SABER Q and A Compilation 7 Mar 2024.pdf

PDF 198 KB Posted

Attached to
SABER - Simplified Acquisition of Base Engineer Requirements Federal contract opportunity
Solicitation number
FA448624R0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains questions and answers related to solicitation FA448624R0001 for Simplified Acquisition of Base Engineer Requirements at Lajes Field in the Azores, Portugal. The solicitation requires construction and renovation services including demolition of existing structures, installation of new lighting fixtures and ceilings, and development of missing project information. Proposals are due by March 22, 2024 at 2:00 PM local time, with a single award to be made. The questions and answers provide clarification such as confirming the building will remain occupied during construction, establishing a 9-foot height for new ceiling installation, and allowing the contractor flexibility to propose changes to exterior lighting locations. Currency exchange rates and the process for addressing cost increases are also addressed.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 – SABER Questions and Answers Simplified Acquisition of Base Engineering Requirements

FA448624R0001

7 March 2024

K – Contracting C – Cost/Pricing T- Technical P – Past Perf.

Solicitation / Attachment Reference

Cross Reference Discussion/Comment/Question Government Response

Pre-Proposal and Site Visit Conference

(27 Feb 2024)

How is price being evaluated (included variants “how is the ordering from lowest to highest being done”)

The answer can be found in the solicitation’s (amendment 00001) Section M paragraph. M.1.3.2a), and b).

How does currency exchange work since RS Means produces an estimate in USD and proposals are to be in EUR?

The DoD issues an annual fiscal year exchange rate that is sent to contractors every FY. Current FY24 is 0.9798 and will be valid until 30 Sep 2024. Vendors are to estimate exchange rate impact in their risk assessment and adjust the coefficient accordingly.

Recency/Relevancy Assessment – Does not reflect today’s magnitude compared to three (3) years ago. Can we include the estimated value reflecting today’s estimate for relevancy?

Vendors can provide an adjustment for inflation/higher cost of materials and labor when they state the amount of the award they are submitting.

How do vendors get PPQs for Government work?

PPQ for Government work is replaced by CPARS reports.

K – Contracting C – Cost/Pricing T- Technical P – Past Perf.

Solicitation / Attachment Reference

Cross Reference Discussion/Comment/Question Government Response

Post Conference

At the first meeting (presentation) it was said that two companies would be chosen for SABER and then they would compete against each other. At yesterday's meeting I had the idea that only one company will be chosen, can you clarify this situation for me?

As per the solicitation, only one award will be made.

This change was due to one of the advantages of SABER is its quick lead time, and having two awardees would deny that advantage, so our customer decided to keep it as only one award.

ATCH 7 –

SOW 2.2.3.2

SOW calls for installation of 4 new light fixtures in Room #102. Drawing shows 2 light fixtures – please clarify.

Install 2 light fixtures in accordance with project drawings.

SOW 2.1.7.1

SOW demolition of antenna Structure – please provide location and details of existing structure.

Location and details provided during site visit.

Structure is located at South side of the building.

ATCH 7 –

SOW 2.1.7.2

SOW demolition of exterior lighting fixtures – drawings do not show location of existing fixtures.

There is one light fixture on each corner, one on the West side and one on the East side.

ATCH 7 –

SOW 2.2.7.1 Provide location and specification for new exterior antenna structure.

Antenna structure is located on the North side of the building. No specification will be provided by the Government. Being a SABER contract, contractor shall develop all the missing information.

SOW 2.2.7.2 Provide location for 6 new exterior light fixtures

– drawings do not show locations

There is one light fixture on each corner, one on the West side and one on the East side. Being a SABER contract, contractor may suggest changes to these locations.

ATCH7.1 -

Drawings 02 of 06

Interior metal stud walls – do the studs continue to deck or terminate just above acoustical ceiling height?

Metal studs terminate just above acoustical ceiling height.

GENERAL -

Can photographs be provided of each room involved in the construction and exterior elevations?

No. Contractor may request a site visit to take pictures.

ATCH7.1 -

Drawings 05 of 06

At what height is the new ACT Ceiling system being installed?

9 feet.

ATCH 7 -

SOW

P3 Demolition -general Notes

VS P5

General Notes

P3 indicated building will be unoccupied during construction while P5 indicates building will remain occupied during construction – please clarify.

Consider P5 – building will be occupied during construction.

Solicitation P2 & P42

Section 13D of Form 1442 indicates 10 days for Government acceptance while Section L.1.4 indicates 90 days for Government acceptance.

Please clarify.

Section L.1.4. is correct. Block 13D will be corrected on the amendment.

FAR 14.202-8

Subpart 4.5

Will the Government consider electronic submission of bid only in lieu of Electronic with paper copy?

The Government will not.

ADD0001 L.3.4

Questions are to be submitted 5 days prior to RFP Closing date at 1600 HRS. If answers are answered by Government on next business day, then there is not enough time to incorporate the answers into our bids, print out hard covers bid as described and deliver to Base. We ask that the bid be extended prior to questions being due so that the dates are known in advance so printing and delivery can be arranged.

The 5 days prior to RFP is the latest the Government guarantees an answer. Questions submitted after that deadline will be accepted, but an answer is not guaranteed. The Government will post Q&A every Friday until the last week of the solicitation, at which point will post every Q&A received as soon as answers are consolidated.

2024-03-07T13:52:30-0100
MENDES.PEDRO.N.1522717181

File details come from the government source that posted it. Updated .