FA4484-18-R-0005_Conformed_Amendment_0001.pdf

PDF 4 MB Posted

Attached to
AFICA - Grounds Maintenance Services Federal contract opportunity
Solicitation number
FA4484-18-R-0005
Issued by
Department of the Air Force Air Mobility Command

About this file

Conformed copy of solicitation, incorporating changes from Amendment 0001.

View the file

Other files for this federal contract opportunity

Other files attached to AFICA - Grounds Maintenance Services, newest first.
File Type Posted
FA4484-18-R-0005_Conformed_Solicitation_(Amendment_0004).pdf PDF
FA4484-18-R-0005_Amendment_0004.pdf PDF
FA4484-18-R-0005_Conformed_Solicitation_(Amendment_0003).pdf PDF
FA4484-18-R-0005_Amendment_0003.pdf PDF
A8_-_Pricing_Schedule.xlsx XLSX spreadsheet
FA4484-18-R-0005_Amendment_0002.pdf PDF
A8_-_Pricing_Schedule.xlsx XLSX spreadsheet
A4_-_PWS_(Rev_No._17).pdf PDF
Consolidated_Questions_and_Answers.pdf PDF
FA4484-18-R-0005_Conformed_Solicitation_(Amendment_0002).pdf PDF
A9_-_Pricing_List_for_CLINs_X020_and_X022.xlsx XLSX spreadsheet
Site_Visit_Meeting_Minutes.pdf PDF
Attachment_2_-_Site_Visit_Itinerary.pdf PDF
A4_-_PWS_(Rev_No._16).pdf PDF
A15_-_Appendix_K_NAVAIR_Snow_Removal_Map.pdf PDF
FA4484-18-R-0005_Amendment_0001.pdf PDF
Attachment_1_-_Site_Visit_Sign-In_sheet.pdf PDF
A14_-_Ocean_County_Wage_Determination.pdf PDF
FA4484-18-R-0005_Grounds_Maintenance.pdf PDF
A9_-_Pricing_List_for_CLINs_X020_and_X022.xlsx XLSX spreadsheet
A7_-_TE-3_Lakehurst_Main_Base_Site_Plan.pdf PDF
A6_-_TE-2_Checkpoint_9.pdf PDF
A1_-_PP_Cover_Letter.pdf PDF
A11_-_Antiterrorism_Awareness_for_Contractors_TriFold.pdf PDF
A2_-_PP_Questionnaire.pdf PDF
A8_-_Pricing_Schedule.xlsx XLSX spreadsheet
A5_-_TE-1_McGuire_Main_Base_Site_Plan.pdf PDF
A3_-_QASP.pdf PDF
A13_-_Burlington_County_Wage_Determination.pdf PDF
A4_-_PWS.pdf PDF
A10_-_Security_Forces_Appendix.PDF PDF
A12_-_Antiterrorism_Awareness_Guide_for_Contractors.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

FA448418R0005 28-Mar-2018

b. TELEPHONE NUMBER

609-754-6191

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 07 May 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

FA44849. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SIOUZANN R. LENDE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

87 CONS/LGC

2402 VANDENBERG AVE

JB MCGUIRE-DIX-LAKEHURST NJ 08641

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE F3A3Q5 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

87 CES/CEOES-F3A3Q5

STEPHEN ROCHE

3104 TUSKEGEE AVE

JB MDL NJ 08641

TEL: 609-754-3641 FAX:

609-754-4948FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

X

SIZE STANDARD:

$7,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF316

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

FA448418R0005

Section SF 1449 - CONTINUATION SHEET

LIST OF ATTACHMENTS

DOCUMENT TITLE DATE NO. PAGES

A1 - Past Performance Questionnaire Cover Letter 5 Mar 18 1

*Document removed upon award

A2 - Past Performance Questionnaire 5 Mar 18 3

*Document removed upon award

A3 - Quality Assurance Surveillance Plan 5 Mar 18 12

A4 - Performance Work Statement 17 Apr 18 49

A5 - PWS Appendix B TE-1 5 Mar 18 1

A6 - PWS Appendix B TE-2 5 Mar 18 1

A7 - PWS Appendix B TE-3 5 Mar 18 1

A8 - Excel Pricing Schedule 5 Mar 18 5 Excel Tabs

A9 - Excel Pricing List for CLINs X020 and X022 5 Mar 18 3 Excel Tabs

A10 - JB MDL Security Forces Appendix 10 Jun 15 19

A11 - JB MDL Antiterrorism Awareness for Contractors (Trifold) N.D. 2

A12 - Antiterrorism Awareness Guide for Contractors 1 Mar 16 6

A13 - Wage Determination No.: 2015-4191 Revision No.: 5 10 Jan 18 20

A14 - Wage Determination No.: 2015-4195 Revision No.: 5 10 Jan 18 20

A15 – PWS Appendix K NAVAIR Snow Removal Maps 5 Mar 18 11

*Indicates a document which will be removed upon award and attachments renumbered

PRICING SUMMARY

SUMMARY OF PRICES FOR BASE YEAR AND FOUR OPTION YEAR

BASE YEAR (1 OCT 18 - 30 SEP 19) $_____________

FIRST OPTION YEAR (1 OCT 19 – 30 SEP 20) $_____________

SECOND OPTION YEAR (1 OCT 20 - 30 SEP 21) $_____________

THIRD OPTION YEAR (1 OCT 21 - 30 SEP 22) $_____________

FOURTH OPTION YEAR (1 OCT 22 - 30 SEP 23) $_____________

GRAND TOTAL (BASE PLUS FOUR YEARS) $_____________

NOTE 1: COMPLETE UNIT PRICES AND TOTAL AMOUNTS. TOTAL MUST BE EXACT. PLEASE

ROUND OFF TO TWO DECIMAL POINTS

NOTE 2: IN CASE OF VARIATION BETWEEN THE UNIT PRICE AND ESTIMATE AMOUNT PRICE, UNIT

PRICE WILL BE CONSIDERED THE OFFER.

NOTE 3: FAILURE TO PROVIDE PRICING ON ALL CLINS WILL BE CONSIDERED A NON-

CONFORMING PROPOSAL AND WILL PRECLUDE THE PROPOSAL FROM ANY FURTHER AWARD

CONSIDERATION.

NOTE 4: COMPLETE ATTACHED EXCEL SPREADSHEET TO REFLECT PRICING SCHEDULE.

NOTE 5: CLAUSES AND PROVISIONS IN THIS DOCUMENT WILL BE NUMBERED IN SEQUENCE, BUT

WILL NOT NECESSARILY APPEAR IN CONSECUTIVE ORDER.

NOTE 6: INSTRUCTIONS TO OFFERORS FOR COMMERCIAL ACQUISITIONS, OFFEROR

REPRESENTATIONS AND CERTIFICATION- COMMERCIAL ITEMS AND PROPOSAL PREPARATION

INSTRUCTIONS WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD, BUT WILL BE

DEEMED TO BE INCORPORATED BY REFERENCE IN THE AWARD.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Grounds Maintenance Services

FFP

Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform grounds maintenance services at Joint

Base, New Jersey for the period 01 Oct 2018 to 30 Sep 2019 in accordance with the PWS.

SIGNAL CODE: A

NET AMT

Maintain Improved Grounds

FFP

Maintain Improved Grounds in accordance with PWS paragraphs 1.1.1, 1.1.2, 1.1.3

& 1.1.5.

0002AA 7 Months Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge and Improved

Grounds Specific Locations) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MAFB, EC- O&M

Funds)

FOB: Destination

0002AB 7 Months Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (ANG Funds)

0002AC 7 Months Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MED Funds)

0002AD 7 Months Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (LKE, ARB, FBI - O&M Funds)

0002AE 7 Months Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (NAVAIR Funds)

0002BA 5 Months Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge and

Improved Grounds Specific Locations) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MAFB, EC- O&M Funds)

0002BB 5 Months Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (ANG Funds)

0002BC 5 Months Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MED Funds)

0002BD 5 Months Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (LKE, ARB, FBI - O&M Funds)

0002BE 5 Months Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (NAVAIR Funds)

Aeration

FFP

Aeration in accordance with PWS paragraph 1.1.4.

0003AA 1 Lot Aeration

FFP

Aeration (PWS 1.1.4) (MAFB, EC - O&M Funds)

0003AB 1 Lot Aeration

FFP

Aeration (PWS 1.1.4) (ANG Funds)

0003AC 1 Lot Aeration

FFP

Aeration (PWS 1.1.4) (MED Funds)

0003AD 1 Lot Aeration

FFP

Aeration (PWS 1.1.4) (LKE - O&M Funds)

0003AE 1 Lot Aeration

FFP

Aeration (PWS 1.1.4) (NAVAIR Funds)

Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds in accordance with PWS paragraph 1.1.6.

0004AA 12 Months Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (MAFB, EC - O&M Funds)

0004AB 12 Months Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (ANG Funds)

0004AC 12 Months Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (MED Funds)

0004AD 12 Months Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (LKE - O&M Funds)

0004AE 12 Months Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (NAVAIR Funds)

Maintain Trash Receptacles

FFP

Maintain Trash Receptacles in accordance with PWS 1.1.6.2.

0005AA 12 Months Maintain Trash Receptacles

FFP

Maintain Trash Receptacles (PWS 1.1.6.2) (MAFB - O&M Funds)

Weed Control

FFP

Weed Control in accordance with PWS 1.1.7.

0006AA 7 Months Weed Control

FFP

Weed Control (PWS 1.1.7) (MAFB, EC - O&M Funds)

0006AB 7 Months Weed Control

FFP

Weed Control (PWS 1.1.7) (ANG Funds)

0006AC 7 Months Weed Control

FFP

Weed Control (PWS 1.1.7) (MED Funds)

0006AD 7 Months Weed Control

FFP

Weed Control (PWS 1.1.7) (LKE - O&M Funds)

0006AE 7 Months Weed Control

FFP

Weed Control (PWS 1.1.7) (NAVAIR Funds)

Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds in accordance with PWS paragraph 1.1.8.

0007AA 1,018 Acre Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (MAFB, EC - O&M Funds)

0007AB 18.50 Acre Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (ANG Funds)

0007AC 16.50 Acre Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (MED Funds)

0007AD 51 Acre Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (LKE, ARB - O&M Funds)

0007AE 80 Acre Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (NAVAIR Funds)

Fertilization

FFP

Fertilization in accordance with PWS paragraph 1.1.9.

0008AA 144 Acre Fertilization

FFP

Fertilization (PWS 1.1.9) (MAFB, EC - O&M Funds)

0008AB 72 Acre Fertilization

FFP

Fertilization (PWS 1.1.9) (ANG - Funds)

0008AC 40 Acre Fertilization

FFP

Fertilization (PWS 1.1.9) (LKH - O&M Funds)

Lawn Renovation

FFP

Lawn Renovation in accordance with PWS paragraph 1.1.10.

0009AA 108,900 Square

Foot

Lawn Renovation

FFP

Lawn Renovation (PWS 1.1.10) (MAFB, EC - O&M Funds)

0009AB 30,000 Square

Lawn Renovation (PWS 1.1.10) (ANG Funds)

0009AC 27,780 Square

Lawn Renovation (PWS 1.1.10) (MED Funds)

0009AD 43,560 Square

Lawn Renovation (PWS 1.1.10) (LKE - O&M Funds)

0009AE 21,780 Square

Lawn Renovation (PWS 1.1.10) (NAVAIR Funds)

Prune Shrubs

FFP

Prune Shrubs in accordance with PWS 1.1.11.

0010AA 7 Months Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (MAFB - O&M Funds)

0010AB 7 Months Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (ANG Funds)

0010AC 7 Months Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (LKE - O&M Funds)

Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas in accordance with PWS 1.1.12.

0011AA 7 Months Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas (PWS 1.1.12) (McGuire - O&M

Funds)

0011AB 7 Months Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas (PWS 1.1.12) (ANG - Funds)

Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds (Mow/Trim/Fences) in accordance with PWS paragraph 1.2.

0012AA 7 Months Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (MAFB, EC - O&M Funds)

0012AB 7 Months Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (LKE - O&M Funds)

0012AC 7 Months Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (NAVAIR Funds)

0012BA 5 Months Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (MAFB, EC - O&M Funds)

0012BB 5 Months Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (LKE - O&M Funds)

0012BC 5 Months Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (NAVAIR Funds)

Maintain Airfield, Semi-Improved Grounds

FFP

Maintain Airfield, Semi-Improved Grounds (Mow/BASH/ Specific Locations) in accordance with PWS paragraph 1.3.

0013AA 7 Months Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (MAFB - O&M Funds)

0013AB 7 Months Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (LKE - O&M Funds)

0013AC 7 Months Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (NAVAIR Funds)

0013BA 5 Months Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (MAFB - O&M Funds)

0013BB 5 Months Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (LKE - O&M Funds)

0013BC 5 Months Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (NAVAIR - Funds)

Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds in accordance with PWS paragraph 1.4.

0014AA 1 Lot Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds (PWS 1.4) (MAFB - O&M Funds)

0014AB 1 Lot Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds (PWS 1.4) (LKE - O&M Funds)

Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches in accordance with PWS paragraph 1.5.

0015AA 7 Months Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (MAFB - O&M Funds)

0015AB 7 Months Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (LKE - O&M Funds)

0015AC 7 Months Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (NAVAIR - Funds)

Snow and Ice Services

FFP

Snow and Ice Services. The contactor shall provide all supervision, personnel, equipment, transportation, material, and other items necessary to provide snow and ice removal services in accordance with PWS 1.6.

0016AA 10 Lot Snow and Ice Services

FFP

Snow and Ice Removal Trace to 4" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

0016AB 6 Lot Snow and Ice Services

FFP

Snow and Ice Removal 4" to 6" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

0016AC 5 Lot Snow and Ice Services

FFP

Snow and Ice Removal 6" to 8" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

0016AD 2 Lot Snow and Ice Services

FFP

Snow and Ice Removal 8" to 12" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

0016AE 8 Lot Snow and Ice Services

FFP

Snow and Ice Removal 1" above 12" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

Service Call Snow and Ice Removal

FFP

Service Call Snow and Ice Removal in accordance with PWS paragraph 1.6.2.1.

0017AA 5 Lot Service Call Snow and Ice Removal

FFP

Service Call Snow (PWS 1.6, 1.61, & 1.6.2.1) (NAVAIR - Funds)

0017AB 22 Lot Service Call Snow and Ice Removal

FFP

Service Call Ice (PWS 1.6, 1.61, & 1.6.2.1) (NAVAIR - Funds)

Augmented Snow Removal

FFP

Augmented Snow Removal in accordance with PWS paragraph 1.6.4.

0018AA 200 Hours Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a Front End loader with a minimum

14' snowbox and operator. (PWS 1.6, 1.61, & 1.6.4) (NAVAIR - Funds)

0018AB 200 Hours Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a Front End loader with a minimum

14' snowbox and operator. (PWS 1.6, 1.61, & 1.6.4) (McGuire O&M)

0018BA 120 Hours Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a 5 ton dump truck or larger with a minimum 10' plow and operator. (PWS 1.6, 1.61, & 1.6.4) (NAVAIR - Funds)

0018BB 120 Hours Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a 5 ton dump truck or larger with a minimum 10' plow and operator. (PWS 1.6, 1.61, & 1.6.4) (McGuire O&M)

Install Snow Fence

FFP

Install Snow Fence in accordance with PWS paragraph 1.6.5.

0019AA 1 Lot Install Snow Fence

FFP

Install Snow Fence (PWS 1.6.5) (MAFB - O&M Funds)

Tree Services

FFP

Tree Services in accordance with PWS paragraphs 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4.

0020AA Lot Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (MAFB, EC - O&M

Funds). DO NOT PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED

BY COMPLETING ATTACHMENT A9 - PRICING LIST FOR CLINS 0020

AND 0022.

0020AB Lot Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (MED - Funds). DO NOT

PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY COMPLETING

ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND 0022.

0020AC Lot Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (LKE - O&M Funds). DO

NOT PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY

COMPLETING ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND

0022.

0020AD Lot Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (NAVAIR Funds). DO

NOT PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY

COMPLETING ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND

0022.

Special Cuts

FFP

Special Cuts in accordance with PWS paragraph 1.7.4. Service requries COR verification.

0021AA 10 Hours Special Cuts

FFP

Special Cuts (PWS 1.7.4) (McGuire, EC - O&M Funds)

0021AB 111 Hours Special Cuts

FFP

Special Cuts (PWS 1.7.4) (ANG - Funds)

Planting Trees, Shrubs, Vegetative Beds

FFP

Planting Trees, Shrubs and Vegetative Beds in accordance with PWS paragraph

1.7.5.

0022AA Lot Planting Trees, Shrubs, Vegetative Beds

FFP

Planting Trees, Shrubs and Vegetative Beds (PWS 1.7.5) (ANG Funds). DO NOT

PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY COMPLETING

ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND 0022.

OPTION Grounds Maintenance Services

FFP

Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform grounds maintenance services at Joint

Base, New Jersey for the period 01 Oct 2019 to 30 Sep 2020 in accordance with

OPTION Maintain Improved Grounds

FFP

Maintain Improved Grounds in accordance with PWS paragraphs 1.1.1, 1.1.2, 1.1.3

1002AA 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge and Improved

Grounds Specific Locations) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MAFB, EC- O&M

Funds)

1002AB 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (ANG Funds)

1002AC 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MED Funds)

1002AD 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (LKE, ARB, FBI - O&M Funds)

1002AE 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (NAVAIR Funds)

1002BA 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge and

Improved Grounds Specific Locations) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MAFB, EC- O&M Funds)

1002BB 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (ANG Funds)

1002BC 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MED Funds)

1002BD 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (LKE, ARB, FBI - O&M Funds)

1002BE 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (NAVAIR Funds)

OPTION Aeration

FFP

1003AA 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (MAFB, EC - O&M Funds)

1003AB 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (ANG Funds)

1003AC 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (MED Funds)

1003AD 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (LKE - O&M Funds)

1003AE 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (NAVAIR Funds)

OPTION Remove Debris / Police Grounds

FFP

1004AA 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (MAFB, EC - O&M Funds)

1004AB 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (ANG Funds)

1004AC 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (MED Funds)

1004AD 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (LKE - O&M Funds)

1004AE 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (NAVAIR Funds)

OPTION Maintain Trash Receptacles

FFP

1005AA 12 Months OPTION Maintain Trash Receptacles

FFP

Maintain Trash Receptacles (PWS 1.1.6.2) (MAFB - O&M Funds)

OPTION Weed Control

FFP

1006AA 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (MAFB, EC - O&M Funds)

1006AB 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (ANG Funds)

1006AC 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (MED Funds)

1006AD 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (LKE - O&M Funds)

1006AE 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (NAVAIR Funds)

OPTION Leaf Removal Improved Grounds

FFP

1007AA 1,018 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (MAFB, EC - O&M Funds)

1007AB 18.50 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (ANG Funds)

1007AC 16.50 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (MED Funds)

1007AD 51 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (LKE, ARB - O&M Funds)

1007AE 80 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (NAVAIR Funds)

OPTION Fertilization

FFP

1008AA 144 Acre OPTION Fertilization

FFP

Fertilization (PWS 1.1.9) (MAFB, EC - O&M Funds)

1008AB 72 Acre OPTION Fertilization

FFP

Fertilization (PWS 1.1.9) (ANG - Funds)

1008AC 40 Acre OPTION Fertilization

FFP

Fertilization (PWS 1.1.9) (LKH - O&M Funds)

OPTION Lawn Renovation

FFP

1009AA 108,900 Square

OPTION Lawn Renovation

Lawn Renovation (PWS 1.1.10) (MAFB, EC - O&M Funds)

1009AB 30,000 Square

Lawn Renovation (PWS 1.1.10) (ANG Funds)

1009AC 27,780 Square

Lawn Renovation (PWS 1.1.10) (MED Funds)

1009AD 43,560 Square

Lawn Renovation (PWS 1.1.10) (LKE - O&M Funds)

1009AE 21,780 Square

Lawn Renovation (PWS 1.1.10) (NAVAIR Funds)

OPTION Prune Shrubs

FFP

1010AA 7 Months OPTION Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (MAFB - O&M Funds)

1010AB 7 Months OPTION Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (ANG Funds)

1010AC 7 Months OPTION Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (LKE - O&M Funds)

OPTION Vegetative, Inert Beds & Related Areas

FFP

1011AA 7 Months OPTION Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas (PWS 1.1.12) (McGuire - O&M

Funds)

1011AB 7 Months OPTION Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas (PWS 1.1.12) (ANG - Funds)

OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds (Mow/Trim/Fences) in accordance with PWS

1012AA 7 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (MAFB, EC - O&M Funds)

1012AB 7 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (LKE - O&M Funds)

1012AC 7 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (NAVAIR Funds)

1012BA 5 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (MAFB, EC - O&M Funds)

1012BB 5 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (LKE - O&M Funds)

1012BC 5 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (NAVAIR Funds)

OPTION Maintain Airfield, Semi-Improved Grounds

FFP

Maintain Airfield, Semi-Improved Grounds (Mow/BASH/ Specific Locations) in

1013AA 7 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (MAFB - O&M Funds)

1013AB 7 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (LKE - O&M Funds)

1013AC 7 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (NAVAIR Funds)

1013BA 5 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (MAFB - O&M Funds)

1013BB 5 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (LKE - O&M Funds)

1013BC 5 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (NAVAIR - Funds)

OPTION Maintain Unimproved Grounds

FFP

1014AA 1 Lot OPTION Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds (PWS 1.4) (MAFB - O&M Funds)

1014AB 1 Lot OPTION Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds (PWS 1.4) (LKE - O&M Funds)

OPTION Maintain Surface Drainage Ditches

FFP

1015AA 7 Months OPTION Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (MAFB - O&M Funds)

1015AB 7 Months OPTION Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (LKE - O&M Funds)

1015AC 7 Months OPTION Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (NAVAIR - Funds)

OPTION Snow and Ice Services

FFP

Snow and Ice Services. The contactor shall provide all supervision, personnel, equipment, transportation, material, and other items necessary to provide snow and

1016AA 10 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal Trace to 4" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

1016AB 6 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 4" to 6" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

1016AC 5 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 6" to 8" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

1016AD 2 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 8" to 12" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

1016AE 8 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 1" above 12" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

OPTION Service Call Snow and Ice Removal

FFP

1017AA 5 Lot OPTION Service Call Snow and Ice Removal

FFP

Service Call Snow (PWS 1.6, 1.61, & 1.6.2.1) (NAVAIR - Funds)

1017AB 22 Lot OPTION Service Call Snow and Ice Removal

FFP

Service Call Ice (PWS 1.6, 1.61, & 1.6.2.1) (NAVAIR - Funds)

OPTION Augmented Snow Removal

FFP

1018AA 200 Hours OPTION Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a Front End loader with a minimum

14' snowbox and operator. (PWS 1.6, 1.61, & 1.6.4) (NAVAIR - Funds)

1018AB 200 Hours OPTION Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a Front End loader with a minimum

14' snowbox and operator. (PWS 1.6, 1.61, & 1.6.4) (McGuire O&M)

1018BA 120 Hours OPTION Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a 5 ton dump truck or larger with a minimum 10' plow and operator. (PWS 1.6, 1.61, & 1.6.4) (NAVAIR - Funds)

1018BB 120 Hours OPTION Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a 5 ton dump truck or larger with a minimum 10' plow and operator. (PWS 1.6, 1.61, & 1.6.4) (McGuire O&M)

OPTION Install Snow Fence

FFP

Install Snow Fence in accordance with PWS paragraph 1.6.5.

1019AA 1 Lot OPTION Install Snow Fence

FFP

Install Snow Fence (PWS 1.6.5) (MAFB - O&M Funds)

OPTION Tree Services

FFP

Tree Services in accordance with PWS paragraphs 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4.

1020AA Lot OPTION Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (MAFB, EC - O&M

Funds). DO NOT PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED

BY COMPLETING ATTACHMENT A9 - PRICING LIST FOR CLINS 0020

AND 0022.

1020AB Lot OPTION Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (MED - Funds). DO NOT

PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY COMPLETING

ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND 0022.

1020AC Lot OPTION Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (LKE - O&M Funds). DO

NOT PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY

COMPLETING ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND

0022.

1020AD Lot OPTION Tree Services

FFP

Tree Services (PWS 1.7, 1.7.1, 1.7.1.2, 1.7.1.3, 1.7.1.4) (NAVAIR Funds). DO

NOT PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY

COMPLETING ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND

0022.

OPTION Special Cuts

FFP

Special Cuts in accordance with PWS paragraph 1.7.4. Service requries COR verification.

1021AA 10 Hours OPTION Special Cuts

FFP

Special Cuts (PWS 1.7.4) (McGuire, EC - O&M Funds)

1021AB 111 Hours OPTION Special Cuts

FFP

Special Cuts (PWS 1.7.4) (ANG - Funds)

OPTION Planting Trees, Shrubs, Vegetative Beds

FFP

Planting Trees, Shrubs and Vegetative Beds in accordance with PWS paragraph

1.7.5.

1022AA Lot OPTION Planting Trees, Shrubs, Vegetative Beds

FFP

Planting Trees, Shrubs and Vegetative Beds (PWS 1.7.5) (ANG Funds). DO NOT

PRICE THIS LINE ITEM. PRICING WILL BE OBTAINED BY COMPLETING

ATTACHMENT A9 - PRICING LIST FOR CLINS 0020 AND 0022.

OPTION Grounds Maintenance Services

FFP

Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform grounds maintenance services at Joint

Base, New Jersey for the period 01 Oct 2020 to 30 Sep 2021 in accordance with

OPTION Maintain Improved Grounds

FFP

Maintain Improved Grounds in accordance with PWS paragraphs 1.1.1, 1.1.2, 1.1.3

2002AA 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge and Improved

Grounds Specific Locations) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MAFB, EC- O&M

Funds)

2002AB 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (ANG Funds)

2002AC 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MED Funds)

2002AD 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (LKE, ARB, FBI - O&M Funds)

2002AE 7 Months OPTION Maintain Improved Grounds, Growing

FFP

Maintain Improved Grounds, Growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (NAVAIR Funds)

2002BA 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge and

Improved Grounds Specific Locations) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MAFB, EC- O&M Funds)

2002BB 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (ANG Funds)

2002BC 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (MED Funds)

2002BD 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (LKE, ARB, FBI - O&M Funds)

2002BE 5 Months OPTION Maintain Improved Grounds, Non-Growing

FFP

Maintain Improved Grounds, Non-growing Season (Mow/Trim/Edge) (PWS 1.1.1, 1.1.2, 1.1.3 & 1.1.5) (NAVAIR Funds)

OPTION Aeration

FFP

2003AA 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (MAFB, EC - O&M Funds)

2003AB 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (ANG Funds)

2003AC 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (MED Funds)

2003AD 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (LKE - O&M Funds)

2003AE 1 Lot OPTION Aeration

FFP

Aeration (PWS 1.1.4) (NAVAIR Funds)

OPTION Remove Debris / Police Grounds

FFP

2004AA 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (MAFB, EC - O&M Funds)

2004AB 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (ANG Funds)

2004AC 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (MED Funds)

2004AD 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (LKE - O&M Funds)

2004AE 12 Months OPTION Remove Debris / Police Grounds

FFP

Remove Debris / Police Grounds (PWS 1.1.6) (NAVAIR Funds)

OPTION Maintain Trash Receptacles

FFP

2005AA 12 Months OPTION Maintain Trash Receptacles

FFP

Maintain Trash Receptacles (PWS 1.1.6.2) (MAFB - O&M Funds)

OPTION Weed Control

FFP

2006AA 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (MAFB, EC - O&M Funds)

2006AB 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (ANG Funds)

2006AC 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (MED Funds)

2006AD 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (LKE - O&M Funds)

2006AE 7 Months OPTION Weed Control

FFP

Weed Control (PWS 1.1.7) (NAVAIR Funds)

OPTION Leaf Removal Improved Grounds

FFP

2007AA 1,018 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (MAFB, EC - O&M Funds)

2007AB 18.50 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (ANG Funds)

2007AC 16.50 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (MED Funds)

2007AD 51 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (LKE, ARB - O&M Funds)

2007AE 80 Acre OPTION Leaf Removal Improved Grounds

FFP

Leaf Removal Improved Grounds (PWS 1.1.8) (NAVAIR Funds)

OPTION Fertilization

FFP

2008AA 144 Acre OPTION Fertilization

FFP

Fertilization (PWS 1.1.9) (MAFB, EC - O&M Funds)

2008AB 72 Acre OPTION Fertilization

FFP

Fertilization (PWS 1.1.9) (ANG - Funds)

2008AC 40 Acre OPTION Fertilization

FFP

Fertilization (PWS 1.1.9) (LKH - O&M Funds)

OPTION Lawn Renovation

FFP

2009AA 108,900 Square

Lawn Renovation (PWS 1.1.10) (MAFB, EC - O&M Funds)

2009AB 30,000 Square

Lawn Renovation (PWS 1.1.10) (ANG Funds)

2009AC 27,780 Square

Lawn Renovation (PWS 1.1.10) (MED Funds)

2009AD 43,560 Square

Lawn Renovation (PWS 1.1.10) (LKE - O&M Funds)

2009AE 21,780 Square

Lawn Renovation (PWS 1.1.10) (NAVAIR Funds)

OPTION Prune Shrubs

FFP

2010AA 7 Months OPTION Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (MAFB - O&M Funds)

2010AB 7 Months OPTION Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (ANG Funds)

2010AC 7 Months OPTION Prune Shrubs

FFP

Prune Shrubs (PWS 1.1.11) (LKE - O&M Funds)

OPTION Vegetative, Inert Beds & Related Areas

FFP

2011AA 7 Months OPTION Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas (PWS 1.1.12) (McGuire - O&M

Funds)

2011AB 7 Months OPTION Vegetative, Inert Beds & Related Areas

FFP

Maintain Vegetative, Inert Beds & Related Areas (PWS 1.1.12) (ANG - Funds)

OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds (Mow/Trim/Fences) in accordance with PWS

2012AA 7 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (MAFB, EC - O&M Funds)

2012AB 7 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (LKE - O&M Funds)

2012AC 7 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Growing Season (Mow/Trim/Fences) (PWS

1.2) (NAVAIR Funds)

2012BA 5 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (MAFB, EC - O&M Funds)

2012BB 5 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (LKE - O&M Funds)

2012BC 5 Months OPTION Maintain Semi-Improved Grounds

FFP

Maintain Semi-Improved Grounds, Non-Growing Season (Mow/Trim/Fences)

(PWS 1.2) (NAVAIR Funds)

OPTION Maintain Airfield, Semi-Improved Grounds

FFP

Maintain Airfield, Semi-Improved Grounds (Mow/BASH/ Specific Locations) in

2013AA 7 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (MAFB - O&M Funds)

2013AB 7 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (LKE - O&M Funds)

2013AC 7 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (NAVAIR Funds)

2013BA 5 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (MAFB - O&M Funds)

2013BB 5 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (LKE - O&M Funds)

2013BC 5 Months OPTION Maintain Airfield, Semi-Improved Ground

FFP

Maintain Airfield, Semi-Improved Grounds, Non-Growing Season (Mow/BASH/

Specific Locations) (PWS 1.3) (NAVAIR - Funds)

OPTION Maintain Unimproved Grounds

FFP

2014AA 1 Lot OPTION Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds (PWS 1.4) (MAFB - O&M Funds)

2014AB 1 Lot OPTION Maintain Unimproved Grounds

FFP

Maintain Unimproved Grounds (PWS 1.4) (LKE - O&M Funds)

OPTION Maintain Surface Drainage Ditches

FFP

2015AA 7 Months OPTION Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (MAFB - O&M Funds)

2015AB 7 Months OPTION Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (LKE - O&M Funds)

2015AC 7 Months OPTION Maintain Surface Drainage Ditches

FFP

Maintain Surface Drainage Ditches (PWS 1.5) (NAVAIR - Funds)

OPTION Snow and Ice Services

FFP

Snow and Ice Services. The contactor shall provide all supervision, personnel, equipment, transportation, material, and other items necessary to provide snow and

2016AA 10 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal Trace to 4" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

2016AB 6 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 4" to 6" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

2016AC 5 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 6" to 8" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

2016AD 2 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 8" to 12" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

2016AE 8 Lot OPTION Snow and Ice Services

FFP

Snow and Ice Removal 1" above 12" (PWS 1.6, 1.6.1, & 1.6.2) (NAVAIR - Funds)

OPTION Service Call Snow and Ice Removal

FFP

2017AA 5 Lot OPTION Service Call Snow and Ice Removal

FFP

Service Call Snow (PWS 1.6, 1.61, & 1.6.2.1) (NAVAIR - Funds)

2017AB 22 Lot OPTION Service Call Snow and Ice Removal

FFP

Service Call Ice (PWS 1.6, 1.61, & 1.6.2.1) (NAVAIR - Funds)

OPTION Augmented Snow Removal

FFP

2018AA 200 Hours OPTION Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a Front End loader with a minimum

14' snowbox and operator. (PWS 1.6, 1.61, & 1.6.4) (NAVAIR - Funds)

2018AB 200 Hours OPTION Augmented Snow Removal

FFP

Augmented Snow and Ice Removal utilizing a Front End loader with a minimum

14' snowbox and operator. (PWS 1.6, 1.61, & 1.6.4) (McGuire O&M)

2018BA 120 Hours OPTION Augment

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.