Attachment 3 - Offer Schedule.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
5 Year Protective Coating IDIQ - Minot AFB, ND Federal contract opportunity
Solicitation number
FA452824R0003
Issued by
Department of the Air Force Global Strike Command

About this file

This document outlines a five-year Protective Coating Indefinite-Delivery Indefinite-Quantity contract solicitation. The 5th Civil Engineering Squadron at Minot Air Force Base is seeking coating services for various facilities, including interior and exterior painting, airfield markings, street and parking lot striping, vinyl wall covering installation, and wood finishing. The contractor will also paint fire hydrants, sign posts, and aircraft hangar floor markings. The acquisition is a 100% small business set-aside with a magnitude between $1,000,000 to $4,900,000. A pre-proposal site visit is scheduled for March 27, 2024 and proposals are due by April 10, 2024. The contract will be awarded without discussions and the initial proposal must contain the offeror's best terms. The Department of the Air Force Global Strike Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to 5 Year Protective Coating IDIQ - Minot AFB, ND, newest first.
File Type Posted
Solicitation Amendment - FA452824R00030001.pdf PDF
Solicitation Amendment FA452824R00030001 SF 30.pdf PDF
RFI Attachment - B870 Floor Plan.pdf PDF
RFI Attachment - Historical Data.pdf PDF
RFI Attachment - B221 Floor Plan.pdf PDF
RFI Tracker - Protective Coating.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Wage Determination.pdf PDF
Attachment 5 - Financial Responsibility.docx DOCX document
Attachment 6 - Project Detail - Seed Project.xlsx XLSX spreadsheet
Attachment 7 - Subcontractor Consent.docx DOCX document
Solicitation - FA452824R0003.pdf PDF
Attachment 4 - Past Performance Information Form.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Parking Lot SF

BLDG #Master SFDESCRIPTION#of SymbolsTypePkng TSF
121214Comm FacilityN/A214
122475DORMN/A475
123160DormN/A160
12818191 SW training/kitchn181
130&131773DORMSN/A773
1351445Post Office/Lemon LotN/A1445
140563Bowling Alley563
145 & 1551411Mini Mall9Arrows1411
1561337Ed Center/LibraryN/A1337
158-161433TLF'sN/A433
164 & 168426Housing Mgmt6Arrows426
166646CDC7Arrows & 1 crswlk646
1685005Cons/Wellness500
167427BW Hdqrtrs427
1674295SVS429
174 & 175811O-Club/Sak InnN/A811
178677Linen ExchangeN/A677
183 & 184341VAQN/A341
1941870Hosp Staff lot7Arrows1870
194234Hosp Emergency lotN/A234
1941523Hosp Patient lotN/A1523
196313Visitors Center2Arrows313
205316DORM316
202256Community CenterN/A256
207/Theater2055Dorm/Theater/CommunityHandcap1 crswlk2055
208718DORMN/A718
210,211,213,2172328Chow HallN/A2328
215,220,222,2242171FTAC Dorm32171
2463108Commissary12Arrows3108
260745Professional Dev cntr2Arrows745
270277Burger KingN/A277
275575Dorm West lot575
276/2841006Vet Clinic/DormN/A1006
280Base Pool2Arrows
286563Youth Center4Arrows563
289645Hsng Maint Shop645
29192Family Spt Cent2Arrows92
292512JR ROCKERSN/A512
393735Combat ArmsN/A735
420176POLN/A176
4373123BX12 Arrow4 hand caps3123
442694Bus Barn15Arrows694
445563MAIN CE pkng3Arrows563
4552200Base GymN/A2200
4601045Vehicle Trans25MPH1045
460393Vehicle trans east lot393
4752369PRIDE East lot2369
4754094Pride main pkng12Arrows4094
476365Flight Simulator365
50510505SFS/Water shop1050
521 & 526998Cocess/Road&Grnds5Arrows998
532 thru 5272049Zone #3 & LRS2049
531144DRMO(east)N/A144
543103391 Mw Maint garageN/A1033
54617591 SW Front lotN/A175
546150091SW NE Portion4Arrows1500
546300291 MW NW pkng7Arrows3002
546944MW S Center lot5Arrows944
54734255 SPS Hdqtrs5Arrows3425
583110Skills Development2Arrows110
585642Aafees gas station32 Arrows & 1EXIT642
587959SubShop2Arrows959
598101BioenvironmentalN/A101
679150SP Maint Office bldg150
692120Uniform-1 U-1120
7461037Base Ops5Arrows1037
7489015 MXS maint shop9Arrows901
758120Dock #9120
763300Dock #10300
767106Base photo lab2Arrows106
768606Logistics Hdqrtrs606
773,774,7756515 SPTG Hqs1Arrows651
846891INN Flight (South)N/A891
8484085AMXS408
781176POLN/A176
85714485 MXS Acft North lot5Arrows1448
8573675 MXS FacilitySouth lot367
859408MUNS5Arrows408
862 & 863614Docks #2 & #4N/A614
86939323BS Maint shopN/A393
870901Comm Sqdn1901
879245Liquid fuel/PowerPro3Arrows245
893195Parachute Shop3Arrows195
896265Fire Dept265
8973825 CES EOD3Arrows382
898308Heli Hanger308
970325DOCK #7N/A325
973645SUPS Storage64
9753725 MXS Maint shopN/A372
1088208Comm OpsN/A208
1115757WSAN/A0
1134 & Guide lines7000WSAN/A0
1142 &114421755MXS FacilityIncludes Yellow2175
1176725Golf ClubN/A725
85063Total SF77306

Street Paint

Area DiscriptionSquare FootageWaterborneEpoxyEpoxy RemovalTotal WaterborneTotal EpoxyTotal removal
Apply Epoxy - 4'' width "YELLOW" center skips, intesrsection turn channels,& diversion Y's (EST 8,888 Square Feet)_ Turn Channels Located on Missile Ave Intersections located at Missile/Peacekeeper Ave and Missile/Summit Ave_Diversion Y's located at main and south gates
9770$0.55$2.73$3.63$5,373.50$26,672.10$35,465.10
Apply Epoxy - 4'' width "WHITE" continuous edge line (EST 6,002) Square Feet)_White edge line is located in various areas. Construction Inspector will Identify areas during project completion.
6706$0.55$2.73$3.63$3,688.30$18,307.38$24,342.78
Apply Epoxy - 6'' width "WHITE" Intersection Turn Channels (EST 490 Square Feet)_Intersections are located on Missile/Peacekeeper Ave, Missile/Summit Ave and Missile Ave
590$0.55$2.73$3.63$324.50$1,610.70$2,141.70
Apply Epoxy - "WHITE" Turn Arrow Intersection symbol markings (8' height) QTY -29_Intersections are located on Missile/Peacekeeper Ave, Missile/Summit Ave and Missile Ave
512$0.90$5.45$3.63$460.80$2,790.40$1,858.56
Apply Epoxy - "WHITE" Stop Bars (12" width x 10' length) Est 80 Stop Bars_Stop Bars are located throughout the industrial side of the base streets. Apply Stop Bars adjacent to the Stop signs.
940$0.90$5.45$3.63$846.00$5,123.00$3,412.20
Apply Epoxy - "WHITE" Crosswalks (18" x 6' marks, 18" spaced) Est 123 Hash Marks_Crosswalks are located throughout the industrial side of the base streets.
828$0.90$5.45$3.63$745.20$4,512.60$3,005.64
base housing crosswalks and stopbars at the following_3 each at intersection of Huey Lane and Roaming road

locations_4 ea at intersection of Roaming Road and Peacekeeper Place_1 each at the intersection of H Street and Dauphin Drive

1102$0.90$5.45$3.63$991.80$6,005.90$4,000.26
Project Totals$12,430.10$65,022.08$74,226.24

Parking Form 9 Contract # FA4528-11-R-0014 Option Year 1: Furnish all labor, transportation, tools, materials, equipment, and supervision as specified in the Protective Coatings Statement of Work at Minot AFB ND for 1 Oct 2012-30 Sep 2013 DO# 5019

ITEMDESCRIPTIONEST QUANTITYUNITUnit PriceCLIN Total
1009PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7)
1009AARoutine (TTP-1952 Water Borne Paint)79,100SF0.60$47,460.00
Peroid of Performance20 August 2013 thru 19 August 2014DO Total47,460.00
Description: Perform Restriping of all base parking lots.

Base Year

Gov't Schedule
FA452824R0003Contractor Name
Protective Coating IDIQContractor Cage Code
Attachment 4Date
CLIN 0001Description of ItemEstimated QuantityUnitUnit PriceExtended Price
0001EXTERIOR PAINTING, (Section C-6)
0001AAPrime Coat or 1st Coat Paint225,000SF$0.00
0001AB2nd Coat paint if required225,000SF$0.00
0002INTERIOR PAINTING (Section C-6)
0002AAPrime Coat or 1st Coat Paint460,000SF$0.00
0002AB2nd Coat paint if required205,000SF$0.00
0002AC3rd Coat paint if required3,750SF$0.00
0003GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9)
0003AARemove existing wall covering9,000SF$0.00
0003ABRoutine Installation1,750SF$0.00
0004REPAIR WALL SURFACES (Section C-6)
0004AARoutine45,000SF$0.00
0005APPLY TEXTURE COATING (Section C-6)
0005AARoutine40,000SF$0.00
0006TAPE & BED NEW GYPSUM BOARD (Section C-6)
0006AARoutine10,000SF$0.00
0007STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7)$0.00
0007AARoutine (TTP-1952 Water Borne)1,000SF$0.00
0008STREET STRIPING (Section C-7)$0.00
0008AARoutine (TTP-1952 Water Borne Paint)1,000SF$0.00
0009PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7)
0009AARoutine (TTP-1952 Water Borne Paint)38,000SF$0.00
0010AIRFIELD RUNWAY (Section C-7)
0010AARoutine (with reflective beads)150,746SF$0.00
0010ABRoutine (without reflective beads)64,708SF$0.00
0011AIRFIELD TAXIWAY AND RAMPS (Section C-7)
0011AARoutine (with reflective beads)118,406SF$0.00
0011ABRoutine (without reflective beads)188,655SF$0.00
0011ACSpecial request,(with/without beads)4,000SF$0.00
0011ADPaint Restricted Area Signs Waterborne (Attachment 1, Section C-7)379EA$0.00
0012WOOD FLOOR REFINISHING (Section C-10)
0012AARoutine800SF$0.00
0013WOODWORK REFINISHING (Section C-11)
0013AARoutine500SF$0.00
0014SECURITY DELAYS (Section C-1.5)
0014AASecurity Delay100Per 15 Mins$0.00
0015SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2)
0015AASandblasting/Hydroblasting6,000SF$0.00
0015ABSandblasting/Hydroblasting Rubber Removal640,000SF$0.00
0016MASONARY JOINT SEALING/CAULKING (Section C-12)
0016AARoutine2,000SF$0.00
0017SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application)
0017AARoutine--Section C-8 Sign Posts, Fire Hydrants, etc.100EA$0.00
0017ABRoutine--Section C-13, Oil/Alkyd Hangar Floor Markings4,500SF$0.00
0017ACRoutine--Section C-8, Hangers Anti-Bird Nest exterior Teflon coating3,500SF$0.00
0018PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5)
0018AARoutine500SF$0.00
0019PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5)
0019AARoutine500SF$0.00
0020PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5)
0020AARoutine500SF$0.00
0021EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4)
0021AARoutine1,500SF$0.00
0022EPOXY STREET STRIPING (Section C-7.4)
0022AARoutine8,500SF$0.00
0023"EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4)
0023AAEPOXY (Existing)Scarifying/Removal1,000SF$0.00
0024STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7)
0024AAAnalysis including XRF Machine (Sections 1.6.7.2)20HOURS$0.00
0024ABMobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.53EA$0.00
0024ACLab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2)10EA$0.00
0025MAF MOBILIZATION
0025AAMOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.53EA$0.00
0026Base Swimming Pool Preparation & Painting (Section C-14)
0026AASurface Preparation and Painting - Outdoor Pool (Sec C-14)7,575SF$0.00
0026ABSurface Preparation and Painting - Indoor Pool (Sec C-14)4,865SF$0.00
Total - Base Year$0.00

Option Year 1

Gov't Schedule
FA452824R0003Contractor Name
Protective Coating IDIQContractor Cage Code
Attachment 4Date
CLIN 1001Description of ItemEstimated QuantityUnitUnit PriceExtended Price
1001EXTERIOR PAINTING, (Section C-6)
1001AAPrime Coat or 1st Coat Paint225,000SF$0.00
1001AB2nd Coat paint if required225,000SF$0.00
1002INTERIOR PAINTING (Section C-6)
1002AAPrime Coat or 1st Coat Paint460,000SF$0.00
1002AB2nd Coat paint if required205,000SF$0.00
1002AC3rd Coat paint if required3,750SF$0.00
1003GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9)
1003AARemove existing wall covering9,000SF$0.00
1003ABRoutine Installation1,750SF$0.00
1004REPAIR WALL SURFACES (Section C-6)
1004AARoutine45,000SF$0.00
1005APPLY TEXTURE COATING (Section C-6)
1005AARoutine40,000SF$0.00
1006TAPE & BED NEW GYPSUM BOARD (Section C-6)
1006AARoutine10,000SF$0.00
1007STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7)$0.00
1007AARoutine (TTP-1952 Water Borne)1,000SF$0.00
1008STREET STRIPING (Section C-7)$0.00
1008AARoutine (TTP-1952 Water Borne Paint)1,000SF$0.00
1009PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7)
1009AARoutine (TTP-1952 Water Borne Paint)38,000SF$0.00
1010AIRFIELD RUNWAY (Section C-7)
1010AARoutine (with reflective beads)150,746SF$0.00
1010ABRoutine (without reflective beads)64,708SF$0.00
1011AIRFIELD TAXIWAY AND RAMPS (Section C-7)
1011AARoutine (with reflective beads)118,406SF$0.00
1011ABRoutine (without reflective beads)188,655SF$0.00
1011ACUrgent (special request, with/without beads)4,000SF$0.00
1011ADPaint Restricted Area Signs Waterborne (Attachment 1, Section C-7)379EA$0.00
1012WOOD FLOOR REFINISHING (Section C-10)
1012AARoutine800SF$0.00
1013WOODWORK REFINISHING (Section C-11)
1013AARoutine500SF$0.00
1014SECURITY DELAYS (Section C-1.5)
1014AASecurity Delay100Per 15 Mins$0.00
1015SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2)
1015AASandblasting/Hydroblasting6,000SF$0.00
1015ABSandblasthing/Hydroblasting Rubber Removal640,000SF$0.00
1016MASONARY JOINT SEALING/CAULKING (Section C-12)
1016AARoutine2,000SF$0.00
1017SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application)
1017AARoutine--Section C-8 Sign Posts, Fire Hydrants, etc.100EA$0.00
1017ABRoutine--Section C-13, Oil/Alkyd Hangar Floor Markings4,500SF$0.00
1017ACRoutine--Section C-8, Hangers Anti-Bird Nest exterior coating3,500SF$0.00
1018PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5)
1018AARoutine500SF$0.00
1019PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5)
1019AARoutine500SF$0.00
1020PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5)
1020AARoutine500SF$0.00
1021EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4)
1021AARoutine1,500SF$0.00
1022EPOXY STREET STRIPING (Section C-7.4)
1022AARoutine8,500SF$0.00
1023"EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4)
1023AAEPOXY (Existing)Scarifying/Removal1,000SF$0.00
1024STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7)
1024AAAnalysis including XRF Machine (Sections 1.6.7.2)20HOURS$0.00
1024ABMobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.53EA$0.00
1024ACLab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2)10EA$0.00
1025MAF MOBILIZATION
1025AAMOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.53EA$0.00
1026Base Swimming Pool Preparation & Painting (Section C-14)
1026AASurface Preparation and Painting - Outdoor Pool (Sec C-14)7,575SF$0.00
1026ABSurface Preparation and Painting - Indoor Pool (Sec C-14)4,865SF$0.00
Total - Option Year 1$0.00

Option Year 2

Gov't Schedule
FA452824R0003Contractor Name
Protective Coating IDIQContractor Cage Code
Attachment 4Date
CLIN 2001Description of ItemEstimated QuantityUnitUnit PriceExtended Price
2001EXTERIOR PAINTING, (Section C-6)
2001AAPrime Coat or 1st Coat Paint225,000SF$0.00
2001AB2nd Coat paint if required225,000SF$0.00
2002INTERIOR PAINTING (Section C-6)
2002AAPrime Coat or 1st Coat Paint460,000SF$0.00
2002AB2nd Coat paint if required205,000SF$0.00
2002AC3rd Coat paint if required3,750SF$0.00
2003GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9)
2003AARemove existing wall covering9,000SF$0.00
2003ABRoutine Installation1,750SF$0.00
2004REPAIR WALL SURFACES (Section C-6)
2004AARoutine45,000SF$0.00
2005APPLY TEXTURE COATING (Section C-6)
2005AARoutine40,000SF$0.00
2006TAPE & BED NEW GYPSUM BOARD (Section C-6)
2006AARoutine10,000SF$0.00
2007STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7)$0.00
2007AARoutine (TTP-1952 Water Borne)1,000SF$0.00
2008STREET STRIPING (Section C-7)$0.00
2008AARoutine (TTP-1952 Water Borne Paint)1,000SF$0.00
2009PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7)
2009AARoutine (TTP-1952 Water Borne Paint)38,000SF$0.00
2010AIRFIELD RUNWAY (Section C-7)
2010AARoutine (with reflective beads)150,746SF$0.00
2010ABRoutine (without reflective beads)64,708SF$0.00
2011AIRFIELD TAXIWAY AND RAMPS (Section C-7)
2011AARoutine (with reflective beads)118,406SF$0.00
2011ABRoutine (without reflective beads)188,655SF$0.00
2011ACUrgent (special request, with/without beads)4,000SF$0.00
2011ADPaint Restricted Area Signs Waterborne (Attachment 1, Section C-7)379EA$0.00
2012WOOD FLOOR REFINISHING (Section C-10)
2012AARoutine800SF$0.00
2013WOODWORK REFINISHING (Section C-11)
2013AARoutine500SF$0.00
2014SECURITY DELAYS (Section C-1.5)
2014AASecurity Delay100Per 15 Mins$0.00
2015SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2)
2015AASandblasting/Hydroblasting6,000SF$0.00
2015ABSandblasting/Hydroblasting640,000SF$0.00
2016MASONARY JOINT SEALING/CAULKING (Section C-12)
2016AARoutine2,000SF$0.00
2017SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application)
2017AARoutine--Section C-8 Sign Posts, Fire Hydrants, etc.100EA$0.00
2017ABRoutine--Section C-13, Oil/Alkyd Hangar Floor Markings4,500SF$0.00
2017ACRoutine--Section C-8, Hangers Anti-Bird Nest exterior coating3,500SF$0.00
2018PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5)
2018AARoutine500SF$0.00
2019PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5)
2019AARoutine500SF$0.00
2020PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5)
2020AARoutine500SF$0.00
2021EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4)
2021AARoutine1,500SF$0.00
2022EPOXY STREET STRIPING (Section C-7.4)
2022AARoutine8,500SF$0.00
2023"EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4)
2023AAEPOXY (Existing)Scarifying/Removal1,000SF$0.00
2024STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7)
2024AAAnalysis including XRF Machine (Sections 1.6.7.2)20HOURS$0.00
2024ABMobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.53EA$0.00
2024ACLab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2)10EA$0.00
2025MAF MOBILIZATION
2025AAMOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.53EA$0.00
2026Base Swimming Pool Preparation & Painting (Section C-14)
2026AASurface Preparation and Painting - Outdoor Pool (Sec C-14)7,575SF$0.00
2026ABSurface Preparation and Painting - Indoor Pool (Sec C-14)4,865SF$0.00
Total - Option Year 2$0.00

Option Year 3

Gov't Schedule
FA452824R0003Contractor Name
Protective Coating IDIQContractor Cage Code
Attachment 4Date
CLIN 3001Description of ItemEstimated QuantityUnitUnit PriceExtended Price
3001EXTERIOR PAINTING, (Section C-6)
3001AAPrime Coat or 1st Coat Paint225,000SF$0.00
3001AB2nd Coat paint if required225,000SF$0.00
3002INTERIOR PAINTING (Section C-6)
3002AAPrime Coat or 1st Coat Paint460,000SF$0.00
3002AB2nd Coat paint if required205,000SF$0.00
3002AC3rd Coat paint if required3,750SF$0.00
3003GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9)
3003AARemove existing wall covering9,000SF$0.00
3003ABRoutine Installation1,750SF$0.00
3004REPAIR WALL SURFACES (Section C-6)
3004AARoutine45,000SF$0.00
3005APPLY TEXTURE COATING (Section C-6)
3005AARoutine40,000SF$0.00
3006TAPE & BED NEW GYPSUM BOARD (Section C-6)
3006AARoutine10,000SF$0.00
3007STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7)$0.00
3007AARoutine (TTP-1952 Water Borne)1,000SF$0.00
3008STREET STRIPING (Section C-7)$0.00
3008AARoutine (TTP-1952 Water Borne Paint)1,000SF$0.00
3009PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7)
3009AARoutine (TTP-1952 Water Borne Paint)38,000SF$0.00
3010AIRFIELD RUNWAY (Section C-7)
3010AARoutine (with reflective beads)150,746SF$0.00
3010ABRoutine (without reflective beads)64,708SF$0.00
3011AIRFIELD TAXIWAY AND RAMPS (Section C-7)
3011AARoutine (with reflective beads)118,406SF$0.00
3011ABRoutine (without reflective beads)188,655SF$0.00
3011ACUrgent (special request, with/without beads)4,000SF$0.00
3011ADPaint Restricted Area Signs Waterborne (Attachment 1, Section C-7)379EA$0.00
3012WOOD FLOOR REFINISHING (Section C-10)
3012AARoutine800SF$0.00
3013WOODWORK REFINISHING (Section C-11)
3013AARoutine500SF$0.00
3014SECURITY DELAYS (Section C-1.5)
3014AASecurity Delay100Per 15 Mins$0.00
3015SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2)
3015AASandblasting/Hydroblasting6,000SF$0.00
3015ABSandblasting/Hydroblasting640,000SF$0.00
3016MASONARY JOINT SEALING/CAULKING (Section C-12)
3016AARoutine2,000SF$0.00
3017SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application)
3017AARoutine--Section C-8 Sign Posts, Fire Hydrants, etc.100EA$0.00
3017ABRoutine--Section C-13, Oil/Alkyd Hangar Floor Markings4,500SF$0.00
3017ACRoutine--Section C-8, Hangers Anti-Bird Nest exterior coating3,500SF$0.00
3018PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5)
3018AARoutine500SF$0.00
3019PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5)
3019AARoutine500SF$0.00
3020PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5)
3020AARoutine500SF$0.00
3021EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4)
3021AARoutine1,500SF$0.00
3022EPOXY STREET STRIPING (Section C-7.4)
3022AARoutine8,500SF$0.00
3023"EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4)
3023AAEPOXY (Existing)Scarifying/Removal1,000SF$0.00
3024STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7)
3024AAAnalysis including XRF Machine (Sections 1.6.7.2)20HOURS$0.00
3024ABMobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.53EA$0.00
3024ACLab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2)10EA$0.00
3025MAF MOBILIZATION
3025AAMOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.53EA$0.00
3026Base Swimming Pool Preparation & Painting (Section C-14)
3026AASurface Preparation and Painting - Outdoor Pool (Sec C-14)7,575SF$0.00
3026ABSurface Preparation and Painting - Indoor Pool (Sec C-14)4,865SF$0.00
Total - Option Year 3$0.00

Option Year 4

Gov't Schedule
FA452824R0003Contractor Name
Protective Coating IDIQContractor Cage Code
Attachment 4Date
CLIN 4001Description of ItemEstimated QuantityUnitUnit PriceExtended Price
4001EXTERIOR PAINTING, (Section C-6)
4001AAPrime Coat or 1st Coat Paint225,000SF$0.00
4001AB2nd Coat paint if required225,000SF$0.00
4002INTERIOR PAINTING (Section C-6)
4002AAPrime Coat or 1st Coat Paint460,000SF$0.00
4002AB2nd Coat paint if required205,000SF$0.00
4002AC3rd Coat paint if required3,750SF$0.00
4003GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9)
4003AARemove existing wall covering9,000SF$0.00
4003ABRoutine Installation1,750SF$0.00
4004REPAIR WALL SURFACES (Section C-6)
4004AARoutine45,000SF$0.00
4005APPLY TEXTURE COATING (Section C-6)
4005AARoutine40,000SF$0.00
4006TAPE & BED NEW GYPSUM BOARD (Section C-6)
4006AARoutine10,000SF$0.00
4007STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7)$0.00
4007AARoutine (TTP-1952 Water Borne)1,000SF$0.00
4008STREET STRIPING (Section C-7)$0.00
4008AARoutine (TTP-1952 Water Borne Paint)1,000SF$0.00
4009PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7)
4009AARoutine (TTP-1952 Water Borne Paint)38,000SF$0.00
4010AIRFIELD RUNWAY (Section C-7)
4010AARoutine (with reflective beads)150,746SF$0.00
4010ABRoutine (without reflective beads)64,708SF$0.00
4011AIRFIELD TAXIWAY AND RAMPS (Section C-7)
4011AARoutine (with reflective beads)118,406SF$0.00
4011ABRoutine (without reflective beads)188,655SF$0.00
4011ACUrgent (special request, with/without beads)4,000SF$0.00
4011ADPaint Restricted Area Signs Waterborne (Attachment 1, Section C-7)379EA$0.00
4012WOOD FLOOR REFINISHING (Section C-10)
4012AARoutine800SF$0.00
4013WOODWORK REFINISHING (Section C-11)
4013AARoutine500SF$0.00
4014SECURITY DELAYS (Section C-1.5)
4014AASecurity Delay100Per 15 Mins$0.00
4015SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2)
4015AASandblasting/Hydroblasting6,000SF$0.00
4015ABSandblasting/Hydroblasting640,000SF$0.00
4016MASONARY JOINT SEALING/CAULKING (Section C-12)
4016AARoutine2,000SF$0.00
4017SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application)
4017AARoutine--Section C-8 Sign Posts, Fire Hydrants, etc.100EA$0.00
4017ABRoutine--Section C-13, Oil/Alkyd Hangar Floor Markings4,500SF$0.00
4017ACRoutine--Section C-8, Hangers Anti-Bird Nest exterior coating3,500SF$0.00
4018PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5)
4018AARoutine500SF$0.00
4019PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5)
4019AARoutine500SF$0.00
4020PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5)
4020AARoutine500SF$0.00
4021EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4)
4021AARoutine1,500SF$0.00
4022EPOXY STREET STRIPING (Section C-7.4)
4022AARoutine8,500SF$0.00
4023"EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4)
4023AAEPOXY (Existing)Scarifying/Removal1,000SF$0.00
4024STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7)
4024AAAnalysis including XRF Machine (Sections 1.6.7.2)20HOURS$0.00
4024ABMobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.53EA$0.00
4024ACLab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2)10EA$0.00
4025MAF MOBILIZATION
4025AAMOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.53EA$0.00
4026Base Swimming Pool Preparation & Painting (Section C-14)
4026AASurface Preparation and Painting - Outdoor Pool (Sec C-14)7,575SF$0.00
4026ABSurface Preparation and Painting - Indoor Pool (Sec C-14)4,865SF$0.00
Total - Option Year 4$0.00

Total - All 5 Years $0.00