RFI Attachment - Historical Data.pdf
PDF 122 KB Posted
- Attached to
- 5 Year Protective Coating IDIQ - Minot AFB, ND Federal contract opportunity
- Solicitation number
- FA452824R0003
About this file
The provided document is an RFI (Request for Information) Attachment that contains historical data on various painting and repair projects at Minot Air Force Base. The key details include:
The document details several past projects, such as airfield painting and rubber removal, interior painting and wall repair work on multiple buildings, and painting in interior halls and stairs of dormitories. The work scopes include approximately 507,985 square feet of airfield painting and 706,000 square feet of sand/hydro blasting and rubber removal, as well as interior painting, wall repair, drywall work, and floor work in various buildings and dormitories.
The related federal contract opportunity is a 5-Year Protective Coating Indefinite-Delivery Indefinite-Quantity (IDIQ) Contract for Minot AFB and associated facilities. The scope includes providing interior and exterior protective coatings, painting airfield pavement markings, installing vinyl wall covering, finishing wood floors and trim, and other related services. The acquisition is a 100% Small Business Set-Aside with an estimated value between $1,000,000 and $4,900,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA452824R00030001.pdf | ||
| Solicitation Amendment FA452824R00030001 SF 30.pdf | ||
| RFI Attachment - B221 Floor Plan.pdf | ||
| RFI Tracker - Protective Coating.pdf | ||
| RFI Attachment - B870 Floor Plan.pdf | ||
| Solicitation - FA452824R0003.pdf | ||
| Attachment 4 - Past Performance Information Form.docx | DOCX document | |
| Attachment 3 - Offer Schedule.xlsx | XLSX spreadsheet | |
| Attachment 5 - Financial Responsibility.docx | DOCX document | |
| Attachment 6 - Project Detail - Seed Project.xlsx | XLSX spreadsheet | |
| Attachment 7 - Subcontractor Consent.docx | DOCX document | |
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 2 - Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Project Name Details In Work Airfield Paint and
Rubber Removal Approximately 507,985 sq � of pain�ng and 706,000 of sand/hydro blas�ng and rubber removal
In Work Dorm 1 building 10 rooms
• interior pain�ng – 7,150 SF
• repair walls and apply texture – 1,660 SF
Mar 24 Building 174 Interior pain�ng - above chair rail
• interior pain�ng – 9,455.5 SF
• repair walls and apply texture – 400 SF
Interior pain�ng - below chair rail
• interior pain�ng – 2,052.9 SF
• repair walls and apply texture – 200 SF
Mar 24 Building 450 interior pain�ng – 8,644 SF repair walls and apply texture – 5,000 SF Tap and bed drywall – 3,000 SF Remove exis�ng wall cover – 876 SF
Sep 23 Dorms mul�ple buildings
Interior halls/stairs
• interior pain�ng – 98,245 SF
• repair walls and apply texture – 4,918 SF
Interior pain�ng
• interior pain�ng – 3,588 SF
• repair walls and apply texture – 3,588 SF
• tape and bed, remove covering – 411 SF
Interior pain�ng
• interior pain�ng – 182,375 SF
• repair walls and apply texture – 12,369 SF
Aug 23 Building 168 Interior pain�ng
• interior pain�ng – 7,647 SF
• repair walls and apply texture – 6,848 SF
Sep 23 Building 1176 Interior pain�ng
• interior pain�ng – 10,080 SF
• repair walls and apply texture – 5,040 SF
May 23 Airfield Paint Approximately 507,985 sq � of pain�ng and 706,000 of sand/hydro blas�ng and rubber removal
File details come from the government source that posted it. Updated .