Attachment 1 Specifications 24 January 2020.pdf

PDF 30 MB Posted

Attached to
Renovate Building T-715 Federal contract opportunity
Solicitation number
FA448620R0014
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This solicitation is for the renovation of Building T-715 at a cost between $1,000,000 and $5,000,000. The Department of the Air Force United States Air Forces in Europe - Air Forces Africa will award a firm fixed price contract to renovate the building in accordance with the specifications dated January 24, 2020, project drawings dated January 24, 2020, and submittal requirements dated January 24, 2020. Offerors must consider these documents in their proposals. The NAICS code for this project is 236220. Proposals are due in accordance with the dates and requirements in Sections L and M of the solicitation. A single award is contemplated for this renovation project to the responsible offeror that meets all requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Building T-715, newest first.
File Type Posted
Solicitation Amendment FA448620R00140006 SF 30.pdf PDF
Attachment 7 Questions and Answers Part II.pdf PDF
M-104 Rev 1.pdf PDF
Attachment 3 Submittal Register 9 October 2020.pdf PDF
Solicitation Amendment FA448620R00140005 SF 30.pdf PDF
E-100 rev2.pdf PDF
14 21 23.pdf PDF
Lighting Fixture X Datasheet.pdf PDF
ThyssenKrupp Synergy BLUE Elevator.pdf PDF
ufc_4_010_01_2018_c1.pdf PDF
E-202 rev1.pdf PDF
G-002.pdf PDF
MQNA 13-1017 Submittal Register.pdf PDF
E-201 rev2.pdf PDF
G-001.pdf PDF
Solicitation Amendment FA448620R00140004 SF 30.pdf PDF
Questions and Answers 9 October 2020.pdf PDF
Solicitation Amendment FA448620R00140003.pdf PDF
Attachment 5 Past Present Performance Questionnaire (PPQ) V2.pdf PDF
Attachment 4 Past Performance Information (PPI) V2.pdf PDF
SF 30 FA448620R00140002.pdf PDF
SF 30 FA448620R00140001.pdf PDF
Solicitation Amendment - FA448620R00140001.pdf PDF
Solicitation - FA448620R0014.pdf PDF
Attachment 5 Past Present Performance Questionnaire (PPQ).pdf PDF
Attachment 3 Submittal Register 24 January 2020.pdf PDF
Attachment 4 Past Performance Information (PPI).pdf PDF
Attachment 2 DrawingS 24 January 2020.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

RENOVATE T-715 FOR CE

CONSOLIDATION EFFICIENCY

MQNA 13-1017

Portfolio Optimization Office, 65th Civil Engineer Squadron

24 January 2020

USAFE

Lajes Field, Azores, Portugal

65th Civil Engineer Squadron

APO AE 09720

RENOVATE T-715 FOR CE CONSOLIDATION

LAJES FIELD, 24 JAN 2020

PROJECT TABLE OF CONTENTS Page | 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 73 03 SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 13.00 10 ASBESTOS ABATEMENT

02 83 19.13 10 LEAD-BASED PAINT ABATEMENT

02 83 19.13 99 T-715 HAZMAT SURVEY

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16

BUILDING INSULATION

07 22 00 ROOF AND DECK INSULATION

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES

07 84 00 FIRESTOPPING

PROJECT TABLE OF CONTENTS Page | 2

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 COILING COUNTER DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 CEMENT STUCCO

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00

23 05 93

40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

PROJECT TABLE OF CONTENTS Page | 3

BUILDING CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 00 00.98 T-715 GEOTECHNICAL REPORT

31 00 00.99 ADDITIONAL INFORMATION FOR DESIGN

31 23 00.00 20 EXCAVATION AND FILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 52 10 SERVICE PIPING, FUEL SYSTEMS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

SECTION 00 73 03 Page | 1

PART 1 GENERAL

1.1 SUBMITTALS

DOCUMENT 00 73 03

SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS

08/08

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. The following shall be submitted in accordance with 01 33 00 SUBMITTAL

PROCEDURES:

1.2 PHYSICAL DATA

Data referred to below is furnished for the Contractor's information.

However, it is expressly understood that the Government will not be responsible for interpretation or conclusion drawn there from by the

Contractor.

a. The physical conditions indicated on the drawings and in the specifications are the result of site investigations.

b. Geographic Conditions

(1) The Azores are comprised of a group of nine small islands, politically an integral part of Portugal, lying in the North

Atlantic, about 2,300 miles east of New York and about 980 miles west of Lisbon, Portugal. The islands have a total area of 1,581 square miles with a total population of about 360,000. The economic mainstays of the Azores are fishing and agriculture.

There is no heavy industry, and facilities for repairing machinery are limited. Most tools, implements, and farm utensils are handmade.

(2) The climate is mild and the humidity high. Average annual temperature is 63 degrees F. Diuranal fluctuation in temperature is approximately 10 degrees. Highest recorded temperature, 80 degrees F, lowest recorded temperature, 40 degrees F. The yearly average rainfall is 44.80 inches; the monthly average rainfall and probability of rain is as follows:

High winds occur from December through March. Average winds during this period are 11.6 knots. The recorded high winds are:

November 90 knots, December 72 knots, January 90 knots, February

128 knots, March 106 knots, April 89 knots.

(3) Terceira Island measures roughly 11 by 18 miles, almost entirely bordered by high cliffs. The terrain is hilly and dominated by volcanic ranges, including two extinct craters. The airfield is located on the northeast side of the island. The total population of Terceira Island is approximately 80,000. The city of Angra do

Heroismo, capitol of the district, has a population of about

30,000; and the nearest town to the airfield, Praia da Vitoria, has a population of about 11,000.

c. Transportation Facilities for Lajes Field. Lajes Field is defined as

SECTION 00 73 03 Page | 2 the U.S. Forces Azores operational area on Terceira Island.

(1) Railroads: There are no railroads on the island.

(2) Highways and Roads: The majority of the roads are paved. An asphalt highway links Praia da Vitoria and Angra do Heroismo. The use or construction of haul roads and bridges shall be subject to prior approval of the Contracting Officer.

(3) Ports: The island has one port capable of handling deep draft ocean freighters, Praia da Vitoria. The port facility is limited since most freight must be lightered ashore in barges. There are no regularly scheduled commercial vessels arriving or departing

Terceira Island.

(4) Air: Lajes Field is served by the commercial Portuguese airline

TAP. TAP make connections from New York to Terceira Island through Lisbon approximately several times a week. SATA makes daily connections with several larger airlines including TAP.

1.3 HOLIDAY PERFORMANCE AND HOURS OF WORK

1.3.1 Job Site Access

Normal access to the job site shall be between the hours of 0800 and 1700 hrs, Monday through Friday. No work will be performed after hours, during the weekends, or on host nation holidays unless otherwise negotiated prior to contract award.

1.3.2 List of Host Country Holidays Lajes, Azores:

New Year's Day 01 January

Mardi Gras Variable

Good Friday Friday before Easter

Day of Liberty 25 April

Day of the Worker 01 May

Holy Spirit Monday Variable

Corpus Christi Variable

Day of Portugal 10 June

Praia da Vitoria Day 11 August

Assumption Day 15 August

Founding of the Republic 05 October

All Saint's Day 01 November

Restoration of Independence 01 December

Immaculate Conception 08 December

Christmas Day 25 December

SECTION 00 73 03 Page | 3

1.4 SPECIAL CONSIDERATIONS

a. Contractor(s) must use and regard the most current and valid "Lajes

Field Facilities Excellence Standards (LFFES)" for construction projects on Lajes Field, Azores. A copy of this standard will be provided to the contractor(s) by the CO upon request by each contractor. All project staging areas, construction sites, and storage areas shall be securely fenced around the entire perimeter of the job site. Fencing shall be completely secured at top and bottom to prevent pedestrian access. Fences shall be screened with opaque screening material to prevent visibility of the fenced area (min 2 m in height) in areas where material storage, contractor work trailers, trash container and any debris that maybe collected as result of construction. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Submit photos or samples of the screening material for approval prior to installation.

b. The contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The contractor shall only remove trees when specifically authorized by 65 CES

Environmental Management function to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The contractor shall return all areas disturbed during construction to its original condition.

c. The contractor shall request approval for laydown area and placing an office trailer at any project location. Any office trailer shall be no more than 10' x 32' in size, provided with a skirt on all sides, in like new condition, and painted Cream Beige or an equivalent color of similar tone approved by CO, if it is not obscured and hidden by the opaque fencing material. Office trailers in need of painting and / or repairs or, that are in an unsightly condition will not be allowed at the project site. A nameplate shall be displayed on the exterior of all trailers which lists the name of the contractor's company, contractor's point(s) of contact (POC) and telephone number where he/she can be reached, contract number, and title, and the date trailer was placed at the job site.

d. All contractor employees shall obey all traffic laws on installation.

The contractor shall park all vehicles only in legally designated locations, or within the fence line of the construction site.

e. The contractor shall perform normal housekeeping functions inside and outside contractor job sites. Such functions include grounds maintenance, sweeping, mopping, dusting, disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. All rubbish and waste materials shall be removed daily and shall be placed in contractor furnished containers.

During construction, the contractor shall maintain all areas in a neat and orderly manner. The contractor shall clean the construction site and/or structure of all construction trash, trash generated by employees, debris, demolished building materials, combustible waste material, and/or dust daily or more frequently as necessary for safe operations. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned daily. The contractor shall treat with lime entrances and exits to asphalt work

SECTION 00 73 03 Page | 4 site at their own expense. The contractor shall ensure all light or moderate weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. At the end of each project all equipment, rubble and rubbish shall be completely removed from the base by the contractor, leaving the area in a safe, clean and orderly manner to the satisfaction of the CO.

f. The contractor shall provide a haul route plan for approval for the project.

g. Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered. Fasten a suitable cover, such as tarpaulin, over the load before his/her vehicles and such spillage shall be cleaned up immediately. For the duration of entering surrounding streets. The contractor is solely responsible for spillage from this contract and on a daily basis, the contractor shall remove from all base roads and/or streets asphalt, mud, soil, rocks, trash, and debris that result from their construction business on the particular day affected. In the case of asphalt, roads will be cleaned operation on base. All roads and/or streets affected shall be cleaned before close of and/or treated with lime immediately.

h. Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded or seeded as required on each delivery order. Contractor shall be responsible for the successful growth and maintenance of all new grass areas under this contract for a period of thirty (30) calendar days, or three mowings, after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the contractor.

i. All contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences that are erected during construction, shall be removed entirely after completion of project and prior to Government acceptance of the project site. The contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period.

j. If there are any uncertainties with respect to elevations, location of new or existing utilities, or any other information in this contract, the contractor shall obtain clarification from the CO or his designated representative. See "Permit", paragraph 1.18.

k. The contractor shall coordinate the exact location of each item of work with the Inspector, such as drainage systems, drop inlets, repairs, and so forth. Once a week, the contractor shall layout and stake the proposed work in the field, and then review the layout with the

Inspector, who shall make recommendations as to adjustments needed.

Prior to doing any work, the contractor shall receive approval from the

Inspector, who will coordinate with the CO, engineer, and environmental flight as required.

1.5 CONDUCT OF CONTRACTOR PERSONNEL

The Contractor shall report to the Contracting Officer, immediately upon receipt or discovery of any information, whether or not verified, relating to physical security incidents, misconduct, crimes, and misdemeanors, including but not limited to murder, arson, larceny of any weapon, ammunition, or explosives, larceny of other property, robbery, burglary, narcotics and dangerous drugs, destruction of Government property, fraud, SECTION 00 73 03 Page | 5 malfeasance, sabotage, subversions, disaffections, treasons, or espionage.

The Contractor shall recognize and comply with the rules and regulations promulgated by the foreign country where the work is performed to the extent required by pertinent international agreements.

1.6 TURN-IN OF U.S. GOVERNMENT-OWNED MATERIAL AND EQUIPMENT

Property, material, or equipment removed during the course of repairs, alterations, or renovation of any building or other structure remains the property of the U.S. Government and shall be disposed of as follows:

a. Material other than scrap shall be turned over to the Government on

Friday of any week.

b. The materials shall be first offered to Air Base No. 4; if the offer of the materials is declined, the materials shall be turned over to the

Defense Logistics Agency Disposition Services (DLA-DS).

c. The Contracting Officer will designate the time and place and prepare the necessary forms for receiving the materials.

d. The items designated as scrap by the Contracting Officer shall be disposed of as directed.

1.7 SURPLUS PROPERTY DISPOSAL OF MATERIALS OF NON-PORTUGUESE ORIGIN

Excess new materials are those originally imported for use on U.S.

construction contracts but which, upon completion of the contract, have not been used. The materials have been imported into Portugal duty free and shall be disposed of in the following order:

a. If the Contractor has received material payment for the materials, title is vested in the U.S. Government and the materials shall be turned over to the base civil engineer upon contract completion.

b. If the materials have not been purchased through a material payment, the U.S. Government shall be given the first option to purchase the materials at the Contractor's cost.

c. If the materials are not purchased by the U.S. Government, the

Contractor may pay the appropriate custom and duty fees, offer to sell the materials to Air Base No. 4, or the Contractor shall export the materials from Portugal. Arrangement for sales to Air Base No. 4 or payment of customs fees shall be the Contractor's responsibility.

1.8 INVESTIGATION OF DAMAGE OR INJURY

The U.S. Government will have the right to conduct an investigation, or participate in the Contractor's investigation, of any damage or injury to

U.S. Government property, equipment, or personnel.

1.9 PROCESSING OF CONTRACTOR'S PERSONNEL AND PROPERTY

The Contractor shall process Contractor personnel and property through the

Contracting Officer prior to commencement and at the completion of work under this contract. This processing shall include such things as registering and deregistering vehicles, arranging for the issuance and turn-in of identification and passes, and clearing liabilities incurred such as clubs, billeting, and loans.

1.10 VISAS--DIPLOMATIC CLEARANCES

SECTION 00 73 03 Page | 6

The Contractor shall ensure that his employees obtain the required diplomatic clearances (visas) of sufficient duration to cover the performance period of the contract.

1.11 WRITTEN CORRESPONDENCE

Written correspondence from the Contractor to the Contracting Officer shall be in English language, including but not limited to Contractor's invoice, Contractor's schedules, samples and submittals, reports, and as-built drawing markups.

1.12 PORTUGUESE EQUIVALENT

Where equipment, materials, or installations are to be in accordance with

American standards, the equivalent Portuguese standard may be used subject to the approval of the Contracting Officer. The Contractor shall be responsible for proving the equivalency of the Portuguese standard.

1.13 SOURCE REQUIREMENTS CLAUSE (01 MAY 86)

The requirements of this clause are material conditions of this contract.

The Contractor shall, in the performance of this contract, use Portuguese sources to the maximum extent feasible for the goods and services required to perform the contract including labor, materials, supplies, services, equipment, and subcontracts provided such goods and services meet the contract specifications and standards, will be available at the required locale within the required time limits and are equal or lower in cost than those from other sources. The Contractor shall demonstrate compliance with this requirement.

The requirement to use Portuguese sources to the maximum extent feasible does not apply when not in accordance with requirements, standards, or specifications specifically set forth elsewhere in this contract.

Consistent with the foregoing, the Contractor shall submit a four-part written "Report of Sources" to the Contracting Officer as follows:

PART I. The Contractor shall prepare a listing indicating for each category of expenditures anticipated under the contract the U.S. dollar value estimated to be paid to Portuguese sources and the U.S. dollar value estimated to be paid to other sources. The categories shall include as a minimum those shown in the following sample format:

SECTION 00 73 03 Page | 7

REPORT OF SOURCES

Category $ to

Portuguese

$ to Other Sources

Transportation

Direct Hire Labor

Construction Materials

Equipment

Purchases

Rentals

Supplies

Services

Subcontracts

Other

Total: (Sum must equal contract price)

NOTES:

(1) Items that are included in subcontracts, such as labor and materials, should be reported only as subcontracts and shall not be included with other categories.

(2) Overhead and profit must be prorated among the categories.

PART II. The Contractor shall prepare a list of subcontracts indicating the purpose of the subcontract, the name of the subcontractor, and whether

Portuguese or other source.

PART III. The Contractor shall prepare a list of each item or subcontract not procured from a Portuguese source, indicating the reason for not procuring the item or subcontract from a Portuguese source.

PART IV. The Contractor shall indicate the approximate percentage of the total contract price that he will pay collectively to Portuguese sources.

The initial four-part "Report of Sources" shall be submitted by the

Contractor to the Contracting Officer not later than 30 calendar days after contract award. In addition, the Contractor shall submit an updated report in the same four-part format every 30 calendar days thereafter. If no changes have occurred since the last report, the Contractor may submit a negative report by letter.

1.14 SECURITY REQUIREMENTS

a. The contractor shall comply with security regulations imposed by the Installation Commander and/or the agency occupying the space where the work is to be performed, including adhering to, or, obtaining any

SECTION 00 73 03 Page | 8 security clearances.

b. Closure of Openings: The contractor shall close every fence opening resulting from work in order to prevent outside intrusion at the end of each workday. The Closure(s) shall remain in place when contractor is not actively engaged in working on the site(s), including each and every day, night, weekends, and holidays, to reduce wind and weather intrusion. The closure(s) shall be constructed of mesh wire anchored in place to stud framing, if necessary, or similar construction as approved by a government representative through the CO.

c. Contractor Access to Air Force Installations: The contractor shall obtain temporary installation passes for all contractor/subcontractor personnel who visit or perform work on the Air Force Installations cited in the contract. The contractor shall obtain passes through the

65th Contracting Flight. Contractor personnel are required to wear or prominently display contractor furnished badges while visiting or performing work on the installation.

d. Work Performed in Secured Areas: Projects in secured areas may require a local agency check of contractor personnel and all sub-contractors prior to commencement of work. If a check is required, the contractor should allocate time in the work schedule to accomplish this check. The contractor shall price work performed in secured areas according to standard work hour rates unless prior approval to use non-standard work hour rates is obtained from the CO.

e. Escort in Restricted Areas: Contractor personnel must be escorted at all times in a controlled/restricted area by a government escort.

Escorts for secured areas will be scheduled by the contractor at least ten (10) calendar days prior to starting work. The government will provide an escort as quickly as possible, but the contractor should expect delays due to the sensitive nature of secured areas.

f Unauthorized Reconnaissance: The contractor shall inform all personnel working under his/her jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside the immediate work area (excluding cafeterias and rest rooms near the work site, direct haul and access routes, contracting and points of supply and storage) is strictly prohibited. Circulation of the above personnel shall be limited to official business only. Persons engaged in unauthorized reconnaissance of other contractor or government activity will be referred to the CO for disposition. Infractions involving possible compromise of national security will be turned over to the

Office of Special Investigation (OSI) for disposition.

1.15 CONSTRUCTION SITE MAINTENANCE

a. The contractor shall maintain each site in a neat and orderly manner.

All supplies and equipment on the project site shall be stored to preclude mechanical and climatic damage. All grass, weeds, etc. shall be cut as necessary to prevent any fire/safety hazards and shall be no higher than 5 cm at any one time or as directed by the CO. All trash, debris, paper etc. shall be picked up immediately and placed in proper containers.

b. Contractor Parking: The contractor shall inform his employees, suppliers, and subcontractors that their vehicles shall not be parked on grass, in Fire Lanes or other restricted areas, parking spaces marked as "Handicapped" or "Government", at any time. In addition, vehicles may not be driven over grass surfaces, unless indicated during a site visit or pre-performance conference. Any damage done to lawns, SECTION 00 73 03 Page | 9 shrubs, sidewalks etc. shall be repaired or replaced by the contractor at no additional cost to the government.

c. Trucking: Loose debris on trucks leaving the site shall be loaded in a manner that will prevent dropping of materials on streets and conform to local ordinances and laws. Fasten suitable cover, such as a tarpaulin, over the load before entering surrounding streets. The contractor shall be responsible for immediately cleaning up any materials that fall from trucks.

d. Fencing of Construction Site: Fences will be used to isolate construction sites as per instructions by the CO and per recommendations of the Lajes Facility Excellence Standards.

e. Barricades

(1) The contractor shall barricade access to all construction sites.

Barricading shall be used to isolate areas from access. The barricades shall be maintained in good condition, and be installed such that people approaching from the predominant direction can clearly read the warning. Barricades on streets shall have battery powered flashers for night use. Construction fencing shall be used to isolate exterior areas from pedestrian access, and shall be maintained in good condition. Cones shall only be used to temporarily block pedestrian traffic. Extended pedestrian blockages or road traffic shall use rigid barrels/barricades. All barricades, barrels, cones, etc., are included in the contractor's supplied equipment/supplies and therefore shall not be a direct cost to any contract unless the CO deems the individual contract requirements so extensive as to warrant payment.

(2) All projects involving excavation shall be secured with flashing lights on all sides and have construction fencing completely surrounding the site at a minimum of five (5) feet from the hole.

1.16 DRAWING REQUIREMENTS

a. Existing Condition Drawings and As-built Drawings (including utilities):

(1) Existing condition drawings showing existing underground utilities are available upon request. The contractor shall avail himself of the drawings. Any utility line shown on the record drawings (or made known to the contractor) and damaged during construction work shall be repaired immediately by the contractor at no additional cost to the government.

(2) The government does not guarantee the accuracy or adequacy of existing record drawings. It is the contractor's responsibility to verify all existing conditions prior to starting work.

(3) During the progress of the job, the contractor shall keep a careful record at the job site of all work accomplished from the layouts shown on the drawings. The contractor shall provide documents (drawings or sketches) to describe all of the work accomplished, and enter changes and corrections on contract or record drawings promptly and submit to the CO.

b. As-built Work Element in Progress Schedule:

(2) As-builts shall be in the form of one (1) CD-ROM with all documents and drawings as .pdf-files and shall be turned over to the CO within twenty-one (21) calendar days of final inspection.

SECTION 00 73 03 Page | 10

(3) The as-builts shall be professionally drafted in AutoCAD and the contractor shall use conventional drafting techniques, nomenclature, symbols, lettering, noting, and dimensioning.

Resolution of reproducible as-builts shall be legible.

(4) Computer-Aided Design and Drafting (CADD) drawings shall comply with the most current version of Department of Defense (DOD)

Technical Report arcGIS.

(5) The as-built drawings shall indicate, in addition to all changes and corrections, the actual as-built condition. In order that the location of sub-surface utility lines and appurtenances may be determined in the event the surface openings or indicators become covered over or obscured, utility record drawings shall show by offset dimensions to two permanently fixed surfaced features, the end of each run including each change in direction. Valve, splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded.

1.17 PERMITS

a. Welding Permit: No welding shall be started without first obtaining a permit issued by the 65 CES/CEF, Fire Prevention and Emergency Service

Office. Contractor shall request the welding permit not less than five

(5) working days before the welding work starts.

b. Work Clearance Requests:

(1) In order to avoid damaging any underground utilities, such as sewer, water, gas, electrical, telephone, cable TV, and possibly others, the contractor must obtain digging permits. The contractor shall process, obtain and maintain a Work Clearance Request (AF

Form 103) required, prior to beginning construction.

(2) The contractor is responsible for obtaining a Work Clearance Request for each contract right after Notice to Proceed (NTP) is issued. The contractor must fill out the request form (AF Form

103) with pertinent information and attach a plan showing the location of the respective work (contract drawings with areas highlighted is acceptable).

(3) Contractor shall submit to CO two (2) signed copies of the form (AF Form 103).

(4) Also, as a part of the work request process, the contractor shall be required to mark all locations of excavation work on site with white spray paint or stakes with flagging. Existing utilities will be marked in the field by the respective agency in proposed construction areas. The contractor is required to maintain these markings (or reference points) so that the pertinent agency does not have to duplicate their work.

1.18 PROGRESS REPORTS

The reports mentioned in FAR clause 52.236-15, "Schedules for Construction

Contracts" shall be accomplished on AF Form 3064, Contracts Progress

Schedule, and AF Form 3065, Contract Progress Report.

1.19 MATERIAL SUBMITTAL AND APPROVAL FORM

SECTION 00 73 03 Page | 11

In accordance with FAR clause 52.236-5 "Materials and Workmanship," all material requiring approval shall be submitted by the contractor to the CO for approval on an AF Form 3000 within ten (10) calendar days after NTP (or as other-wise established by the CO).

1.20 UNIQUE PROJECT REQUIREMENTS

a. Paving and Excavation Projects:

(1) Prior to start of any paving, striping and excavation under this contract, the contractor shall coordinate start and completion dates in writing with the CO or his/her designated representative, five (5) work days prior to the scheduled start date.

(2) Special Requirements for Excavating Around or Locating Existing Utilities: Excavations for street and utility outages will also include the following requirements unless waived by the CO: Prior to the start of work, all valve locations will be identified/located so the utility can be shut off in the event of accidental damage. To preclude accidental damage, the contractor shall locate the exact location of all known utilities by hand digging within lm in each direction of the marked utility prior to any excavation with power equipment. Any utilities discovered during excavations that are not shown on the drawings will be marked on the contract drawings and will be identified on the contractor's as-built drawings.

1.21 COORDINATION WITH GOVERNMENT ACTIVITIES

a. If it becomes necessary to interrupt work activities due to construction, permission to do so must be requested in writing to the

CO twenty-one (21) calendar days in advance.

b. The contractor shall request street closings, both partial and/or total, twenty-one (21) calendar days prior to the closing.

c. Work in conjunction with this contract which requires utility outages which will affect (as determined by the CO) normal activities in the building, construction area, or other work areas, shall be performed by the contractor at a time other than regular work periods of the organization occupying the facility or area.

d. Temporary construction for facilities used by the contractor for preventing interruption of normal work activity or loss of utilities shall be subject to approval of 65 CES/CEN through the CO.

e. Utility Outages:

(1) The contractor shall coordinate all utility outages with the using agency through the CO or his representative prior to the outage.

Services shall not be interrupted until receipt of approval of proposed hours and dates from the 65 CES/CEN through the CO. All work shall be arranged to ensure that the outage will be of minimum duration. The contractor will provide notice to the CO, in writing, not less than twenty-one (21) working calendar days prior to the required outage or as determined by the CO. No response to the outage/interruption request shall be considered as disapproval for the outage/interruption. In the event a scheduled utility outage is canceled by the Government, notification shall be given to the contractor at least 24 hours in advance of the time for the outage to start and the contractor waives his right to any claim for equitable adjustment or increased cost of performance under

SECTION 00 73 03 Page | 12 this contract as a result of this cancellation. Once a utility outage is arranged and work begun, work must go on continuously until the affected utilities are restored to the affected facility.

(2) The contractor's Interruption and Outage Requests shall include specific location of interruption/outage, hours and dates of interruption/outage, services affected by the interruption/outage.

(3) Water Mains. Operation of valves on water mains will be by government personnel only. Where shut-off of water lines interrupts service to fire hydrants or fire sprinkler systems, the contractor shall contact the CO and arrange his operations to have sufficient personnel available to restore service without delay in the event of an emergency as determined by the 65 CES/CEF Fire

Prevention Office.

(4) Fire Protection System. Where interruption of electrical power affects a fire protection system service, the contractor shall notify the CO twenty-one (21) working calendar days before making such interruptions and shall restore service prior to leaving the job site each day.

1.22 GOVERNMENT FURNISHED EQUIPMENT AND MATERIALS

a. Government Furnished Materials (GFM) will not be furnished to the contractor as a general rule, however, the Government reserves the right to provide GFM and/or Government Furnished Equipment (GFE) to be used on any contract. In such cases, these materials will be receipted for by the contractor and excluded from the price of the contract.

b. The contractor, with his own forces, shall transport all GFE/GFM, if any, described on the contract from the Government storage area to the work site indicated on the contract. As unit prices include materials/equipment, work using GFE/GFM shall be accomplished by use of the non-standard hours item clause.

c. The contractor assumes the risk and responsibility for the loss or damage to GFE/GFM

d. The contractor shall follow the instructions of the Inspector regarding the disposition of all GFE/GFM not consumed in performance of a contract.

1.23 REMOVAL AND REPLACEMENT RESPONSIBILITY

a. The contractor shall be responsible for the replacement or repair of all existing finished surfaces, utilities, equipment, landscapes, grounds, and structures or parts thereof that he/she has damaged, removed, or cut into in order to perform work specified. Removed items to be reinstalled shall be stored by the contractor, free from damage, until reinstalled at no additional cost to the Government.

1.24 WARRANTY SERVICE REQUIREMENTS

a. The contractor shall furnish, as a minimum, one (1) primary name and telephone number of an individual on his/her management staff, available twenty four (24) hours per day, seven (7) days per week, for the life of this contract to respond to warranty situations. In the event the primary individual is unavailable, the contractor shall furnish an alternate individual and shall notify the CO of the alternate individual's telephone number.

SECTION 00 73 03 Page | 13

b. Following notification by the CO or, the Inspector, the contractor shall respond to a warranty service requirement identified by the CO, or the Inspector, in accordance with the "Warranty Service Priority

List" of this program. This list prioritizes warranty work into the following categories:

Emergency: Perform on site inspection to evaluate situation, determine course of action, initiate work within 2 hours and work continuously to completion.

Urgent: Perform on site inspection to evaluate situation, determine course of action, initiate work within 24 hours and work

Routine: All other work to be initiated within 48 hours and work

c. The "Warranty Service Priority List" is as follows:

Emergency: Emergency deemed as any damage on the active runway.

Urgent: All repairs on the airfield taxiways and/or parking aprons.

Routine: All other areas.

d. Should parts be required to complete the work and the parts are not immediately available the contractor shall have a maximum of 12 hours after arrival at the job site to provide the CO with firm, written proposals for emergency alternatives and temporary repairs for government participation with the contractor to provide emergency relief until the required parts are available on site for the contractor to perform permanent warranty repair. The contractor's proposals shall include a firm date and time that the required parts shall be available on site to complete the permanent warranty repair.

The CO will evaluate the proposed alternatives and select the alternative considered to be in the best interest of the government to reduce the impact of the emergency condition. Alternatives considered by the CO will include the alternative for the contractor to "do nothing" while waiting until the required parts are available to perform permanent warranty repair. Negotiating a proposal, which will require government participation and the expenditure of government funds, shall constitute a separate procurement action by the government.

1.25 CONTRACTOR PERSONNEL

Contract Manager: The contractor shall provide a contract manager and at least one alternate. The contract manager and alternate shall have full authority to act for the contractor in all contractual matters. The contract manager or alternate shall be available during standard work hours. The contract manager and alternate shall be able to read, speak and write English fluently.

1.26 GOVERNMENT PERSONNEL

Personnel from 65 CES/CEN are designated as the representative of the CO for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the CO to commit the Government to changes in the terms of the contract. No oral statement of any person and no written statement of anyone other than the CO shall modify or other-wise affect the terms or meaning of this contract. All requests by the contractor for interpretations, modifications, or changes shall be made in

SECTION 00 73 03 Page | 14 writing to the CO. The Government shall not be liable for any costs incurred by the government or any action taken by the contractor, which are not in conformance with this statement.

1.27 E-MAIL CAPABILITY

The contractor shall have e-mail capability, via Internet or other means.

This will allow the CO and 65 CES/CEN to communicate with contractor via email.

1.28 GOVERNMENT LIABILITY

The Government shall not be liable for any loss or damage to the contractor's property, including stock, or for expenses incidental to such loss or damage. The contractor shall file a report with the Base Security

Forces immediately as is practicable to report loss.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

-- End of Document --

SECTION 01 11 00 Page | 1

PART 1 GENERAL

1.1 NOT USED

SECTION 01 11 00

SUMMARY OF WORK

08/15

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the reconfiguration of programmatic spaces which consist mostly of offices, conference rooms, office reception areas, storage, bathrooms and shop space. Renovations will include selective demolition, asbestos abatement, new partitions and finish upgrades including flooring, ceilings, doors, frames and hardware. Also included is an elevator installation, lateral structural improvements, automatic temperature controls and HVAC replacement. Plumbing work will include the replacement of the domestic water system, water heater and toilet room plumbing fixtures. Electrical work consists of conversion of the system to a

European standard system including; replacement of the transformer, distribution equipment, lighting, lighting switching, devices and boxes.

New site lighting will be added. A new automatic sprinkler system will be added. The fire alarm system shall be upgraded and a new mass notification system shall be provided throughout the building, and incidental related work.

Contractor shall also deliver Life Safety Plan for building T-715 in accordance with UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES, NFPA 101 LIFE SAFETY CODE and INTERNATIONAL BUILDING CODE (IBC).

1.2.2 Location

The work is located at the Lajes Field, Azores, Portugal, where indicated by the plans.

1.3 PERIOD OF PERFORMANCE

The Contractor shall complete the work associated with this contract with in 365 calendar days of Notice to Proceed.

1.4 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with

Installation requirements for locating and marking underground utilities.

Verify existing utility locations indicated on contract drawings, within area of work.

SECTION 01 11 00 Page | 2

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 21 days prior to starting excavation work.

Not used.

-- End of Section --

SECTION 01 14 00 Page | 1

SECTION 01 14 00

WORK RESTRICTIONS

11/11 submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.2.1.1 Subcontractors and Personnel

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists and transmit to the Contracting Officer.

1.2.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.2.2 Working Hours

Regular working hours are between 8:00 a.m. and 5:00 p.m., Monday through

Friday, excluding Government holidays.

1.2.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 21 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the

Contracting Officer may approve work outside regular hours. During periods

SECTION 01 14 00 Page | 2 of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.2.4 Occupied Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the

Contracting Officer.

The Government will remove and relocate Government property in the building.

1.2.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, and fire alarm, are considered utility cutovers pursuant to the paragraph WORK OUTSIDE

REGULAR HOURS.

SECTION 01 30 00 Page | 1

1.1 REFERENCES

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/15

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements

Manual

1.2 SUBMITTALS

the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map; G

Progress and Completion Pictures; G

1.3 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.4 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color 200 dpi minimum resolution in JPEG file format showing the sequence and progress of work.

Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting

Officer. Submit with the monthly invoice a set of digital photographs.

Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report.

Photographs provided are for unrestricted use by the Government.

1.5 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 LIABILITY, during the entire period of performance under this contract. Provide other insurance coverage as required by law.

SECTION 01 30 00 Page | 2

1.5.1 Waiver for Worker's Compensation

In addition to "FAR 52.228-4, Workers' Compensation and War Hazard

Insurance Overseas,: the Secretary of Labor has granted a waiver. The waiver does not apply to employees who are hired in the United States, or who are residents, or citizens of the United States.

1.6 NOT USED

1.7 SUPERVISION

1.7.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work.

This is the start of the file's text. The full file is on GovTribe.