08100.pdf

PDF 59 KB Posted

Attached to
RECOVERY - SGBP970107 - Repair J-Wing Elec, Strat
Solicitation number
FA4600-09-B-0006
Issued by

About this file

Attachment 1 Specs

View the file

Other files

File Type Posted
QA 2 Repair J Wing Electrical RFI.doc DOC document
QA RECOVERY Repair J Wing Electrical RFI.doc DOC document
OFF-B-6073 Sheet 02 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 04 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0006-0003.pdf PDF
OFF-B-6074 Sheet 03 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 05 - Amendment 1 - May 09.dwf DWF file
OFF-B-6074 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 06 - Amendment 1 - May 09.dwf DWF file
OFF-B-6073 Sheet 01 - Amendment 1 - May 09.dwf DWF file
amend 0002.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
Section 1A J-WING BJ-1J.pdf PDF
Sheet 05-5.dwf DWF file
09650.pdf PDF
Section 1C J-WING BJ-1J.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 04-4.dwf DWF file
09000.pdf PDF
Sheet 06-6.dwf DWF file
Sheet 07-7.dwf DWF file
02110.pdf PDF
Sheet 05-5.dwf DWF file
16452 Final Grounding.pdf PDF
16135 Final Electrical Boxes and Fittings.pdf PDF
Sheet 02-2.dwf DWF file
09900.pdf PDF
Sheet 09-Layout.dwf DWF file
16361 Final Secondary Unit Substations.pdf PDF
09250.pdf PDF
16470 Final Panelboards.pdf PDF
Section 1B J-WING BJ-1J.pdf PDF
Sheet 07-7.dwf DWF file
16120 Final Wires and Cables.pdf PDF
Section 1 AF66 J-WING bj-1j.xls XLS spreadsheet
16190 Final Supporting Devices.pdf PDF
Sheet 03-3.dwf DWF file
Sheet 01-01.dwf DWF file
16482 Final Motor Control Centers.pdf PDF
06300.pdf PDF
Sheet 04-4.dwf DWF file
16110 Final Raceways.pdf PDF
Sheet 06-6.dwf DWF file
16124 Final Medium Voltage Cables.pdf PDF
Atch 4 General Decision Number.doc DOC document
07200.pdf PDF
Atch 5 offeror checklist.doc DOC document
TOC - Repair Electrical J-Wing Stratcom Floors BJ 1J.pdf PDF
Sheet 08-8.dwf DWF file
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

112-006 08100-1

DIVISION 8 - DOORS AND WINDOWS 1

SECTION 08100 3

METAL DOORS AND FRAMES 4

A. GENERAL 6

RELATED WORK SPECIFIED ELSEWHERE 8

Caulking and sealants Section 07900 10 Hardware, including silencers Section 08700 11 Grouting of frames in metal stud walls Section 09250 12 Bracing of frame heads in metal stud walls Section 09250 13 Painting Section 09900 14

SCOPE 16

Provide all labor, materials, tools, and equipment necessary for the furnishing and installation, complete, of all 18 hollow metal doors and frames as shown on the Drawings or specified, in accordance with the provisions of the 19 Contract Documents and completely coordinated with that of all other trades. 20 Although such work is not specifically shown or specified, furnish and install all supplementary or miscellaneous 22 items, appurtenances, and devices incidental to or necessary for a sound, secure, and complete installation. 23

QUALITY ASSURANCE 25

Hollow metal doors and frames shall be supplied by a single source supplier of all door hardware, hollow metal 27 doors and frames. Suppliers shall be responsible for all coordination and preparation of products as they relate to 28 each other. 29 Specified gauges of metals in doors, frames and reinforcing, and specified sizes, locations and extent of 31 reinforcing will prevail in any case of conflict with industry standards. 32 Doors and frames shall comply with the Steel Door Institute "Recommended Specifications: Standard Steel Doors 34 and Frames" (SDI-100) and as herein specified. Doors and frames shall also comply with American Society for 35 Testing and Materials (ASTM), Door and Hardware Institute standards, and National Fire Protection Association 36 (NFPA) as they may apply to this project. 37

HARDWARE TEMPLATES 39

Hardware templates shall be furnished to the fabricator by the hardware manufacturer. The fabricator shall drill 41 and tap all holes, and make all cutouts and reinforcements in frames and doors to receive hardware in a neat and 42 proper manner. 43

SUBMITTALS 45

Submit Shop Drawings in accordance with Section 1B, Shop Drawings/Submittals. Include details of each frame 47 type, elevations of door design types, conditions at openings, details of construction, location and installation 48 requirements of finish hardware and reinforcements, and details of joints and connections. Show anchorage and 49 accessory items. 50 Provide schedule of doors and frames using same reference numbers for details and openings as those on the 52 Drawings. 53

DELIVERY, STORAGE AND HANDLING 55

Doors shall be shipped individually packed. Frames shall be shipped with angle spreaders at door opening 57 bottoms. Doors and frames shall be stored on the building site, in an upright position, under cover, on wood sills 58 or floors, in a manner that will prevent rust or damage. Ventilate canvas or plastic to prevent moisture traps. 59

112-006 08100-2

Inspect hollow metal work upon delivery for damage. Minor damage may be repaired provided items are equal in 1 all respects to new work and acceptable to the Government Construction Representative. Rejected work shall be 2 replaced with new items. 3

B. PRODUCTS 5

MATERIALS 7

Steel sheets shall be cold-rolled, commercial quality carbon steel complying with ASTM A 366 and ASTM A 568. 9 Fabricate supports and anchors of not less than 18-gauge galvanized sheet steel unless otherwise noted. 11 Inserts, bolts and fasteners shall be the manufacturer's standard units, complying with ASTM A 153, Class C or D 13 as applicable. 14 Shop-applied primer for all doors, frames, and related accessories shall be rust-inhibitive enamel or paint, either 16 air-dried or baked, suitable as a base for specified finish paints listed in Section 09900. 17 Unless otherwise indicated, provide countersunk flat Phillips heads for exposed screws and bolts. 19

HOLLOW METAL DOORS - FULL FLUSH TYPE 21

Face sheets shall be 16-gauge cold-rolled stretcher-leveled steel internally welded to steel stiffeners of sufficient 23 strength and spacing to support the face sheets against impact and to assure flat face sheet surfaces, or shall be 24 bonded to a rigid polystyrene or polyurethane core. If steel stiffeners are used, doors shall be filled with mineral 25 rock wool or fiberglass. 26 Vertical edges shall be minimum 16-gauge continuous channels (12-gauge continuous "C" channels with minimum 28 3/16-inch thread depth or 3/16-inch x 12-inch continuous steel plate at hinge edges from top to bottom of door) 29 with each face sheet wrapped around the channels meeting at the center of the edge, with the resulting seam 30 closed, welded, ground smooth, filled and finished, or continuously welded and ground smooth. If edges are not 31 continuously welded, provide hinge reinforcing at all hinges equal to Steelcraft’s high frequency hinge 32 reinforcement. Provide 1/8-inch bevel on lock edge of door. Provide square edges on hinge edges of door. Non-33 handed doors will not be permitted. 34 Top and bottom edges shall be 14 or 16-gauge continuous steel channels. Back of channel shall align with the top 36 of face sheets and shall be smooth and flush. Flush plastic filler caps may be used in lieu of metal channel top 37 closure for interior doors only. Inverted channels (legs down) shall be used as door bottoms. 38

HOLLOW METAL FRAMES 40

Provide metal frames for doors, transoms, sidelights, borrowed lights, and other openings of types and styles as 42 shown on the Drawings and Schedules. Conceal fastenings, unless otherwise indicated. 43 Fabricate frames and associated members from 14-gauge, cold-rolled steel. 45 Frame corners for the three-sided door frames shall be die-mitered with frame face continuously welded and 47 ground smooth. Continuously back weld soffit and rabbets. Frame corners for transom, sidelight, and borrowed 48 light frames shall be saw-mitered or butt joint. Intermediate rail connections shall be coped and let into adjacent 49 members and all corners and connections shall be face welded and ground smooth. 50 Prepare stops to receive three door silencers on strike jambs of frames on single-leaf doors and two silencers on 52 heads of frames on double-leaf doors. Silencers shall be type GJ64 manufactured by Glynn Johnson. Silencers 53 shall not be omitted at doors scheduled to receive sound strips or weatherstripping. Silencers shall be furnished 54 under Section 08700. 55 Stops shall be 5/8-inch high unless noted otherwise on the Drawings or required to achieve specified fire ratings. 57 Jamb anchors shall be adjustable, 16-gauge corrugated steel, permanently fastened to the frame for setting into 58 masonry partitions, or standard steel stud anchors for metal stud/gypsum board partitions. Each jamb shall be 59

112-006 08100-3 anchored to the floor with an adjustable base anchor. Other types of anchors shall be provided when required for 1 other conditions. Provide a minimum of three anchors per jamb for frames up to 90 inches high and four anchors 2 per jamb for frames over 90 inches high. 3

FABRICATION 5

Fabricate metal doors and frame units to be rigid, neat in appearance and free from defects, warp or buckle. 7 Wherever practicable, fit and assemble units in manufacturer's plant. 8 Welds shall be ground invisible and depressions shall be filled smooth. 10

FINISH HARDWARE PREPARATION 12

Prepare doors and frames to receive mortised and concealed finish hardware in accordance with final Finish 14 Hardware Schedule and templates provided by hardware supplier. Comply with the applicable requirements of 15 ANSI A115 Series Specifications for door and frame preparation for hardware. 16 Doors and frames shall be mortised, reinforced, drilled and tapped for scheduled mortised hardware. 18 Reinforce doors and frames to receive surface-applied hardware. Drilling and tapping for surface-applied finish 20 hardware may be done at project site. 21

FRAME HINGE REINFORCEMENT 23

-All doors provide high-frequency hinge reinforcement at top hinge only. 25

DOOR REINFORCEMENT FOR ALL DOORS 27

Closer/Holder/Overhead Stop Minimum 12-gauge tubular 5-inch x 18-inch length, or as required. 29

ADDITIONAL FRAME REQUIREMENTS 31

1. Install 1-inch x 2-inch x length required foam insulation where grouted frames must be penetrated by 33 machine or sheet metal screws for attachment of closers, rim panic strikes, or jamb up weatherstrip. 34 Attach securely with tape or adhesive as required. 35

2. Plaster guard covers shall be welded in place over all drilled reinforcements of frames. 36

SHOP PAINTING 38

Clean steel surfaces of mill scale, rust, oil, grease, dirt, and other foreign materials before application of paint. 40 Apply shop coat of prime paint of even consistency to all doors and frames to provide a uniform and smooth 42 finished surface ready to receive finish paint, including back surfaces of all frames. 43

C. EXECUTION 45

INSPECTION 47

Examine substrate and conditions under which metal doors and frames are to be installed. Do not proceed with 49 work until unsatisfactory conditions have been corrected. 50

INSTALLATION 52

Comply with provisions of SDI-105 "Recommended Erection Instructions for Steel Frames," unless otherwise 54 indicated. 55 Place frames prior to construction of enclosing walls and ceilings. After wall construction is completed, remove 57 temporary braces, and spreaders, leaving surfaces smooth and undamaged. 58

112-006 08100-4

At new sills and thresholds installed on existing floor materials, level existing materials with grout as required to 1 make proper substrate for installation of new sill or threshold. 2 Install frames accurately in position, plumbed and aligned to Door and Hardware Institute standards, and braced 4 securely until permanent anchors are set. Anchor frames securely to floor and at jambs. Furnish necessary clips, 5 fastenings and anchorages, and conceal unless otherwise noted. Weld all field joints, grind smooth, and fill with 6 body putty to completely conceal seams and to form a smooth, unbroken finish surface. 7 Spot grout at all jambs of frames set into metal stud construction; this work is included under Section 09250. 9 Where frames are anchored with bolts, bolts shall be countersunk, and surfaces shall be made smooth with putty. 11 Install fire-rated frames in accordance with NFPA Standard No. 80. 12

DOOR INSTALLATION 14

Fit hollow metal doors accurately in frames, within clearances specified in SDI-100 with doors plumb and true 16 without hinge binding. 17

ADJUST AND CLEAN 19

Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touch-up of 21 compatible air-drying primer, paying particular attention to bottom of frames at the floor line. 22 Check and readjust operating finish hardware items, leaving metal doors and frames undamaged and in complete 24 and proper operating condition. 25