Airfield Paving IDIQ 1 Oct 16
Solicitation Number: FA4497-17-R-0005 Contract Number:
Attachment 6
MANDATORY VERIFICATION
PROJECT NUMBER: 141086
The work listed herein requires mandatory verification by the Government Inspector before any follow-on work is allowed to start. The Contractor must provide evidence of verification by the individual designated as responsible for the Contractor’s Inspection Program, that the work to be verified by the Government complies with these specifications and drawings. The Contractor shall notify the Government Inspector that the work is ready for verification at least four hours prior to the desired verification date unless indicated otherwise below.
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION COMPLETED
Cold Milling Of Pavements 02115/3.2 24 hours
Select Material Sub-Base Course 02232/3.9,3.10 24 hours
Graded Aggregate Base Course 02233/3.8.3,3.10,3.11 24 hours
Rigid Concrete Pavement 02513/1.5.2 48 hours Surface for Airfields
Cracking and Seating of 02550/3.2 24 hours Nonreinforced Portland Cement Concrete
Bituminous Pavement 02557/1.3.4 48 hours For Airfields
Bituminous Tack Coat 02558/3.5 24 hours
Fuel-Resistant Sealing 02584/1.7 48 hours
Coal-Tar 02585/1.6, 1.13 48 hours Sealer/Rejuvenator
Field Molded Sealant 02592/1.9, 3.5 48 hours
Preformed 02593/1.6, 3.5 48 hours Elastomeric Joint Seals
Sealing of Cracks 02594/3.4 48 hours In Bituminous Pavements
Airfield Paving IDIQ 1 Oct 16
Solicitation Number: FA4497-17-R-0005 Contract Number:
Attachment 6
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION COMPLETED
Pavement 02600/1.4 48 hours Markings