STATEMENT OF WORK
FOR REPAIR OF
AIRCRAFT FIRE TRAINING FACILITY
File: 01 Fire Training Pit Repair-Maintain SoW 090409.doc Updated: 090721 1 of 7 62 CES/CEOEC Revision 1.2
SECTION PAGE
I. DESCRIPTION OF SERVICES 2
II. SERVICE DELIVERY SUMMARY 2
III. GOVERNMENT FURNISHED PROPERTY
AND SERVICES 3
IV. GENERAL INFORMATION 3
V. APPENDICES
1. Repair Statement of Work
2. Safety
3. Technical Order 35E1-2-13-1
Attachment 1
Updated: 090721 2 of 7
I. DESCRIPTION OF SERVICES
1.1 Scope of Work: The Contractor shall repair items listed in Appendix 1 – "Repair Statement of Work" and make 100% operational the Aircraft Fire Training Facility (Fire Training Pit) at McChord AFB, Washington. The Contractor shall ensure compliance with all Federal, State, and Local Laws or regulations related to this facility’s equipment.
II. SERVICE DELIVERY SUMMARY
2.1 Maintenance Requirements: Repair of the Fire Training Pit shall include providing 100% operational capability of the facility IAW Appendix 1. Repair shall comprise of ensuring functional condition of propane and nitrogen valves, pipes, ignitors, electrical switches, electrical wiring, electrical disconnects and circuit breakers, flexible membrane liner, pumps and holding pond for water recycling and specifically addressing know deficiencies listed in Appendix 1. Various steps in this work package may require personnel to be exposed to liquid propane vapor and fumes, propane and high voltage - low current electricity. Therefore, it is imperative that safety precautions outlined in Appendix 2 “Safety” be followed.
2.1.1 Known Defective Items: Appendix 1 identifies known pit deficiencies. The existence of an omission is always a possibility. Omission items discovered and identified by the Contractor will be processed under paragraph 2.4 Modifications.
2.1.2 Unknown Defective Items: After award of contract and prior to initiating repairs to "Faulty Fire Training Pit Items," Appendix 1, a functional/operational test of the Fire Training Pit will be conducted by both the Contractor and Government personnel. This functional/operational test will be utilized to determine any Unknown Defective Items. Defective Items identified during the functional/operational test not listed in Appendix 1, shall be evaluated by the Contractor, who shall then prepare cost and estimated completion time proposals for consideration by the Government. Repair of items discovered during the functional/operational test which are not listed in Appendix 1 shall not be repaired until the contractor’s proposal(s) is/are approved by the Government.
2.1.1 As-Built Drawings: Contractor is responsible for providing a set of As-Built drawings (submitted in AutoCAD 2007 format) at project completion, identifying all work performed, to update Aircraft Fire Training Facility documentation file.
2.2 Environmental and Occupational Safety and Health: The Contractor shall be fully responsible for compliance with all Base, Federal and Air Force environmental and occupational safety laws, rules and regulations. The Contractor shall follow all OSHA and AFOSH codes, and take necessary actions to avoid conditions which may be hazardous to the health and safety of contractor and base personnel. Any apparent conflict between compliance with the above information and satisfying the requirements of the contract shall be immediately brought to the attention of the Contracting Officer for resolution, prior to the performance of the work in question.
2.2.1 The Contractor shall provide a list of all chemicals used for maintenance and repair. A “Material Safety Data Sheet” (MSDS) must be provided to the government for each chemical on the list. The list must be approved by the Contracting Officer prior to being brought onto the base and must be coordinated through the base Environmental office (telephone number 253-982-6211). In addition, if the Contractor has any concerns regarding Air Force use of
Updated: 090721 3 of 7 62 CES/CEOEC Revision 1.2 chemicals in the area they should contact the Quality Assurance Representative (QAR, also known as the QA) or the HAZMART.
2.2.2 If the Contractor spills or releases any substance listed in the Washington Regulation entitled Reporting the Discharge of a Pollutant or an Air Contaminant (RDPAC) into the environment, the Contractor shall immediately report the incident to the CM/QA, Base Fire Department, and Base Civil Engineering. The Contractor shall be liable for containment and environmental clean up of the spill or release of such substance per McChord AFB SPLAN 191- 98 Oil and Hazardous Substance Pollution Contingency Spill Plan
2.3 Water Conservation Pond: The Contractor shall clean the Water Conservation Pond.
Cleaning shall include the removal of algae/weed growth and the removal of solid material deposited from the burn area through the drainpipe. Water collected in the Water Conservation Pond is discharged to sewer lift stations where final processing occurs at the Fort Lewis Sewage Treatment Plant. Prior to treating the Water Conservation Pond with any aquatic herbicide, the Contractor shall obtain permits and approval from the 62 Civil Engineer Squadron, Environmental Flight Chief, Building 574, Phone: (253) 982-3913, and comply with their guidelines.
2.4 Modifications: Proposals for modification, to improve operation or efficiency, may be submitted by the Contractor or Government. The Contractor shall evaluate proposals for costs and estimated completion time and submit information to the QA or Contracting Officer.
Modifications to the Aircraft Fire Training Facility shall not occur unless approved by the Contracting Officer. Approved modifications and all repairs, when complete, shall include as-built drawings in AutoCAD 2007 format to update Aircraft Fire Training Facility documentation file.
2.5 Expertise Statement: The contractor shall provide a list of all personnel working on this contract including a statement that these personnel have a thorough knowledge of equipment and components of the system and are aware of the properties, hazards and safety requirements of electrical voltages, propane gas and pressurized nitrogen.
2.6 Expertise Statement: The contractor will provide at least three similar scope projects complete with references for evaluation.
2.7 Warranty of Work: The contractor shall warrant that work performed under this contract conforms to the contract requirements and is free of defects. The contractor shall remedy at the contractor’s expense any defects noted after work completion.
III GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1 The Government will be responsible for refilling the propane tank.
3.2 The Government will be responsible for maintaining a supply of full nitrogen bottles.
3.3 The Government will provide access to the Aircraft Fire Training Facility "Technical Order 35E1-2-13-1 (Change 3 dated 7 Aug 07)”, which is included as Appendix 3.
3.4 The Government will provide access to Aircraft Fire Training Facility as-built drawings in its possession.
3.5 The Government will provide base maps for initial base acclimation.
Updated: 090721 4 of 7
Updated: 090721 5 of 7 62 CES/CEOEC Revision 1.2
IV GENERAL INFORMATION
4.1 CONTRACTOR'S REPRESENTATIVE: The Contractor shall provide a point of contact, in writing, to the Contracting Officer prior to the contract start date. The point of contact shall have full authority to act on behalf of the Contractor on all contract matters. The designated individual will be required to meet as necessary, during normal duty hours (0700-1600), with the Contracting Officer or their authorized representative, to discuss contract performance matters.
In addition, the Contractor shall provide a name and telephone number of a point of contact for this contract. This person shall be available to receive calls 24 hrs a day/7 days a week, including holidays, during Contract performance period.
4.2 CONTRACTOR'S EMPLOYEES: The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the Contracting Officer as a potential threat to the health, safety, security, general well being, or operational mission of the installation and its population.
4.2.1 Contractor's personnel shall present a neat appearance and be easily recognized as Contractor employees. The Contractor shall provide each employee with an identification badge that shall include the employee’s name and contractor’s name.
4.2.2 The Contractor shall make sure employees have current license and valid professional certifications to accomplish the services before starting work under this contract and are in compliance with all federal, state, and local environmental requirements or laws.
4.2.2 The Contractor shall not employ any person who is an employee of the United States Government if employing that person would create a conflict of interest or the appearance of a conflict of interest. Additionally, the Contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives government approval.
4.3 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (JUN 2002) (LOCAL)
AFFARS 5352.242-9000.
(a) The Contractor shall obtain base identification and vehicle passes for all contractor / subcontractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Every person (contractor/subcontractor) must obtain a pass, long term or short term, (AF Form 75) to gain entry to base. Short- term passes (24 hours or less) may be obtained at the Main Gate Visitors Center. All passes for longer than 24 hours are issued at Pass and Registration, Building 100. Duty hours are 0730-1630 hours, Monday through Friday. Large vehicles (pickup trucks or larger) that carry tools, tool boxes, equipment, supplies, etc. shall use the Commercial Gate for base access. Passenger type vehicles including minivans and pickup trucks that do not carry tools, tool boxes, supplies, and equipment, etc. shall use the Main Gate for base access. All contractor / subcontractor employees shall exit via the Main Gate.
Contractors / subcontractors will not have access to base facilities other than work location, except for on-base eating facilities located in the Base Exchange, Burger King, and Co-Located Clubs (BLDGS 700 & 1146). Contract work hours will be as stated in the Statement of Work.
Contractors / subcontractors will not have access to the base on nights and weekends unless the contract requires work to be done at those times. Any vehicle entering the base is subject to inspection at any time. Refusal may result in the individual being temporarily or permanently barred from the base.
(b) All contractors / subcontractors are subject to criminal background checks prior to being allowed on base to work. Contractors / subcontractors will not be issued passes prior to
Updated: 090721 6 of 7 62 CES/CEOEC Revision 1.2 submitting to background checks and being cleared by SFS (approximately a two week period).
Contractors / subcontractors may be barred from base at the Installation Commander’s discretion based on unfavorable information resulting from background checks. The contractor shall submit a written request to the Contracting Officer electronically in Excel format. A statement that all personal information will be handled in the manner required by the Privacy Act of 1974 shall be included on the form. The request shall include the following information for each contractor / subcontractor employee:
Full name, driver’s license number including state of issuance (or date of birth if no driver’s license is available), contract number / solicitation number, expiration date, and Contracting Office point of contact/telephone number. The Contracting Officer will endorse the request and forward it to the Security Forces Pass and Registration Office for processing. When reporting to the pass and registration office, the authorized contractor individual(s) shall provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass. Contractors / subcontractors will not be allowed to escort any contractor / subcontractor employees onto the base. Personnel that are not United States citizens or are foreign nationals may be required to provide additional identification documents with the request for base access. Special authorization may be necessary, prolonging approval / disapproval.
The Government reserves the right to deny access to anyone. Failure to allow a contractor / subcontractor employee on base does not constitute justification for a time extension or request for equitable adjustment.
(c) During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned contractor / subcontractor personnel. If contractor / subcontractor employees are added after initiation of work, the base entry list, in its entirety, indicating additions / deletions, shall be resubmitted not later than seven (7) days prior to the individual(s) starting work on McChord AFB.
(d) The contractor shall also be responsible for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site. Contractors must return passes if an individual is no longer part of the contract (finished with portion of work, terminated from service, barred from base). Contractors must report lost passes. Contractors must report missing employees with passes. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with this requirement may result in withholding of final payment.
(f) Contractor/subcontractor access may be limited or not allowed in higher Force Protection Conditions (FPCONS) or higher threat situations. In higher FPCONS, entry may be limited to only the Contractor Gate. Contractor POVS/unmarked contract vehicles may not be allowed in higher FPCONS.
4.4 WORKING HOURS: The contractor shall perform the services required under this contract during normal working hours (0700 – 1600), Monday through Friday, except for Federal holidays. When the contractor’s access to a work area conflicts with an Air Force mission requirement, the contractor shall schedule the work to minimize the disruption; this may require performing the work at times other than normal duty hours.
Updated: 090721 7 of 7
V APPENDIX(s)
Appendix(s)
1. Repair Statement of Work
2. Safety
3. T.O. 35E1-2-13-1
File: 01 Fire Training Pit – Repair SoW Technical Requirements 090622.doc Updated: 090721 1 of 2 62 CES/CEOEC Revision 1.0
Appendix 1
REPAIR STATEMENT OF WORK
1. GENERAL REPAIR REQUIREMENTS: All repair work shall comply with AFCESA/CEOA requirements, including Technical Order (TO) 35E1-2-13-1 “Operation and Maintenance Instruction Manual Aircraft Fire Training Facility”, and AFI 32-2001 “Fire Emergency Services Program.” The term “provide” in this statement of work means to furnish and install, complete and ready for use.
2. ELECTRICAL REPAIR REQUIREMENTS: Electrical work shall comply with NFPA 70 (2008), IEEE/ANSI C2 (2007), and all other applicable Federal, State and local standards regarding work performed. All new exterior electrical equipment, including bollards, supports, etc, shall be painted Fed Std 595b Color #20062 (Dark Brown). Electrical repair work shall be performed as follows:
2.1 Relocate existing transformer cabinet from existing location near tower to new location in front of mockup. Locate cabinet outside the edge of burn pit towards front of aircraft. Provide new 6in thick concrete pad for relocated cabinet. Provide galvanized channel supports for relocated cabinet and anchor into new pad. Provide new 5/8” thick steel heat shield (full width of cabinet) for relocated cabinet. Heat shield shall be angled from top of cabinet down to front of pad at approximate 60degree angle (from horizontal), and be anchored into pad with galvanized supports. Provide four
(4) 4” RGS conduits as bollards, positioned at the corners of relocated cabinet pad. Bollards shall be filled with concrete, set in 8” square concrete foundations extending at least 48” below grade; top of bollards shall be at least 48” above grade. Provide 2” white reflective tape strips at top of each bollard. Provide 2” conduit from control tower to relocated cabinet, complete with control wiring for 18 burner operation. Provide spare 4” conduit between relocated cabinet and supply rack. Provide 4-2” conduits between relocated cabinet and two existing junction boxes; 2-2” conduits between relocated cabinet and each of the existing junction boxes. The two existing junction boxes are installed at grade, located inside the burn pit at the front of the aircraft (one each side of aircraft). Provide eighteen
(18) new igniter cable circuits between the relocated transformer cabinet and the eighteen (18) igniters located throughout mockup pit. Each igniter circuit shall be 2-#16AWG 30kV DC Mil-C-3702 cables with 1-#12AWG THWN 600V copper ground. Provide circuits in new 4-2” conduits between relocated cabinet and existing junction boxes, and in individual existing 1” conduits between two existing junction boxes and igniters. All underground electrical work and site restoration shall be IAW TO 35E1-2-13-1.
2.2 Six (6) existing ground burner igniters are not set at the correct elevation, in relation to the burn pit pool operating level. Remove six (6) existing ground burner igniters, reset igniter boxes to proper elevation (IAW TO 35E1-2-13-1) and then reinstall existing ground burner igniters.
File: 01 Fire Training Pit – Repair SoW Technical Requirements 090622.doc Updated: 090721 2 of 2 62 CES/CEOEC Revision 1.0
3. MECHANICAL/SITE/STRUCTURAL REPAIR REQUIREMENTS: Repair work shall be performed as follows:
3.1 Remove all brush and weeds from the water conservation pond area (located inside the fenced area).
3.2 PROPANE SYSTEM REPAIRS
3.2.1 Replace the Co-Ax valve on the low wing ground burner and test for adequate flow to the burner unit.
3.2.2 Replace the existing regulators with fixed orifice piping.
3.3 NITROGEN SYSTEM REPAIRS
3.3.1 Replace all of the tubing lines and fittings.
3.2.2 At the unloading station for the propane tank - Replace the emergency stop switch which actuates the air to perform the necessary duties of opening and closing propane valves.
3.4 WATER SYSTEM REPAIRS
3.4.1 Hand excavate and disassemble the lines serving the Outboard Rear, Inboard Rear and Wheel Well Water Jackets to locate and correct the problem restricting water discharge. Then reassemble and test to verify adequate discharge.
3.4.2 Provide PT Flood Jets on the discharges from the water jackets in a manner to keep the igniters cool. Weld a threaded coupler on the end of the existing water jacket and set a PT Flood Jet at eleven locations throughout the mockup.
3.4.3 Hose and pressure wash the liner of the water conservation pond to remove the existing algae and plant growth. Refill the pond and treat water to help prevent future growth.
3.4.4 The drain pipe for the weir has a restricted flow. Employ a high pressure water unit suitable for performing sewer cleaning operations to completely remove all debris within the drainage pipe between the weir and the water conservation pond.
3.5 AIRFRAME MOCKUP REPAIRS
3.5.1 Provide Engine Cowlings on the Inboard and Outboard engine pods.
3.5.2 Provide hinged inspection doors for access to the igniters on the
APU and the Wheel Wells so that inspections and maintenance can easily be performed.
4. CERTIFICATION: Test and certify that the entire system is operational after performing all repair work.
*** End of Appendix 1 ***
DRAFT
APPENDIX 2
FIRE TRAINING PIT SAFETY
Owner: CRH 62 CES/CEOEC 1 of 1
NOTICE: It cannot be stressed enough to adhere and/or comply with the following safety requirements on this site. All personnel engaged in operations involving this site’s equipment shall be thoroughly trained and capable of recognizing hazardous situations and conditions.
Thinking safely and working safely must become a habit when working with this site’s possible hazardous characteristics, i.e. explosive, thermal, flammable, or toxic .
1. Various steps in this work package may require personnel to be exposed to liquid propane vapor and fumes, and high voltage - low current electricity. It is imperative to wear appropriate protective clothing and to be aware of emergency procedures.
2. The entire training facility is a no smoking area.
3. No vehicles are allowed in burn area.
4. Liquid propane used in the facility is potentially explosive. Ensure proper grounding procedures in accordance with the NEC are practiced by all personnel.
Personnel working with or near high voltage equipment should be familiar with modern methods of resuscitation.
5. Emergency Shutdown. If an unsafe or emergency condition is observed perform the following:
a. Activate emergency shutdown control switch on control stand.
b. Close manual propane shutoff control valve on control stand.
c. Close all manual propane distribution control valves on the LPG control ack.
d. Position all ignitor switches located on the electrical rack to OFF.
6. Once the unsafe condition has been remedied, gas lines must be purged to release residual propane as follows:
a. Reposition the emergency shutdown switch to normal position.
b. Position all appropriate ignitor switches to ON. All ground burner switch(es) must be held in ON position.
c. Once all burners have burned out, position all ignitor switches to OFF.
Appendix 3 See Attachment 2:
Technical Order 35E1-2-13-1
| Fire Training Pit Repair-Maintain SoW 090622 UPDATE.pdf |
| III GOVERNMENT FURNISHED PROPERTY AND SERVICES |
| IV GENERAL INFORMATION |
| Fire Traininig Repair SOW (Appendix 1) |
| Fire Training Pit Safety (Appendix 2) |
| Appendix 3 |
File details come from the government source that posted it. Updated .