Tab 4 - B 650 2018 Pharmacy Renovation Wastewater Drawings.pdf
PDF 416 KB Posted
- Attached to
- PKA - Wastewater Repair - B650
- Solicitation number
- FA442726R0005
About this file
This document is a plumbing legend, conventions, and abbreviations guide for architectural and engineering drawings, specifically for a Phase 2 new work project at a facility. The document establishes standardized symbols and conventions used throughout plumbing construction drawings, including symbols for various types of piping (domestic cold water, domestic hot water, sanitary, storm water, vent pipes, fire protection, and medical gas systems), valves (ball valves, check valves, gate valves, butterfly valves, pressure relief valves), fixtures (floor drains, roof drains, area drains, cleanouts), and control devices (pressure switches, flow meters, thermometers, solenoid valves). The legend covers both new piping and equipment (shown in heavy solid lines) and existing piping and equipment to remain (shown in light solid lines) or to be removed (shown in heavy dashed lines).
The document includes detailed abbreviations for HVAC, plumbing, and mechanical systems terminology (such as GPM for gallons per minute, BTUh for BTU per hour, PSIG for pounds per square inch gauge). Supporting drawings show part floor plans at 1/4" scale with specific piping layouts for Phase 2 work in areas including a pharmacy, offices, lounge, janitor closet, and mall corridor, with sanitary and vent piping routed through multiple levels. Additional details address refrigerator water connections, fixture schedules, and riser diagrams for sanitary, domestic cold water, and domestic hot water systems. The document is proprietary to Davis, Stokes Collaborative, P.C. and is dated August 2015 and 2017.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONSCONVENTIONSPLUMBING LEGEND ABBREVIATIONSCONVENTIONSPLUMBING LEGEND
(VERSION 08/15)(VERSION 08/15)
WALL HYDRANTWH
C
1 DENOTES REFERENCE TO MEDICAL GAS/VACUUM OUTLETS
(HEAVY, SOLID)
NEW PIPING, AND EQUIPMENT
SYMBOL ABBREV DESCRIPTIONSYMBOL ABBREV DESCRIPTION
TP
SP
FD
D
DPS
TP
FDV
S.A.
SP
HWR
HW
CW
V
SW
SAN
O
N
G
CA
AV
AW
F
D
CO
CO
RD
FD
AD
DIA
CX
PRV
HED
HB
BV
CKV
GBV
GV
MAV
AAV
INVERT (ELEVATION)
DOMESTIC WATER RISER DIAGRAM NUMBER
SANITARY RISER DIAGRAM NUMBER
TRAP PRIMER PIPE
FIRE DEPARTMENT VALVE
SHOCK ABSORBER
FOUNDATION DRAIN
SPRINKLER
DOMESTIC HOT WATER RECIRCULATING
DOMESTIC HOT WATER (TEMPERATURE),
DOMESTIC COLD WATER
VENT PIPE
STORM WATER
SANITARY
OXYGEN
NITROGEN
NATURAL GAS
COMPRESSED AIR
ACID VENT
ACID WASTE
FIRE PROTECTION
DRAIN
CLEANOUT IN VERTICAL
CLEANOUT IN HORIZONTAL
ROOF DRAIN
FLOOR DRAIN
AREA DRAIN
DIAMETER
POINT OF CONNECTION, NEW TO EXISTING
PLUG VALVE
BALL VALVE
MOTORIZED BUTTERFLY VALVE
MANUAL BUTTERFLY VALVE
UNION
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE WITH COCK AND SNUBBER
PRESSURE GAUGE
PIPE FLOW DIRECTION
PIPE/DUCT CAPPED
PIPE DOWN
PIPE UP
PIPE GUIDE
PIPE ANCHOR
HOSE END DRAIN
HOSE BIBB
FLANGED CONNECTION
ECCENTRIC REDUCER
CONCENTRIC REDUCER
BALANCING VALVE
CHECK VALVE
GLOBE VALVE
GATE VALVE
MANUAL AIR VENT
AUTOMATIC AIR VENT
STRAINER WITH BLOWDOWN VALVE
TWO WAY AUTOMATIC CONTROL VALVE
THERMOMETER
DIFFERENTIAL PRESSURE SWITCH
PRESSURE AND TEMPERATURE PLUG
FLOW METER FITTING (ANNUBAR TYPE)
CENTER LINE
V-
V-
DPS
P/T
FMF
SW
F
G
N
O
AW
AV
CO
CO
SECTION DESIGNATION
LETTER DENOTES SECTION IDENTIFICATION
INDICATES DRAWING NUMBER WHERE SECTION IS DRAWN
DENOTES REFERENCE TO DRAWING NOTES
BALANCING VALVE W/FMF
EXISTING PIPING, AND EQUIPMENT
TO REMAIN (LIGHT, SOLID)
EXISTING PIPING, AND EQUIPMENT
TO BE REMOVED (HEAVY, DASHED)
H-_ DENOTES REFERENCE TO HOSPITAL EQUIPMENT
DESIGNATION.
(SINGLE LINE) (DOUBLE LINE)
SYMBOL
BFP BACKFLOW PREVENTER
A
M4 M5
FLOOR DRAIN - TYPE AND SIZEFD-XX"
AREA DRAIN - TYPE AND SIZEAD-XX"
ROOF DRAIN - TYPE AND SIZERD-XX"
FLOW METER FITTING (VENTURI TYPE)FMF
NO
V
NITROUS OXIDE
VACUUMV
NO
WAGD WASTE ANESTHESIA GAS DISPOSAL
MA MA MEDICAL AIR
SB SMOKE BARRIER
S SMOKE TIGHT PARTITION
3H 3 HOUR RATED FIRE WALL
2H 2 HOUR RATED FIRE WALL
1H 1 HOUR RATED FIRE WALL
3HSB 3 HOUR RATED FIRE WALL SMOKE BARRIER
2HSB 2 HOUR RATED FIRE WALL SMOKE BARRIER
1HSB 1 HOUR RATED FIRE WALL SMOKE BARRIER
GAS COCK TT
VFC
FT
DESIGNATION
AS
DIFFERENTIAL PRESSURE SWITCHDPS
ES END SWITCH ES-
MOTORIZED BUTTERFLY VALVE V-
FM
CS
INSERTION FLOW METER (TRANSMITTER)
CURRENT SWITCH
FM-
CS-
TT
VPT VELOCITY PRESSURE TRANSMITTER
SOLENOID VALVE
VPT-
SV-
SYMBOL DEVICE
TEMPERATURE TRANSMITTER TT-
AUTOMATIC CONTROL VALVE (TWO-WAY) V-
AUTOMATIC CONTROL VALVE (THREE-WAY) V-
PUMP P-
TEMPERATURE TRANSMITTER (PNEUMATIC) TT-
VARIABLE FREQUENCY CONTROLLER VFC-
DIFFERENTIAL FLOW TRANSMITTER FT-
FLOW METER FITTING FM-
AQUASTAT AS-
FLOW SWITCH FS-
CA
CO CARBON DIOXIDECO
MEDICAL GAS OUTLET
PD PUMPED DISCHARGE (SAN OR SW)PD
WAGD
SB
S
3H
2H
1H
3HSB
2HSB
1HSB
FIRE DEPARTMENT SIAMESE CONNECTION
STORM WATER RISER DIAGRAM NUMBER
FIRE RISER DIAGRAM NUMBER
MEDICAL GAS RISER DIAGRAM NUMBER
MFM MAGNETIC FLOW METER (TRANSMITTER) MFM-
THERMOSTATIC BALANCING VALVE
FLOW SWITCH
OS&Y VALVE
TB TBV
LPG LOW PRESSURE GAS (PROPANE)LPG
DPSP DRY PIPE SPRINKLERDPSP
NPW NON-POTABLE WATERNP
GW GREY WATERGW
(TEMPERATURE INDICATED IF HIGHER THAN 120°F)
00.00
W
S
SW
F
MG
WALL HYDRANTWH
C
1 DENOTES REFERENCE TO MEDICAL GAS/VACUUM OUTLETS
(HEAVY, SOLID)
NEW PIPING, AND EQUIPMENT
SYMBOL ABBREV DESCRIPTIONSYMBOL ABBREV DESCRIPTION
TP
SP
FD
D
DPS
TP
FDV
S.A.
SP
HWR
HW
CW
V
SW
SAN
O
N
G
CA
AV
AW
F
D
CO
CO
RD
FD
AD
DIA
CX
PRV
HED
HB
BV
CKV
GBV
GV
MAV
AAV
INVERT (ELEVATION)
DOMESTIC WATER RISER DIAGRAM NUMBER
SANITARY RISER DIAGRAM NUMBER
TRAP PRIMER PIPE
FIRE DEPARTMENT VALVE
SHOCK ABSORBER
FOUNDATION DRAIN
SPRINKLER
DOMESTIC HOT WATER RECIRCULATING
DOMESTIC HOT WATER (TEMPERATURE),
DOMESTIC COLD WATER
VENT PIPE
STORM WATER
SANITARY
OXYGEN
NITROGEN
NATURAL GAS
COMPRESSED AIR
ACID VENT
ACID WASTE
FIRE PROTECTION
DRAIN
CLEANOUT IN VERTICAL
CLEANOUT IN HORIZONTAL
ROOF DRAIN
FLOOR DRAIN
AREA DRAIN
DIAMETER
POINT OF CONNECTION, NEW TO EXISTING
PLUG VALVE
BALL VALVE
MOTORIZED BUTTERFLY VALVE
MANUAL BUTTERFLY VALVE
UNION
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE WITH COCK AND SNUBBER
PRESSURE GAUGE
PIPE FLOW DIRECTION
PIPE/DUCT CAPPED
PIPE DOWN
PIPE UP
PIPE GUIDE
PIPE ANCHOR
HOSE END DRAIN
HOSE BIBB
FLANGED CONNECTION
ECCENTRIC REDUCER
CONCENTRIC REDUCER
BALANCING VALVE
CHECK VALVE
GLOBE VALVE
GATE VALVE
MANUAL AIR VENT
AUTOMATIC AIR VENT
STRAINER WITH BLOWDOWN VALVE
THREE WAY AUTOMATIC CONTROL VALVE
TWO WAY AUTOMATIC CONTROL VALVE
THERMOMETER
DIFFERENTIAL PRESSURE SWITCH
PRESSURE AND TEMPERATURE PLUG
FLOW METER FITTING (ANNUBAR TYPE)
CENTER LINE
V-
V-
DPS
P/T
FMF
SW
F
G
N
O
AW
AV
CO
CO
SECTION DESIGNATION
LETTER DENOTES SECTION IDENTIFICATION
INDICATES DRAWING NUMBER WHERE SECTION IS DRAWN
DENOTES REFERENCE TO DRAWING NOTES
BALANCING VALVE W/FMF
EXISTING PIPING, AND EQUIPMENT
TO REMAIN (LIGHT, SOLID)
EXISTING PIPING, AND EQUIPMENT
TO BE REMOVED (HEAVY, DASHED)
H-_ DENOTES REFERENCE TO HOSPITAL EQUIPMENT
DESIGNATION.
(SINGLE LINE) (DOUBLE LINE)
SYMBOL
BFP BACKFLOW PREVENTER
A
M4 M5
INDICATES DRAWING NUMBER WHERE SECTION IS TAKEN
FLOOR DRAIN - TYPE AND SIZEFD-XX"
AREA DRAIN - TYPE AND SIZEAD-XX"
ROOF DRAIN - TYPE AND SIZERD-XX"
FLOW METER FITTING (VENTURI TYPE)FMF
NO
V
NITROUS OXIDE
VACUUMV
NO
WAGD WASTE ANESTHESIA GAS DISPOSAL
MA MA MEDICAL AIR
SB SMOKE BARRIER
S SMOKE TIGHT PARTITION
3H 3 HOUR RATED FIRE WALL
2H 2 HOUR RATED FIRE WALL
1H 1 HOUR RATED FIRE WALL
3HSB 3 HOUR RATED FIRE WALL SMOKE BARRIER
2HSB 2 HOUR RATED FIRE WALL SMOKE BARRIER
1HSB 1 HOUR RATED FIRE WALL SMOKE BARRIER
GAS COCK TT
VFC
FT
DESIGNATION
AS
DIFFERENTIAL PRESSURE SWITCHDPS
ES END SWITCH ES-
MOTORIZED BUTTERFLY VALVE V-
FM
CS
INSERTION FLOW METER (TRANSMITTER)
CURRENT SWITCH
FM-
CS-
TT
VPT VELOCITY PRESSURE TRANSMITTER
SOLENOID VALVE
VPT-
SV-
SYMBOL DEVICE
TEMPERATURE TRANSMITTER TT-
AUTOMATIC CONTROL VALVE (TWO-WAY) V-
AUTOMATIC CONTROL VALVE (THREE-WAY) V-
PUMP P-
TEMPERATURE TRANSMITTER (PNEUMATIC) TT-
VARIABLE FREQUENCY CONTROLLER VFC-
DIFFERENTIAL FLOW TRANSMITTER FT-
FLOW METER FITTING FM-
AQUASTAT AS-
FLOW SWITCH FS-
CA
CO CARBON DIOXIDECO
MEDICAL GAS OUTLET
PD PUMPED DISCHARGE (SAN OR SW)PD
WAGD
SB
S
3H
2H
1H
3HSB
2HSB
1HSB
AABC ASSOCIATED AIR BALANCE COUNCIL
AAP MEDICAL GAS AREA ALARM PANEL
ABBREV ABBREVIATION
ABV ABOVE
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AP ALARM PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE, APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
ARRG ARRANGEMENT
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING AND
AIR CONDITIONING ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ATC AUTOMATIC TEMPERATURE CONTROLS
BHP BRAKE HORSEPOWER
BLDG BUILDING
BLW BELOW
BNTH BENEATH
BTUh BTU PER HOUR
C. COMMON
CC COOLING COIL
CLG CEILING, COOLING
COMP. COMPRESSOR
CONC CONCRETE
CONN CONNECTION, CONNECT
CONT CONTINUATION, CONTINUED
CUH CABINET UNIT HEATER
dB DRY BULB
DBA DECIBEL (REFERENCE "A" SCALE)
DESIG DESIGNATION
DIFF DIFFUSER
DISCH. DISCHARGE
DN DOWN
DWG DRAWING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EDR EQUIVALENT DIRECT RADIATION
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EFT ENTERING FLUID TEMPERATURE, EFFECTIVENESS
ELEC ELECTRICAL
ELEV ELEVATION
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
EXP EXPOSED
F DEGREES FAHRENHEIT
FB FILTER BANK
FCU FAN COIL UNIT
FHC FIRE HOSE CABINET
FLA FULL LOAD AMPS
FLR FLOOR
FO FUEL OIL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
GA GAGE
GAL GALLON
GALV GALVANIZED
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
H HEIGHT
H.P. HIGH PRESSURE
HD HEAD
HORIZ HORIZONTAL
HP HORSEPOWER, HEAT PUMP
HVAC HEATING, VENTILATING, AIR CONDITIONING
Hz HERTZ
IMP IMPELLER
IN. W.G. INCHES OF PRESSURE, WATER GUAGE
kW KILOWATT
L LENGTH
L.P. LOW PRESSURE
LAT LEAVING AIR TEMPERATURE
LB. POUNDS
LFT LEAVING FLUID TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MECH MECHANICAL
MIN MINIMUM
M.O.D. MOTOR OPERATED DAMPER
MTD MOUNTED
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
No. NUMBER
NC NOISE CRITERIA
NEBB NATIONAL ENVIRONMENTAL BALANCING BUREAU
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
OA OUTSIDE AIR
OED OPEN END DUCT
OEP OPEN END PIPE
OS&Y OUTSIDE STEM AND YOKE
PH PHASE
PLBG PLUMBING
PPH POUNDS PER HOUR (STEAM)
PPM PARTS PER MILLION
PSIG POUNDS PER SQUARE INCH (GAGE)
QTY QUANTITY
RA RETURN AIR
REG REGISTER
REQ'D REQUIRED
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLFA RELIEF AIR
RPM REVOLUTIONS PER MINUTE
RWC RAINWATER CONDUCTOR
RX. REMOVE EXISTING
SA SUPPLY AIR
SF SQUARE FEET
SH SENSIBLE HEAT
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SPEC SPECIFICATIONS
STRUCT STRUCTURAL
SUCT. SUCTION
TH TOTAL HEAT
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
V VOLTS
V.B. VACUUM BREAKER
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VRF VARIABLE REFRIGERANT FLOW
VRV VARIABLE REFRIGERANT VOLUME
VTR VENT THRU ROOF
W WIDTH, WATTS
W/ WITH
W.G. WATER GAGE
wB WET BULB
WPD WATER PRESSURE DROP
ZVB MEDICAL GAS ZONE VALVE BOX
FIRE DEPARTMENT SIAMESE CONNECTION
STORM WATER RISER DIAGRAM NUMBER
FIRE RISER DIAGRAM NUMBER
MEDICAL GAS RISER DIAGRAM NUMBER
MFM MAGNETIC FLOW METER (TRANSMITTER) MFM-
THERMOSTATIC BALANCING VALVE
FLOW SWITCH
OS&Y VALVE
TB TBV
LPG LOW PRESSURE GAS (PROPANE)LPG
DPSP DRY PIPE SPRINKLERDPSP
NPW NON-POTABLE WATERNP
GW GREY WATERGW
(TEMPERATURE INDICATED IF HIGHER THAN 120°F)
00.00
W
S
SW
F
MG
GENERAL NOTES:
G1. ALL SANITARY, STORM WATER, AND MISCELLANEOUS DRAIN PIPING SHALL BE
INSTALLED AT A MINIMUM SLOPE OF 1/4" PER FOOT(OR AS INDICATED ON THE FLOOR
PLANS).
G2. COORDINATE EXACT LOCATION OF FIRE AND SMOKE RATED WALL TYPES WITH
ARCHITECTURAL PLANS.
G3. PROVIDE ALL SLEEVES, SAW CUTTING AND FIRE STOPPING ASSOCIATED WITH
PLUMBING DIVISION WORK. SEAL (FIRE, SMOKE, AS REQUIRED) ALL PENETRATIONS
(BOTH NEW AND DEMOLITION WORK) CAUSED BY PLUMBING WORK. SEAL ALL FLOOR
AND DECK PENETRATIONS CAUSED BY PLUMBING DEMOLITION WITH CONCRETE. ALL
PENETRATIONS MUST BE FIRE STOPPED IN THE SAME DAY THEY ARE CREATED.
G4. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO ENSURE THAT
AT THE BEGINNING OF EACH NIGHT OUTAGE, THAT AIR, PLUMBING, MEDICAL GASES
AND ALL OTHER SERVICES DISRUPTED/AFFECTED BY THIS SCOPE OF WORK ARE
SUPPLIED TO ALL AREAS OF THE FACILITY REMAINING IN OPERATION. THIS INCLUDES
FURNISHING AND INSTALLING ANY TEMPORARY MATERIALS NECESSARY TO
ACCOMPLISH THIS.
G5. PIPING SHALL BE INSTALLED ABOVE FINISHED CEILINGS UNLESS NOTED OTHERWISE.
G6. BOTTOM OF PIPE ELEVATIONS, INDICATED AS < > ARE FOR REFERENCE ONLY.
G7. FURNISH AND INSTALL ALL ROOF MOUNTED SUPPORT STRUCTURES. INCLUDE ALL
SUPPORTS, CURBS, ANGLES, CLIPS, ALL THREAD, BOLTS, AND OTHER CONNECTIONS
TO SUPPORT AND MOUNT NEW WORK. COORDINATE WITH ROOFING TRADE
CONTRACTOR.
G8. CONCRETE CURBS AS INDICATED TO BE PROVIDED IN THE EXISTING MECHANICAL
ROOMS FOR EQUIPMENT BASES, ETC., SHALL BE PROVIDED UNDER THE PLUMBING
DIVISION. ALL OTHER CONCRETE CURBS TO BE PROVIDED BY STRUCTURAL DIVISION.
ATC DIAGRAM LEGEND
NOT ALL SYMBOLS
APPLY TO THIS PROJECT
AND ABBREVIATIONS
NOTE:
ATC DIAGRAM LEGEND
NOT ALL SYMBOLS
APPLY TO THIS PROJECT
AND ABBREVIATIONS
NOTE:
(4
) 5
-8
F
A X
(4
) 5
-9
E lk rid ge , M
D
M ea do w rid ge
R oa d C on su lti ng
E ng in ee rs Le ac h
W al la ce
A ss oc ia te s, In c.
LWA PROJ.: 17-383-00
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
M
AR
K
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
PL
O
T
SC
AL
E:
VOLUME 2
LI
TT
LE
R
O C
K D
IS
TR
IC
T
C O
PY
RI
GH
T
DA
VI
S, S
TO
K
ES
C
O
LL
AB
O
RA
TI
VE
P .C
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
TH
IS
D O C U M
EN
T C O N
TA
IN
S
IN
FO
RM
AT
IO
N T H
AT
I S
PR
O
PR
IE
TA
RY
T O D
AV
IS
ST
O K
ES
C
O
LL
AB
O
RA
TI
VE
P.
C
TH
IS
D O C U M
EN
T
AN
D/
O R
IT
'S C
O N
TE
N
TS
M
AY
N O T B E
RE
PR
O
DU
C
ED
O
R
DI
SL
O
SE
D
TO
O
TH
ER
S, EI
TH
ER
I N W
H O
LE
O
R
IN
P
AR
T, W
IT
H O U T
TH
E
PR
IO
R W
RI
TT
EN
C
O N
SE
N T O F
DA
VI
S, S
TO
K
ES
C O
LL
AB
O
RA
TI
VE
P.
C C O
PY
RI
GH
T
AL
L
RI
GH
TS
R
ES
ER
VE
D
"x
2"
'-0
TJ
D
/0
9/
JM
G
C
TM
W
S
-1 3-
D -6
P0.00
FY
S A
TE
LL
IT
E
P H
A R
M A
C Y
M O
D E
R N
IZ
A
TI
O
N
TR
A
V
IS
A
IR
F O
R C
E B
A S
E
PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS
D
C
B
A
1 2 3 4
EX. 1 1/2"
EX. 3/4"
1 1/2"
1/2"
3/4"
S.A.
2" VTR
P-2A
P-11A
CO
P-17
1 1/4"
FO
R
C O
N
TI
N U
A
TI
O N
M A
TC
H
LI
N
E
R E
FE
R
T O
D R
A W
IN
G
P 2.
FO
R C
O N
TI
N
U A
TI
O
N
M A
TC
H
LI
N
E
R E
FE
R
T O
D R
A W
IN
G
P 2.
1/2"
OFFICE,
SUPERVISOR
OFA04
P11
OFFICE,
NCOIC
OFA04
P10
OFFICE,
OIC
OFA04
P12
HOT
DESKS
OFA03
P09
TOILET,
STAFF
TLTU1
P08
LOUNGE/
CONFERENCE,
STAFF
SL001
AAFES
STORAGE
P06
EXISTING
ELEC/COMM
ROOM
MECH1
P07
JANITOR
CLOSET
JANC1 P05
VESTIBULE P04
PHARMACY
COMMUNICATIONS
ROOM
COMC1
P02
PHARMACY
WORK
AREA
P02
PHARMACY
WORK
AREA
EXISTING
MECHANICAL
ROOM
AAFES
COMM
ROOM
COMC1
SHARED
LOADING
DOCK
VESTIBULE
VES01
MALL
CORRIDOR
P-15
1 1/2" <100>
1 1/2" <100>
1 1/2" <184>
1 1/2" <100>
1 1/2" <100>
EX. 1 1/2" <180>
1/2"
CO
1/2"
CO
2" SAN UP
2" SAN UP
2" SAN UP
1 1/2" VENT UP
1 1/2" VENT UP
1 1/2" VENT UP
3/4"
3/4"
1 1/2" <180>
3/4"
EX. 3/4"
1 1/2"
1/2" 1/2"
D
AHU-PHARM-2 AHU-PHARM-1
B-1 B-2
1" G UP
P13
MEZZANINE
AHU-7
1 1/2" VENT DN
1 1/2" VENT DN
1 1/2" VENT DN
1 1/2" VTR
TP
TP
TP
(4
) 5
-8
F
A X
(4
) 5
-9
E lk rid ge , M
D
M ea do w rid ge
R oa d C on su lti ng
E ng in ee rs Le ac h
W al la ce
A ss oc ia te s, In c.
LWA PROJ.: 17-383-00
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
M
AR
K
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
PL
O
T
SC
AL
E:
VOLUME 2
LI
TT
LE
R
O C
K D
IS
TR
IC
T
C O
PY
RI
GH
T
DA
VI
S, S
TO
K
ES
C
O
LL
AB
O
RA
TI
VE
P .C
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
TH
IS
D O C U M
EN
T C O N
TA
IN
S
IN
FO
RM
AT
IO
N T H
AT
I S
PR
O
PR
IE
TA
RY
T O D
AV
IS
ST
O K
ES
C
O
LL
AB
O
RA
TI
VE
P.
C
TH
IS
D O C U M
EN
T
AN
D/
O R
IT
'S C
O N
TE
N O T B E
RE
PR
O
DU
C
ED
O
R
DI
SL
O
SE
D
TO
O
TH
ER
S, EI
TH
ER
I N W
H O
LE
O
R
IN
P
AR
T, W
IT
H O U T
TH
E
PR
IO
R W
RI
TT
EN
C
O N
SE
N T O F
DA
VI
S, S
TO
K
ES
C O
LL
AB
O
RA
TI
VE
P.
C C O
PY
RI
GH
T
AL
L
RI
GH
TS
R
ES
ER
VE
D
"x
/4
'-0
TJ
D
/0
9/
JM
G
C
TM
W
S
-1 3-
D -6
P2.01
FY
S A
TE
LL
IT
E
P H
A R
M A
C Y
M O
D E
R N
IZ
A
TI
O
N
TR
A
V
IS
A
IR
F O
R C
E B
A S
E
PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING
1/4" = 1'-0"
PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING
DRAWING NOTES:
1. PIPING LOCATED BELOW FLOOR SLAB. REFER TO STRUCTURAL
DRAWINGS FOR TRENCHING AND FLOOR REPAIR DETAIL.
2. 1/2" CW DOWN IN WALL TO REFRIGERATOR. REFER TO DETAILS FOR ADDITIONAL
INFORMATION.
3. REFER TO "PART MEZZANINE PLAN - PHASE 2 NEW WORK - PLUMBING", THIS
DRAWING, FOR WORK ABOVE.
4. 2" SANITARY DOWN THROUGH MEZZANINE. PROVIDE 3" FUNNEL FOR INDIRECT
DRAIN FROM AIR HANDLING UNIT CONDENSATE.
5. FULL SIZE CONDENSATE DRAIN PIPED INDIRECT TO FUNNEL DRAIN. TOP OF
FUNNEL TO BE FLUSH WITH MEZZANINE FLOOR.
6. PROVIDE AUTOMATIC TRAP PRIMER, MIFAB MODEL MR-500 OR APPROVED EQUAL
BY PRECISION PLUMBING PRODUCTS.
2 2 4 6 8 10 1/4" = 1'-0"
FEETSCALE
GENERAL NOTES:
G1. REFER TO ARCHITECTURAL DRAWING A0.02 FOR PHASE 2 PHASING PLANS.
1/4" = 1'-0"
PART MEZZANINE PLAN - PHASE 2 NEW WORK - PLUMBING
1535287119C Line
1535287119C Line
1535287119C Line
1535287119C Line
1535287119C Line
1535287119C Line
1535287119C Polygonal Line
1535287119C Line
1535287119C Polygonal Line
1535287119C Line
D
C
B
A
EX. 3/4"
EX. 1 1/2"
EX. 1 1/2"P-19
1 1/2"
S W
EX. 3/4"
FO
R
C O
N
TI
N U
A
TI
O N
M A
TC
H
LI
N
E
R E
FE
R
T O
D R
A W
IN
G
P 2.
FO
R C
O N
TI
N
U A
TI
O
N
M A
TC
H
LI
N
E
R E
FE
R
T O
D R
A W
IN
G
P 2.
P01
WAITING
WRC01
P03
PRESCRIPTION
CONSULTATION
OFDC2
MALL
CORRIDOR
CO
EX. 4" SAN
EX. 4" SAN
1/2"
CO
3/4"
(4
) 5
-8
F
A X
(4
) 5
-9
E lk rid ge , M
D
M ea do w rid ge
R oa d C on su lti ng
E ng in ee rs Le ac h
W al la ce
A ss oc ia te s, In c.
LWA PROJ.: 17-383-00
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
M
AR
K
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
PL
O
T
SC
AL
E:
VOLUME 2
LI
TT
LE
R
O C
K D
IS
TR
IC
T
C O
PY
RI
GH
T
DA
VI
S, S
TO
K
ES
C
O
LL
AB
O
RA
TI
VE
P .C
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
TH
IS
D O C U M
EN
T C O N
TA
IN
S
IN
FO
RM
AT
IO
N T H
AT
I S
PR
O
PR
IE
TA
RY
T O D
AV
IS
ST
O K
ES
C
O
LL
AB
O
RA
TI
VE
P.
C
TH
IS
D O C U M
EN
T
AN
D/
O R
IT
'S C
O N
TE
N O T B E
RE
PR
O
DU
C
ED
O
R
DI
SL
O
SE
D
TO
O
TH
ER
S, EI
TH
ER
I N W
H O
LE
O
R
IN
P
AR
T, W
IT
H O U T
TH
E
PR
IO
R W
RI
TT
EN
C
O N
SE
N T O F
DA
VI
S, S
TO
K
ES
C O
LL
AB
O
RA
TI
VE
P.
C C O
PY
RI
GH
T
AL
L
RI
GH
TS
R
ES
ER
VE
D
"x
/4
'-0
TJ
D
/0
9/
JM
G
C
TM
W
S
-1 3-
D -6
P2.02
FY
S A
TE
LL
IT
E
P H
A R
M A
C Y
M O
D E
R N
IZ
A
TI
O
N
TR
A
V
IS
A
IR
F O
R C
E B
A S
E
PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING
1/4" = 1'-0"
PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING
DRAWING NOTES:
1. PIPING LOCATED BELOW FLOOR SLAB. REFER TO STRUCTURAL
DRAWINGS FOR TRENCHING AND FLOOR REPAIR DETAIL.
2. PROVIDE CLEANOUT AT 4" SANITARY OF REMOVED WATER CLOSET.
2 2 4 6 8 10 1/4" = 1'-0"
FEETSCALE
GENERAL NOTES:
G1. REFER TO ARCHITECTURAL DRAWING A0.02 FOR PHASE 2 PHASING PLANS.
1535287119C Polygonal Line
1535287119C Line
1535287119C Line
Line
SANITARY RISER DIAGRAM
NOT TO SCALE
DOMESTIC COLD WATER RISER DIAGRAM
NOT TO SCALE
DOMESTIC HOT WATER RISER DIAGRAM
NOT TO SCALE
P-19
P-15A
P-17 P-11A
P-2A
COCO CO
CO
WATER FILTER
(NOTE 1)
FUNNEL
DRAIN
FUNNEL
DRAIN
FUNNEL
DRAIN
DOMESTIC COLD WATER
PRESSURE
GUAGE (TYP.)
1/2"
1/2"
REGRIGERATOR
(NOTE 1)
NOTES:
1. FURNISHED BY EQUIPMENT VENDOR.
2. PROVIDE 1/4" STAINLESS STEEL BRAIDED FLEXIBLE LINE.
CONNECT PER MANUFACTURER'S RECOMMENDATIONS.
DETAIL - REFRIGERATOR WATER CONNECTION
NOT TO SCALE
NOTE 2
S.A.1 1/2" 3/4"
3/4" 1/2" 1/2" 1/2" 1 1/4" 1/2"
1/2" 3/4" 1/2"
1 1/2" 1 1/2"
EX. 1 1/2"EX. 1 1/2"
EX. 3/4"
EX. 1 1/2" EX. 1 1/2"
P-15 P-17 TO REFRIGERATOR P-11A P-2A P-19
P-11A P-15 P-17
2"
JANITOR
CLOSET
P07
LOUNGE/
CONFERENCE
P07
TLT,
STAFF
P09
TLT,
STAFF
P09
PHARMACY
P02
WORK
AREA
JANITOR
CLOSET
P07
LOUNGE/
CONFERENCE
P08
LOUNGE/
CONFERENCE
P08
TLT.
STAFF
P09
TLT.
STAFF
P09
PHARMACY
WORK AREA
P02
TLT.
STAFF
P09
JANITOR
CLOSET
P07
LOUNGE/
CONFERENCE
P08
2" VTR 1 1/2" VTR
EX. 4"
SAN
4" 4"
3"
2"
1 1/2" 2"
2"
1 1/2"
3"
1 1/2" 2"
4"
2"
2"
2" 2"
2"
2"
2"
1 1/2" 1 1/2" 1 1/2"
2"
4"
SLAB
MEZZANINE
SLAB
ROOF
SLAB
ROOF
ROOF
(4
) 5
-8
F
A X
(4
) 5
-9
E lk rid ge , M
D
M ea do w rid ge
R oa d C on su lti ng
E ng in ee rs Le ac h
W al la ce
A ss oc ia te s, In c.
LWA PROJ.: 17-383-00
US Army Corps of Engineers
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
M
AR
K
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
ES
C R
IP
TI
O N
C O
N
TR
AC
T
N O
SHEET
IDENTIFICATION
D
AT
E
AP
PR
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
PL
O
T
SC
AL
E:
VOLUME 2
LI
TT
LE
R
O C
K D
IS
TR
IC
T
C O
PY
RI
GH
T
DA
VI
S, S
TO
K
ES
C
O
LL
AB
O
RA
TI
VE
P .C
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
TH
IS
D O C U M
EN
T C O N
TA
IN
S
IN
FO
RM
AT
IO
N T H
AT
I S
PR
O
PR
IE
TA
RY
T O D
AV
IS
ST
O K
ES
C
O
LL
AB
O
RA
TI
VE
P.
C
TH
IS
D O C U M
EN
T
AN
D/
O R
IT
'S C
O N
TE
N O T B E
RE
PR
O
DU
C
ED
O
R
DI
SL
O
SE
D
TO
O
TH
ER
S, EI
TH
ER
I N W
H O
LE
O
R
IN
P
AR
T, W
IT
H O U T
TH
E
PR
IO
R W
RI
TT
EN
C
O N
SE
N T O F
DA
VI
S, S
TO
K
ES
C O
LL
AB
O
RA
TI
VE
P.
C C O
PY
RI
GH
T
AL
L
RI
GH
TS
R
ES
ER
VE
D
"x
2"
'-0
TJ
D
/0
9/
JM
G
C
TM
W
S
-1 3-
D -6
P4.01
FY
S A
TE
LL
IT
E
P H
A R
M A
C Y
M O
D E
R N
IZ
A
TI
O
N
TR
A
V
IS
A
IR
F O
R C
E B
A S
E
PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2
PLUMBING FIXTURE SCHEDULE
DESIG. JSN # FIXTURE
ROUGH-IN CONNECTION MOUNTING
ARRANGEMENT REMARKSCW HW TRAP SAN VENT
P-2A WATER CLOSET 1" - INT. 4" 2" WALL HUNG HANDICAPPED
P-11A LAVATORY ½” ½” 1½” 2" 1½” WALL HUNG HANDICAPPED
P-15 SERVICE SINK ¾” ¾” 3" 3" 2" FLOOR MT'D. -
P-17 SINGLE COMPARTMENT SINK ½” ½” 1½” 2" 1½” COUNTERTOP -
P-19 SINGLE COMPARTMENT SINK ½” ½” 1½” 2" 1½” COUNTERTOP W/ EYEWASH
1535287119C Line
1535287119C Polygonal Line
1535287119C Polygonal Line
1535287119C Polygonal Line
1535287119C Polygonal Line
1535287119C Polygonal Line
1535287119C Polygonal Line
1535287119C Polygonal Line
Polygonal Line
| Travis AFB Vol 2 Structural Corrected Final |
| 17048_Travis AFB-LifeSafety |
| Sheets and Views |
| 17048_Travis AFB-LifeSafety-VOL 2 - LS101 |
| Architecture Combined |
| 17048_Travis AFB - Sheet - G1-02 - TABLE OF CONTENTS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - G2-02 - WALL DESIGNATIONS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - G4-02 - ACCESIBILITY GENERAL NOTES |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A0-11 - VOLUME 1 PHASING PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A0-12 - VOLUME 2 PHASING PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A0-13 - LEVELS OF ALTERATION |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - AD1-02 - DEMO FLOOR PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A1-02 - DIMENSIONED FLOOR PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A1-03 - FLOOR PLAN, MEZZANINE |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A1-52 - NOTED FLOOR PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A1-71 - MEDICAL COORDINATION PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A2-02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A2-03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A2-04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A3-02 - REFLECTED CEILING PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A4-02 - ROOF PLAN |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A6-22 - WALL SECTIONS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A6-52 - DETAILS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A7-02 - DOOR SCHEDULE |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| 17048_Travis AFB - Sheet - A9-00 - RENDERINGS |
| Sheets |
| A0.11 - VOLUME 1 PHASING PLAN |
| A0.12 - VOLUME 2 PHASING PLAN |
| A0.13 - LEVELS OF ALTERATION |
| A1.02 - DIMENSIONED FLOOR PLAN |
| A1.03 - FLOOR PLAN, MEZZANINE |
| A1.52 - NOTED FLOOR PLAN |
| A1.71 - MEDICAL COORDINATION PLAN |
| A2.02 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.03 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A2.04 - ENLARGED FLOOR PLANS AND ELEVATIONS |
| A3.02 - REFLECTED CEILING PLAN |
| A4.02 - ROOF PLAN |
| A6.22 - WALL SECTIONS |
| A6.52 - DETAILS |
| A7.02 - DOOR SCHEDULE |
| A9.00 - RENDERINGS |
| AD1.02 - DEMO FLOOR PLAN |
| G1.02 - TABLE OF CONTENTS |
| G2.02 - WALL DESIGNATIONS |
| G4.02 - ACCESIBILITY GENERAL NOTES |
| Travis SID Vol2 Submittal 3 |
| Sheets |
| F0.1.2 - FINISH SELECTIONS AND GENERAL NOTES - VOLUME 2 |
| F0.2.2 - FINISH SELECTIONS AND GENERAL NOTES- VOLUME 2 |
| F0.3.2 - ROOM FINISH SCHEDULE- VOLUME 2 |
| F1.1.2 - FINISH PLAN - VOLUME 2 |
| F1.3.2 - FLOOR PATTERN PLAN - VOLUME 2 |
| F0-2-2 - FINISH SELECTIONS AND GENERAL NOTES- VOLUME 2.pdf |
| Sheets |
| F0.1.2 - FINISH SELECTIONS AND GENERAL NOTES - VOLUME 2 |
| F0.2.2 - FINISH SELECTIONS AND GENERAL NOTES- VOLUME 2 |
| F0.3.2 - ROOM FINISH SCHEDULE- VOLUME 2 |
| F1.1.2 - FINISH PLAN - VOLUME 2 |
| F1.3.2 - FLOOR PATTERN PLAN - VOLUME 2 |
| F0-3-2 - ROOM FINISH SCHEDULE- VOLUME 2.pdf |
| Sheets |
| F0.1.2 - FINISH SELECTIONS AND GENERAL NOTES - VOLUME 2 |
| F0.2.2 - FINISH SELECTIONS AND GENERAL NOTES- VOLUME 2 |
| F0.3.2 - ROOM FINISH SCHEDULE- VOLUME 2 |
| F1.1.2 - FINISH PLAN - VOLUME 2 |
| F1.3.2 - FLOOR PATTERN PLAN - VOLUME 2 |
| F1-1-2 - FINISH PLAN - VOLUME 2.pdf |
| Sheets |
| F0.1.2 - FINISH SELECTIONS AND GENERAL NOTES - VOLUME 2 |
| F0.2.2 - FINISH SELECTIONS AND GENERAL NOTES- VOLUME 2 |
| F0.3.2 - ROOM FINISH SCHEDULE- VOLUME 2 |
| F1.1.2 - FINISH PLAN - VOLUME 2 |
| F1.3.2 - FLOOR PATTERN PLAN - VOLUME 2 |
| F1-2-2 - WALL PROTECTION PLAN - VOLUME 2.pdf |
| Sheets |
| F1.2.2 - WALL PROTECTION PLAN - VOLUME 2 |
| F1-3-2 - FLOOR PATTERN PLAN - VOLUME 2.pdf |
| Sheets |
| F0.1.2 - FINISH SELECTIONS AND GENERAL NOTES - VOLUME 2 |
| F0.2.2 - FINISH SELECTIONS AND GENERAL NOTES- VOLUME 2 |
| F0.3.2 - ROOM FINISH SCHEDULE- VOLUME 2 |
| F1.1.2 - FINISH PLAN - VOLUME 2 |
| F1.3.2 - FLOOR PATTERN PLAN - VOLUME 2 |
| Q1-11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Sheets |
| Q1.11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Q1-12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Sheets |
| Q1.12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Q1-13 - FF&E ENLARGED TYPICALS-ROOM PLACEMENT PLANS- VOLUME 2 |
| Sheets |
| Q1.13 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1-14 - FF&E ENLARGED TYPICALS-ROOM PLACEMENT PLANS- VOLUME 2 |
| Sheets |
| Q1.11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Q1.12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Q1.13 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.14 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.15 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.16 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.17 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.18 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.19 - ART PLACEMENT PLAN |
| Q3.05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Q3.06 - SIGNAGE TYPE DETAILS |
| Q3.07 - TEMPORARY WAYFINDING |
| Q3.08 - TEMPORARY WAYFINDING |
| Q1-15 - FF&E ENLARGED TYPICALS-ROOM PLACEMENT PLANS- VOLUME 2 |
| Sheets |
| Q1.11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Q1.12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Q1.13 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.14 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.15 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.16 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.17 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.18 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.19 - ART PLACEMENT PLAN |
| Q3.05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Q3.06 - SIGNAGE TYPE DETAILS |
| Q3.07 - TEMPORARY WAYFINDING |
| Q3.08 - TEMPORARY WAYFINDING |
| Q1-16 - FF&E ENLARGED TYPICALS-ROOM PLACEMENT PLANS- VOLUME 2 |
| Sheets |
| Q1.11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Q1.12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Q1.13 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.14 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.15 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.16 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.17 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.18 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.19 - ART PLACEMENT PLAN |
| Q3.05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Q3.06 - SIGNAGE TYPE DETAILS |
| Q3.07 - TEMPORARY WAYFINDING |
| Q3.08 - TEMPORARY WAYFINDING |
| Q1-17 - FF&E ENLARGED TYPICALS-ROOM PLACEMENT PLANS- VOLUME 2 |
| Sheets |
| Q1.11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Q1.12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Q1.13 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.14 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.15 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.16 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.17 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.18 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.19 - ART PLACEMENT PLAN |
| Q3.05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Q3.06 - SIGNAGE TYPE DETAILS |
| Q3.07 - TEMPORARY WAYFINDING |
| Q3.08 - TEMPORARY WAYFINDING |
| Q1-18 - FF&E ENLARGED TYPICALS-ROOM PLACEMENT PLANS- VOLUME 2 |
| Sheets |
| Q1.18 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1-19 - ART PLACEMENT PLAN |
| Sheets |
| Q1.11 - FF&E COMPOSITE PLAN- VOLUME 2 |
| Q1.12 - FF&E ENLARGED PLAN - VOLUME 2 |
| Q1.13 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.14 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.15 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.16 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.17 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.18 - FF&E ENLARGED TYPICALS/ROOM PLACEMENT PLANS- VOLUME 2 |
| Q1.19 - ART PLACEMENT PLAN |
| Q3.05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Q3.06 - SIGNAGE TYPE DETAILS |
| Q3.07 - TEMPORARY WAYFINDING |
| Q3.08 - TEMPORARY WAYFINDING |
| Q3-05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Sheets |
| Q3.05 - SIGNAGE PLAN- VOLUME 2- PHARMACY |
| Q3-06 - SIGNAGE TYPE DETAILS |
| Sheets |
| Q3.06 - SIGNAGE TYPE DETAILS |
| Q3-07 - TEMPORARY WAYFINDING |
| Sheets |
| Q3.07 - TEMPORARY WAYFINDING |
| Q3-08 - TEMPORARY WAYFINDING |
| Sheets |
| Q3.08 - TEMPORARY WAYFINDING |
| Mechanical Plumbing |
| M0-01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M1-02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M1-03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M2-02 - PART FLOOR PLAN 1-3 - PHASE 2 NEW WORK - HVAC |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M2-03 - PART FLOOR PLAN 2-3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| Sheets |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2-04 - PART FLOOR PLAN 3-3 - PHASE 2 NEW WORK - HVAC |
| Sheets |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2-05 - PART FLOOR PLAN 1-2 - PHASE 2 NEW WORK - HVAC PIPING |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M2-06 - PART FLOOR PLAN 2-2 - PHASE 2 NEW WORK - HVAC PIPING |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M3-02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M4-02 - MECHANICAL SCHEDULES - PHASE 2 |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M5-01 - MECHANICAL SCHEMATICS - PHASE 2 |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M6-01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| M1.02 - PART FIRST FLOOR PLAN & MEZZANINE PLAN - PHASE 2 REMOVAL WORK - HVAC |
| M1.03 - PART ROOF PLAN - PHASE 2 REMOVAL WORK - MECHANICAL |
| M2.02 - PART FLOOR PLAN 1/3 - PHASE 2 NEW WORK - HVAC |
| M2.03 - PART FLOOR PLAN 2/3 & MEZZANINE PLAN - PHASE 2 NEW WORK - HVAC |
| M2.04 - PART FLOOR PLAN 3/3 - PHASE 2 NEW WORK - HVAC |
| M2.05 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M2.06 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - HVAC PIPING |
| M3.02 - PART ROOF PLAN - PHASE 2 NEW WORK - MECHANICAL |
| M4.02 - MECHANICAL SCHEDULES - PHASE 2 |
| M5.01 - MECHANICAL SCHEMATICS - PHASE 2 |
| M6.01 - MECHANICAL DETAILS AND RISERS - PHASE 2 |
| M6.02 - MECHANICAL DETAILS - PHASE 2 |
| M7.01 - AIR HANDLING UNIT DETAILS - PHASE 2 |
| M8.01 - AUTOMATIC TEMPERATURE CONTROLS 1/4 - PHASE 2 |
| M8.02 - AUTOMATIC TEMPERATURE CONTROLS 2/4 - PHASE 2 |
| M8.03 - AUTOMATIC TEMPERATURE CONTROLS 3/4 - PHASE 2 |
| M8.04 - AUTOMATIC TEMPERATURE CONTROLS 4/4 - PHASE 2 |
| P0.00 - PLUMBING LEGEND, CONVENTIONS, AND ABBREVIATIONS |
| P1.01 - PART FIRST FLOOR PLAN - PHASE 2 REMOVAL WORK - PLUMBING |
| P2.01 - PART FLOOR PLAN 1/2 - PHASE 2 NEW WORK - PLUMBING |
| P2.02 - PART FLOOR PLAN 2/2 - PHASE 2 NEW WORK - PLUMBING |
| P4.01 - PLUMBING DETAILS, SCHEDULES, AND RISER DIAGRAMS - PHASE 2 |
| M6-02 - MECHANICAL DETAILS - PHASE 2 |
| Sheets |
| M0.01 - MECHANICAL LEGEND, CONVENTIONS, AND ABBREVIATIONS |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .