Attachment 6 - Project Detail - Seed Project.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
5 Year Protective Coating IDIQ - Minot AFB, ND
Solicitation number
FA452824R0003
Issued by

About this file

This solicitation is for a 5-Year Protective Coating Indefinite-Delivery Indefinite-Quantity contract at Minot Air Force Base in North Dakota. The contractor will provide all labor, equipment, materials, supervision and services for interior and exterior protective coatings, including painting airfield pavement markings, street and parking lot striping, installing vinyl wall coverings and taping, bedding and texturing walls and ceilings, finishing wood floors and trim, sealing masonry joints, and painting fire hydrants, sign posts and equipment. The estimated value is between $1,000,000 to $4,900,000. This is a 100% small business set-aside. A pre-proposal site visit will be held on March 27, 2024 and proposals are due by an unspecified date. The seed project involves interior painting of approximately 8,700 square feet in Buildings 870 and 221.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 870 Building 870 Room 139 Interior Painting

SERVICE REQUIRED (to include approx. sq. footage etc. to be painted):
Interior Painting
1st Coat Painting
2nd Coat Painting
Repair Wall Surficed (routine)
Texture Walls (routine)

Keep track of amount of Square feet painted per room and notate the amount on the back of this Control Sheet

FY24
CONTRACT INFORMATION:Estimated SFUnit Cost
1st Coat Painting875
2nd Coat Painting250
Repair Wall Surficed (routine)189
Texture Walls (routine)189

TOTAL PRICE FOR PROJECT: $0.00

&"Arial,Bold"&14MINOT AFB

PROJECT

CONTROL SHEET

Building 221 Building 221 Quads 107/108 and Room 105c Interior Painting

SERVICE REQUIRED (to include approx. sq. footage etc. to be painted):
Interior Painting
1st Coat Painting
2nd Coat Painting
Repair Wall Surficed (routine)
Texture Walls (routine)

Keep track of amount of Square feet painted per room and notate the amount on the back of this Control Sheet

FY24
CONTRACT INFORMATION:Estimated SFUnit Cost
1st Coat Painting6,914
2nd Coat Painting500
Repair Wall Surficed (routine)350
Texture Walls (routine)350

TOTAL PRICE FOR PROJECT: $0.00

&"Arial,Bold"&14MINOT AFB

PROJECT

CONTROL SHEET

File details come from the government source that posted it. Updated .