Attachment_2_Airfield_Paving_Specs.pdf

PDF 615 KB Posted

Attached to
Airfield Paving IDIQ MAPC Federal contract opportunity
Solicitation number
FA4497-17-R-0005
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO.: FA4497-17-R-0005

CONTRACT NO.:

Attachment 2

SPECIFICATIONS

FOR

141086, AIRFIELD AND HEAVY DUTY PAVEMENTS IDIQ

AT

DOVER AIR FORCE BASE, DELAWARE

BASE CIVIL ENGINEER

DOVER AFB, DE

1 Oct 2014

1 Oct 2014 TABLE OF CONTENTS 141086

TOC - 1

TABLE OF CONTENTS

SECTION TITLE PAGE

01000 GENERAL 01000-1 to 01000-9

01001 SITE MANAGEMENT 01001-1 to 01001-4

01002 ENVIRONMENTAL 01002-1 to 01002-17

01003 SEDIMENT AND EROSION CONTROL 01003-1 to 01003-3

01300 SUBMITTAL DESCRIPTIONS 01300-1

01305 SUBMITTAL PROCEDURES 01305-1

02110 DEMOLITION AND REMOVAL 02110-1 to 02110-3

02115 COLD MILLING OF PAVEMENTS 02115-1 to 02115-2

02130 REMOVAL OF EXISTING CATCH BASINS, 02130-1

MANHOLES, AND DRAINAGE PIPE

02220 TEMPORARY EROSION AND SEDIMENT 02220-1 to 02220-2

CONTROL

02225 EARTHWORK FOR AIRFIELDS 02225-1 to 02225-7

02226 EXCAVATION OF CONTAMINATED SOIL 02226-1

02231 CRUSHED-AGGREGATE SUBBASE COURSE 02231-1 to 02231-2

02232 SELECT-MATERIAL SUBBASE COURSE 02232-1 to 02232-4

02233 GRADED-CRUSHED-AGGREGATE BASE 02233-1 to 02233-6

COURSE

02310 EXCAVATION AND BACKFILL FOR PIPE 02310-1 to 02310-2

TRENCHES

02410 REINFORCED CONCRETE PIPE 02410-1

02420 POLYVINYL CLORIDE (PVC) PIPE 02420-1

02513 CONCRETE PAVEMENT FOR AIRFIELDS 02513-1 to 02513-32

02520 DRAINAGE INLETS AND MANHOLES 02520-1 to 02520-2

02525 ADJUSTMENT OF EXISTING DRAINAGE 02525-1 to 02525-2

INLETS, MANHOLES, & WATER VALVE BOXES

TOC - 2

SECTION TITLE PAGE

02530 CONCRETE STRUCTURES 02530-1

02540 WELDED STEEL WIRE FABRIC 02540-1

02550 CRACKING & SEATING OF NONREINFORCED 02550-1 to 02550-2

PORTLAND CEMENT CONCRETE

02552 GROUND ROD/TIE-DOWN ANCHORS 02552-1 to 02552-2

02555 PAVEMENT FABRIC 02555-1 to 02555-5

02557 BITUMINOUS PAVEMENT FOR AIRFIELDS 02557-1 to 02557-20

02558 BITUMINOUS TACK COAT 02558-1 to 02558-3

02580 SPALL REPAIR OF RIGID PAVEMENTS 02580-1 to 02580-5

02584 FUEL-RESISTANT SEALING 02584-1 to 02584-7

02585 COAL-TAR SEALER/REJUVENATOR 02585-1 to 02585-4

02592 FIELD MOLDED SEALANTS 02592-1 to 02592-6

02593 PREFORMED ELASTOMERIC JOINT SEALS 02593-1 to 02593-4

02594 SEALING OF CRACKS IN BITUMINOUS 02594-1 to 02594-4

PAVEMENTS

02595 FILLING OF CRACKS IN BITUMINOUS 02595-1

PAVEMENTS

02600 PAVEMENT MARKINGS 02600-1 to 02600-4

02660 TOPSOIL 02660-1

02670 TOPSOILING 02670-1

02680 SEEDING, MULCHING, AND SODDING 02680-1 to 02680-2

TOC - 3

1 Oct 2014 SECTION 01000 141086

1000 - 1

SECTION 01000

DOVER AFB GENERAL REQUIREMENTS

1.1 SUMMARY OF WORK: Furnish all plant, equipment, supervision, labor, supplies, services, and materials required to accomplish the work indicated in these specifications, the related drawings and as otherwise set forth in the contract.

1.2 SUMMARY OF PROJECT: The project consists essentially of, but is not limited to, the construction of airfield and heavy duty asphalt and concrete pavements, including demolition and removal of same, and other miscellaneous appurtenances. Heavy duty pavements can be located on the airfield or off the airfield on the base side where conditions warrant. Examples of heavy duty pavement activities include, but are not limited to, large piping projects, crack and seating of concrete, large paving projects and base-wide striping projects.

1.3 WORK SCHEDULE:

1.3.1 Work shall be performed between 7:30 A.M. and 4:30 P.M. daily, Monday through Friday, excluding federal legal holidays as outlined by Public Law Number 98-144 (or days not worked on Dover Air Force Base due to the observance of such holidays). Unless otherwise specifically authorized herein or in writing by the Contracting Officer, the scheduling of work for times other than as set forth above is not permitted.

1.4 DOVER AIR FORCE BASE PERMITS

1.4.1 AF Form 103 “Work Clearance Request”. Approval is required to be obtained from the Government prior to initiating any ground disturbing activity on the site. The contractor shall follow the procedure as indicated below.

1.4.1.1 The contractor shall submit to the Government Inspector the Work Clearance Request no earlier than 10 and no later than 7 working days prior to any proposed ground disturbing activity. The contractor shall obtain from the Government Inspector a blank copy of the Work Clearance Request and shall complete the form with the necessary information.

1.4.1.2 The contractor shall contact Miss Utility and obtain a Miss Utility Ticket Number and include that information on the submitted form. The Government Inspector will provide the contractor with the Miss Utility grid map page number, grid coordinates, and nearest intersection information.

NOTE: It is the responsibility of the contractor to coordinate with, and obtain clearance from, Miss Utility (phone 1-800-282-8555) for utility services not owned by Dover AFB (i.e. Chesapeake Utility’s steel gas lines, Verizon communication lines, Comcast Cablevision lines, and Kent County sanitary sewer lines). Call Miss Utility prior to submitting the request to the Government Inspector. Adequately describe the exact location and type of excavation work involved to Miss Utility in lieu of, perhaps, just the job title. The Government process makes this communication solely the responsibility of the contractor.

1.4.1.3 The contractor shall submit the completed form to the Government Inspector for processing within Base Civil Engineering for Government owned utilities. The contractor shall return the completed form along with an 8.5” x 11” site map showing limits of proposed excavation and the surrounding existing

1000 - 2 facilities to the Government Inspector. The Government Inspector will notify the contractor when the Work Clearance Request has been approved and is ready to be picked-up.

1.4.1.4 The contractor shall mark proposed excavation locations in the field in white paint prior to submission of the Work Clearance Request. Paint markings must be within 18 inches of the proposed excavation. If the location of excavation changes the Work Clearance Request process for the new locations must be reaccomplished and reapproved. The contractor is responsible for protecting the utility markings made by the Government and/or Miss Utility. If the utility markings disappear or become unreadable, all work will stop until all remarking has been accomplished. Remarking may require collection of remarking cost to be paid by the contractor. A new Work Clearance Request must be processed to obtain new markings. The contractor may wish to submit Work Clearance Requests incrementally depending upon the extent of site work in order to avoid having to resubmit or maintain multiple markings. Dover Air Force Base issued Work Clearance Requests will expire 30 days after approval. Contractor shall comply with all Miss Utility permit renewal requirements.

1.4.1.5 The contractor shall be responsible for hand digging within 24 inches of either side of Government marked utility lines. In the event any damage occurs to a utility, notify the Government Inspector immediately.

1.4.2 Utility Outages and Road Closures. Approval is required to be obtained from the Government prior to initiating any utility outage, road or lane closure, or parking lot closure in accordance with a previously arranged schedule. The Contractor is responsible for notifying the Base Civil Engineer at least 21 days in advance of the intended outage or closure. For road or lane closures submit proposed temporary traffic control design for approval prior to the closure. Temporary traffic control design including signs and devices for road and lane closures shall be provided in accordance with the requirements of the Federal Highway Administration “Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD)”, latest edition.

1.4.3 Crane Permits. Approval is required to be obtained from the Government prior to erecting any crane. The Contractor is responsible for notifying the Base Civil Engineer at least 60 days in advance of the intended dates of crane usage. Notification will include the maximum crane height, crane location(s), and proposed starting and ending dates of crane use. Dover AFB will submit and obtain approval from the appropriate approval authorities. The Contractor shall comply with all requirements of the approved crane permit.

1.4.4 Burn Permits. Prior to any soldering, brazing, torch cutting, and welding, the contractor must obtain a signed AF Form 592, USAF Welding, Cutting, or Blazing Permit, from the Dover AFB Fire Department, Technical Services Element. When any of these activities take place in or near a combustible facility or materials, the contractor shall prepare and submit a fire protection plan for approval. The approved plan shall be in place prior to proceeding with the work. If any fire detection or suppression system devices need to be disabled, the contractor shall coordinate with the Government and schedule the disabling of the devices by the Base Civil Engineer (BCE), and shall notify the Government upon completion of the work to have the BCE place the system back into service. A fire watch must be present when life safety systems are disabled.

1.4.5 Radioactive material Access Requirements. Contractor use of radioactive material on Dover AFB must be approved in advance. The contractor shall not store radioactive material on Dover AFB. The contractor shall remove radioactive material from Dover AFB each day. The 436 AMDS/SGPB Bioenvironmental Engineering is the Dover AFB Radioactive Material Access Authority. At least 30 days in advance of material being brought onto Dover AFB, the contractor shall submit the following information to the Base Contracting Officer for approval by the Base Radiation Protection Officer.

1000 - 3

Dover AFB Radioactive Material Access Authority

436 AMDS Bioenvironmental Engineering

(302) 677-2595; email: 436 AMDS/SGPB@dover.af.mil

(Effective 1 Aug 2010)

1) Government Project Number or Contract Number:

Copy of contract clause w/description of work to be conducted:

Government Agency: (authorizing work i.e. Corp of Engineers):

Agency Point of Contact Name:

Point of Contact Phone Number:

Point of Contact Email Address:

2) Primary Contractor Name

Point of Contact Name:

Point of Contact Phone Number:

Point of Contact Email Address:

3) Sub-contractor Name

Point of Contact Name:

Point of Contact Phone Number:

Point of Contact Email Address:

4) Dates of Project/description:

5) Location of project: (i.e. location area, building number)

6) Copy of Nuclear Regulatory Commission (NRC) Permit or

State Radioactive Material License with NRC form 241, "Report of Proposed Activities in Non-Agreement States, Areas of Exclusive Federal Jurisdiction, or Offshore Waters".

7) Item name and bill of lading for transportation (i.e. Troxler model and serial number)

8) Copy of current swipe sample results

1000 - 4

9) Copy of all personnel training certificates

1.5 KENT COUNTY SEWER PERMIT

1.5.1 The sanitary sewer collection and local transmission system on Dover Air Force Base is owned and maintained by Kent County, Delaware. All work, as shown on the contract drawings and required by the contract specifications, associated with the sanitary sewer collection and local transmission system is subject to permitting and inspection by the Kent County Public Works Department (Department) in accordance with Kent County Code, Chapters 128 and 180, as amended, and will be conducted in accordance with the related Department sewer construction permit. Through agreement between the Department and Dover Air Force Base, this project is exempt from an Impact Fee; however an Inspection Fee of $325 is required by the Department.

1.5.2 The contractor shall obtain a Sewer Permit for all new construction or a Sewer Abandonment Permit for all demolition work associated with the sanitary sewer collection and local transmission system, as applicable, from the Department (302-744-2430). The contractor shall submit to the Department the necessary application documents and make payment of required fees in order to obtain the necessary permits associated with the connection, modification, abandonment, or demolition of the sanitary sewer collection and local transmission system, in accordance with Kent County Code, Chapter 128 and 180, as amended.

1.5.3 The contractor shall submit copies of the obtained permits to the Contracting Officer for approval.

No construction activities on the sanitary sewer collection and local transmission system shall be performed by the contractor until the necessary permits have been obtained by the contractor and submitted to the Government for approval.

1.5.4 The contractor shall make all notifications to the Department as required by the County’s permit regarding required inspections of the work by the Department.

1.5.5 The Contractor shall notify the Government Inspector a minimum of 24 hours in advance of all work on the sanitary sewer collection and local transmission system, including inspections scheduled with the Department. This is a Mandatory Verification contract requirement as required by the respective contract schedule.

1.6 WORK CONDITIONS: The work to be performed under this project will be on an occupied facility.

1.7 FIRE PROTECTION DURING CONSTRUCTION: During the performance of on-site construction activities, the contractor shall comply with all requirements of the Army Corps of Engineering Manual (EM), EM 385-1-1, “Safety and Health Requirements Manual”, NFPA 241 “Safeguarding Construction, Alteration, and Demolition Operations”, NFPA 1 Chapter 16 Safeguards During Building Construction, Alteration, and Demolition Operations, Dover Air Force Base Instruction DAFBI 32-2001, and all Air Force, AMC, OSHA, CFR, regulations and directives.

1.7.1 Supervisors shall brief all personnel under their direction on fire prevention practices in accordance with the above documents.

1.7.2 The supervisor shall attend a contractor’s briefing on fire safety prior to any work. This is normally conducted at the pre-construction meeting.

1.7.3 Post fire reporting procedures and emergency phone numbers in a conspicuous location.

1000 - 5

1.7 QUALITY CONTROL:

1.8.1 In addition to the requirements specified in the FAR clause "Inspection of Construction", the Contractor shall designate in writing, an individual responsible for managing the Contractor's inspection program. Such designation shall be made to the Contracting Officer prior to commencement of work on the job site.

1.8.2 The Government will require that work progress in stages when verification of the quantity, adequacy and/or accuracy of underlying work is necessary before follow-on work is allowed to start.

When required by these specifications, such verifications shall be mandatory, and an allowance for these verifications shall be made in the Contractor's Contract Progress Schedule. The Contractor shall provide notification that work is ready for verification in accordance with the requirements outlined on the Mandatory Verification Schedule. Required mandatory verifications are as listed by the schedule.

1.9 ADVANCE NOTIFICATION: It is required that the Contractor provide at least a 24 hour advance notification to establish when on-site work will start initially, and prior to restarting on-site work following any discontinuances lasting longer than five normal workdays. Notification may be provided by phone, in person, or in writing, and shall be given directly to the designated Government Inspector, Building 600 on Dover Air Force Base. The mailing address is 436 CES/CEPM, 600 Chevron Ave, Dover AFB, DE, 19902-5600.

1.10 MANUFACTURER’S INSTALLATION INSTRUCTIONS: Manufacturer's instructions pertaining to the use or installation of products, materials, or equipment used or installed in the prosecution of work under this contract, whether furnished as a normal, usual or customary practice of the manufacturer or if furnished in response to a requirement stipulated herein, form a part of these specifications as though specifically set forth herein. In the event of conflict between the specifications or drawings and manufacturers' instructions, the Contractor shall bring such conflict to the attention of the Contracting Officer for resolution before proceeding with the work involved.

1.11 SECURITY

1.11.1 All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.

1.11.2 At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.

1.11.3 The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Investigation (CBI).

1.11.4 Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.

1000 - 6

1.11.5 The contractor shall not be entitled to any compensation for delays or expenses associated with complying with these security instructions and directives. Furthermore, nothing in these security instructions and directives shall excuse the contractor from proceeding with the contract as required.

1.11.6 All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

1.11.7 Contractor Badge Policies:

1.11.7.1 All contactor employees requiring unescorted access to the installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation. Continued employment is contingent upon successful completion and favorable reporting of the criminal background check.

1.11.7.2 All requests for contractor badges will be submitted through the Base Contracting Squadron Office and/or the requesting agencies Base point of contact. The contractor must provide the name, date of birth, Social Security number, driver’s license number and state of issue, for each individual requesting a contractor badge. The Contracting Squadron Office or Base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registration section for approval IAW DAFBI 31-101. As a minimum the ORM will be submitted 72-hours prior to access being required.

1.11.7.3 For contractor personnel safety the contractor badge does not need to be physically displayed, however it must be on the contractor’s person (i.e. wallet or pocket) in the event of an emergency or a change in Force Protection and immediate accountability of personnel is required.

1.11.7.4 Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to Pass and Registration for destruction. Also before a new badge will be issued an ORM must be resubmitted to the Pass and Registration section for approval again. In the event a badge is lost or stolen, the badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th Security Forces Squadron and submit a new request for badge renewal before a new badge can be reissued.

1.11.7.5 Base Contracting Office or Base point of contact will immediately notify Security Forces, Pass and Registration when a contractor’s employment has been terminated. The Agency Chief or Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial;

they need to contact the Contracting Squadron. Any person who has been DENIED access to Dover AFB may request a copy of their criminal history report through the State Bureau of Identification. They must include the following: full set of fingerprints, a signed release, pay the fee set by the Superintendent of the Delaware State Police. For individuals who are not residents of Delaware they must contact their home of record State Police for guidance.

1.11.8 Installation Access:

1.11.8.1 Contractor employees are not allowed to “escort” any person who does not have a security clearance for installation access. The contractor shall obtain contractor badges for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from Pass and

1000 - 7

Registration, for the duration of the contract. Employees are only permitted to enter the installation during the date and time periods indicted on their contractor badge.

1.11.8.2 Persons operating vehicles on the installation must be able to present a valid driver’s license, vehicle registration and proof of insurance. All vehicles entering the installation or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their Base access and immediate confiscation of this access badge.

1.11.8.3 Contractor material delivery or service call personnel must be processed through the Dover AFB Commercial (South) Gate. Contractor personnel who do not possess a contractor badge must consent to a Criminal Background Investigation (CBI). The items required for the CBI are the same as for contractor badges. The vehicle registration and proof of insurance documentation will also be checked. Vehicle drivers who pass the background check and possess the required vehicle documentation will be provided with a Day Pass (PAW PASS). If necessary, contractor personnel may meet the delivery vehicle at the Commercial Gate and have the driver follow them to the construction delivery site. Vehicle drivers who do not pass the background check or do not possess the required vehicle documentation will not be allowed access to Dover AFB. Delivery drivers must provide a printed (not hand written) Bill of Lading which includes a description of materials being delivered, the Dover AFB delivery location (i.e., building number, street address, project name), and name and telephone number of the Dover AFB employee Point of Contact.

1.11.8.4 During Force Protection Condition (FPCON) Normal and Alpha, personnel without Base issued badges must be sponsored onto the installation.

1.11.8.5 During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.

1.11.8.6 During Higher FPCONs (Charlie and Delta) the Base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended at the direction of the Installation Commander.

1.11.8.7 Antiterrorism Awareness Level I Training: (select applicable category based on type of contractor support)

1.11.8.7.1 DoD Contractors possessing a Common Access Card (CAC) embedded in an organization (e.g., Civilian Medical Physicians, Flight Safety Instructor, etc.) will complete AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the Advanced Distributed Learning System (ADLS) site. This training site is available through the AF Portal at https://golearn.csd.disa.mil/kc/main/kc_frame.asp?blnWhatsNew=True. This site automatically records members completion of training and enables the user to print a certificate if needed by the Unit or Base Training Manager.

1.11.8.7.2 DoD Contractors supporting a Base Service Contract (e.g., Custodial Services, Ground Maintenance, etc.) are highly encouraged to complete AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html for individuals without access to government Non-classified Internet Protocol Router Network (NIPRNET) computer and who do not possess a CAC card.

1000 - 8

1.11.8.7.3 DoD Contractors or subcontractors without a CAC or who do not have access to a government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction on the installation should consider completing AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the― Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html IMPORTANT: The standalone course MUST be completed on the computer in which it is started. Course progress is not transferable between computers. The standalone course does provide a completion certificate but will not be tracked on JKO and no record will be maintained. AT Awareness Level I Training should be provided by the requiring unit after contract award or the sponsoring organization.

1.11.8.8 Contractors will have to adhere to the provisions in DAFBI 13-202 if operating a vehicle on the airfield.

1.12 COORDINATION OF WORK: The Contractor shall coordinate the work of subcontractors and shall ensure the coordination of the work between the various trades. In many instances the contract drawings indicate only the general location and arrangement of equipment, fixtures, piping, conduit, or outlets and may not in all cases show, identify or detail all materials or components that are necessary, usual and customary for proper installation, connection or attachment. The Contractor shall study, examine and evaluate the contract drawings to establish the work, coordination, or materials required and necessary to provide a product complete in the usual and customary manner, and shall provide for all such requirements as though expressly detailed herein or on the drawings.

1.13 WORKING RECORD AND FINAL RECORD DRAWINGS: The Contractor shall maintain on the jobsite at all times and keep current at least on a weekly basis one set of Working Record (red line) Drawings which shall be annotated in red pencil to show all as-built construction during the prosecution of the work. These red line drawings shall be submitted to the Contracting Officer at project close-out.

The red line drawings shall clearly and accurately depict any deviations or changes to both existing and new construction from that which is indicated on the construction drawings. This requirement is in addition to the submission of electronic Final Record (as-built) Drawings which may also be required by other sections of this specification.

1.14 TEMPORARY UTILITY CONNECTIONS AND CHARGES: As outlined in FAR Clause 52.236- 14 “Availability and Use of Utility Services”, the Government will make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies. Electric and gas utility service for contractor-furnished office/storage facilities and for actual construction activities will be charged to the contractor at prevailing rates prescribed by the FAR and Air Force regulation. The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. The cost of water utility service will not be charged to the contractor.

1.14.1 For temporary electric service, the contractor shall provide all necessary, cable, transformers, hardware, miscellaneous items and all labor necessary to obtain service from the nearest electric source.

The Government will make the final connection to the electric source.

1.14.2 For temporary water service, the contractor shall not connect to any fire hydrant on Dover Air Force Base without prior authorization from the Contracting Officer or designated representative.

Tampering with a fire hydrant on Dover Air Force Base is a federal offense per US CODE Title 42, Section 300i-1.

1000 - 9

1.14.2.1 When authorized to obtain water from a fire hydrant for construction or other purposes, the contractor shall provide and install a connection assembly consisting of a ASSE (American Society of Sanitary Engineering) approved Reduced Pressure Principle Backflow (RPPB) assembly and a throttling device. The assembly shall be connected only to the fire hydrant 2-1/2 outlet nozzle. Prior to use, the fire hydrant connection assembly must be inspected by DAFB Base Civil Engineer personnel to insure proper installation and function. The contractor shall provide documentation from an accredited testing agency certifying the proper operation of the RPPB assembly. The certification shall be dated no more than one year from the date that the assembly installed on the jobsite. Regardless of the intended use, under no circumstance shall the contractor use a fire hydrant without an attached and approved connection assembly.

1.14.2.2 Only contractor personnel who are specifically authorized by DAFB will be permitted to open and close the main operating nut of fire hydrants. Only hydrant wrenches specifically designed for the hydrant operating nut will be used. Fire hydrants will be opened completely to prevent weep holes located in the hydrant boot from discharging and undermining the hydrant foundation. Fire hydrant main operating nut shall not be used to throttle the water pressure or volume. When contractor use of a fire hydrant will exceed one hour the hydrant number located on the hydrant barrel shall be forwarded to the DAFB Base Civil Engineer to notify the Base Fire Department of the service status.

1.14.2.3 Operation of a fire hydrant during freezing temperatures may cause damage to the hydrant.

During freezing temperature conditions the contractor shall make necessary provisions to prevent the hydrant barrel and attached backflow prevention/meter assembly from freezing and causing damage to the hydrant.

1.14.2.4 Damaged fire hydrants resulting from contractor abuse or failure to comply with these requirements shall be repaired or replaced at the contractor’s expense.

1.14.3 The contractor shall provide billing information to the project inspector who will prepare a Contractor Utility Connection Worksheet for the contractor’s signature which will serve as the source document for billing of utility service. At the completion of the project a Contractor Utility Disconnection Worksheet will be processed in a similar manner to terminate billing for utility service.

Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

1.14.4 Contractor is responsible for all costs associated with telephone service. Telephone service will not be Government furnished.

1.15 AS-BUILT UTILITY LOCATIONS: The contractor shall coordinate with the Government Inspector as underground utilities outside of building footprints are being installed to permit the Government to survey the installed locations prior to the contractor’s backfilling operations. A minimum 24 hour advance notification is required. In the event that any unknown existing underground utilities are discovered, the contractor shall immediately notify the Government Inspector to permit Government survey of the discovered utilities.

1.16 REFERENCED PUBLICATIONS:

1.16.1 Specifications: The document titled "Delaware Standard Specifications, Specifications for Road and Bridge Construction" and “Supplemental Specifications” (latest editions as of the date of this contract), hereinafter referred to as the Standard Specifications, shall govern the work performed as required by this specification or as shown on the drawings, and form a part of this specification or the drawings to the extent indicated by the references thereto. For the purposes of this project, all references

1000 - 10 to the "Director", "Inspector", or "Engineer" in the Standard Specifications shall be construed to mean "Contracting Officer". In the event of conflict between this specification or the drawings and the Standard Specifications, this specification or the drawings shall govern.

1.16.2 Standards: The document titled "Delaware Erosion and Sediment Control Handbook" (available on-line), hereinafter referred to as the Delaware Handbook, shall govern the work performed as required by this specification or as shown on the drawings, and form a part of this specification or the drawings to the extent indicated by the references thereto. In the event of conflict between this specification or the drawings and the Delaware Handbook, this specification or the drawings shall govern.

1.16.3 Drawings: The document titled "The State of Delaware Department of Transportation Standards" (latest edition as of the date of this contract), hereinafter referred to as the Standard Drawings, shall govern the work performed as required by this specification or as shown on the drawings, and form a part of this specification or the drawings to the extent indicated by the references thereto. In the event of conflict between this specification or the drawings and the Standard Drawings, this specification or the drawings shall govern.

END OF SECTION

1 Oct 2014 SECTION 01001 141086

01001 - 1

SECTION 01001

SITE MANAGEMENT

1.1 GENERAL

1.1.1 The appearance of construction sites at Dover Air Force Base is of paramount importance to the Commander of Dover Air Force Base. A clean and well-kept construction site will help ensure proper compliance with the safety and environmental requirements of the contract. The management element of the Contractor’s performance rating will be affected by the compliance with this specification. The Contractor shall comply with all of the requirements specified herein and associated specification sections.

1.1.2 The Contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the performance of work under this contract. All such materials shall be removed from Dover Air Force Base by the Contractor and disposed of in a State approved permitted landfill. The contractor shall recycle concrete, untreated wood and other demolition debris as required by Executive Order 13101 and other sections of this specification. The Contractor is not permitted to deposit any such materials in Base trash collection containers or at any on-Base location without prior approval of the Contracting Officer. The Contractor is responsible for remediating and/or reimbursing the Base for any spills caused by him, his personnel and/or his equipment.

1.2 SUBMITTALS: The following shall be submitted:

1.2.1 Site Layout Plan

Submit for approval a detailed scaled plan drawing showing the layout of the construction site prior to starting work. As a minimum the drawing shall include the locations of office and storage trailers, required utility connection points, equipment storage and material staging areas, construction entrance(s) including temporary stabilized construction entrance where required, contractor employee parking areas, temporary construction fence including placement of safety signs (i.e. hard hat area, etc.), and trash dumpsters and containers. The submittal shall also include photographs of the site prior to disturbance by the start of work.

1.2.2 Dust Control Plan

Submit a plan for controlling the accumulation of dirt, debris, and dust on roadways and other surfaces adjacent to the construction site. As a minimum the plan shall include the name of the contractor including a designated point of contact, equipment to be used for cleaning the streets of this material, and the measures to be taken to reduce transportation of mud onto adjacent roadways (i.e. rotating or replacing the stones in the temporary stabilized construction entrance to clean the truck tires).

PART 2 PRODUCTS

2.1 DUMPSTERS

Dumpsters shall be free of graffiti, and be equipped with a securable cover. The cover shall be in place at all times except when trash is being deposited or removed.

2.2 TRASH CONTAINERS

01001 - 2

Trash containers shall consist of 55 gallon drums, free of graffiti, and have "TRASH" printed in 10 inch high white lettering on the side of the container at two locations opposite each other. The Contractor shall provide a minimum of one trash container for each 10,000 square feet of construction area.

2.3 OFFICE/STORAGE TRAILERS/SITES

2.3.1 Contractor’s office and storage trailers shall be in new or like new condition and be painted ICI Devoe/Glidden color Pastel tint base: Formula #BLK 1P32 YOX 1P39 OXR19 “DAFB Eagle Feather Tan” or approved equal on the exterior. Each trailer shall have an emergency notification card (5 x 7 or 3 x 5) in a weatherproof holder affixed on the outside of the trailer near the entry door. The card shall indicate the name of the Contractor, and the name and telephone number of the point of contact for emergency notification. Provide trailer foundation skirting of either lattice or metal panel design.

Storage of materials and debris under the trailers is prohibited. The trailer shall be securely fastened to the ground with appropriate fastening devices to adequately brace the structure against hurricane force winds.

2.3.2 The contractor will be provided with storage sites as deemed necessary to support the construction.

The primary site is the construction site. The supplemental site, if needed, may not be in close proximity to the construction site, but will be on Dover Air Force Base.

2.4 TEMPORARY CONSTRUCTION FENCE

2.4.1 As a minimum the temporary construction fence shall be a 6’ high chain link fence constructed of a welded galvanized steel pipe frame and attached woven steel wire mesh attached with wire ties. The fence shall be adequately supported and held securely in place by the use of precast concrete post blocks, stand-off post braces, embedded posts or a combination thereof, as necessary for the particular location and conditions. Stand-off post braces, when used, shall only be installed on the inside of the temporary construction fence. Where temporary construction fence is required to have vision screening, additional support posts at each panel shall be provided and embedded in both turf and paved areas.

2.4.2 The temporary construction fence shall also be provided with vision screening which shall consist of either fabric or slats. Screening fabric shall have the following minimum material characteristics:

Color Black Shading 70% Weight 6.20 oz/sq yd Burst Strength 475 psi

Screening fabric shall be provided with hemmed reinforced edges and mid-spans with grommets for attachment to chain link fabric at 24 inch intervals.

2.5 ELECTRICAL SERVICE

Where electrical service is desired at the contractor’s facilities, connection shall be made in accordance with the contract drawings.

2.6 SANITATION FACILITIES

The contractor shall provide portable sanitation facilities. Portable sanitation facilities shall be self-contained units with both urinals and stool capabilities. Units shall be adequately ventilated, cleaned and emptied at least once a week or more if determined necessary and directed by the Contracting Officer.

01001 - 3

The doors shall be self-closing and securable. The exterior of the unit shall match “Eagle Feather Tan”.

Locate these facilities out of the view of the public, within the construction fence area.

2.7 CONSTRUCTION ACCESS ROUTE SIGNS

Any construction access route signs which the contractor may wish to erect in order to facilitate location of the site by suppliers or subcontractors must receive prior approval by the Contracting Officer.

Approved signs shall not exceed 12” x 18” in size, shall consist of white letters on a dark brown background (back of sign and post shall be dark brown also), and be mounted at locations approved by the Contracting Officer.

PART 3 EXECUTIONS

3.1 CONSTRUCTION SITE LAYOUT

The contractor shall arrange the office trailers, storage trailers, construction entrance, temporary construction fence, sanitation facilities, and trash dumpsters to effectively use the area designated on the plans. The contractor shall indicate at least one construction entrance for the project.

3.2 TEMPORARY STABILIZED CONSTRUCTION ENTRANCE

The nature of the project may also require a temporary stabilized construction entrance at non-paved areas when exiting to paved areas. The entrance shall be constructed as required by the Sediment and Stormwater Management Plan permit drawings. The contractor shall maintain the temporary stabilized construction entrance such that it functions adequately in the removal of sediment from construction vehicle tires. Stones in the entrance shall be periodically rotated or changed to ensure construction vehicle tires are clean when leaving the site.

3.3 CLEANING ROADWAYS

The contractor shall make special effort to prevent the generation of dirt, debris, or dust as a result of activities related to the work under this contract. All roadways adjacent to the construction site which accumulate construction dirt, debris, dust, or other foreign materials as a result of activities related to this contract shall be cleaned at least daily or more often if determined necessary and directed by the Contracting Officer in order to maintain a neat appearance. The method of cleaning shall remove and not just displace the material.

3.4 TRASH REMOVAL

The 55 gallon trash containers shall be emptied a minimum of once a day or more often if directed by the Contracting Officer. The site dumpsters shall be emptied a minimum of once a week or more often if directed by the Contracting Officer in order to keep the site clean of trash. Dumpsters and containers shall not be allowed to overflow and permit trash to enter the site or adjacent areas.

3.5 EROSION CONTROL AND SAFETY FENCE

Erosion control fence and safety fence shall be maintained in a neat and orderly appearance. As a minimum the Contractor shall perform weekly checks of the condition of the erosion control fence and safety fence. Sagging or falling fences shall be immediately repaired.

3.6 TEMPORARY CONSTRUCTION FENCE

01001 - 4

Location of temporary construction fence shall be as shown on the approved site layout plan. The fence shall be constructed around the perimeter of all construction, staging, and storage areas prior to the start of any work. Trailers may be on site prior to completion of the fence. The fence shall be maintained in a neat and orderly appearance. Fence panels shall be maintained to within one (1) foot of plan horizontal alignment and within 3-inches of vertical. As a minimum the Contractor shall perform weekly checks of the condition of the fence. Leaning or fallen fences and torn or missing vision screening fabric shall be immediately repaired.

3.7 GRASS CUTTING

Any grass on the construction site shall be cut at least once a week during the growing season. The grass immediately adjacent to both sides of the erosion control fence, safety fence, or construction fence shall also be cut as required above to keep a neat and professional appearance.

3.8 SAFETY SIGNS

Safety signs shall be posted at all entrances to the construction site. The signs shall be ICI Devoe/Glidden color Pastel tint base: Formula # BLK 1P32 YOX 1P39 OXR 19 “DAFB Eagle Feather Tan” unless safety mandates otherwise.

3.9 RESTORATION

3.9.1 Except as otherwise required by the contract, all disturbed or damaged landscaping, paved areas, curbs or sidewalks shall be restored to the original condition. This condition will be as documented in the photographs of the undisturbed site submitted with the site layout plan.

1 Oct 2014 SECTION 01002 141086

01002 - 1

SECTION 01002

DOVER AFB ENVIRONMENTAL SPECIFICATIONS

Part A. Hazardous Materials Usage Part B. Affirmative Procurement Part C. Recycling of Construction Debris Part D. Excess Soil Requiring Disposal Guidelines Part E. Disposal of Encountered Groundwater Part F. Conformance with Environmental Management System Part G. Air Permitting

Part A. Hazardous Materials Usage by Contractors

1. Purpose. As required by AFI 32-7086, Hazardous Materials Management, paragraphs 2.5.5.2.4,

2.5.5.2.8 and 2.5.5.2.9; requires Dover AFB to account for all hazardous materials (HAZMATs) brought on the facility to include contractors as well as providing procedures for the reporting of those items.

1.1. This part outlines actions to be taken by the contractor in the request for approval of hazardous materials prior to initiating field activities associated with the subject project and the reporting of approved hazardous materials usage during contract performance.

1.2. Compliance with this part is mandatory and contactor failure to comply will result in the contractor not being allowed to bring any hazardous materials on Dover AFB. Contractors must also comply with mandatory Federal, State and local guidelines, regarding storage and management of hazardous materials, failure to comply can result in legal action by Federal, State or local enforcement officers against the offender.

2. Policy. Dover AFB policy is to comply with Federal, State, Local and Air Force regulations pertaining to the purchase, storage, handling and reporting of HAZMAT.

3. Responsibilities for Contractor Reported Usage of HAZMAT.

3.1. Contractors must submit to the associated Contracting Office the information and supporting documentation (including Material Safety Data Sheets (MSDSs)) necessary to obtain HAZMAT usage authorization. Report data on the HAZMAT used during the performance of the contract at intervals and in the format specified by Dover AFB (reference Attachment 2).

3.2. The contractor shall provide a completed Dover AFB HAZMAT Chemical Worksheet, (sample included below as Attachment 1) for each HAZMAT to be used during the duration of the contract to include MSDS. This list of all HAZMATs shall be provided at the beginning of the contract. Any additional HAZMATs required during the course of the contract shall be requested for approval at that time. In addition, the quantity of chemicals expended will be reported to the Dover AFB Hazardous Materials Pharmacy (HAZMART) by filling out the Contractor’s Monthly Report for HAZMATS, reference Attachment 2 below. For contracts with duration of less than six months, and Blanket Purchase Agreements, the contractor shall complete the form at Attachment 2 at the completion of each contract/call.

01002 - 2

3.3. If non-compliance is identified, the QAE/Government Inspector will notify the Contracting Officer of the specific issue. Contractor, upon notification from Contracting Officer, will take immediate action to ensure compliance.

3.4 Attachment 3 contains the volatile organic compound (VOC) limits for architectural coatings.

Applicable hazardous materials requests for use will be compared to these limits. VOC levels for a particular coating cannot exceed the limit presented in Attachment 3. Coatings submitted for use with VOC levels above those in Attachment 3 will be disapproved for use on Dover AFB in accordance with the Delaware Regulations Governing Air Pollution, Regulation 41. A copy of the Delaware Regulations Governing Air Pollution, Regulation 41 is available at the following web site.

http://www.dnrec.state.de.us/air/aqm_page/regs.htm

01002 - 3

ATTACHMENT 1 DOVER AFB HAZMAT CHEMICAL WORKSHEET

Contractor Name:

[Company preforming the w ork]

Contract Number and Title:

Project Number (FJXT):

Estimated Start Date: Estimated Completion Date:

Shop Code (DV):

[To be completed by base personnel]

PROCESS CODE:

[To be completed by Bioenvironmental Engineering]

National Stock Number (NSN), or Part Number:

Manufacture:

Material Name: Size:

[Be Specif ic] [ounces, gallons or pounds,etc.]

Amount used: Container type:

[Per w eek, month, year] [box, bottle, can, tube, drum etc.]

Unit of Issue: Units per container:

[each, dozen, kit, etc.] [2 ea., one dz., 3 part kit, etc.]

Will the process be performed inside or outside?

Will the process be performed on equipment, structure or aircraft?

Physical location of process proformance:

Location Of stored Material:

Is a Hazardous Waste Generated? YES NO If yes, how is waste disposed:

[remarks]

Is a site digram available? YES NO [remarks]

Does the site have a listing of base procedures for reporting a spill? YES NO [remarks]

This request requires both the contractors and QAE signature for processing.

Contractor and Title:

Phone: Date:

Government Representative:

Phone: Date:

01002 - 4

ATTACHMENT 2

CONTRACTOR’S MONTHLY REPORT FOR HAZMATS

Contractor: Shop Code:

Contract# Location:

The following information is required for tracking of Hazardous Materials on Dover AFB. For contracts exceeding six months, this form is required to be filled out on a monthly basis and returned to the Government Representative (QAE). Contracts less than six months, this form is required at the beginning and at the completion of the work.

The QAE will provide a copy to the Hazmart Pharmacy. This information is required to comply with State, Federal and Air Force laws and regulation.

Material Name Manufacture NSN/Part # Start

Balance Amount Used

Use additional sheets are required.

Contractor printed and name and date:

Signature:

Government Rep. printed name and date:

Signature:

01002 - 5

ATTACHMENT 3

VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS

Note: Limits are expressed in grams of VOC per liter of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .