About this file
This document contains questions and answers related to solicitation FA448624R0001 for Simplified Acquisition of Base Engineer Requirements at Lajes Field in the Azores, Portugal. The solicitation requires construction and renovation services including demolition of existing structures, installation of new lighting fixtures and ceilings, and development of missing project information. Proposals are due by March 22, 2024 at 2:00 PM local time, with a single award to be made. The questions and answers provide clarification such as confirming the building will remain occupied during construction, establishing a 9-foot height for new ceiling installation, and allowing the contractor flexibility to propose changes to exterior lighting locations. Currency exchange rates and the process for addressing cost increases are also addressed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA448624R00010002 SF 30.pdf | ||
| SABER QA Compilation 15 Mar 2024.pdf | ||
| Solicitation Amendment FA448624R00010001 SF 30.pdf | ||
| Solicitation - FA448624R0001.pdf | ||
| Attachment 4 - Past Performance Information (PPI).pdf | ||
| Attachment 6 - Pre-Proposal Conference and Site Visit Invitation.pdf | ||
| Attachment 7 - Seed Project Statement of Work 3 January 2024.pdf | ||
| Attachment 5 Past and Present Performance Questionnaire (PPQ).docx | DOCX document | |
| Attachment 3 -Sample Questions and Answers Form.docx | DOCX document | |
| Attachment 1 - Specifications 19 January 2024.pdf | ||
| Attachment 7.1 - Seed Project Drawings 3 January 2024.pdf | ||
| Attachment 2 - SABER Special Contract Requirements.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 – SABER Questions and Answers Simplified Acquisition of Base Engineering Requirements
FA448624R0001
7 March 2024
K – Contracting C – Cost/Pricing T- Technical P – Past Perf.
Solicitation / Attachment Reference
Cross Reference Discussion/Comment/Question Government Response
Pre-Proposal and Site Visit Conference
(27 Feb 2024)
How is price being evaluated (included variants “how is the ordering from lowest to highest being done”)
The answer can be found in the solicitation’s (amendment 00001) Section M paragraph. M.1.3.2a), and b).
How does currency exchange work since RS Means produces an estimate in USD and proposals are to be in EUR?
The DoD issues an annual fiscal year exchange rate that is sent to contractors every FY. Current FY24 is 0.9798 and will be valid until 30 Sep 2024. Vendors are to estimate exchange rate impact in their risk assessment and adjust the coefficient accordingly.
Recency/Relevancy Assessment – Does not reflect today’s magnitude compared to three (3) years ago. Can we include the estimated value reflecting today’s estimate for relevancy?
Vendors can provide an adjustment for inflation/higher cost of materials and labor when they state the amount of the award they are submitting.
How do vendors get PPQs for Government work?
PPQ for Government work is replaced by CPARS reports.
K – Contracting C – Cost/Pricing T- Technical P – Past Perf.
Solicitation / Attachment Reference
Cross Reference Discussion/Comment/Question Government Response
Post Conference
At the first meeting (presentation) it was said that two companies would be chosen for SABER and then they would compete against each other. At yesterday's meeting I had the idea that only one company will be chosen, can you clarify this situation for me?
As per the solicitation, only one award will be made.
This change was due to one of the advantages of SABER is its quick lead time, and having two awardees would deny that advantage, so our customer decided to keep it as only one award.
ATCH 7 –
SOW 2.2.3.2
SOW calls for installation of 4 new light fixtures in Room #102. Drawing shows 2 light fixtures – please clarify.
Install 2 light fixtures in accordance with project drawings.
SOW 2.1.7.1
SOW demolition of antenna Structure – please provide location and details of existing structure.
Location and details provided during site visit.
Structure is located at South side of the building.
ATCH 7 –
SOW 2.1.7.2
SOW demolition of exterior lighting fixtures – drawings do not show location of existing fixtures.
There is one light fixture on each corner, one on the West side and one on the East side.
ATCH 7 –
SOW 2.2.7.1 Provide location and specification for new exterior antenna structure.
Antenna structure is located on the North side of the building. No specification will be provided by the Government. Being a SABER contract, contractor shall develop all the missing information.
SOW 2.2.7.2 Provide location for 6 new exterior light fixtures
– drawings do not show locations
There is one light fixture on each corner, one on the West side and one on the East side. Being a SABER contract, contractor may suggest changes to these locations.
ATCH7.1 -
Drawings 02 of 06
Interior metal stud walls – do the studs continue to deck or terminate just above acoustical ceiling height?
Metal studs terminate just above acoustical ceiling height.
GENERAL -
Can photographs be provided of each room involved in the construction and exterior elevations?
No. Contractor may request a site visit to take pictures.
ATCH7.1 -
Drawings 05 of 06
At what height is the new ACT Ceiling system being installed?
9 feet.
ATCH 7 -
SOW
P3 Demolition -general Notes
VS P5
General Notes
P3 indicated building will be unoccupied during construction while P5 indicates building will remain occupied during construction – please clarify.
Consider P5 – building will be occupied during construction.
Solicitation P2 & P42
Section 13D of Form 1442 indicates 10 days for Government acceptance while Section L.1.4 indicates 90 days for Government acceptance.
Please clarify.
Section L.1.4. is correct. Block 13D will be corrected on the amendment.
FAR 14.202-8
Subpart 4.5
Will the Government consider electronic submission of bid only in lieu of Electronic with paper copy?
The Government will not.
ADD0001 L.3.4
Questions are to be submitted 5 days prior to RFP Closing date at 1600 HRS. If answers are answered by Government on next business day, then there is not enough time to incorporate the answers into our bids, print out hard covers bid as described and deliver to Base. We ask that the bid be extended prior to questions being due so that the dates are known in advance so printing and delivery can be arranged.
The 5 days prior to RFP is the latest the Government guarantees an answer. Questions submitted after that deadline will be accepted, but an answer is not guaranteed. The Government will post Q&A every Friday until the last week of the solicitation, at which point will post every Q&A received as soon as answers are consolidated.