Amendment 0003 to Solicitation No. FA4484-17-R-0006

View the file

Other files

File Type Posted
JB_MDL_FA4484-17-R-0006-0004.docx.pdf PDF
JB_MDL_New_Collective_Bargaining_Agreement.pdf PDF
JB-MDL_Technical_Exhibit_07_Revision_01.pdf PDF
JB-MDL_FA4484-17-R-0006-0002.pdf PDF
JB-MDL_PERFORMANCE_WORK_STATEMENT_20170721_(Rev_1).pdf PDF
FA4484-17-R-0006_Amendment_0001.pdf PDF
Wage_Determination_2015-4191_(Rev_2).pdf PDF
TECHNICAL_EXHIBIT_01_CDRL.pdf PDF
TECHNICAL_EXHIBIT_07_FIRE_EXTINGUISHER_COUNT_AND_LOCATION.pdf PDF
A7_Antiterrorism_Awareness_Guide_for_Contractors,_MAR_16.pdf PDF
A2_QUESTIONNAIRE.docx DOCX document
TECHNICAL_EXHIBIT_06_CONFINED_SPACE_LOCATIONS.pdf PDF
A4_PERFORMANCE_WORK_STATEMENT_20170320.pdf PDF
TECHNICAL_EXHIBIT_03-1_NJPDES_FINAL_TTBS.pdf PDF
A9_Wage_Determination_2015-4191.docx DOCX document
TECHNICAL_EXHIBIT_03-3_Plant_Permit_03012016thru02282021.pdf PDF
A5_JB-MDL_Security_Forces_Appendix_20150610.PDF PDF
A1_QUESTIONNAIRE_COVER_LETTER.pdf PDF
TECHNICAL_EXHIBIT_04_GENERATOR_INVENTORY_AND_MAINTENANCE_ACTION.pdf PDF
JB-MDL_FA4484-17-R-0006__20170706.docx.pdf PDF
A8_Collective_Bargaining_Agreement.pdf PDF
A3_QASP_TWTP.pdf PDF
TECHNICAL_EXHIBIT_03-2_Pinelands_Beneficial_Reuse_Permit.pdf PDF
TECHNICAL_EXHIBIT_02_Security_Requirements.pdf PDF
TECHNICAL_EXHIBIT_05_TTBSS_PDF_Drawings.pdf PDF
A6_JB_MDL_Antiterrorism_Awareness_for_Contractors_(Trifold).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of Amendment 0003 to Solicitation No. FA4484-17-R-0006 is to:

i. Provide the new Collective Bargaining Agreement (CBA), dated 28 July 2017, between the incumbent contractor, Optech Monette and the

International Union of Operating Engineers.

ii. Correct the verbiage in block 14C of Amendments 0001 and 0002 to read, “All other terms and conditions of the SOLICITATION remain unchanged.”

B. Proposal submission date/time remains as 11 August 2017/4:00 PM, local time.

C. Offerors shall follow procedures relating to the acknowledgment and receipt of solicitation amendments.

D. All other terms and conditions of the solicitation remain unchanged.

******REVIEW THE ATTACHMENT FOR THE NEW CBA FOR DETAILS***

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4484-17-R-0006

X 9B. DATED (SEE ITEM 11)

06-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jul-2017

CODE

87 CONS/LGC

2402 VANDENBERG AVE

JB MCGUIRE-DIX-LAKEHURST NJ 08641

FA4484 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4484-17-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

LIST OF ATTACHMENTS

DOCUMENT TITLE DATE NO. PAGES

A1 - Past Performance Questionnaire Cover Letter 6 Jul 17 1

*Document removed upon award

A2 - Past Performance Questionnaire 6 Jul 17 2

A3 – Quality Assurance Surveillance Plan 1 Jul 17 13

A4 - Performance Work Statement Revision No. 1 21 Jul 17 26

A5 - JB MDL Security Forces Appendix 10 Jun 15 19

A6 – JB MDL Antiterrorism Awareness for Contractors (Trifold) N/A 2

A7 – Antiterrorism Awareness Guide for Contractors March 16 6

A8 – New Collective Bargaining Agreement 28 July 2017 31

A9 - Wage Determination No.: 2015-4191 Revision No. 2 13 July 2017 18

**A10 – Mission-Essential Contractor Services Plan TBD TBD

**A11 – Subcontracting Plan TBD TBD

*Indicates a document which will be removed upon award and attachments renumbered

**Indicates documents that will be added upon award and attachments renumbered

(End of Summary of Changes)

File details come from the government source that posted it. Updated .