Fittings.pdf PDF
Sheet 02-2.dwf DWF file
Sheet 09-Layout.dwf DWF file
16361 Final Secondary Unit Substations.pdf PDF
09250.pdf PDF
16470 Final Panelboards.pdf PDF
Section 1B J-WING BJ-1J.pdf PDF
Sheet 07-7.dwf DWF file
16120 Final Wires and Cables.pdf PDF
Section 1 AF66 J-WING bj-1j.xls XLS spreadsheet
16190 Final Supporting Devices.pdf PDF
Sheet 03-3.dwf DWF file
Sheet 01-01.dwf DWF file
16482 Final Motor Control Centers.pdf PDF
06300.pdf PDF
Sheet 04-4.dwf DWF file
16110 Final Raceways.pdf PDF
Sheet 06-6.dwf DWF file
16124 Final Medium Voltage Cables.pdf PDF
Atch 4 General Decision Number.doc DOC document
07200.pdf PDF
Atch 5 offeror checklist.doc DOC document
TOC - Repair Electrical J-Wing Stratcom Floors BJ 1J.pdf PDF
Sheet 08-8.dwf DWF file
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

112-006 09900-1

SECTION 09900 1

PAINTING 2

A. GENERAL 4

SCOPE 6

The scope and extent of painting and finishing shall be as designated by Specifications, Schedules and Drawing 8 notations. 9

WORK NOT INCLUDED 11

Unless otherwise specified, shop priming of ferrous metal items is included under various sections for 13 miscellaneous metal, metal doors and frames and similar items. Same applies for shop-fabricated or factory -built 14 mechanical and electrical equipment. See list of items later in this Section. However, the presence of a shop-15 applied primer shall not reduce the number of coats required to be applied in the field as specified under the Paint 16 Schedule later in this Section. Touch-up of primer on damaged or abraded steel items listed above shall be 17 accomplished under the sections where these items are specified. Touch-up of primer on steel doors and frames 18 damaged or abraded surfaces shall be accomplished under Section 08100. 19 Unless otherwise indicated, do not include painting when factory-finishing or installer-finishing is specified for such 21 items as (but not limited to) metal toilet enclosures, acoustic materials, and finished mechanical and electrical 22 equipment, including light fixtures, switchgear and distribution cabinets. See list of items later in this Section. 23 Unless otherwise indicated, painting is not required on surfaces such as walls or ceilings in concealed areas and 25 generally inaccessible areas, foundation spaces, furred areas, utility tunnels, pipe spaces, duct shafts, and 26 elevator shafts. See list of items later in this Section. 27 Metal surfaces of anodized aluminum, stainless steel, chromium plate, copper, bronze and similar finished 29 materials will not require finish painting, unless otherwise indicated. See list of items later in this Section. 30 Moving parts of operating units, mechanical and electrical parts, such as valve and damper operations, linkages, 32 sensing devices, motor and fan shafts will not require finish painting, unless otherwise indicated. 33 Do not paint over any code-required labels, such as Underwriters’ Laboratories and Factory Mutual, or any 35 equipment identification, performance rating, name, or nomenclature plates. 36 Omit paint and/or finishing as noted for the following items: 38

• Stainless steel items 39

• Security cameras 40

• Fire sprinkler heads 41

• Acoustic materials 42

• Finished mechanical and electrical equipment 43

• Electrical switchgear and distribution panels 44

• Light fixtures 45

QUALITY ASSURANCE 47

ACCEPTABLE MANUFACTURERS are as follows (or approved equal): 49

Benjamin Moore and Company 50 Diamond Vogel 51 ICI Dulux Paints 52 Kwal Paint 53 Pittsburgh Paints, PPG Industries, Inc. 54 Pratt and Lambert 55 Sherwin-Williams Company 56 Tnemec Co., Inc. 57

112-006 09900-2

REVIEW OF PAINTING SCOPE BEFORE BIDDING 1

The Painting Contractor shall be responsible for performing all work and providing all materials required to achieve 3 the design intent shown on these Drawings. The Owner will not be responsible for any additional expense to the 4 Contractor if the conditions causing those expenses could have been discovered in an on-site inspection prior to 5 bid submittal. 6

SUBMITTALS 8

Submit samples of each type of finish and color in accordance with Section 1B, Shop Drawings/Submittals. Paint 10 samples shall be submitted on 8 1/2-inch x 11-inch Mead Mark I cover paper, coated on one side, with paint 11 sprayed or applied with a foam rubber roller. Samples shall be submitted within 15 days after the Contract date. 12 Back of paint samples shall show the paint manufacturer and the trade name of the proposed paint. 13

DELIVERY, STORAGE AND PROTECTION 15

All paints, paste fillers, and similar materials shall be delivered in the original containers with seals unbroken and 17 labels intact. 18 All materials used on the project shall be stored in a single place designated by the Government Construction 20 Representative. Such storage place shall be kept neat and clean, and all damage thereto or to its surroundings 21 shall be made good. Any oil, rags, waste, etc. shall be removed from the building every night, and every 22 precaution taken to avoid the danger of fire. 23

JOB CONDITIONS 25

Surface temperature shall be maintained at the minimum temperature required by the paint manufacturer during 27 application and drying of paints. See manufacturer’s written instructions for more specific information. 28 Adjacent work, building finishes and surfaces, together with cabinets and similar items, shall be totally protected 30 with masking tape, drop cloths or other suitable coverings. Cabinets, shelving, furnishings and equipment, or 31 similar items shall not be utilized for any construction-related purpose or utilized as work surface, scaffolding, 32 plank supports or in any way walked upon. 33

B. PRODUCTS 35

MATERIALS 37

The Contractor shall have the option of using materials and finishes manufactured by any one of the 39 manufacturers previously listed (or approved equal). Materials used throughout shall be the products of one 40 manufacturer only, and shall be first line and top grade materials produced by the manufacturer selected. The 41 mentioning of a specific brand name is done to establish a minimum acceptable standard or quality desired. 42

C. EXECUTION 44

PREPARATION 46

All surfaces to be finished shall be scraped and wiped cleaned free of loose dirt and dust before painting. After the 48 first coat, putty nail holes, cracks, etc. with putty of a color to match that of finish. Bring putty flush to the adjoining 49 surface. 50 Metal surfaces which are not galvanized or shop-coated shall be washed with mineral spirits to remove dirt and 52 grease. Remove rust or scale by wire brushing or sandpapering clean. 53 Roof deck, beams, joists, ductwork, conduit, etc. scheduled to receive paint shall be clean and dry, and shall have 55 all loose rust, paint and other foreign material removed before painting. 56 Clean and treat galvanized metal chemically with a compound designed for this purpose, such as "Lithoform", 58 "Stibley", or "Solfo Metallic Coat", in accordance with the paint manufacturer's instructions. 59

112-006 09900-3

Sand hard glossy-previously painted surface finishes to insure adhesion. Spot prime with primer specified for new 1 surfaces where existing paint or primer has been partially removed by blistering, peeling, rupture, or cracking. 2 Completely remove existing finish if 25 percent or more of the existing finish has failed or can be easily scraped off 3 the surface. 4

APPLICATION 6

Application of the first coat shall constitute acceptance of surfaces as fit and proper to receive finish. 8 Apply all materials under adequate illumination, spread evenly and flow on smoothly without runs or sags. All 10 coats must be thoroughly dry before applying succeeding coats. 11 Spray application of paints will be permitted provided the application is by airless-type spray equipment, and 13 provided the application by spray is followed by a roller on wall surfaces. Roller shall thoroughly work paint into 14 pores for complete surface coverage. Conventional paint spray equipment will be permitted on metal fabrications. 15 Sprayed surfaces shall be smooth, free of imperfections, and paint runs, and shall be completely covered by each 16 coat. 17 Undercoats of paint shall be of the approximate color as the final coat. 19 For factory-primed and mill-primed surfaces, use the materials specified in every case for such surfaces and use in 21 accordance with the manufacturer's directions for the first or priming coat. 22

ADJUSTING AND CLEANING 24

Clean adjacent and other surfaces which are smeared or splattered as a result of painting and finishing work. 26

PAINT SCHEDULE 28

See list of approved manufacturers of paint products earlier in this section. The paint materials listed below are 30 given as a means of establishing the standard for the required paint materials. 31

INTERIOR WORK 33

FERROUS METAL AND ALUMINUM ITEMS (I.E., INTERIOR METAL DOORS, METAL DOOR AND WINDOW 35

FRAMES, SHOP-PRIMED STEEL, ETC., EXCEPT AS NOTED BELOW) 36

1 coat S-W Kem Bond HS Universal Metal Primer, B50 Series (4 mils wet, 1.2 mils dry) 37 2 coats S-W All Surface Enamel Alkyd Eg-Shel, A11 Series (4 mils wet, 1.6 mils dry per coat) 38

EXISTING GWB 40

2 coats S-W ProMar 200 Latex Eg-Shel Enamel, B20W200 (4 mils wet, 1.6 mils dry per coat) 41

NEW GWB 43

1 coat S-W PrepRite 200 Latex Wall Primer, B28W200 (4 mils wet, 1.2 mils dry) 44 2 coats S-W ProMar 200 Latex Eg-Shel Enamel, B20W200 (4 mils wet, 1.6 mils dry per coat) 45

PREVIOUSLY PAINTED CMU OR CONCRETE 47

2 coats S-W ProMar 200 Latex Eg-Shel Enamel B20W200 (4 mils wet, 1.5 mils dry per coat) 48

MISCELLANEOUS ITEMS 50

Registers, grilles, heating and water pipes, electrical conduits, outlet boxes, and panelboard fronts exposed in 52 finished rooms shall be painted as specified for Metal Work or as specified or required for the surfaces to be 53 painted. Color shall match color of adjacent wall or ceiling surfaces. 54

PAINT COLOR SELECTIONS 56

See Section 09000, Color Schedule. 58

112-006 09900-4

PAINT LOCATION SCHEDULE 1

See Section 09000, Color Schedule. 3

INTERIOR COLOR PLACEMENT 5

GWB walls P-1 7 CMU walls in existing rooms P-1 9 Hollow metal doors P-2 11 Hollow metal frames P-2 13