MAC-D estimated workload
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GDSS
| The following are estimates and may increase or decrease due to operational and other factors. | ||||
| Categories: | Quantity/Frequency: | Scope/Size | Notes: | Program Additional Notes/Comments |
| Agile Team Participation | 250/year | Daily participation in the Agile spiral development process starting from assisting with the requirement definition, prototpe design/validation, and testing. | ||
| Releases (Major) | 3/year GDSS | Minimum 50 software change requests per Release |
Regression Testing Required – At least 2000 Test cases
| Documented release or patch that requires significant effort and experties i.e. database conversions, OS/Database engine upgrades, major infrastructure upgrades, no service interruption, significant DIACAP review. Often requires travel. Please estimate the projected number of releases per year. Programs may differentiate releases, examples being major, minor, etc. Normally requires testing, engineering, fielding. | Releases include GDSS/AVORM/ESM/ACDS/MAC-D | |
| Releases (Minor) | 4/year GDSS 5/year AVORM 2/year ACDS/MAC-D 4/year ESM 2/year MSD 2/year EMC | Fewer than 50 software change requests per Release |
Limited Regression Testing Required - At least 100 Test cases
| Focused release, may involve a web kit, utility change, COTS updates, Patches, etc. May require a concerted effort, Travel unlikely. | ||||
| Configuration or small updates | 50/year GDSS 15/year AVORM 10/year ACDS/MAC-D 20/year ESM 5/year MSD 10/year EMC | Targeted testing, basic system functionality regression testing required | ||
| Minor out of cycle code changes, hot fixes normally replacement of a few .DLL files, SQL or Web packages. Requires testing. | ||||
| Requirements Specification Agreements | 20/year | Estimate and coordination on release content, milestones, risks, etc, involving estimates for engineering, testing, and fielding. | ||
| TCNO /IAVA/ Security Patches | 20/month | Targeted testing, basic system functionality regression testing required | ||
| COTS / GOTS / IOS / Hardware security updates. Requiring testing. | ||||
| Technical Refreshes | 13 enclaves/at a minimum 2 times per year | Targeted testing, basic system functionality regression testing required | ||
| Upgrade/change out of system Hardware/OS/utilitities to include servers and appliances. Can occur in conjunction with other activiites such as releases. Multiple fielding events can occur in the same time frame. | Travel involved to enclaves not located at Scott. | |||
| Training Classes | At a minmum 10 Training TDY's annually. There are monthly classes held here at Scott - at least 20 per year. | Training classes may be regularly schedule, tied to a release, or dictated by operation need. Programs may want to note the number of TDY's necessary. | ||
| Training Material | 1 difference training guide/created with each release. 5 Specialized guides that need to be kept up to date and new ones created when requested. 12 Client User Manuals that must be updated with each release. 13 Web User Manuals that must be updated with each release. Currently there are 23 CBT's that must be kept up to date and new ones created when requested or a need is identified. | This may include user manuals or CBTs and may be regularly schedule, tied to a release, or dictated by operation need.. | ||
| Level III Technical Support requests | 500/Year | Includes trouble tickets, assistance requests, troublshooting, and overall problem coordination with Level I and II help desks and Level III developer, etc. Normally for operational issues that could not be resolved by Level 2 Technical helpdesk. May be after normal duty hours and require on-site support. Can apply to non-production environments to key events such as testing or training. | ||
| CCBs | 92/year | Configuration Control Board Items - These items include release go/no go decisions, configuration changes to hardware/GOTS/COTS, OS, patches, etc. for implementation in government configuration controlled environments e.g. Production, testing , prototyping. | Each Release (Major, Minor, Configruation, TCNO, and techincal refreshes) will require AISS to install in the government test facility, AISS tested, and then AISS will be given approval to field. | |
| Engineering Request | 50/year | This would be a request to engineer solutions to introduce new technology, functionality, or system enhancement resulting in a white paper or technical proposal. | ||
| Other Projects/Activities | 4/year | Projects outside releases and tech refreshes. Normally requires some form of a paper/proposals, testing , diagrams, fielding , installation plans, and other supporting documents. | ||
| Support Documentation | 20/year | Includes agreements and documents such as IDD, MOA, MOU, SLA, Project support, interface agreements, etc. | ||
| System Documentation | 40/year | Includes ISPs, architecture, topology, connectivity, network, facility, diagrams and related documents. |
| Server counts and locations can be located in the Asset Management Folder. * |
| Software / hardware baselines can be found in the Configuration Management folder.* |
| * Note: Server counts, locations, and software versions may change. |
MAC-D
| The following are estimates and may increase or decrease due to operational and other factors. | |||||
| Mobility Air Cross-Domain | |||||
| Categories: | Quantity/Frequency: | Scope/Size | Notes: | Program Additional Notes/Comments | |
| Agile Team Participation | None | ||||
| Releases (Major) | None | ||||
| Releases (Minor) | 4/year | Fewer than 10 software change requests per MAC-D Release | |||
| Regression Testing Required - At least 5 MAC-D Test cases | Focused MAC-D release may consist of a DataSync+/MLDBR (MLDBR Host) and DBSync (GDSS Database) change. May require a concerted effort with functional testers to introduce user data and DBAs to install/configure DBSync and perform Veridata source/target database analysis. Travel unlikely. | All GDSS functional releases will be tested with MAC-D to ensure no data changes impact replication between GDSS low and high databases through the cross domain. All GDSS schema releases require the new GDSS database schema be loaded on a database in C2SE and a new MAC-D schema be generated from this database. These actions are performed by AISS. | |||
| Configuration or small updates | 10/year | Regression Testing Required - At least 5 MAC-D Test cases | Minor out of cycle code and/or configuration changes. May consist of a DataSync+ (MLDBR Host) and DBSync (GDSS Database) change. May require a concerted effort with functional AISS testers to introduce user data and AISS DBAs to install and configure DBSync on the GDSS database. Travel unlikely. | ||
| Requirements Specification Agreements | 4/year | MAC-D development is performed by AFRL (DataSync+ and DBSync) and ISSE (Star Guard and MLDBR). Formal RSAs are not currently used in this process but will be integrated into future releases. | |||
| TCNO /IAVA/ Security Patches | 1/month | Anti-Virus .dat updates are loaded montly by AISS on MAC-D ISSE Star Guard in C2SE. No patching is done on the MLDBR server. No testing is done in C2SE. | |||
| Technical Refreshes | 1 every 5 years | MAC-D MLDBR and ISSE Star Guard servers and configuration are tightly controlled and accredited under the DSAWG. Refreshes to this hardware are controlled by these organizations and must meet their approved baseline. Formal approval STE through the DSAWG is required for all MAC-D tech refreshes. | MAC-D is a 'black box' for AMC. ISSE Star Guard and MLDBR are controlled by ISSE and AFRL. Upgrade/change out of system hardware / OS for these components is performed by AFRL/ISSE with AISS participation only to connect the new devices to the network and assist with testing from a GDSS perspective. The switch that connects the MAC-D components is managed by AISS however refresh of this switch must be approved through the DSAWG. | ||
| Training Classes | 4/yr | Training classes may be scheduled upon request if a release or technical refresh impacts operational procedures. TDY may be required. | |||
| Training Material | 4/year | Create/update operations manuals as needed for a release or technical refresh. | |||
| Level III Technical Support requests | 2/month | Includes trouble tickets, assistance requests, troubleshooting, and overall problem coordination with Level II help desks and ISSE/AFRL Helpdesk/Developers, etc. Normally for operational issues that could not be resolved by Level 2 Technical helpdesk. May be after normal duty hours and require on-site support. Can apply to non-production environments to key events such as testing or training. | |||
| CCBs | 14/year | Configuration Control Board Items - These items include release go/no go decisions, configuration changes to hardware/GOTS/COTS, OS, patches, etc. for implementation in government configuration controlled environments e.g. Production, testing , prototyping. | Each Release (Major, Minor, Configuration, and techincal refreshes) will require AISS to install in the government test facility, AISS tested, and then AISS will be given approval to field. TDY to McConnell AFB may be required for fielding events. | ||
| Engineering Request | 1/year | MAC-D MLDBR and ISSE Star Guard servers and configuration are tightly controlled and accredited under the DSAWG. Engineering requests would be limited to integration of the MAC-D suite into the enclave network infrastructure. | |||
| Other Projects/Activities | None | ||||
| Support Documentation | None | ||||
| System Documentation | None | Architecture diagrams for MAC-D are created by the vendor and/or A6. Enclave topology diagrams would show the cross-domain VLAN and IP addresses assigned to the MLDBR and ISSE Star Guard. |
| Server counts and locations can be located in the Asset Management Folder. * |
| Software / hardware baselines can be found in the Configuration Management folder.* |