Attachment 7 Questions and Answers Part II.pdf
PDF 225 KB Posted
- Attached to
- Renovate Building T-715 Federal contract opportunity
- Solicitation number
- FA448620R0014
About this file
This document contains questions and answers regarding solicitation number FA448620R0014 for the renovation of Building T-715 at Lajes Field in Portugal. The solicitation will result in a firm fixed price contract to renovate the building in accordance with provided specifications and drawings dated January 24, 2020. Questions posed by contractors relate to clarification of materials, equipment, and construction details in the drawings and specifications. The answers provided address discrepancies and clarify requirements for items such as wall construction, plumbing fixtures, mechanical equipment, electrical panels and lighting.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA448620R0014 Renovate Building T-715 Questions & Answers
34. Please clarify if the answer provided for Key note 19 means that the wall between Room
135 & room 138 will be constructed with CMU up to 8 feet and chain link from the 8 feet up to Roof structure? No, Keynote 19 refers to the construction of a new 8 feet high CMU wall and the ceiling of that room that shall be chain link fence to match the existing ceiling in room 136. (please see response to question #13)
35. Drawings:
REF DWGS REF
SPECS
Question
A102
N/A
Keynotes legend are not tagged on drawing and/or may not refer to any described work:
- #2; #3; #5; #6; #8; #9; #10; #12; #13; #14; #15 Please clarify where these notes are to be applied or if are not used The aforementioned Keynotes are applicable to both A101 and A102.
- Keynote #2 refers to the kitchen opening (between rooms #103 and #101. Details are in Drawing A- 401, detail #6)
- Keynote #3 is not applicable on this drawing, should be considered a general note;
- Keynote #5 is not applicable on this drawing, should be considered a general note;
- Keynote #6 is not applicable on this drawing, should be considered a general note;
- Keynote #10 is applicable on door 225;
- Keynote #12, where location is not defined, please refer to drawings G001 and G002. For detail, refer to 9/A401;
- Keynote #13, where location is not defined, please refer to drawings G001 and G002.
- Keynote #14 shall be considered a General Note, applicable to all new toilets;
- Keynote #14 shall be considered a General Note, applicable to all new toilets;
- Keynote #9 is located in exterior stairs (see alignment E) of Drawing A102.
- Keynote #8 appears in Drawing A101.
A102 / A602 / S303
Rm#225/230/230a&230b area are hatched w/new slab floor patch & marked as raised floor in room schedule.
However there is jo specs or detailed drawings for the raised floor Please provide details for the required raised floor For raised floor detail, see detail N/S304 and E/S303.
New raised floor shall be galvanized steel structure, with corrugated galvanized metal sheet and wood paneling, and shall be calculated to support average office loads.
A111
Drawing A111 shows ACT throughout building.
Detail 2 shows GWB ceiling at corridor Please clarify
Detail 2 is only applicable to drawing A112 (second floor) where the ACT meets the corridor walls.
Note: 4’ represented size on GWB is only schematic, as is the height difference from one ceiling type to the other.
A201 / A202
Roof over mech room #142 denotes new roof sandwich panels (keynote 10). However over mech room the roof is flat, not sloped.
Please clarify if it´s required to install munditelha roofing system (creating a slope) or is a membrane roof should be installed at this location
New roof panels shall be sandwich type, similar to Munditelha 40mm (RAL 8023) or equivalent.
New mech room roof is sloped, see Detail 1/A-202
A202
Elevations denote detail H/S303 Please provide detail H
This detail (H/S303) is not applicable.
A201/A202/A31 2 / S301
Elevations denotes detail 3-A312. Legend of detail states NEW exterior wall but detail states existing wall.
C-S301 & D-S301 refers to new Shear wall not shown anywhre else on drawings Please clarify
The exterior CMU walls are to maintain.
Detail C-S301 is not applicable.
A401
Key note #24 on enlarged plan 3/A401 not referenced on key note legend Please provide keynote 24 description
Where Keynote #24 is referenced in the drawings, please consider the description of Keynote #2 on the
“Floor Plan Keynote” list.
A401 / P-402 /
P-901
Kitchen equipment not specified to be provided or to be installed (namely, comercial kitchen sink, ice maker, refrigerator
Ice maker and refrigerator are not to be supplied by the contractor. The Kitchen sink is defined in drawing
P601 (MARK P7).
A401 / P402 / P601 / P901
Kitchen elevations 5/A401 & 6/a401 denotes SS-1 Countertop service sink at kitchen east AND Kitchen west Plumbing plans & riser diagram doesn't have noted on SS-1. Fixtures schedule refer to P7 utility sink (not countertop installed)
Please Clarify
Kitchen sink shall be the one designated on the “Plumbing Fixture Schedule” (P7). Countertop opening shall be adjusted to sink(s) size(s).
A501
Detail 9/A501 denotes guardrail not shown on floor plans A101 & A102 Please clarify where is to be installed the guardrail
The guard rail shall replace any existing peripheral barriers and shall be applied in both open mezzanines (Rooms #232 and #231) on their (open) perimeter.
A521
Fire rated walls not identified on floor plans Please provide location if any for the fire rated walls The Government will provide a Life Safety Plan for this project.
A521
Window schedule not provided. Missing information for window type W2 Please provide the window schedule All windows shall be new. All windows shall be top hang outward type and comply with LFFES and with UFC 4-010-
01. Dimensions of windows are equal to existing with the exception of W1 that is 4’wide and 4’ 1⅝” high. Contractor shall create new wall openings in existing walls to fit new windows to obtain the window layout designed in drawing A-201 and A-202. W2 is equal in dimensions as existing windows.
Please see PT-4 Porcelain tile information below:
Key Name
PT-4
Description Porcelain Tile
Manufacturer Magres
Size 60 x 60 mm
Color Carbon
EDS
Pattern Edge
Finish R10
A602 N/A Missing material schedule PT-4 and PNT-5 Please provide detaisl for the materials PT-4 and PNT-5
Contractor shall consider PNT-3 where PNT-5 is stated.
S102 / A101 floor plan doesn't match with new floor plan for new mansonary partion types, exterior wall openings and with noted to demo mansonary walls - Several locations Please Clarify
New non-load bearing partions are indicated in A-101 and A-102, new load bearing partions represented in S- 102 and S-103.
Please see response to question n24.
S102
East and west canopy entrances floor slab (grid line C) marked for demo and replace concrete entrance.
Not noted on architectural plans
Please clarify
Proceed as indicated in S-102 and apply porcelain tile
PT-4.
S103 / A102 floor plan doesn't match with new floor plan for new mansonry partion types, exterior wall openings and with noted to demo mansonary walls
- Several locations
New non-load bearing partitions are indicated in A-101 and A-102, new load bearing partitions represented in S-102 and S-103.
Please see response to question n24.
A101/A102 / S102 / S103
Drawings Show two columns at grid line C.5 on east and west walls. They are not represented on demo dwg and not part of new work Please clarifY
Existing columns, maintain.
S103
Hatch on mezzannie rm#231 not clear for type of work to be performed. Hatch legend refers to new and existing pre-engineered steel framed platform. Existing not noted to demo and no related notes on architectural drawings
As denoted in drawing S-103, contractor shall design a new pre-engineered steel frame platform. Finishing similar to existing mezzanine and replace existing guardrail with new (see detail in drawing).
S103 noted new beam on existing steel stairs to mezzannine rm#231. Not clear if to replace stair or mounting beam, no other related notes on architectural drawings. Please clarify
Disregard note. Steel stair
S301
Details C-S301 and D-S301 are not referenced on structural plans. Also they refer to new shear wall and new steel elements not marked on structural or architectural plans.
Disregard details.
S302
Detail C-S302 are not referenced on structural plans and no similar work required on architectural plans.
Please Clarify
Disregard details.
Detail A-S303 titles new to existing platform and is referenced on dwg. S103 near grid line 4/D.6. plans do not note any new work on existing platform and details omits new work.
Please clarify
As denoted in drawing S-103, contractor shall design a new pre-engineered steel frame platform to add to existing, in order to comply with the live load indicated in Legend in S-103.
Detail J-S303 is not referenced on strutucal plans.
New platform with new CFS structure is not noted in structural plans
Detail regarding reinforcement of mezzanine 232.
Metal structure is schematic and shall be executed according to legend in S-103.
S402
Leader note near grid line D denotes work at exterior wall vertical control joint. Is this isolated work or typical note throughout all exterior walls?
Work described in note shall be done throughout building, all control joints shall be redone.
S402
Tag detail M/S-304 at bathroom chase is not detailed on sheet S-304 Please provide detail M
Disregard note referring detail.
S501
On Detail 5/S-501, no lintels are specified on architectural plans. Please clarify where is to be used detail 5/S-501
It applies to all new openings.
S501
On Detail 7/S-501, only columns BP-2 exist on architectural plans. Please confirm if only BP-2 is to be used
Columns used identified in drawing S-102
S502
Details 1/2/3/5/6/S-502 are not referenced on plans work, totally or partially. Please clarify
Detail 6 is not applicable. Generic details that shall be applied when applicable.
M-103 Note 7 / A-202 South elevation
Only free-area is indicated for Generator Room Intake Louver, please provide required Louver Dimensions.
Dimensions shall be 5’2” x 6’ (aluminum).
M-501 Detail 7 N/A Please clarify if the use of a Motorized Damper at Louver is applicable only at Generator Room Intake Louver.
Yes.
A-202 / M-103 / M-104
North Elevation
N/A Louver located on North Elevation is not mentioned or required on Mechanical Drawings. There is no other reference or dimensions for the mentioned Louver.
Please Clarify
Install a 4’7” x 2’ aluminum louver.
M-103 / M-104 / M-604
N/A There are some discrepancy on Grilles, and Diffusers related with Models and quantities. Please Clarify.
Please see attached revised drawing M104 ( M-104 Rev 1).
M-103 / M-104 / M-501 Detail 3
23 00 00 / 2.8.4.5
According Specs Duct Liner is not permitted. Sound Attenuating Transfer Air Ducts as per Detail requires the installation of 1/2" thick Liner. Please inform if the use of liner is allowed, on the specs for liner, and if is to be installed only on the outside of the refered ducts.
Apply liner where specified in drawings.
M-001 Note 12 / 23 07 00 / 3.3.2
As per Project Specs Exhaust ducts do not require the application of Insulation. Despite Recovery Units are selected for 100% AO Systems, the ducts from each extraction point to the Units were considered as Return Ducts, with 1 1/2" thickness Insulation, due to the fact that they are part of a recovery system.
Please advise if this assumption is correct.
Yes, that assumption is correct
M-103 / M-104 / M-604 N/A
Energy Recovery Ventilators schedule do not match with plan Mark Units in terms of Airflow Rate.
Please Clarify
In M-104 sheet, ERV-715-1-1 shall be ERV-715-1-3 and ERV-715-1-3 shall be ERV-715-1-1.
Same requirements from schedule shall be kept.
F-101 / F-102 / M-103 / M- 104
M-
23 00 00 / 2.8.3
On DWG/s F-101 / F-102 there are different Fire Classification Areas. On Mechanical Drawings there are no reference to Fire Dampers.
Please advise.
501 Detail 6 Comply with Project Specifications and NFPA applicable requirements.
P001 / P501
General note #17 refers to trap primers installation as a general requirement. Plans doesn't specify which floor drains shall be installed TP-1.
Disregard trap primers. Maintain floor drain and p-traps.
P105 N/A Missing plumbing note 3 referenced on detail 3/P-402
Disregard P-105 note 3.
P105 N/A Leader note at rm#129 pointing to no equipment
Disregard.
A-401 / P401
At A401 is shown SS-1 details 5 & 6, however there is no SS-1 shown at 1/P-401 nor at P- 601 (Plumbing Fixture Schedule)
See keynote #1 on P-901.
P601
P101 states that existing air compressor is to remain.
Air compressor schedule note 2 states that electrical motor shall be replaced as per specs. Specs doesn't contain any related information.
Please Clarify
Motor shall be equivalent to existing (to work with the existing compressor) but 230/400V 50Hz.
E-100, E-106, E-
27 10 00
Spec's define data cable type as UTP, 4 pair, Cat 6.
Electrical Legend dwg. E-100, the symbol used on dwgs E-105 & E-106 define data cable as "secure data drop - 2 Cat 6 orange shielded cable, red connector, red faceplate"
Cable shall be UTP, 4 pair, Cat 6. Please disregard “secure data drop – 2 Cat 6 orange shielded cable, red connector, red faceplate” in E-100.
E-501
With exception of panelboard MSB, all the others panelboards have no main circuit breaker or main switch that allow to disconnect the panelboard as
36. Shall the Contractor’s perform all work in accordance with the Lajes Field Installation
Facilities Standards (IFS) latest version?
Yes. The Contractors can find the that document at:
https://www.wbdg.org/ffc/af‐afcec/installation‐facilities‐standards‐ifs/lajes‐afb‐ifs
37. What type and colour of paint shall be used to paint all exterior walls?
required by the Portuguese safety codes (R.T.I.E.B.T.).
Please confirm if it is required any main breaker or switch in those panels.
A main circuit breaker is required in all panelboards. The panelboards shall comply with R.T.I.E.B.T.
E-401, E-501
On single line diagram panelboard P1D1 rating is 160A (E-401).
On Panelboard Schedule the main bus rating for this panel is 400A (E-501). We believe the correct panelboard rating is 160A, please confirm.
Panelboard P1D1 rating shall be 160A.
E-401, E-501
On single line diagram panelboard EP1 rating is 125A (E-401).
On Panelboard Schedule the main bus rating for this panel is 150A (E-501). We believe the correct panelboard rating is 125A, please confirm.
Panelboard EP1 rating shall be 125A.
E-100, E-201
On stairs #2 - level 0, show a luminaire type M (E-201).
There are no reference of this type of luminaire on Luminaire Schedule (E-100). Please inform characteristics of required luminaire.
Please also inform if it is required the installation of this type of luminaire on stairs #1 and stairs #3, level 0.
See revised E-100, E-201 and E-202 attached.
Exterior paint shall be Water-Based Semi-textured 100% Acrylic. All facades shall be treated with an aqueous disinfectant and an Anti-Algae and Fungi shall be added in order to extend the paints life expectancy.
38. In the aftermath of the delivery of the Life Safety Plan on the 09/10/2020, kindly note that this plan contains discrepancies concerning some of its areas´ use and occupancy identification.
Please note that all the spaces identified with letter “G” in the drawings have no statutory correspondence as per the International Building Code, IBC 2018, Chapter 3 (see attachment), NFPA 101, or International Fire Code, IFC, concerning the use and occupancy of the building, i.e. The provided Life Safety Plan´s legend refers “Industrial/General” for letter G, however the codes do not use the letter G for any occupancy and use classification, thus the industrial type of classification falls under letter “F”, which stands for Factory category, in this case F-1 and which requires further attention.
Therefore, and for all the above stated, Marques S.A. kindly requests:
a) The revision of the Life Safety Plan provided as a complementary bid document on the
09/10/2020, to remove discrepancies and allow a correct and full evaluation of the impact on building requirements and the life safety of the building and its occupants.
In accordance with NFPA 101, Table 7.3.1.2 – Occupant Load Factor shall be Industrial Use – General and high hazard industrial.
b) The drawing of question 30.
No drawing will be provided. See answer 30 for more information.
39. Unless stated otherwise, is it the contractor’s responsibility to ensure that adjacent pavements are leveled?
Yes, unless stated otherwise, the Contractor shall perform all necessary work to add filling/foundation materials (as opposed to removing filling/foundation material) so that adjacent pavements are all at the same height.
In addition to keeping all adjacent pavements at the same height to avoid “steps” or level differences, adjacent pavements composed of different materials (for example, when tile floor meets floating floor) the transition shall be achieved by installing an aluminum profile (Type “PROJOINT T FROM PROFILAS” or equivalent), 1 inch wide, and as long as each specific pavement section (i.e. from wall to wall).