Attachment 7 Questions and Answers Part II.pdf

PDF 225 KB Posted

Attached to
Renovate Building T-715 Federal contract opportunity
Solicitation number
FA448620R0014
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains questions and answers regarding solicitation number FA448620R0014 for the renovation of Building T-715 at Lajes Field in Portugal. The solicitation will result in a firm fixed price contract to renovate the building in accordance with provided specifications and drawings dated January 24, 2020. Questions posed by contractors relate to clarification of materials, equipment, and construction details in the drawings and specifications. The answers provided address discrepancies and clarify requirements for items such as wall construction, plumbing fixtures, mechanical equipment, electrical panels and lighting.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Building T-715, newest first.
File Type Posted
M-104 Rev 1.pdf PDF
Solicitation Amendment FA448620R00140006 SF 30.pdf PDF
Attachment 3 Submittal Register 9 October 2020.pdf PDF
Solicitation Amendment FA448620R00140005 SF 30.pdf PDF
G-001.pdf PDF
E-100 rev2.pdf PDF
14 21 23.pdf PDF
Lighting Fixture X Datasheet.pdf PDF
E-201 rev2.pdf PDF
ThyssenKrupp Synergy BLUE Elevator.pdf PDF
ufc_4_010_01_2018_c1.pdf PDF
E-202 rev1.pdf PDF
G-002.pdf PDF
MQNA 13-1017 Submittal Register.pdf PDF
Questions and Answers 9 October 2020.pdf PDF
Solicitation Amendment FA448620R00140004 SF 30.pdf PDF
Solicitation Amendment FA448620R00140003.pdf PDF
Attachment 5 Past Present Performance Questionnaire (PPQ) V2.pdf PDF
Attachment 4 Past Performance Information (PPI) V2.pdf PDF
SF 30 FA448620R00140002.pdf PDF
Solicitation Amendment - FA448620R00140001.pdf PDF
SF 30 FA448620R00140001.pdf PDF
Attachment 1 Specifications 24 January 2020.pdf PDF
Attachment 2 DrawingS 24 January 2020.pdf PDF
Solicitation - FA448620R0014.pdf PDF
Attachment 5 Past Present Performance Questionnaire (PPQ).pdf PDF
Attachment 3 Submittal Register 24 January 2020.pdf PDF
Attachment 4 Past Performance Information (PPI).pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA448620R0014 Renovate Building T-715 Questions & Answers

34. Please clarify if the answer provided for Key note 19 means that the wall between Room

135 & room 138 will be constructed with CMU up to 8 feet and chain link from the 8 feet up to Roof structure? No, Keynote 19 refers to the construction of a new 8 feet high CMU wall and the ceiling of that room that shall be chain link fence to match the existing ceiling in room 136. (please see response to question #13)

35. Drawings:

REF DWGS REF

SPECS

Question

A102

N/A

Keynotes legend are not tagged on drawing and/or may not refer to any described work:

- #2; #3; #5; #6; #8; #9; #10; #12; #13; #14; #15 Please clarify where these notes are to be applied or if are not used The aforementioned Keynotes are applicable to both A101 and A102.

- Keynote #2 refers to the kitchen opening (between rooms #103 and #101. Details are in Drawing A- 401, detail #6)

- Keynote #3 is not applicable on this drawing, should be considered a general note;

- Keynote #5 is not applicable on this drawing, should be considered a general note;

- Keynote #6 is not applicable on this drawing, should be considered a general note;

- Keynote #10 is applicable on door 225;

- Keynote #12, where location is not defined, please refer to drawings G001 and G002. For detail, refer to 9/A401;

- Keynote #13, where location is not defined, please refer to drawings G001 and G002.

- Keynote #14 shall be considered a General Note, applicable to all new toilets;

- Keynote #14 shall be considered a General Note, applicable to all new toilets;

- Keynote #9 is located in exterior stairs (see alignment E) of Drawing A102.

- Keynote #8 appears in Drawing A101.

A102 / A602 / S303

Rm#225/230/230a&230b area are hatched w/new slab floor patch & marked as raised floor in room schedule.

However there is jo specs or detailed drawings for the raised floor Please provide details for the required raised floor For raised floor detail, see detail N/S304 and E/S303.

New raised floor shall be galvanized steel structure, with corrugated galvanized metal sheet and wood paneling, and shall be calculated to support average office loads.

A111

Drawing A111 shows ACT throughout building.

Detail 2 shows GWB ceiling at corridor Please clarify

Detail 2 is only applicable to drawing A112 (second floor) where the ACT meets the corridor walls.

Note: 4’ represented size on GWB is only schematic, as is the height difference from one ceiling type to the other.

A201 / A202

Roof over mech room #142 denotes new roof sandwich panels (keynote 10). However over mech room the roof is flat, not sloped.

Please clarify if it´s required to install munditelha roofing system (creating a slope) or is a membrane roof should be installed at this location

New roof panels shall be sandwich type, similar to Munditelha 40mm (RAL 8023) or equivalent.

New mech room roof is sloped, see Detail 1/A-202

A202

Elevations denote detail H/S303 Please provide detail H

This detail (H/S303) is not applicable.

A201/A202/A31 2 / S301

Elevations denotes detail 3-A312. Legend of detail states NEW exterior wall but detail states existing wall.

C-S301 & D-S301 refers to new Shear wall not shown anywhre else on drawings Please clarify

The exterior CMU walls are to maintain.

Detail C-S301 is not applicable.

A401

Key note #24 on enlarged plan 3/A401 not referenced on key note legend Please provide keynote 24 description

Where Keynote #24 is referenced in the drawings, please consider the description of Keynote #2 on the

“Floor Plan Keynote” list.

A401 / P-402 /

P-901

Kitchen equipment not specified to be provided or to be installed (namely, comercial kitchen sink, ice maker, refrigerator

Ice maker and refrigerator are not to be supplied by the contractor. The Kitchen sink is defined in drawing

P601 (MARK P7).

A401 / P402 / P601 / P901

Kitchen elevations 5/A401 & 6/a401 denotes SS-1 Countertop service sink at kitchen east AND Kitchen west Plumbing plans & riser diagram doesn't have noted on SS-1. Fixtures schedule refer to P7 utility sink (not countertop installed)

Please Clarify

Kitchen sink shall be the one designated on the “Plumbing Fixture Schedule” (P7). Countertop opening shall be adjusted to sink(s) size(s).

A501

Detail 9/A501 denotes guardrail not shown on floor plans A101 & A102 Please clarify where is to be installed the guardrail

The guard rail shall replace any existing peripheral barriers and shall be applied in both open mezzanines (Rooms #232 and #231) on their (open) perimeter.

A521

Fire rated walls not identified on floor plans Please provide location if any for the fire rated walls The Government will provide a Life Safety Plan for this project.

A521

Window schedule not provided. Missing information for window type W2 Please provide the window schedule All windows shall be new. All windows shall be top hang outward type and comply with LFFES and with UFC 4-010-

01. Dimensions of windows are equal to existing with the exception of W1 that is 4’wide and 4’ 1⅝” high. Contractor shall create new wall openings in existing walls to fit new windows to obtain the window layout designed in drawing A-201 and A-202. W2 is equal in dimensions as existing windows.

Please see PT-4 Porcelain tile information below:

Key Name

PT-4

Description Porcelain Tile

Manufacturer Magres

Size 60 x 60 mm

Color Carbon

EDS

Pattern Edge

Finish R10

A602 N/A Missing material schedule PT-4 and PNT-5 Please provide detaisl for the materials PT-4 and PNT-5

Contractor shall consider PNT-3 where PNT-5 is stated.

S102 / A101 floor plan doesn't match with new floor plan for new mansonary partion types, exterior wall openings and with noted to demo mansonary walls - Several locations Please Clarify

New non-load bearing partions are indicated in A-101 and A-102, new load bearing partions represented in S- 102 and S-103.

Please see response to question n24.

S102

East and west canopy entrances floor slab (grid line C) marked for demo and replace concrete entrance.

Not noted on architectural plans

Please clarify

Proceed as indicated in S-102 and apply porcelain tile

PT-4.

S103 / A102 floor plan doesn't match with new floor plan for new mansonry partion types, exterior wall openings and with noted to demo mansonary walls

- Several locations

New non-load bearing partitions are indicated in A-101 and A-102, new load bearing partitions represented in S-102 and S-103.

Please see response to question n24.

A101/A102 / S102 / S103

Drawings Show two columns at grid line C.5 on east and west walls. They are not represented on demo dwg and not part of new work Please clarifY

Existing columns, maintain.

S103

Hatch on mezzannie rm#231 not clear for type of work to be performed. Hatch legend refers to new and existing pre-engineered steel framed platform. Existing not noted to demo and no related notes on architectural drawings

As denoted in drawing S-103, contractor shall design a new pre-engineered steel frame platform. Finishing similar to existing mezzanine and replace existing guardrail with new (see detail in drawing).

S103 noted new beam on existing steel stairs to mezzannine rm#231. Not clear if to replace stair or mounting beam, no other related notes on architectural drawings. Please clarify

Disregard note. Steel stair

S301

Details C-S301 and D-S301 are not referenced on structural plans. Also they refer to new shear wall and new steel elements not marked on structural or architectural plans.

Disregard details.

S302

Detail C-S302 are not referenced on structural plans and no similar work required on architectural plans.

Please Clarify

Disregard details.

Detail A-S303 titles new to existing platform and is referenced on dwg. S103 near grid line 4/D.6. plans do not note any new work on existing platform and details omits new work.

Please clarify

As denoted in drawing S-103, contractor shall design a new pre-engineered steel frame platform to add to existing, in order to comply with the live load indicated in Legend in S-103.

Detail J-S303 is not referenced on strutucal plans.

New platform with new CFS structure is not noted in structural plans

Detail regarding reinforcement of mezzanine 232.

Metal structure is schematic and shall be executed according to legend in S-103.

S402

Leader note near grid line D denotes work at exterior wall vertical control joint. Is this isolated work or typical note throughout all exterior walls?

Work described in note shall be done throughout building, all control joints shall be redone.

S402

Tag detail M/S-304 at bathroom chase is not detailed on sheet S-304 Please provide detail M

Disregard note referring detail.

S501

On Detail 5/S-501, no lintels are specified on architectural plans. Please clarify where is to be used detail 5/S-501

It applies to all new openings.

S501

On Detail 7/S-501, only columns BP-2 exist on architectural plans. Please confirm if only BP-2 is to be used

Columns used identified in drawing S-102

S502

Details 1/2/3/5/6/S-502 are not referenced on plans work, totally or partially. Please clarify

Detail 6 is not applicable. Generic details that shall be applied when applicable.

M-103 Note 7 / A-202 South elevation

Only free-area is indicated for Generator Room Intake Louver, please provide required Louver Dimensions.

Dimensions shall be 5’2” x 6’ (aluminum).

M-501 Detail 7 N/A Please clarify if the use of a Motorized Damper at Louver is applicable only at Generator Room Intake Louver.

Yes.

A-202 / M-103 / M-104

North Elevation

N/A Louver located on North Elevation is not mentioned or required on Mechanical Drawings. There is no other reference or dimensions for the mentioned Louver.

Please Clarify

Install a 4’7” x 2’ aluminum louver.

M-103 / M-104 / M-604

N/A There are some discrepancy on Grilles, and Diffusers related with Models and quantities. Please Clarify.

Please see attached revised drawing M104 ( M-104 Rev 1).

M-103 / M-104 / M-501 Detail 3

23 00 00 / 2.8.4.5

According Specs Duct Liner is not permitted. Sound Attenuating Transfer Air Ducts as per Detail requires the installation of 1/2" thick Liner. Please inform if the use of liner is allowed, on the specs for liner, and if is to be installed only on the outside of the refered ducts.

Apply liner where specified in drawings.

M-001 Note 12 / 23 07 00 / 3.3.2

As per Project Specs Exhaust ducts do not require the application of Insulation. Despite Recovery Units are selected for 100% AO Systems, the ducts from each extraction point to the Units were considered as Return Ducts, with 1 1/2" thickness Insulation, due to the fact that they are part of a recovery system.

Please advise if this assumption is correct.

Yes, that assumption is correct

M-103 / M-104 / M-604 N/A

Energy Recovery Ventilators schedule do not match with plan Mark Units in terms of Airflow Rate.

Please Clarify

In M-104 sheet, ERV-715-1-1 shall be ERV-715-1-3 and ERV-715-1-3 shall be ERV-715-1-1.

Same requirements from schedule shall be kept.

F-101 / F-102 / M-103 / M- 104

M-

23 00 00 / 2.8.3

On DWG/s F-101 / F-102 there are different Fire Classification Areas. On Mechanical Drawings there are no reference to Fire Dampers.

Please advise.

501 Detail 6 Comply with Project Specifications and NFPA applicable requirements.

P001 / P501

General note #17 refers to trap primers installation as a general requirement. Plans doesn't specify which floor drains shall be installed TP-1.

Disregard trap primers. Maintain floor drain and p-traps.

P105 N/A Missing plumbing note 3 referenced on detail 3/P-402

Disregard P-105 note 3.

P105 N/A Leader note at rm#129 pointing to no equipment

Disregard.

A-401 / P401

At A401 is shown SS-1 details 5 & 6, however there is no SS-1 shown at 1/P-401 nor at P- 601 (Plumbing Fixture Schedule)

See keynote #1 on P-901.

P601

P101 states that existing air compressor is to remain.

Air compressor schedule note 2 states that electrical motor shall be replaced as per specs. Specs doesn't contain any related information.

Please Clarify

Motor shall be equivalent to existing (to work with the existing compressor) but 230/400V 50Hz.

E-100, E-106, E-

27 10 00

Spec's define data cable type as UTP, 4 pair, Cat 6.

Electrical Legend dwg. E-100, the symbol used on dwgs E-105 & E-106 define data cable as "secure data drop - 2 Cat 6 orange shielded cable, red connector, red faceplate"

Cable shall be UTP, 4 pair, Cat 6. Please disregard “secure data drop – 2 Cat 6 orange shielded cable, red connector, red faceplate” in E-100.

E-501

With exception of panelboard MSB, all the others panelboards have no main circuit breaker or main switch that allow to disconnect the panelboard as

36. Shall the Contractor’s perform all work in accordance with the Lajes Field Installation

Facilities Standards (IFS) latest version?

Yes. The Contractors can find the that document at:

https://www.wbdg.org/ffc/af‐afcec/installation‐facilities‐standards‐ifs/lajes‐afb‐ifs

37. What type and colour of paint shall be used to paint all exterior walls?

required by the Portuguese safety codes (R.T.I.E.B.T.).

Please confirm if it is required any main breaker or switch in those panels.

A main circuit breaker is required in all panelboards. The panelboards shall comply with R.T.I.E.B.T.

E-401, E-501

On single line diagram panelboard P1D1 rating is 160A (E-401).

On Panelboard Schedule the main bus rating for this panel is 400A (E-501). We believe the correct panelboard rating is 160A, please confirm.

Panelboard P1D1 rating shall be 160A.

E-401, E-501

On single line diagram panelboard EP1 rating is 125A (E-401).

On Panelboard Schedule the main bus rating for this panel is 150A (E-501). We believe the correct panelboard rating is 125A, please confirm.

Panelboard EP1 rating shall be 125A.

E-100, E-201

On stairs #2 - level 0, show a luminaire type M (E-201).

There are no reference of this type of luminaire on Luminaire Schedule (E-100). Please inform characteristics of required luminaire.

Please also inform if it is required the installation of this type of luminaire on stairs #1 and stairs #3, level 0.

See revised E-100, E-201 and E-202 attached.

Exterior paint shall be Water-Based Semi-textured 100% Acrylic. All facades shall be treated with an aqueous disinfectant and an Anti-Algae and Fungi shall be added in order to extend the paints life expectancy.

38. In the aftermath of the delivery of the Life Safety Plan on the 09/10/2020, kindly note that this plan contains discrepancies concerning some of its areas´ use and occupancy identification.

Please note that all the spaces identified with letter “G” in the drawings have no statutory correspondence as per the International Building Code, IBC 2018, Chapter 3 (see attachment), NFPA 101, or International Fire Code, IFC, concerning the use and occupancy of the building, i.e. The provided Life Safety Plan´s legend refers “Industrial/General” for letter G, however the codes do not use the letter G for any occupancy and use classification, thus the industrial type of classification falls under letter “F”, which stands for Factory category, in this case F-1 and which requires further attention.

Therefore, and for all the above stated, Marques S.A. kindly requests:

a) The revision of the Life Safety Plan provided as a complementary bid document on the

09/10/2020, to remove discrepancies and allow a correct and full evaluation of the impact on building requirements and the life safety of the building and its occupants.

In accordance with NFPA 101, Table 7.3.1.2 – Occupant Load Factor shall be Industrial Use – General and high hazard industrial.

b) The drawing of question 30.

No drawing will be provided. See answer 30 for more information.

39. Unless stated otherwise, is it the contractor’s responsibility to ensure that adjacent pavements are leveled?

Yes, unless stated otherwise, the Contractor shall perform all necessary work to add filling/foundation materials (as opposed to removing filling/foundation material) so that adjacent pavements are all at the same height.

In addition to keeping all adjacent pavements at the same height to avoid “steps” or level differences, adjacent pavements composed of different materials (for example, when tile floor meets floating floor) the transition shall be achieved by installing an aluminum profile (Type “PROJOINT T FROM PROFILAS” or equivalent), 1 inch wide, and as long as each specific pavement section (i.e. from wall to wall).