Attachment 2 - COM-F II QASP
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
TABLE OF CONTENTS:
1.0 Mission
2.0 Purpose
3.0 Authority
4.0 Roles and Responsibilities
5.0 Contractor’s Quality Control Plan (QCP)
6.0 Performance Requirements and Method(s) of Surveillance
7.0 Surveillance Documentation
8.0 Acceptance of Services
9.0 Contract Management
Appendices:
1. Services Summary (SS) and Method of Surveillance
2. Corrective Action Report (CAR)
3. Customer Complaint Record
Quality Assurance Surveillance Plan (QASP)
1.0 Mission
The mission of this contract is to provide information technology (IT) support to enable the operational readiness of the systems, infrastructure, and services that satisfy the AMC and USTRANSCOM missions. Services consist of operations and maintenance including help desk, system administration, network administration, database administration, web page support, and configuration management in support of the Air Mobility Command (AMC) and US Transportation Command (USTRANSCOM) Command and Control (C2), In-Transit Visibility (ITV), and business systems (hereafter referred to as “Systems”).
2.0 Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this surveillance/inspection process will be conducted to ensure successful PWS performance. It provides a systematic method for a continuous oversight process to determine conformity with the technical requirements of the contract. The QASP establishes:
· What will be monitored.
· How monitoring will take place.
· Who will conduct monitoring.
· How monitoring efforts and results will be documented.
The contractor is responsible for implementing and delivering performance that meets contract objectives using its Quality Control Plan (QCP). The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract requirements. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance. The Contracting Officer (CO) shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract and determines the final assessment of contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s QCP. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
The QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
3.0 Authority
Authority for issuance of this QASP is provided under Part 37.604 and 46.4 of the Federal Acquisition Regulation (FAR), Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the Contracting Officer (CO) or a duly authorized representative.
4.0 Roles and Responsibilities
The following personnel comprise the Multi-Functional Team (MFT) and shall oversee and coordinate surveillance activities.
Government Representatives:
Contracting Officer Representative (COR) Supervisor– The COR Supervisor nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR’s surveillance activities.
Assigned COR Supervisor: TBD Organization or Agency:
Telephone:
Email:
Contracting Officer (CO)/Contract Specialist (CS) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.
Specific duties of the CO include:
· Delegating authority for inspection and/or acceptance to COR in accordance with the terms and conditions of the contract.
· Informing the contractor of the names, duties, and limitations of authority for all COR assigned to the contract.
· Periodically assessing COR’s performance.
· Managing contractor performance surveillance data, including submitting Contractor Performance Assessment Reporting System (CPARS) reports.
· Ensuring the MFT reviews this QASP annually (at a minimum) for recommended changes.
· Providing contract-specific training (to include refresher training) administered by CO or CO’s designee to all appointed CORs.
Assigned CO: TBD Organization or Agency: TBD Telephone: TBD Email: TBD
Alternate CO: TBD Organization or Agency: TBD Telephone: TBD Email: TBD
Contracting Officer’s Representative (COR) - The COR is responsible for providing continuous program and technical oversight of the contractor’s performance. While the COR may serve as a direct conduit to provide Government guidance and feedback to the contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf. The COR is responsible for reporting early identification of performance problems to the CO and may use the applicable appendix items for documenting contractor performance.
Specific duties of the COR include:
· Evaluating and documenting the contractor’s performance in accordance with the procedures set forth in the QASP.
· Recommending any changes necessary to the contract, PWS, QASP, or other items to provide more effective operations or eliminate unnecessary costs.
· Keeping a COR file that accurately documents the contractor’s actual performance (i.e. COR surveillance reports).
· Utilizing COR file data (i.e. performance and COR surveillance reports) to assist the CO in the preparation of the CPARS reports.
· Receiving required training before performing any COR duties (IAW MP5301.602-2(d)).
· Notifying the CO immediately regarding contractor non-compliance with FAR 52.222-50, “Combating Trafficking in Persons.”
Assigned COR: TBD Organization or Agency:
Telephone:
Email:
Alternate COR: TBD Organization or Agency:
Telephone:
Email:
Alternate COR: TBD Organization or Agency:
Telephone:
Email:
Other Key Government Personnel - This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
TBD
Quality Assurance Program Coordinator (QAPC) - The QAPC is responsible for developing, managing, and implementing the Quality Assurance Program. The QAPC may also provide refresher training, as needed.
Assigned QAPC:
Organization or Agency:
Telephone:
Email:
Contractor Representatives: (Complete this section after contract award.)
Contractor – Complies fully with the terms and conditions of the contract and ensures non-conforming contract services are identified and corrected.
Specific duties of the Contractor include:
· Participating as a member of the MFT in the post-award management phase.
· Maintaining and implementing their commercial quality procedures that ensure contract requirements are met.
· Ensuring that the QCP is revised when necessary to prevent recurrence of non-conforming contract services.
· Tendering to the government for acceptance, only those services that conform to contract requirements.
· Recommending any changes to the contract that will provide more effective operations or eliminate unnecessary costs.
Contract Manager: <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Contract Personnel: <upon award, enter name or delete this line if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
5.0 Contractor’s Quality Control Plan (QCP)
As required by the contract, the contractor’s commercial QCP included in the final proposal dated ___fill in after contract award__, is incorporated by reference.
6.0 Performance Requirements and Method(s) of Surveillance
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the CO and the contractor, which enables positive, open and timely communications. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the Government, is responsible for management and quality control/quality assurance actions to successfully meet the terms of the contract.
6.2 Surveillance Summary
The Services Summary (SS) and Method of Surveillance (Appendix 1) is the list of performance objectives and thresholds that must be performed by the contractor. This summary details the method(s) of surveillance the COR will use to validate and inspect these performance objectives. Inspection of each objective will be documented in the COR file.
Performance objectives define the desired outcomes. Performance thresholds define the level of service required under the contract to successfully meet the performance objective. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance thresholds. The PWS and QASP should be used to form the foundation of the COR’s inspection.
Method(s) of Surveillance:
100% Inspection: The COR will inspect and evaluate the contractor’s performance each time it is performed. The result of the contractor’s overall performance is then evaluated to determine acceptability of the service provided.
Random Sampling: When selecting samples, the number of selections should exceed the required sample size by at least 10 percent to allow for situations where a selected sample cannot be evaluated. For example, if the sample size is 25 samples, select 28 samples. The COR will make every attempt to evaluate the first 25 samples selected, but should surveillance of the 15th sample be impossible, then the COR must evaluate the 26th sample instead. The COR must evaluate only 25 samples.
If the COR does not evaluate the total number of required samples, then the samples not evaluated are deemed to have been performed and are recorded as acceptable.
The Government inspector will submit a schedule to the contracting officer/contract administrator (CO/CA) the month prior to the month being inspected. Schedule will show time, date, location, and item(s) that will be inspected. Any changes to the schedule will be submitted to the CO/CA when the change occurs.
Periodic Inspection: These items are inspected using periodic surveillance (daily, weekly, monthly, quarterly, etc.) as determined by the COR. The results of the periodic surveillance inspections may be used as the basis for actions (other than payment deductions) toward the contractor. In such cases the Inspection of Services clause becomes the basis for the CO’s actions. The schedules (if applicable) are submitted to the CA for review prior to the month being inspected.
Customer Complaint: The COR is the point of contact and must collect all customer complaints. The Customer Complaint Record below will be used for this purpose. All complaints and any resulting resolution of such complaints must be documented with the information required on the customer complaint form. Customer complaint forms become a permanent part of the COR file.
7.0 Surveillance Documentation
7.1 Corrective Action Report (CAR) (Appendix 2)
Corrective Action reporting is divided into two categories, which are as follows: minor and major.
Minor: A minor discrepancy is a departure from established standards having little bearing on the service provided. Some examples would be data deliverables with minor grammatical or spelling errors or insufficient copies of documents. When the COR identifies a minor discrepancy, the COR shall document the discrepancy and verbally contact the designated contractor representatives, but is not required to notify the CO; however, if the same minor discrepancy is identified more than once, it may be an indication that a major discrepancy is occurring or has occurred because the contractor has not taken proper steps to prevent recurrence. In this case, the COR shall notify the CO in writing, which may include e-mail.
Major: If at any time the COR identifies a condition as having a significant adverse effect on the quality of the service, such as those stated below, the COR shall document their findings and notify the CO immediately in writing. E-mail is acceptable. Major discrepancies will be reported by the COR to the designated contractor representative in writing; however, copies of written correspondence will be coordinated with the CO prior to issuance to the contactor representative. Some examples would be contractor failure to meet a performance objective, failure to provide adequate corrective action to preclude recurrence of government-identified findings, failure to provide corrective action to deficiencies identified by the COR within a prescribed suspense period or failure to adhere to security regulations that results in a security incident.
7.2 Customer Complaint Record (Appendix 3)
The COR shall ensure complaint procedures and forms are made available to all customers (See Customer Complaint Record below). Any personnel that observe questionable or incomplete services or services not performed, or performed improperly, should immediately contact the COR. The COR shall receive, document, and validate or invalidate all complaints. If the complaint is invalid, the COR shall contact the complainant and explain why the complaint was invalid. The COR shall fully document the resolution for each complaint on the Customer Complaint Record. Complaints will be tracked and if the performance threshold is exceeded, the COR shall notify the CO in writing. The CO will notify the contractor and appropriate action can be taken.
7.3 Performance Assessment Report (PAR) (Appendix 4)
PARs will be used to report all minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractors will be given 10 days to correct PARs unless they have requested an extension. If 3 minor discrepancies are found, combine them and process a CAR.
7.4 Sample COR Services Summary Surveillance Report (Appendix 5)
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the methods of surveillance shown in the SS surveillance.
8.0 Acceptance of Services
Before acceptance of product(s) or service(s) and/or approval of an invoice, the COR shall prepare a COR Services Summary Surveillance Report (Appendix 5) in accordance with the QASP and FAR 52.212-4 (Contract Terms and Conditions – Commercial Items), Inspection and Acceptance Clause. The report shall identify both positive and negative performance. At a minimum, the report shall identify the number of assessments scheduled and conducted, the number of unacceptable/acceptable performances observed, the number of CARs issued, number of valid complaints, any significant contractor performance discrepancies, and a rating of the Contractor’s overall performance. The report shall be signed and dated by the COR and uploaded to the CORT Tool.
The COR will certify that acceptable services were received, in accordance with the terms and conditions of the contract. The COR will certify receipt of contractor services via the Wide Area Workflow (WAWF) website. Certification of services shall be accomplished no later than seven calendar days after receipt of the invoice. To avoid payment of interest penalties, if the invoice is unacceptable, it should be rejected in WAWF within the first seven calendar days after receipt of the invoice, and the CO should be notified immediately.
9.0 Contract Management
The MFT shall conduct periodic progress meetings to review the contractor’s performance. At these meetings the CO will apprise the contractor of how the Government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. The contractor will immediately notify the CO and/or COR of any work being performed that the contractor considers over and above the requirements of the contract. Appropriate action shall be taken to resolve any outstanding issues (i.e. CPARS, customer complaint reports, etc.).
The MFT shall also provide any recommended changes to the QASP to the CO at the progress meetings or on an annual basis (at a minimum).
FA4452-14-R-0001
Attachment 2
Appendix 1 – Services Summary (SS) and Method of Surveillance
| Performance Objective |
| PWS Para |
| Performance Threshold |
| Metric |
| Method of Surveillance |
Level of expertise, coordination, and support necessary to accomplish the contract in a responsive, satisfactory, and timely manner is provided
| 2.1 et seq, 2.2 et seq, 6.2.6 |
| No more than one documented complaint (via e-mail or memo) from the supported program management offices (PMO) or system managers (SM) per System per month in performance of required tasks |
| Number of documented PMO/SM complaints |
100% inspection of customer complaint e-mails/memos from PMO/SMs
| Systems are operated and maintained in accordance with the PWS |
| 2.2 et seq, Appendix 1 |
| Systems meet the availability thresholds in Appendix 1 |
| Amount of time Systems are unavailable over and above the published thresholds |
| 100% inspection of unscheduled outages above the published thresholds |
| Configuration Management (CM) baselines operated and maintained by the Contractor are maintained accurately as per the Configuration Management Plan (CMP) |
| 2.2.6 |
| CM baseline operated and maintained as per the CMP with 95% accuracy |
| Number of missing or inaccurate Configuration Items |
Random/Periodic inspection of CML
| System web pages are updated with the most current system related information/ documentation |
| 2.2.5 |
| Systems web page shall be current and accurate 95% of the time |
| Number of outdated or inaccurate web pages |
| Random inspection of web pages |
| Respond to outages, issues, problems, and abnormal conditions and initiate actions by evaluating and documenting the issue |
| 2.2.1, 2.2.2, 2.2.3, 2.2.4 |
| Complete initial triage of occurrence and document the issue(s) with an evaluation of the issue, potential impact, proposed course of action (if not immediately resolved), and establish or validate the priority within 30 minutes 95% of the time |
| Time to complete initial triage |
| Random inspection of trouble tickets |
| Modifications/upgrades are accomplished in accordance with provided installation procedures |
| 2.2.2, 2.2.3, 2.2.4 |
| Modifications/upgrades to Systems under Contractor control shall be accomplished in accordance with provided installation procedures and within the established timelines 95% of the time |
| Number of inaccurate or late modification/ upgrade actions |
Random/Periodic inspection of modification/ upgrade actions
| Accurate final documentation of issue resolution |
| 2.2.1, 2.2.2, 2.2.3, 2.2.4 |
| Final closed trouble ticket accurately reflects what the actual issue was and how it was resolved 95% of the time |
| Number of inaccurately documented issue resolutions |
| Random inspection of trouble tickets |
| Notifications are made in accordance with Government-provided criteria |
| 2.2.1, 2.2.2, 2.2.3, 2.2.4 |
| When an outage meets the Government reporting criteria (e.g. Operations Reportable (OR) Criteria), notifications shall be made in accordance with established guidance to the appropriate personnel 95% of the time |
| Time to make correct notification |
| 100% inspection of reportable notifications |
Appendix 2 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Appendix 3 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY