This is a Questions & Answers document from a site visit for a runway repair project at an Air Force facility. The document clarifies bidding requirements and technical specifications for the Repair Runway 14/32 Phase 3 project.
Key details include: bidders must submit pages 1-2 of the solicitation along with the Bid Schedule and Past Performance Survey; the applicable sections of the Bid Schedule are Summary, Division 1, and Division 32; either Excel or PDF versions of the bid schedule are acceptable; pavement markings quantity of 18,360 SF includes 3' edge lines; low-profile lighted barriers are required if work is completed in one week (weighted down Xs required for longer durations); and AT & OPSEC awareness training (approximately 1 hour) is now mandatory for all personnel requiring base access.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Runway 14/32 Phase 3
Post Site-Visit Questions V2
1. Are we to complete and return only pages 1 & 2 of the solicitation with our offer?
Answer: Yes, as well as the Bid Schedule and Past Performance Survey and information.
2. Please confirm that the only applicable tabs in the Bid Schedule excel file are Summary and 32.
Answer:
The Bid Schedule provided is a standard form covering the major divisions of a generic project. For this project, the Summary, Division 1 and Division 32 are applicable.
Note: The quantities provided are estimates. If the offeror feels the provided quantities are not reflective of the work to be done, they are free to bid the quantities and items necessary to provide a complete and useable facility to the Government
3. Are we to return the entire Bid Schedule excel file with our offer or just PDF versions of the applicable tabs?
Answer:
Bids shall be submitted in the Bid Schedule format provided. Either Excel or PDF versions are acceptable.
4. Section 1.6-D of the Scope in the Statement of Work indicates pavement markings consist of 11 EA arrows. The 3’ edge lines will also need to be replaced. Are the edge lines included in your quantity of 18,360 (SF) on the Bid Schedule?
Answer:
Yes
5. Will closed runway markers be required during this work? If so, confirm that lay-flat yellow Xs are acceptable.
Answer:
The new sketch attached to the Q&A indicates only low-profile lighted barriers needed if the work is completed in one week. If longer periods are required, flat weighted down Xs will also be required.
6. Please confirm that AT & OPSEC awareness training is NOT required (Statement of Work states “highly encouraged”) for ANY individuals working on this project. If this is not the case, please advise if ALL individuals will be required to complete the training and approximately how long (hours) the online training takes to complete so we can include this cost in our offer.
Answer:
This training is now required and takes approximately 1 hour per person for All individuals that will have access to the base.