This document outlines a five-year Protective Coating Indefinite-Delivery Indefinite-Quantity contract solicitation. The 5th Civil Engineering Squadron at Minot Air Force Base is seeking coating services for various facilities, including interior and exterior painting, airfield markings, street and parking lot striping, vinyl wall covering installation, and wood finishing. The contractor will also paint fire hydrants, sign posts, and aircraft hangar floor markings. The acquisition is a 100% small business set-aside with a magnitude between $1,000,000 to $4,900,000. A pre-proposal site visit is scheduled for March 27, 2024 and proposals are due by April 10, 2024. The contract will be awarded without discussions and the initial proposal must contain the offeror's best terms. The Department of the Air Force Global Strike Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA452824R00030001.pdf | ||
| Solicitation Amendment FA452824R00030001 SF 30.pdf | ||
| RFI Attachment - B870 Floor Plan.pdf | ||
| RFI Attachment - Historical Data.pdf | ||
| RFI Attachment - B221 Floor Plan.pdf | ||
| RFI Tracker - Protective Coating.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Attachment 5 - Financial Responsibility.docx | DOCX document | |
| Attachment 6 - Project Detail - Seed Project.xlsx | XLSX spreadsheet | |
| Attachment 7 - Subcontractor Consent.docx | DOCX document | |
| Solicitation - FA452824R0003.pdf | ||
| Attachment 4 - Past Performance Information Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Parking Lot SF
| BLDG # | Master SF | DESCRIPTION | #of Symbols | Type | Pkng TSF |
| 121 | 214 | Comm Facility | N/A | 214 | |
| 122 | 475 | DORM | N/A | 475 | |
| 123 | 160 | Dorm | N/A | 160 | |
| 128 | 181 | 91 SW training/kitchn | 181 | ||
| 130&131 | 773 | DORMS | N/A | 773 | |
| 135 | 1445 | Post Office/Lemon Lot | N/A | 1445 | |
| 140 | 563 | Bowling Alley | 563 | ||
| 145 & 155 | 1411 | Mini Mall | 9 | Arrows | 1411 |
| 156 | 1337 | Ed Center/Library | N/A | 1337 | |
| 158-161 | 433 | TLF's | N/A | 433 | |
| 164 & 168 | 426 | Housing Mgmt | 6 | Arrows | 426 |
| 166 | 646 | CDC | 7 | Arrows & 1 crswlk | 646 |
| 168 | 500 | 5Cons/Wellness | 500 | ||
| 167 | 427 | BW Hdqrtrs | 427 | ||
| 167 | 429 | 5SVS | 429 | ||
| 174 & 175 | 811 | O-Club/Sak Inn | N/A | 811 | |
| 178 | 677 | Linen Exchange | N/A | 677 | |
| 183 & 184 | 341 | VAQ | N/A | 341 | |
| 194 | 1870 | Hosp Staff lot | 7 | Arrows | 1870 |
| 194 | 234 | Hosp Emergency lot | N/A | 234 | |
| 194 | 1523 | Hosp Patient lot | N/A | 1523 | |
| 196 | 313 | Visitors Center | 2 | Arrows | 313 |
| 205 | 316 | DORM | 316 | ||
| 202 | 256 | Community Center | N/A | 256 | |
| 207/Theater | 2055 | Dorm/Theater/Community | Handcap | 1 crswlk | 2055 |
| 208 | 718 | DORM | N/A | 718 | |
| 210,211,213,217 | 2328 | Chow Hall | N/A | 2328 | |
| 215,220,222,224 | 2171 | FTAC Dorm | 3 | 2171 | |
| 246 | 3108 | Commissary | 12 | Arrows | 3108 |
| 260 | 745 | Professional Dev cntr | 2 | Arrows | 745 |
| 270 | 277 | Burger King | N/A | 277 | |
| 275 | 575 | Dorm West lot | 575 | ||
| 276/284 | 1006 | Vet Clinic/Dorm | N/A | 1006 | |
| 280 | Base Pool | 2 | Arrows | ||
| 286 | 563 | Youth Center | 4 | Arrows | 563 |
| 289 | 645 | Hsng Maint Shop | 645 | ||
| 291 | 92 | Family Spt Cent | 2 | Arrows | 92 |
| 292 | 512 | JR ROCKERS | N/A | 512 | |
| 393 | 735 | Combat Arms | N/A | 735 | |
| 420 | 176 | POL | N/A | 176 | |
| 437 | 3123 | BX | 12 Arrow | 4 hand caps | 3123 |
| 442 | 694 | Bus Barn | 15 | Arrows | 694 |
| 445 | 563 | MAIN CE pkng | 3 | Arrows | 563 |
| 455 | 2200 | Base Gym | N/A | 2200 | |
| 460 | 1045 | Vehicle Trans | 2 | 5MPH | 1045 |
| 460 | 393 | Vehicle trans east lot | 393 | ||
| 475 | 2369 | PRIDE East lot | 2369 | ||
| 475 | 4094 | Pride main pkng | 12 | Arrows | 4094 |
| 476 | 365 | Flight Simulator | 365 | ||
| 505 | 1050 | 5SFS/Water shop | 1050 | ||
| 521 & 526 | 998 | Cocess/Road&Grnds | 5 | Arrows | 998 |
| 532 thru 527 | 2049 | Zone #3 & LRS | 2049 | ||
| 531 | 144 | DRMO(east) | N/A | 144 | |
| 543 | 1033 | 91 Mw Maint garage | N/A | 1033 | |
| 546 | 175 | 91 SW Front lot | N/A | 175 | |
| 546 | 1500 | 91SW NE Portion | 4 | Arrows | 1500 |
| 546 | 3002 | 91 MW NW pkng | 7 | Arrows | 3002 |
| 546 | 944 | MW S Center lot | 5 | Arrows | 944 |
| 547 | 3425 | 5 SPS Hdqtrs | 5 | Arrows | 3425 |
| 583 | 110 | Skills Development | 2 | Arrows | 110 |
| 585 | 642 | Aafees gas station | 3 | 2 Arrows & 1EXIT | 642 |
| 587 | 959 | SubShop | 2 | Arrows | 959 |
| 598 | 101 | Bioenvironmental | N/A | 101 | |
| 679 | 150 | SP Maint Office bldg | 150 | ||
| 692 | 120 | Uniform-1 U-1 | 120 | ||
| 746 | 1037 | Base Ops | 5 | Arrows | 1037 |
| 748 | 901 | 5 MXS maint shop | 9 | Arrows | 901 |
| 758 | 120 | Dock #9 | 120 | ||
| 763 | 300 | Dock #10 | 300 | ||
| 767 | 106 | Base photo lab | 2 | Arrows | 106 |
| 768 | 606 | Logistics Hdqrtrs | 606 | ||
| 773,774,775 | 651 | 5 SPTG Hqs | 1 | Arrows | 651 |
| 846 | 891 | INN Flight (South) | N/A | 891 | |
| 848 | 408 | 5AMXS | 408 | ||
| 781 | 176 | POL | N/A | 176 | |
| 857 | 1448 | 5 MXS Acft North lot | 5 | Arrows | 1448 |
| 857 | 367 | 5 MXS Facility | South lot | 367 | |
| 859 | 408 | MUNS | 5 | Arrows | 408 |
| 862 & 863 | 614 | Docks #2 & #4 | N/A | 614 | |
| 869 | 393 | 23BS Maint shop | N/A | 393 | |
| 870 | 901 | Comm Sqdn | 1 | 901 | |
| 879 | 245 | Liquid fuel/PowerPro | 3 | Arrows | 245 |
| 893 | 195 | Parachute Shop | 3 | Arrows | 195 |
| 896 | 265 | Fire Dept | 265 | ||
| 897 | 382 | 5 CES EOD | 3 | Arrows | 382 |
| 898 | 308 | Heli Hanger | 308 | ||
| 970 | 325 | DOCK #7 | N/A | 325 | |
| 973 | 64 | 5SUPS Storage | 64 | ||
| 975 | 372 | 5 MXS Maint shop | N/A | 372 | |
| 1088 | 208 | Comm Ops | N/A | 208 | |
| 1115 | 757 | WSA | N/A | 0 | |
| 1134 & Guide lines | 7000 | WSA | N/A | 0 | |
| 1142 &1144 | 2175 | 5MXS Facility | Includes Yellow | 2175 | |
| 1176 | 725 | Golf Club | N/A | 725 | |
| 85063 | Total SF | 77306 |
Street Paint
| Area Discription | Square Footage | Waterborne | Epoxy | Epoxy Removal | Total Waterborne | Total Epoxy | Total removal |
| Apply Epoxy - 4'' width "YELLOW" center skips, intesrsection turn channels,& diversion Y's (EST 8,888 Square Feet)_ Turn Channels Located on Missile Ave Intersections located at Missile/Peacekeeper Ave and Missile/Summit Ave_Diversion Y's located at main and south gates |
| 9770 | $0.55 | $2.73 | $3.63 | $5,373.50 | $26,672.10 | $35,465.10 |
| Apply Epoxy - 4'' width "WHITE" continuous edge line (EST 6,002) Square Feet)_White edge line is located in various areas. Construction Inspector will Identify areas during project completion. | ||||||
| 6706 | $0.55 | $2.73 | $3.63 | $3,688.30 | $18,307.38 | $24,342.78 |
| Apply Epoxy - 6'' width "WHITE" Intersection Turn Channels (EST 490 Square Feet)_Intersections are located on Missile/Peacekeeper Ave, Missile/Summit Ave and Missile Ave | ||||||
| 590 | $0.55 | $2.73 | $3.63 | $324.50 | $1,610.70 | $2,141.70 |
| Apply Epoxy - "WHITE" Turn Arrow Intersection symbol markings (8' height) QTY -29_Intersections are located on Missile/Peacekeeper Ave, Missile/Summit Ave and Missile Ave | ||||||
| 512 | $0.90 | $5.45 | $3.63 | $460.80 | $2,790.40 | $1,858.56 |
| Apply Epoxy - "WHITE" Stop Bars (12" width x 10' length) Est 80 Stop Bars_Stop Bars are located throughout the industrial side of the base streets. Apply Stop Bars adjacent to the Stop signs. | ||||||
| 940 | $0.90 | $5.45 | $3.63 | $846.00 | $5,123.00 | $3,412.20 |
| Apply Epoxy - "WHITE" Crosswalks (18" x 6' marks, 18" spaced) Est 123 Hash Marks_Crosswalks are located throughout the industrial side of the base streets. | ||||||
| 828 | $0.90 | $5.45 | $3.63 | $745.20 | $4,512.60 | $3,005.64 |
| base housing crosswalks and stopbars at the following_3 each at intersection of Huey Lane and Roaming road |
locations_4 ea at intersection of Roaming Road and Peacekeeper Place_1 each at the intersection of H Street and Dauphin Drive
| 1102 | $0.90 | $5.45 | $3.63 | $991.80 | $6,005.90 | $4,000.26 | |
| Project Totals | $12,430.10 | $65,022.08 | $74,226.24 |
Parking Form 9 Contract # FA4528-11-R-0014 Option Year 1: Furnish all labor, transportation, tools, materials, equipment, and supervision as specified in the Protective Coatings Statement of Work at Minot AFB ND for 1 Oct 2012-30 Sep 2013 DO# 5019
| ITEM | DESCRIPTION | EST QUANTITY | UNIT | Unit Price | CLIN Total |
| 1009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 1009AA | Routine (TTP-1952 Water Borne Paint) | 79,100 | SF | 0.60 | $47,460.00 |
| Peroid of Performance | 20 August 2013 thru 19 August 2014 | DO Total | 47,460.00 | ||
| Description: Perform Restriping of all base parking lots. |
Base Year
| Gov't Schedule | ||
| FA452824R0003 | Contractor Name | |
| Protective Coating IDIQ | Contractor Cage Code | |
| Attachment 4 | Date |
| CLIN 0001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 0001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 0001AA | Prime Coat or 1st Coat Paint | 225,000 | SF | $0.00 | |
| 0001AB | 2nd Coat paint if required | 225,000 | SF | $0.00 | |
| 0002 | INTERIOR PAINTING (Section C-6) | ||||
| 0002AA | Prime Coat or 1st Coat Paint | 460,000 | SF | $0.00 | |
| 0002AB | 2nd Coat paint if required | 205,000 | SF | $0.00 | |
| 0002AC | 3rd Coat paint if required | 3,750 | SF | $0.00 | |
| 0003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 0003AA | Remove existing wall covering | 9,000 | SF | $0.00 | |
| 0003AB | Routine Installation | 1,750 | SF | $0.00 | |
| 0004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 0004AA | Routine | 45,000 | SF | $0.00 | |
| 0005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 0005AA | Routine | 40,000 | SF | $0.00 | |
| 0006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 0006AA | Routine | 10,000 | SF | $0.00 | |
| 0007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 0007AA | Routine (TTP-1952 Water Borne) | 1,000 | SF | $0.00 | |
| 0008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 0008AA | Routine (TTP-1952 Water Borne Paint) | 1,000 | SF | $0.00 | |
| 0009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 0009AA | Routine (TTP-1952 Water Borne Paint) | 38,000 | SF | $0.00 | |
| 0010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 0010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 0010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 0011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 0011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 0011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 0011AC | Special request,(with/without beads) | 4,000 | SF | $0.00 | |
| 0011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 0012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 0012AA | Routine | 800 | SF | $0.00 | |
| 0013 | WOODWORK REFINISHING (Section C-11) | ||||
| 0013AA | Routine | 500 | SF | $0.00 | |
| 0014 | SECURITY DELAYS (Section C-1.5) | ||||
| 0014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 0015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 0015AA | Sandblasting/Hydroblasting | 6,000 | SF | $0.00 | |
| 0015AB | Sandblasting/Hydroblasting Rubber Removal | 640,000 | SF | $0.00 | |
| 0016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 0016AA | Routine | 2,000 | SF | $0.00 | |
| 0017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 0017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 0017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 4,500 | SF | $0.00 | |
| 0017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior Teflon coating | 3,500 | SF | $0.00 | |
| 0018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 0018AA | Routine | 500 | SF | $0.00 | |
| 0019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 0019AA | Routine | 500 | SF | $0.00 | |
| 0020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 0020AA | Routine | 500 | SF | $0.00 | |
| 0021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 0021AA | Routine | 1,500 | SF | $0.00 | |
| 0022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 0022AA | Routine | 8,500 | SF | $0.00 | |
| 0023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 0023AA | EPOXY (Existing)Scarifying/Removal | 1,000 | SF | $0.00 | |
| 0024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 0024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 0024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 0024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 0025 | MAF MOBILIZATION | ||||
| 0025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 0026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 0026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 0026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total - Base Year | $0.00 |
Option Year 1
| Gov't Schedule | ||
| FA452824R0003 | Contractor Name | |
| Protective Coating IDIQ | Contractor Cage Code | |
| Attachment 4 | Date |
| CLIN 1001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 1001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 1001AA | Prime Coat or 1st Coat Paint | 225,000 | SF | $0.00 | |
| 1001AB | 2nd Coat paint if required | 225,000 | SF | $0.00 | |
| 1002 | INTERIOR PAINTING (Section C-6) | ||||
| 1002AA | Prime Coat or 1st Coat Paint | 460,000 | SF | $0.00 | |
| 1002AB | 2nd Coat paint if required | 205,000 | SF | $0.00 | |
| 1002AC | 3rd Coat paint if required | 3,750 | SF | $0.00 | |
| 1003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 1003AA | Remove existing wall covering | 9,000 | SF | $0.00 | |
| 1003AB | Routine Installation | 1,750 | SF | $0.00 | |
| 1004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 1004AA | Routine | 45,000 | SF | $0.00 | |
| 1005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 1005AA | Routine | 40,000 | SF | $0.00 | |
| 1006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 1006AA | Routine | 10,000 | SF | $0.00 | |
| 1007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 1007AA | Routine (TTP-1952 Water Borne) | 1,000 | SF | $0.00 | |
| 1008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 1008AA | Routine (TTP-1952 Water Borne Paint) | 1,000 | SF | $0.00 | |
| 1009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 1009AA | Routine (TTP-1952 Water Borne Paint) | 38,000 | SF | $0.00 | |
| 1010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 1010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 1010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 1011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 1011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 1011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 1011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 1011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 1012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 1012AA | Routine | 800 | SF | $0.00 | |
| 1013 | WOODWORK REFINISHING (Section C-11) | ||||
| 1013AA | Routine | 500 | SF | $0.00 | |
| 1014 | SECURITY DELAYS (Section C-1.5) | ||||
| 1014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 1015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 1015AA | Sandblasting/Hydroblasting | 6,000 | SF | $0.00 | |
| 1015AB | Sandblasthing/Hydroblasting Rubber Removal | 640,000 | SF | $0.00 | |
| 1016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 1016AA | Routine | 2,000 | SF | $0.00 | |
| 1017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 1017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 1017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 4,500 | SF | $0.00 | |
| 1017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 3,500 | SF | $0.00 | |
| 1018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 1018AA | Routine | 500 | SF | $0.00 | |
| 1019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 1019AA | Routine | 500 | SF | $0.00 | |
| 1020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 1020AA | Routine | 500 | SF | $0.00 | |
| 1021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 1021AA | Routine | 1,500 | SF | $0.00 | |
| 1022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 1022AA | Routine | 8,500 | SF | $0.00 | |
| 1023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 1023AA | EPOXY (Existing)Scarifying/Removal | 1,000 | SF | $0.00 | |
| 1024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 1024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 1024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 1024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 1025 | MAF MOBILIZATION | ||||
| 1025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 1026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 1026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 1026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total - Option Year 1 | $0.00 |
Option Year 2
| Gov't Schedule | ||
| FA452824R0003 | Contractor Name | |
| Protective Coating IDIQ | Contractor Cage Code | |
| Attachment 4 | Date |
| CLIN 2001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 2001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 2001AA | Prime Coat or 1st Coat Paint | 225,000 | SF | $0.00 | |
| 2001AB | 2nd Coat paint if required | 225,000 | SF | $0.00 | |
| 2002 | INTERIOR PAINTING (Section C-6) | ||||
| 2002AA | Prime Coat or 1st Coat Paint | 460,000 | SF | $0.00 | |
| 2002AB | 2nd Coat paint if required | 205,000 | SF | $0.00 | |
| 2002AC | 3rd Coat paint if required | 3,750 | SF | $0.00 | |
| 2003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 2003AA | Remove existing wall covering | 9,000 | SF | $0.00 | |
| 2003AB | Routine Installation | 1,750 | SF | $0.00 | |
| 2004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 2004AA | Routine | 45,000 | SF | $0.00 | |
| 2005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 2005AA | Routine | 40,000 | SF | $0.00 | |
| 2006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 2006AA | Routine | 10,000 | SF | $0.00 | |
| 2007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 2007AA | Routine (TTP-1952 Water Borne) | 1,000 | SF | $0.00 | |
| 2008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 2008AA | Routine (TTP-1952 Water Borne Paint) | 1,000 | SF | $0.00 | |
| 2009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 2009AA | Routine (TTP-1952 Water Borne Paint) | 38,000 | SF | $0.00 | |
| 2010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 2010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 2010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 2011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 2011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 2011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 2011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 2011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 2012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 2012AA | Routine | 800 | SF | $0.00 | |
| 2013 | WOODWORK REFINISHING (Section C-11) | ||||
| 2013AA | Routine | 500 | SF | $0.00 | |
| 2014 | SECURITY DELAYS (Section C-1.5) | ||||
| 2014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 2015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 2015AA | Sandblasting/Hydroblasting | 6,000 | SF | $0.00 | |
| 2015AB | Sandblasting/Hydroblasting | 640,000 | SF | $0.00 | |
| 2016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 2016AA | Routine | 2,000 | SF | $0.00 | |
| 2017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 2017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 2017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 4,500 | SF | $0.00 | |
| 2017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 3,500 | SF | $0.00 | |
| 2018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 2018AA | Routine | 500 | SF | $0.00 | |
| 2019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 2019AA | Routine | 500 | SF | $0.00 | |
| 2020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 2020AA | Routine | 500 | SF | $0.00 | |
| 2021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 2021AA | Routine | 1,500 | SF | $0.00 | |
| 2022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 2022AA | Routine | 8,500 | SF | $0.00 | |
| 2023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 2023AA | EPOXY (Existing)Scarifying/Removal | 1,000 | SF | $0.00 | |
| 2024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 2024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 2024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 2024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 2025 | MAF MOBILIZATION | ||||
| 2025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 2026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 2026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 2026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total - Option Year 2 | $0.00 |
Option Year 3
| Gov't Schedule | ||
| FA452824R0003 | Contractor Name | |
| Protective Coating IDIQ | Contractor Cage Code | |
| Attachment 4 | Date |
| CLIN 3001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 3001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 3001AA | Prime Coat or 1st Coat Paint | 225,000 | SF | $0.00 | |
| 3001AB | 2nd Coat paint if required | 225,000 | SF | $0.00 | |
| 3002 | INTERIOR PAINTING (Section C-6) | ||||
| 3002AA | Prime Coat or 1st Coat Paint | 460,000 | SF | $0.00 | |
| 3002AB | 2nd Coat paint if required | 205,000 | SF | $0.00 | |
| 3002AC | 3rd Coat paint if required | 3,750 | SF | $0.00 | |
| 3003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 3003AA | Remove existing wall covering | 9,000 | SF | $0.00 | |
| 3003AB | Routine Installation | 1,750 | SF | $0.00 | |
| 3004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 3004AA | Routine | 45,000 | SF | $0.00 | |
| 3005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 3005AA | Routine | 40,000 | SF | $0.00 | |
| 3006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 3006AA | Routine | 10,000 | SF | $0.00 | |
| 3007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 3007AA | Routine (TTP-1952 Water Borne) | 1,000 | SF | $0.00 | |
| 3008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 3008AA | Routine (TTP-1952 Water Borne Paint) | 1,000 | SF | $0.00 | |
| 3009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 3009AA | Routine (TTP-1952 Water Borne Paint) | 38,000 | SF | $0.00 | |
| 3010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 3010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 3010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 3011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 3011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 3011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 3011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 3011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 3012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 3012AA | Routine | 800 | SF | $0.00 | |
| 3013 | WOODWORK REFINISHING (Section C-11) | ||||
| 3013AA | Routine | 500 | SF | $0.00 | |
| 3014 | SECURITY DELAYS (Section C-1.5) | ||||
| 3014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 3015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 3015AA | Sandblasting/Hydroblasting | 6,000 | SF | $0.00 | |
| 3015AB | Sandblasting/Hydroblasting | 640,000 | SF | $0.00 | |
| 3016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 3016AA | Routine | 2,000 | SF | $0.00 | |
| 3017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 3017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 3017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 4,500 | SF | $0.00 | |
| 3017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 3,500 | SF | $0.00 | |
| 3018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 3018AA | Routine | 500 | SF | $0.00 | |
| 3019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 3019AA | Routine | 500 | SF | $0.00 | |
| 3020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 3020AA | Routine | 500 | SF | $0.00 | |
| 3021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 3021AA | Routine | 1,500 | SF | $0.00 | |
| 3022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 3022AA | Routine | 8,500 | SF | $0.00 | |
| 3023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 3023AA | EPOXY (Existing)Scarifying/Removal | 1,000 | SF | $0.00 | |
| 3024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 3024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 3024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 3024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 3025 | MAF MOBILIZATION | ||||
| 3025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 3026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 3026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 3026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total - Option Year 3 | $0.00 |
Option Year 4
| Gov't Schedule | ||
| FA452824R0003 | Contractor Name | |
| Protective Coating IDIQ | Contractor Cage Code | |
| Attachment 4 | Date |
| CLIN 4001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 4001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 4001AA | Prime Coat or 1st Coat Paint | 225,000 | SF | $0.00 | |
| 4001AB | 2nd Coat paint if required | 225,000 | SF | $0.00 | |
| 4002 | INTERIOR PAINTING (Section C-6) | ||||
| 4002AA | Prime Coat or 1st Coat Paint | 460,000 | SF | $0.00 | |
| 4002AB | 2nd Coat paint if required | 205,000 | SF | $0.00 | |
| 4002AC | 3rd Coat paint if required | 3,750 | SF | $0.00 | |
| 4003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 4003AA | Remove existing wall covering | 9,000 | SF | $0.00 | |
| 4003AB | Routine Installation | 1,750 | SF | $0.00 | |
| 4004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 4004AA | Routine | 45,000 | SF | $0.00 | |
| 4005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 4005AA | Routine | 40,000 | SF | $0.00 | |
| 4006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 4006AA | Routine | 10,000 | SF | $0.00 | |
| 4007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 4007AA | Routine (TTP-1952 Water Borne) | 1,000 | SF | $0.00 | |
| 4008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 4008AA | Routine (TTP-1952 Water Borne Paint) | 1,000 | SF | $0.00 | |
| 4009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 4009AA | Routine (TTP-1952 Water Borne Paint) | 38,000 | SF | $0.00 | |
| 4010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 4010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 4010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 4011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 4011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 4011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 4011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 4011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 4012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 4012AA | Routine | 800 | SF | $0.00 | |
| 4013 | WOODWORK REFINISHING (Section C-11) | ||||
| 4013AA | Routine | 500 | SF | $0.00 | |
| 4014 | SECURITY DELAYS (Section C-1.5) | ||||
| 4014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 4015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 4015AA | Sandblasting/Hydroblasting | 6,000 | SF | $0.00 | |
| 4015AB | Sandblasting/Hydroblasting | 640,000 | SF | $0.00 | |
| 4016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 4016AA | Routine | 2,000 | SF | $0.00 | |
| 4017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 4017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 4017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 4,500 | SF | $0.00 | |
| 4017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 3,500 | SF | $0.00 | |
| 4018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 4018AA | Routine | 500 | SF | $0.00 | |
| 4019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 4019AA | Routine | 500 | SF | $0.00 | |
| 4020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 4020AA | Routine | 500 | SF | $0.00 | |
| 4021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 4021AA | Routine | 1,500 | SF | $0.00 | |
| 4022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 4022AA | Routine | 8,500 | SF | $0.00 | |
| 4023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 4023AA | EPOXY (Existing)Scarifying/Removal | 1,000 | SF | $0.00 | |
| 4024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 4024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 4024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 4024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 4025 | MAF MOBILIZATION | ||||
| 4025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 4026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 4026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 4026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total - Option Year 4 | $0.00 |
Total - All 5 Years $0.00