Attachment 2 - Bid Schedule dated 4 June 2025.xlsx
XLSX spreadsheet 46 KB Posted
- Solicitation number
- FA449725R0018
About this file
The file is an Excel-based Bid Schedule for a runway repair project at Dover Air Force Base. The document provides a detailed cost estimation template for a Firm Fixed Price contract to repair Runway 14/32, Phase 3, with a project scope involving pavement milling, sawcutting, hot-laid bituminous concrete placement, pavement markings, crack sealing, and asphalt paving grooves.
Key project details include a contract value between $500,000 and $1,000,000, a 60-calendar day performance period, and a proposal submission deadline of 18 June 2025 at 10:00 AM EST. The project requires repairing a 150 LF x 2100 LF runway section, including milling 2 inches deep, repaving with PG 76-22 binder FAA Mix, grooved pavement, crack sealing of 4200 LF, and restriping with retroreflective markings. The solicitation (FA449725R0018) is a full and open competition under NAICS Code 237310, with a site visit scheduled for 29 May 2025, managed by the Department of the Air Force Air Mobility Command.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Use the information from the prefilled division sheets below to complete the Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute
&"Verdana,Bold"Construction Cost Estimate
&P of &N
Summary
| BID SCHEDULE | Date: | |
| 4-Jun-25 | ||
| COMPANY | ||
| 436th Civil Engineering |
| PROJECT | ||||
| Repair Runway 14/32 Phase 3 | ||||
| LOCATION | PROJECT NO. | FJXT 220010 | ||
| DOVER AIR FORCE BASE, DE | ||||
| DIVISION | DESCRIPTION | % by | ||
| Division | Division Total |
| DIVISION 01 | GENERAL REQUIREMENTS | ERROR:#DIV/0! | - 0 | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | ERROR:#DIV/0! | - 0 | |
| FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| GC Overhead |
| GC Profit |
| HARD COST TOTAL | ERROR:#DIV/0! | - 0 | |
| Risk/Bonding |
| PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | - 0 | This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas |
| SUBTOTAL | - 0 | ||
| PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | - 0 | |
| SUBTOTAL | - 0 | ||
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0% | - 0 | |
| CONTRACT TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div1
| BID SCHEDULE | DATE | |||
| June 4, 2025 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Repair Runway 14/32 Phase 3 | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT 220010 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | EQUIPMENT | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | |||||||
| Site Superintendent | 60 | HR | - 0 | - 0 | - 0 | ||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| - 0 | |||||||
| - 0 | |||||||
| - 0 | |||||||
| TOTAL | $ - 0 |
Div32
| BID SCHEDULE | DATE | |||
| June 4, 2025 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| Repair Runway 14/32 Phase 3 | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT 240004 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | |||||||
| Pavement Milling | 70000 | SY-IN | - 0 | - 0 | - 0 | ||
| Sawcutting | 9000 | LF-IN | - 0 | - 0 | - 0 | ||
| Hot-laid Biituminous Concrete PG 76-22 | 3920 | Tons | - 0 | - 0 | - 0 | ||
| Pavement Markings | 26643 | SF | - 0 | - 0 | - 0 | ||
| Crack Sealing Bituminous Pavement | 4200 | LF | - 0 | - 0 | - 0 | ||
| Groove asphalt paving | 315000 | SF | - 0 | - 0 | - 0 |
| - 0 | - 0 | - 0 | |
| - 0 | - 0 | - 0 | |
| - 0 | - 0 | - 0 | |
| - 0 | - 0 | - 0 | |
| - 0 | - 0 | - 0 | |
| - 0 | - 0 | - 0 | |
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |
| SUBTOTAL | - 0 | ||
| - 0 | |||
| - 0 | |||
| - 0 | |||
| TOTAL | $ - 0 |