MAC-D estimated workload

View the file

Other files

File Type Posted
Sys_Int_AISS_Estimated_Workload.xlsx XLSX spreadsheet
GATES_Estimated_Workload_(corrected).xlsx XLSX spreadsheet
SF_30_-_Amendment_02.pdf PDF
AISS_Questions_Jun_15.docx DOCX document
ACAS_Estimated_Workload.xlsx XLSX spreadsheet
AISS_Questions_8_Jun.docx DOCX document
GDSS-AVORM_Estimated_Workload.xlsx XLSX spreadsheet
GATES_Estimated_Workload.xlsx XLSX spreadsheet
GCCS_Estimated_Workload.xlsx XLSX spreadsheet
SF_30_-_Amendment_01.docx DOCX document
AISS_Questions_7_Jun.docx DOCX document
AISS_III_-_RFP_Atch_4_-_Pricing_Attachment_AMENDMENT_01.xlsx XLSX spreadsheet
NDA.docx DOCX document
AISS_III_-_RFP_Exhibit_A_-_CDRL_Portfolio.pdf PDF
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_2__-_Sample_Consent_Letter.docx DOCX document
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_1_-_PPIS.docx DOCX document
AISS_III_-_RFP_-_FA4452-17-R-0003.docx DOCX document
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_5_-_PPQ_Cover_Letter.pdf PDF
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_3_-_Sample_Client_Authorization_Letter.docx DOCX document
AISS_III_-_RFP_Atch_2_-_QASP.docx DOCX document
AISS_III_-_RFP_Atch_4_-_Pricing_Attachment.xlsx XLSX spreadsheet
AISS_III_-_RFP_Atch_1_-_PWS.docx DOCX document
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_4_-_PPQ.docx DOCX document
AISS_III_-_RFP_Atch_3_-_DD254.doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GDSS

The following are estimates and may increase or decrease due to operational and other factors.
Categories:Quantity/Frequency:Scope/SizeNotes:Program Additional Notes/Comments
Agile Team Participation250/yearDaily participation in the Agile spiral development process starting from assisting with the requirement definition, prototpe design/validation, and testing.
Releases (Major)3/year GDSSMinimum 50 software change requests per Release

Regression Testing Required – At least 2000 Test cases

Documented release or patch that requires significant effort and experties i.e. database conversions, OS/Database engine upgrades, major infrastructure upgrades, no service interruption, significant DIACAP review. Often requires travel. Please estimate the projected number of releases per year. Programs may differentiate releases, examples being major, minor, etc. Normally requires testing, engineering, fielding.Releases include GDSS/AVORM/ESM/ACDS/MAC-D
Releases (Minor)4/year GDSS 5/year AVORM 2/year ACDS/MAC-D 4/year ESM 2/year MSD 2/year EMCFewer than 50 software change requests per Release

Limited Regression Testing Required - At least 100 Test cases

Focused release, may involve a web kit, utility change, COTS updates, Patches, etc. May require a concerted effort, Travel unlikely.
Configuration or small updates50/year GDSS 15/year AVORM 10/year ACDS/MAC-D 20/year ESM 5/year MSD 10/year EMCTargeted testing, basic system functionality regression testing required
Minor out of cycle code changes, hot fixes normally replacement of a few .DLL files, SQL or Web packages. Requires testing.
Requirements Specification Agreements20/yearEstimate and coordination on release content, milestones, risks, etc, involving estimates for engineering, testing, and fielding.
TCNO /IAVA/ Security Patches20/monthTargeted testing, basic system functionality regression testing required
COTS / GOTS / IOS / Hardware security updates. Requiring testing.
Technical Refreshes13 enclaves/at a minimum 2 times per yearTargeted testing, basic system functionality regression testing required
Upgrade/change out of system Hardware/OS/utilitities to include servers and appliances. Can occur in conjunction with other activiites such as releases. Multiple fielding events can occur in the same time frame.Travel involved to enclaves not located at Scott.
Training ClassesAt a minmum 10 Training TDY's annually. There are monthly classes held here at Scott - at least 20 per year.Training classes may be regularly schedule, tied to a release, or dictated by operation need. Programs may want to note the number of TDY's necessary.
Training Material1 difference training guide/created with each release. 5 Specialized guides that need to be kept up to date and new ones created when requested. 12 Client User Manuals that must be updated with each release. 13 Web User Manuals that must be updated with each release. Currently there are 23 CBT's that must be kept up to date and new ones created when requested or a need is identified.This may include user manuals or CBTs and may be regularly schedule, tied to a release, or dictated by operation need..
Level III Technical Support requests500/YearIncludes trouble tickets, assistance requests, troublshooting, and overall problem coordination with Level I and II help desks and Level III developer, etc. Normally for operational issues that could not be resolved by Level 2 Technical helpdesk. May be after normal duty hours and require on-site support. Can apply to non-production environments to key events such as testing or training.
CCBs92/yearConfiguration Control Board Items - These items include release go/no go decisions, configuration changes to hardware/GOTS/COTS, OS, patches, etc. for implementation in government configuration controlled environments e.g. Production, testing , prototyping.Each Release (Major, Minor, Configruation, TCNO, and techincal refreshes) will require AISS to install in the government test facility, AISS tested, and then AISS will be given approval to field.
Engineering Request50/yearThis would be a request to engineer solutions to introduce new technology, functionality, or system enhancement resulting in a white paper or technical proposal.
Other Projects/Activities4/yearProjects outside releases and tech refreshes. Normally requires some form of a paper/proposals, testing , diagrams, fielding , installation plans, and other supporting documents.
Support Documentation20/yearIncludes agreements and documents such as IDD, MOA, MOU, SLA, Project support, interface agreements, etc.
System Documentation40/yearIncludes ISPs, architecture, topology, connectivity, network, facility, diagrams and related documents.
Server counts and locations can be located in the Asset Management Folder. *
Software / hardware baselines can be found in the Configuration Management folder.*
* Note: Server counts, locations, and software versions may change.

MAC-D

The following are estimates and may increase or decrease due to operational and other factors.
Mobility Air Cross-Domain
Categories:Quantity/Frequency:Scope/SizeNotes:Program Additional Notes/Comments
Agile Team ParticipationNone
Releases (Major)None
Releases (Minor)4/yearFewer than 10 software change requests per MAC-D Release
Regression Testing Required - At least 5 MAC-D Test casesFocused MAC-D release may consist of a DataSync+/MLDBR (MLDBR Host) and DBSync (GDSS Database) change. May require a concerted effort with functional testers to introduce user data and DBAs to install/configure DBSync and perform Veridata source/target database analysis. Travel unlikely.All GDSS functional releases will be tested with MAC-D to ensure no data changes impact replication between GDSS low and high databases through the cross domain. All GDSS schema releases require the new GDSS database schema be loaded on a database in C2SE and a new MAC-D schema be generated from this database. These actions are performed by AISS.
Configuration or small updates10/yearRegression Testing Required - At least 5 MAC-D Test casesMinor out of cycle code and/or configuration changes. May consist of a DataSync+ (MLDBR Host) and DBSync (GDSS Database) change. May require a concerted effort with functional AISS testers to introduce user data and AISS DBAs to install and configure DBSync on the GDSS database. Travel unlikely.
Requirements Specification Agreements4/yearMAC-D development is performed by AFRL (DataSync+ and DBSync) and ISSE (Star Guard and MLDBR). Formal RSAs are not currently used in this process but will be integrated into future releases.
TCNO /IAVA/ Security Patches1/monthAnti-Virus .dat updates are loaded montly by AISS on MAC-D ISSE Star Guard in C2SE. No patching is done on the MLDBR server. No testing is done in C2SE.
Technical Refreshes1 every 5 yearsMAC-D MLDBR and ISSE Star Guard servers and configuration are tightly controlled and accredited under the DSAWG. Refreshes to this hardware are controlled by these organizations and must meet their approved baseline. Formal approval STE through the DSAWG is required for all MAC-D tech refreshes.MAC-D is a 'black box' for AMC. ISSE Star Guard and MLDBR are controlled by ISSE and AFRL. Upgrade/change out of system hardware / OS for these components is performed by AFRL/ISSE with AISS participation only to connect the new devices to the network and assist with testing from a GDSS perspective. The switch that connects the MAC-D components is managed by AISS however refresh of this switch must be approved through the DSAWG.
Training Classes4/yrTraining classes may be scheduled upon request if a release or technical refresh impacts operational procedures. TDY may be required.
Training Material4/yearCreate/update operations manuals as needed for a release or technical refresh.
Level III Technical Support requests2/monthIncludes trouble tickets, assistance requests, troubleshooting, and overall problem coordination with Level II help desks and ISSE/AFRL Helpdesk/Developers, etc. Normally for operational issues that could not be resolved by Level 2 Technical helpdesk. May be after normal duty hours and require on-site support. Can apply to non-production environments to key events such as testing or training.
CCBs14/yearConfiguration Control Board Items - These items include release go/no go decisions, configuration changes to hardware/GOTS/COTS, OS, patches, etc. for implementation in government configuration controlled environments e.g. Production, testing , prototyping.Each Release (Major, Minor, Configuration, and techincal refreshes) will require AISS to install in the government test facility, AISS tested, and then AISS will be given approval to field. TDY to McConnell AFB may be required for fielding events.
Engineering Request1/yearMAC-D MLDBR and ISSE Star Guard servers and configuration are tightly controlled and accredited under the DSAWG. Engineering requests would be limited to integration of the MAC-D suite into the enclave network infrastructure.
Other Projects/ActivitiesNone
Support DocumentationNone
System DocumentationNoneArchitecture diagrams for MAC-D are created by the vendor and/or A6. Enclave topology diagrams would show the cross-domain VLAN and IP addresses assigned to the MLDBR and ISSE Star Guard.
Server counts and locations can be located in the Asset Management Folder. *
Software / hardware baselines can be found in the Configuration Management folder.*
* Note: Server counts, locations, and software versions may change.