GATES_Estimated_Workload_(corrected).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Applications, Infrastructure, and Systems Support - Third Iteration (AISS III)
Solicitation number
FA4452-17-R-0003
Issued by

About this file

Corrected GATES workload data

View the file

Other files

File Type Posted
Sys_Int_AISS_Estimated_Workload.xlsx XLSX spreadsheet
SF_30_-_Amendment_02.pdf PDF
AISS_Questions_Jun_15.docx DOCX document
ACAS_Estimated_Workload.xlsx XLSX spreadsheet
AISS_Questions_8_Jun.docx DOCX document
GDSS-AVORM-MACD_Estimated_Workload.xlsx XLSX spreadsheet
GDSS-AVORM_Estimated_Workload.xlsx XLSX spreadsheet
GATES_Estimated_Workload.xlsx XLSX spreadsheet
GCCS_Estimated_Workload.xlsx XLSX spreadsheet
AISS_Questions_7_Jun.docx DOCX document
SF_30_-_Amendment_01.docx DOCX document
AISS_III_-_RFP_Atch_4_-_Pricing_Attachment_AMENDMENT_01.xlsx XLSX spreadsheet
NDA.docx DOCX document
AISS_III_-_RFP_Atch_2_-_QASP.docx DOCX document
AISS_III_-_RFP_Atch_4_-_Pricing_Attachment.xlsx XLSX spreadsheet
AISS_III_-_RFP_Exhibit_A_-_CDRL_Portfolio.pdf PDF
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_2__-_Sample_Consent_Letter.docx DOCX document
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_1_-_PPIS.docx DOCX document
AISS_III_-_RFP_-_FA4452-17-R-0003.docx DOCX document
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_5_-_PPQ_Cover_Letter.pdf PDF
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_3_-_Sample_Client_Authorization_Letter.docx DOCX document
AISS_III_-_RFP_Atch_1_-_PWS.docx DOCX document
AISS_III_-_RFP_-_Addendum_to_FAR_52.212-1,_Attachment_4_-_PPQ.docx DOCX document
AISS_III_-_RFP_Atch_3_-_DD254.doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

The following are estimates and may increase or decrease due to operational and other factors.
Categories:Quantity/Frequency:Notes:
Releases (MAJOR)Annually / planning to adapt to agile development so frequency will increaseDocumented release or patch that requires significant effort and experties i.e. database conversions, OS/Database engine upgrades, major infrastructure upgrades, no service interruption, significant DIACAP review. Often requires travel. Please estimate the projected number of releases per year. Programs may differentiate releases, examples being major, minor, etc. Normally requires testing, engineering, fielding.
Releases (Minor)Quarterly/2/bi-annuallyFocused release, may involve a web kit, utility change, COTS updates, Patches, etc. May require a concerted effort, Travel unlikely.
Configuration or small updatesMonthly / Primarily based upon Software Problem Reports and trouble ticketsMinor out of cycle code changes, hot fixes normally replacement of a few .DLL files, SQL or Web packages. Requires testing.
Requirements Specification AgreementsAnually/Coincides with Major ReleasesEstimate and coordination on release content, milestones, risks, etc, involving estimates for engineering, testing, and fielding.
Testing Change Requests.10 per month / conducted during monthly CCBNumber of tested requests Per/X e.g Baseline Changes Request, Software Problem Reports, Documentation Changes Requests, Interface Change Request.
TCNO /IAVA/ Security Patches1/monthlyCOTS / GOTS / IOS / Hardware security updates. Requiring testing.
Technical Refreshes1/every 3-5 yearsUpgrade/change out of system Hardware/OS/utilitities to include servers and appliances. Can occur in conjunction with other activiites such as releases. Multiple fielding events can occur in the same time frame.
Training ClassesPer request/ less than 10 annuallyTraining classes may be regularly schedule, tied to a release, or dictated by operation need. Programs may want to note the number of TDY's necessary.
Training Material2 per year based on major releaseThis may include user manuals or CBTs and may be regularly schedule, tied to a release, or dictated by operation need..
Level III Technical Support requests10/monthlyIncludes trouble tickets, assistance requests, troublshooting, and overall problem coordination with Level I and II help desks and Level III developer, etc. Normally for operational issues that could not be resolved by Level 2 Technical helpdesk. May be after normal duty hours and require on-site support. Can apply to non-production environments to key events such as testing or training.
CCBsBi-MonthlyConfiguration Control Board Items - These items include release go/no go decisions, configuration changes to hardware/GOTS/COTS, OS, patches, etc. for implementation in government configuration controlled environments e.g. Production, testing , prototyping.
Engineering Request2/monthlyThis would be a request to engineer solutions to introduce new technology, functionality, or system enhancement resulting in a white paper or technical proposal.
Other Projects/ActivitiesAs required by the control, and/or the PM tasking.Projects outside releases and tech refreshes. Normally requires some form of a paper/proposals, testing , diagrams, fielding , installation plans, and other supporting documents.
Support Documentation59 IDDs, 48 MOAs, 58 SLAs; updates occur as often as needed review, update or accept agreements. Update C&A documents or / and ISP as / if needed.Includes agreements and documents such as IDD, MOA, MOU, SLA, Project support, interface agreements, etc.
System DocumentationMaintain ISP. Living document updated per GATES release or system changes.Includes ISPs, architecture, topology, connectivity, network, facility, diagrams and related documents.
Server counts and locations can be located in the Asset Management Folder. *
Software / hardware baselines can be found in the Configuration Management folder.*
* Note: Server counts, locations, and software versions may change.